CN105863166A - Prefabricated L-shaped column energy consumption connection node - Google Patents

Prefabricated L-shaped column energy consumption connection node Download PDF

Info

Publication number
CN105863166A
CN105863166A CN201610341154.6A CN201610341154A CN105863166A CN 105863166 A CN105863166 A CN 105863166A CN 201610341154 A CN201610341154 A CN 201610341154A CN 105863166 A CN105863166 A CN 105863166A
Authority
CN
China
Prior art keywords
side plate
square steel
steel
concrete combination
combination column
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610341154.6A
Other languages
Chinese (zh)
Other versions
CN105863166B (en
Inventor
郝际平
樊春雷
苏海滨
薛强
孙晓岭
陈永昌
刘斌
黄育琪
王磊
刘瀚超
何梦楠
尹伟康
张峻铭
赵子健
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xian University of Architecture and Technology
Original Assignee
Xian University of Architecture and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xian University of Architecture and Technology filed Critical Xian University of Architecture and Technology
Priority to CN201610341154.6A priority Critical patent/CN105863166B/en
Publication of CN105863166A publication Critical patent/CN105863166A/en
Application granted granted Critical
Publication of CN105863166B publication Critical patent/CN105863166B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C3/00Structural elongated elements designed for load-supporting
    • E04C3/30Columns; Pillars; Struts
    • E04C3/34Columns; Pillars; Struts of concrete other stone-like material, with or without permanent form elements, with or without internal or external reinforcement, e.g. metal coverings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/92Protection against other undesired influences or dangers
    • E04B1/98Protection against other undesired influences or dangers against vibrations or shocks; against mechanical destruction, e.g. by air-raids

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Joining Of Building Structures In Genera (AREA)

Abstract

The invention discloses a prefabricated L-shaped column energy consumption connection node which comprises an energy consumption connection piece, a first concrete combination column and a second concrete combination column. The first concrete combination column and the second concrete combination column each comprise a first side plate, a second side plate, a first square steel, a second square steel and a first reinforcing plate, wherein the two side faces of the first reinforcing plate are connected with the inner side of the first side plate and the inner side face of the second side plate respectively, the two ends of the first side plate are connected with the right side face of the first square steel and the left side face of the second square steel respectively, the two ends of the second side plate are connected with the right side face of the first square steel and the left side face of the second square steel respectively, the first side plate is flush with the front face of the first square steel and the front face of the second square steel, and the second side plate is flush with the back face of the first square steel and the back face of the second square steel. The prefabricated L-shaped column energy consumption connection node is good in bearing capacity, ductility and observability, saves space and is short in construction time.

Description

A kind of prefabricated L-shaped post power consumption connects node
Technical field
The present invention relates to a kind of connection node, be specifically related to a kind of prefabricated L-shaped post power consumption connecting joint Point.
Background technology
China " rectangular steel tube with concrete infilled technical regulation " (GECS159:2004) provides at present For steel core concrete column mainly by the node of the forms such as internal partition formula, outer shroud be board-like, but to mesh Till before, the power consumption of existing prefabricated L-shaped post connects node and cripling phenomenon often occurs, carrying Ability and ductility are poor, and indoor-bollard often highlights corner angle, thus are effectively reduced house Usable floor area and ornamental, it addition, existing prefabricated L-shaped post power consumption connect node great majority be Job site pours, construction inconvenience, and the engineering time is longer, thus serious impact Duration.
Summary of the invention
It is an object of the invention to the shortcoming overcoming above-mentioned prior art, it is provided that a kind of prefabricated L-shaped Post power consumption connects node, and the bearing capacity of this connection node, ductility, ornamental are preferable, and save Save space, and the engineering time is shorter.
For reaching above-mentioned purpose, prefabricated L-shaped post of the present invention power consumption connects node and includes that power consumption is even Fitting, the first concrete combination column and the second concrete combination column, the first concrete combination column and Two concrete combination columns all include the first side plate, the second side plate, the first square steel, the second square steel and One stiffener, the two sides of the first stiffener respectively with the medial surface of the first side plate and the second side plate Medial surface is connected, the two ends of the first side plate respectively with the right flank of the first square steel and the second square steel Left surface is connected, the two ends of the second side plate respectively with the right flank of the first square steel and the second square steel Left surface is connected, and the first side plate and the front of the first square steel and the front flush of the second square steel, The back side of the second side plate and the back side of the first square steel and the second square steel flushes, and the first stiffener is positioned at Between one square steel and the second square steel, in the first square steel, in the second square steel and the first stiffener with Concrete has all been poured between first square steel and the second square steel;
In first concrete combination column in the left surface of the first square steel and the second concrete combination column first The front of square steel is connected by power consumption connector.
Also include the 3rd side plate, the 4th side plate, the 5th side plate and the 6th side plate;
One end of 3rd side plate passes side and second side of the first side plate in the first concrete combination column The side of plate is connected with the first side plate and the second side plate, and the side of the 4th side plate one end is mixed with first In solidifying local soil type zygostyle, the left surface of the first square steel is connected;
The side of the 5th side plate one end is connected with the back side of the first square steel in the second concrete combination column Connecing, the side of the 6th side plate one end is connected with the front of the first square steel in the second concrete combination column;
The other end of the 5th side plate and the other end of the 3rd side plate are connected with the right flank of power consumption connector Connecing, the other end of the 6th side plate and the other end of the 4th side plate are connected with the left surface of power consumption connector Connect.
Described power consumption connector includes the first channel-section steel, the second channel-section steel and some second stiffeners, wherein One end of each second stiffener is fixed on the medial surface of the first channel-section steel, another of each second stiffener End is fixed on the medial surface of the second channel-section steel, the side of the 3rd side plate and the right flank phase of the first channel-section steel Connect, the side of the 4th side plate is connected with the left surface of the first channel-section steel, the side of the 5th side plate and The right flank of the second channel-section steel is connected, and the side of the 6th side plate is connected with the left surface of the second channel-section steel.
The side of the 3rd side plate is connected by some first bolts with the right flank of the first channel-section steel;
The side of the 4th side plate is connected by some second bolts with the left surface of the first channel-section steel;
The side of the 5th side plate is connected by some 3rd bolts with the right flank of the second channel-section steel;
The side of the 6th side plate is connected by some 4th bolts with the left surface of the second channel-section steel.
Each first bolt is the most equidistantly distributed, and each second bolt is the most equidistantly distributed;Each 3rd Bolt is the most equidistantly distributed;Each 4th bolt is the most equidistantly distributed;Each 5th bolt is successively etc. Spacing is distributed;Each 6th bolt is the most equidistantly distributed.
Left side and the right side of each second stiffener all offer groove.
The middle part of each second stiffener all offers through hole.
The method have the advantages that
Prefabricated L-shaped post of the present invention power consumption connect node include the first concrete combination column, the Two concrete combination columns and power consumption connector, the first concrete combination column and the second concrete combination column All include the first side plate, the second side plate, the first square steel, the second square steel and the first stiffener, first Square steel, the second square steel and the first stiffener are located between the first side plate and the second side plate, by first First square steel, the second square steel and the first stiffener are carried out spacing by side plate and the second side plate, and simultaneously In one square steel, in the second square steel, all fill between the first stiffener and the first square steel and the second square steel There is concrete, by concrete as the edge constraint component of connection node, improve first greatly Concrete combination column and the bearing capacity of the second concrete combination column and energy dissipation capacity.Simultaneously by first Cavity between first side plate, the second side plate, the first square steel and the second square steel is divided into two by stiffener Individual little chamber, improves the first concrete combination column and the bearing capacity of the second concrete combination column and ductility, Avoid the first side plate and the second side plate generation flexing phenomenon.It addition, when making, can be according to wall Width adjusting first square steel of body and the width of the second square steel such that it is able to make the first Combined concrete Post and the second concrete combination column and the same width of body of wall, increase the usable floor area of building, improves building Ornamental.Meanwhile, the first concrete combination column in the present invention and the second concrete combination column can To produce in batches in the factory, then it is transported to job site, then by the first concrete combination column In the left surface of the first square steel and the second concrete combination column, the front of the first side plate is connected, Form the power consumption of described prefabricated L-shaped post and connect node, it is to avoid poured in place concrete, when reducing construction Between, improve the quality of construction.It addition, by power consumption connector by the first concrete combination column and the In two concrete combination columns, the first square steel is connected, and it is the most firm to connect, and bearing capacity and ductility Higher.
Accompanying drawing explanation
Fig. 1 is the first concrete combination column 10 and exploded view of the second Combined concrete in the present invention;
Fig. 2 is the structural representation of the first concrete combination column 10 in the present invention;
Fig. 3 is the structural representation of the second concrete combination column 11 in the present invention;
Fig. 4 is the structural representation of connector of consuming energy in the present invention;
Fig. 5 is the exploded view of the present invention;
Fig. 6 is the structural representation of the present invention.
Wherein, 1 be the first side plate, 2 be the second side plate, 3 be the first square steel, 4 be the second square steel, 5 it is the first stiffener, 6 is the 3rd side plate, 7 is the 4th side plate, 8 is the 5th side plate, 9 is Six side plates, 10 be the first concrete combination column, 11 be the second concrete combination column, 12 be first Channel-section steel, 13 be the second channel-section steel, 14 be the second stiffener,.
Detailed description of the invention
Below in conjunction with the accompanying drawings the present invention is described in further detail:
With reference to Fig. 1, Fig. 2, Fig. 3, Fig. 4, Fig. 5 and Fig. 6, prefabricated L-shaped of the present invention Post power consumption connects node and includes consume energy connector, the first concrete combination column 10 and the second coagulation local soil type Zygostyle 11, the first concrete combination column 10 and the second concrete combination column 11 all include the first side plate 1, the second side plate the 2, first square steel the 3, second square steel 4 and the first stiffener 5, the first stiffener 5 Two sides be connected with the medial surface of the first side plate 1 and the medial surface of the second side plate 2 respectively, The two ends of side plate 1 are connected with the right flank of the first square steel 3 and the left surface of the second square steel 4 respectively Connect, the two ends of the second side plate 2 respectively with right flank and the left side of the second square steel 4 of the first square steel 3 Face is connected, and the first side plate 1 and the front of the first square steel 3 and the front flush of the second square steel 4, Second side plate 2 flushes with the back side of the first square steel 3 and the back side of the second square steel 4, the first stiffener 5 between the first square steel 3 and the second square steel 4, in the first square steel 3, in the second square steel 4, And first all poured concrete between stiffener 5 and the first square steel 3 and the second square steel 4;The In one concrete combination column 10 in the left surface of the first square steel 3 and the second concrete combination column 11 The front of one square steel 3 is connected by power consumption connector.
Of the present invention also include the 3rd side plate the 6, the 4th side plate the 7, the 5th side plate 8 and the 6th side Plate 9;One end of 3rd side plate 6 is through the side of the first side plate 1 in the first concrete combination column 10 And second the side of side plate 2 be connected with the first side plate 1 and the second side plate 2, the 4th side plate 7 one The side of end is connected with the left surface of the first square steel 3 in the first concrete combination column 10;5th side The side of plate 8 one end is connected with the back side of the first square steel 3 in the second concrete combination column 11, the The side of six side plate 9 one end is connected with the front of the first square steel 3 in the second concrete combination column 11 Connect;The right flank of the other end of the 5th side plate 8 and the other end of the 3rd side plate 6 and power consumption connector It is connected, the other end of the 6th side plate 9 and the other end of the 4th side plate 7 and a left side for power consumption connector Side is connected.
Described power consumption connector includes the first channel-section steel the 12, second channel-section steel 13 and some second stiffeners 14, one end of the most each second stiffener 14 is fixed on the medial surface of the first channel-section steel 12, and each The other end of two stiffeners 14 is fixed on the medial surface of the second channel-section steel 13, the side of the 3rd side plate 6 Face is connected with the right flank of the first channel-section steel 12, the side of the 4th side plate 7 and the first channel-section steel 12 Left surface is connected, and the side of the 5th side plate 8 is connected with the right flank of the second channel-section steel 13, and the 6th The side of side plate 9 is connected with the left surface of the second channel-section steel 13;The side and first of the 3rd side plate 6 The right flank of channel-section steel 12 is connected by some first bolts;The side of the 4th side plate 7 and the first groove The left surface of steel 12 is connected by some second bolts;The side of the 5th side plate 8 and the second channel-section steel The right flank of 13 is connected by some 3rd bolts;The side of the 6th side plate 9 and the second channel-section steel 13 Left surface be connected by some 4th bolts.Concrete, each first bolt the most equidistantly divides Cloth, each second bolt is the most equidistantly distributed;Each 3rd bolt is the most equidistantly distributed;Each 4th Bolt is the most equidistantly distributed;Each 5th bolt is the most equidistantly distributed;Each 6th bolt is successively etc. Spacing is distributed;Left side and the right side of each second stiffener 14 all offer groove;Each second adds The middle part of strength plate 14 all offers through hole.
The work progress of the present invention is:
1) in the 3rd side plate the 6, the 4th side plate the 7, the 5th side plate 8 and the 6th side plate 9 perforate;2) Carrying out the construction of the first concrete combination column 10, work progress is: to the first side plate 1 and the second side Groove is offered in the end of plate 2, then carry out first side plate the 1, second side plate the 2, first square steel 3, Two square steel 4 and the welding of the first stiffener 5, the 3rd side plate 6 is through the groove on the first side plate 1 And second side plate 2 groove and the first side plate 1 and the second side plate 2 phase welding, the most again by the 4th Side plate 7 is welded on the left surface of the first square steel 3, after having welded again by concreting in One square steel 3 is interior, the second square steel 4 is interior and the first stiffener 5 and the first square steel 3 and second party Between steel 4, obtain the first concrete combination column 10;3) executing of the second concrete combination column 11 is carried out Work, work progress is: first carry out first side plate the 1, second side plate the 2, the 5th side plate the 8, the 6th side Plate the 9, first square steel the 3, second square steel 4 and the welding of the first stiffener 5, pour coagulation the most again Soil, obtains the second concrete combination column 11;4) make power consumption connector, under fall down successively by the The two ends of two stiffeners 14 are welded mutually with the medial surface of the first channel-section steel 12 and the medial surface of the second channel-section steel 13 Connect;5) will power consumption connector, the first concrete combination column 10 and the second concrete combination column 11 Transport is to job site, then regulates the first concrete combination column 10 and the second concrete combination column 11 Position, by power consumption connector by the first concrete combination column 10 and the second concrete combination column 11 are connected, and can complete the power consumption of prefabricated L-shaped post and connect the construction of node.

Claims (7)

1. prefabricated L-shaped post power consumption connects node, it is characterised in that the connector that includes consuming energy, First concrete combination column (10) and the second concrete combination column (11), the first concrete combination column (10) and the second concrete combination column (11) all include the first side plate (1), the second side plate (2), First square steel (3), the second square steel (4) and the first stiffener (5), the two of the first stiffener (5) Side is connected with the medial surface of the first side plate (1) and the medial surface of the second side plate (2) respectively, the The two ends of side plate (1) respectively with right flank and the left side for the second square steel (4) of the first square steel (3) Side is connected, the two ends of the second side plate (2) respectively with the right flank and second of the first square steel (3) The left surface of square steel (4) is connected, and the front of the first side plate (1) and the first square steel (3) and The front flush of the second square steel (4), the back side of the second side plate (2) and the first square steel (3) and the The back side of two square steel (4) flushes, and the first stiffener (5) is positioned at the first square steel (3) and second party Between steel (4), the first square steel (3) is interior, the second square steel (4) is interior and the first stiffener (5) And all pour concrete between the first square steel (3) and the second square steel (4);
The left surface of the first square steel (3) and the second coagulation local soil type in first concrete combination column (10) In zygostyle (11), the front of the first square steel (3) is connected by power consumption connector.
Prefabricated L-shaped post the most according to claim 1 power consumption connects node, it is characterised in that Also include the 3rd side plate (6), the 4th side plate (7), the 5th side plate (8) and the 6th side plate (9);
One end of 3rd side plate (6) is through the first side plate (1) in the first concrete combination column (10) Side and the side of the second side plate (2) be connected with the first side plate (1) and the second side plate (2), The side of the 4th side plate (7) one end and the first square steel (3) in the first concrete combination column (10) Left surface is connected;
The side of the 5th side plate (8) one end and the first square steel (3) in the second concrete combination column (11) The back side be connected, in the side of the 6th side plate (9) one end and the second concrete combination column (11) The front of the first square steel (3) is connected;
The right side of the other end of the 5th side plate (8) and the other end of the 3rd side plate (6) and power consumption connector Side is connected, and the other end of the 6th side plate (9) and the other end of the 4th side plate (7) are with power consumption even The left surface of fitting is connected.
Prefabricated L-shaped post the most according to claim 2 power consumption connects node, it is characterised in that Described power consumption connector includes the first channel-section steel (12), the second channel-section steel (13) and some second stiffeners (14), the medial surface of the first channel-section steel (12) is fixed in one end of the most each second stiffener (14) On, the other end of each second stiffener (14) is fixed on the medial surface of the second channel-section steel (13), the The side of three side plates (6) is connected with the right flank of the first channel-section steel (12), the 4th side plate (7) Side is connected with the left surface of the first channel-section steel (12), the side of the 5th side plate (8) and the second groove The right flank of steel (13) is connected, the side of the 6th side plate (9) and a left side for the second channel-section steel (13) Side is connected.
Prefabricated L-shaped post the most according to claim 3 power consumption connects node, it is characterised in that
The side of the 3rd side plate (6) and the right flank of the first channel-section steel (12) are by some first bolts It is connected;
The side of the 4th side plate (7) and the left surface of the first channel-section steel (12) are by some second bolts It is connected;
The side of the 5th side plate (8) and the right flank of the second channel-section steel (13) are by some 3rd bolts It is connected;
The side of the 6th side plate (9) and the left surface of the second channel-section steel (13) are by some 4th bolts It is connected.
Prefabricated L-shaped post the most according to claim 4 power consumption connects node, it is characterised in that Each first bolt is the most equidistantly distributed, and each second bolt is the most equidistantly distributed;Each 3rd bolt depends on Secondary equidistant distribution;Each 4th bolt is the most equidistantly distributed;Each 5th bolt is the most equidistantly distributed; Each 6th bolt is the most equidistantly distributed.
Prefabricated L-shaped post the most according to claim 3 power consumption connects node, it is characterised in that Left side and the right side of each second stiffener (14) all offer groove.
Prefabricated L-shaped post the most according to claim 3 power consumption connects node, it is characterised in that The middle part of each second stiffener (14) all offers through hole.
CN201610341154.6A 2016-05-20 2016-05-20 A kind of prefabricated L-shaped column energy consumption connecting node Expired - Fee Related CN105863166B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610341154.6A CN105863166B (en) 2016-05-20 2016-05-20 A kind of prefabricated L-shaped column energy consumption connecting node

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610341154.6A CN105863166B (en) 2016-05-20 2016-05-20 A kind of prefabricated L-shaped column energy consumption connecting node

Publications (2)

Publication Number Publication Date
CN105863166A true CN105863166A (en) 2016-08-17
CN105863166B CN105863166B (en) 2018-11-02

Family

ID=56634865

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610341154.6A Expired - Fee Related CN105863166B (en) 2016-05-20 2016-05-20 A kind of prefabricated L-shaped column energy consumption connecting node

Country Status (1)

Country Link
CN (1) CN105863166B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107740539A (en) * 2017-09-21 2018-02-27 华侨大学 A kind of rectangular profile corrugated steel concrete combination column

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08246547A (en) * 1995-03-08 1996-09-24 Sumitomo Constr Co Ltd Pole-beam junction structure
JPH10306499A (en) * 1997-05-09 1998-11-17 Sekisui Chem Co Ltd Damping building
JP2000213061A (en) * 1999-01-26 2000-08-02 Taisei Corp Connection section structure between concrete-filled steel pipe column and steel frame beam
CN1793541A (en) * 2005-12-28 2006-06-28 北京工业大学 Shear wall hidden with vertical soft steel energy consupting band and mfg. method thereof
CN101173535A (en) * 2007-11-15 2008-05-07 滕军 Coupled shearing force wall energy-dissipation beam-coupled steel plate damper and its using method
CN101314968A (en) * 2008-07-11 2008-12-03 罗大威 Resilient structural member of buildings against earthquake
CN201785889U (en) * 2010-07-19 2011-04-06 大连大学 Novel energy-dissipation vibration damper
CN102587577A (en) * 2012-03-15 2012-07-18 天津大学 Steel tube-I beam combination steel tube concrete special-shaped columns and manufacture method thereof
CN103590504A (en) * 2013-11-14 2014-02-19 上海大学 Honeycomb-like round-hole steel-plate damper
CN105484388A (en) * 2015-11-18 2016-04-13 福建工程学院 Prefabricated assembly type shear wall vertical slit connecting structure and construction method thereof
CN205637336U (en) * 2016-05-20 2016-10-12 西安建筑科技大学 Prefabricated L shape post power consumption connected node

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08246547A (en) * 1995-03-08 1996-09-24 Sumitomo Constr Co Ltd Pole-beam junction structure
JPH10306499A (en) * 1997-05-09 1998-11-17 Sekisui Chem Co Ltd Damping building
JP2000213061A (en) * 1999-01-26 2000-08-02 Taisei Corp Connection section structure between concrete-filled steel pipe column and steel frame beam
CN1793541A (en) * 2005-12-28 2006-06-28 北京工业大学 Shear wall hidden with vertical soft steel energy consupting band and mfg. method thereof
CN101173535A (en) * 2007-11-15 2008-05-07 滕军 Coupled shearing force wall energy-dissipation beam-coupled steel plate damper and its using method
CN101314968A (en) * 2008-07-11 2008-12-03 罗大威 Resilient structural member of buildings against earthquake
CN201785889U (en) * 2010-07-19 2011-04-06 大连大学 Novel energy-dissipation vibration damper
CN102587577A (en) * 2012-03-15 2012-07-18 天津大学 Steel tube-I beam combination steel tube concrete special-shaped columns and manufacture method thereof
CN103590504A (en) * 2013-11-14 2014-02-19 上海大学 Honeycomb-like round-hole steel-plate damper
CN105484388A (en) * 2015-11-18 2016-04-13 福建工程学院 Prefabricated assembly type shear wall vertical slit connecting structure and construction method thereof
CN205637336U (en) * 2016-05-20 2016-10-12 西安建筑科技大学 Prefabricated L shape post power consumption connected node

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107740539A (en) * 2017-09-21 2018-02-27 华侨大学 A kind of rectangular profile corrugated steel concrete combination column

Also Published As

Publication number Publication date
CN105863166B (en) 2018-11-02

Similar Documents

Publication Publication Date Title
CN104912232B (en) Assembly-type special-shaped composite wall made by thin-walled cold-formed steel
CN106638616A (en) Foundation pit engineering steel box cement-soil diaphragm wall and construction method thereof
WO2015199622A1 (en) Precast reinforced concrete walls h-shape
CN104294920B (en) The node component of a kind of U-shaped steel-concrete combination beam and special-shaped steel pipe concrete post and preparation method
CN105863163B (en) A kind of Prefabricated L-shaped composite pile prepared from special section steel tube concrete based on square steel connector
CN205637332U (en) Prefabricated L type dysmorphism steel pipe -concrete composite post based on square steel connecting piece
CN105863166A (en) Prefabricated L-shaped column energy consumption connection node
CN205637336U (en) Prefabricated L shape post power consumption connected node
CN205637335U (en) Prefabricated L type dysmorphism steel pipe -concrete composite post
CN205663030U (en) Prefabricated T type dysmorphism steel pipe -concrete composite post
CN105839774B (en) A kind of prefabricated T-shaped power consumption connecting node
CN207314537U (en) A kind of assembled Outsourcing-type steel chain type combining structure
CN106351235A (en) Assembled type four-combined-round-steel-pipe concrete inner support structure and manufacturing method
CN110318472A (en) Steel core concrete column and armored concrete Prefabricated beam connection structure and connection method
CN206916998U (en) A kind of frame joint assembled wall body construction
CN205663027U (en) Prefabricated T type power consumption connected node
CN105821967B (en) A kind of prefabricated T-shaped composite pile prepared from special section steel tube concrete
CN206800657U (en) A kind of connecting plate being used between prefabricated wallboard
CN105839852B (en) A kind of Prefabricated L-shaped composite pile prepared from special section steel tube concrete
CN104746791A (en) Wallboard manufactured by filling semi-rigid frame with recycled concrete and manufacturing method
CN212670855U (en) Assembly type building node connection structure
CN107201782A (en) A kind of wall of assembled architecture, floor connecting node and method
CN204081090U (en) The node component of a kind of U-shaped steel-concrete combination beam and special-shaped steel pipe concrete post
CN106351234A (en) Assembled type three-combined-round-steel-pipe concrete inner support structure and manufacturing method
CN209082827U (en) Pin-connected panel multi-cavity steel tube concrete column

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181102

CF01 Termination of patent right due to non-payment of annual fee