CN105862802A - Rectangular opening inserting connecting pile wall - Google Patents
Rectangular opening inserting connecting pile wall Download PDFInfo
- Publication number
- CN105862802A CN105862802A CN201610254079.XA CN201610254079A CN105862802A CN 105862802 A CN105862802 A CN 105862802A CN 201610254079 A CN201610254079 A CN 201610254079A CN 105862802 A CN105862802 A CN 105862802A
- Authority
- CN
- China
- Prior art keywords
- convex
- recessed
- rectangle
- rectangular head
- cutter hub
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/34—Concrete or concrete-like piles cast in position ; Apparatus for making same
- E02D5/46—Concrete or concrete-like piles cast in position ; Apparatus for making same making in situ by forcing bonding agents into gravel fillings or the soil
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/18—Bulkheads or similar walls made solely of concrete in situ
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B4/00—Drives for drilling, used in the borehole
- E21B4/16—Plural down-hole drives, e.g. for combined percussion and rotary drilling; Drives for multi-bit drilling units
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B7/00—Special methods or apparatus for drilling
- E21B7/001—Drilling a non circular hole
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2200/00—Geometrical or physical properties
- E02D2200/16—Shapes
- E02D2200/165—Shapes polygonal
Abstract
The invention discloses a rectangular opening inserting connecting pile wall device which comprises a concave rectangular head drilling machine and a convex rectangular head drilling machine. Multiple concrete concave rectangular head piles spaced by the distance of one convex rectangular head pile are manufactured; when the strength of concrete of the concave rectangular head piles on the two edges reaches a certain degree, one cemented soil convex rectangular head pile is manufactured in the distance between every two adjacent concave rectangular head piles through the convex rectangular head pile drilling machine according to the working manner of the above convex rectangular head pile drilling machine; and therefore a pile wall formed by mutual opening inserting connecting of the multiple concrete concave head piles and the cemented soil convex rectangular head piles between the corresponding concave rectangular head piles is formed and is used for soil blocking and leakage preventing of a building foundation.
Description
Technical field
The present invention relates to a kind of piling wall, the rectangular receptacle used in a kind of building foundation engineering connects piling wall.
Background technology
At present, pile body formed by the cement-soil mixing pile machine of other pattern is all the assembly of multiple soil cement cylinder, it is impossible to manufacture the piling wall that socket connects.
Summary of the invention
The invention provides a kind of rectangular receptacle that can manufacture and connect the rectangular receptacle connection piling wall equipment of piling wall.
The present invention is achieved through the following technical solutions:
A kind of rectangular receptacle connects piling wall equipment, including recessed rectangular head rig and convex rectangular head rig.
The structure of recessed rectangular head rig includes: the middle upper portion of steel pipe support one is fixed in the lower end of drilling rod one, the middle lower portion of steel pipe support one is fixed on the upper end of steel plate support two, the shell middle upper portion of motor two is fixed in the lower end of steel plate support two, the front end output shaft of motor two is fixed with front semi-convex rectangle tool post, and the rear end output shaft of motor two is fixed with rear semi-convex rectangle tool post;The upper end of steel plate support one is fixed in the left end bottom of steel pipe support one, the shell middle upper portion of motor one is fixed in the lower end of steel plate support one, the front end output shaft of motor one is fixed with first half recessed rectangle tool post one, and the rear end output shaft of motor one is fixed with later half recessed rectangle tool post one;The upper end of steel plate support three is fixed in the right-hand member bottom of steel pipe support one, the shell middle upper portion of motor three is fixed in the lower end of steel plate support three, the front end output shaft of motor three is fixed with first half recessed rectangle tool post two, and the rear end output shaft of motor three is fixed with later half recessed rectangle tool post two;First half recessed rectangle tool post one and later half recessed rectangle tool post one form a umbilicate recessed rectangle tool post, first half recessed rectangle tool post two and later half recessed rectangle tool post two form another umbilicate recessed rectangle tool post, and the side surface of each recessed rectangle tool post is separately installed with multiple cutter head;Front semi-convex rectangle tool post and rear semi-convex rectangle tool post form the convex rectangle tool post that a centre is convex, and the side surface of convex rectangle tool post is provided with multiple cutter head;The recessed rectangle of recessed rectangle tool post cross section coincide with the convex rectangle of convex rectangle tool post cross section.
The structure of convex rectangular head rig includes: the middle upper portion of steel pipe support two is fixed in the lower end of drilling rod two, the middle lower portion of steel pipe support two is fixed on the upper end of steel support two, the shell middle upper portion of motor two is fixed in the lower end of steel support two, the front end output shaft of motor two is fixed with first half recessed rectangle cutter hub, and the rear end output shaft of motor two is fixed with later half recessed rectangle cutter hub;The upper end of steel support one is fixed in the left end bottom of steel pipe support two, and the shell middle upper portion of motor one is fixed in the lower end of steel support one, and the front end output shaft of motor one is fixed with front semi-convex rectangle cutter hub one, and the rear end output shaft of motor one is fixed with rear semi-convex rectangle cutter hub one;The upper end of steel support three is fixed in the right-hand member bottom of steel pipe support two, and the shell middle upper portion of motor three is fixed in the lower end of steel support three, and the front end output shaft of motor three is fixed with front semi-convex rectangle cutter hub two, and the rear end output shaft of motor three is fixed with rear semi-convex rectangle cutter hub two;Front semi-convex rectangle cutter hub one and rear semi-convex rectangle cutter hub one form a convex convex rectangle cutter hub in centre, front semi-convex rectangle cutter hub two and rear semi-convex rectangle cutter hub two form convex rectangle cutter hub convex in the middle of another, and the side surface of each convex rectangle cutter hub is separately installed with multiple cutter head;First half recessed rectangle cutter hub and later half recessed rectangle cutter hub one umbilicate recessed rectangle cutter hub of composition, the side surface of recessed rectangle cutter hub is provided with multiple cutter head;The convex rectangle of convex rectangle cutter hub cross section coincide with the recessed rectangle of recessed rectangle cutter hub cross section.
The present invention has a following feature:
The present invention can manufacture the piling wall that the soil cement convex rectangular head mutual socket of stake between multiple concrete recessed rectangular head stake rectangular head recessed with each two stake is connected, for gear soil, the antiseep on building basis.
Accompanying drawing explanation
The present invention is further illustrated below in conjunction with the accompanying drawings:
Fig. 1 is the front view of recessed rectangular head rig;
Fig. 2 is the rearview of recessed rectangular head rig
Fig. 3 is the A A view of Fig. 1;
Fig. 4 is the front view of convex rectangular head rig;
Fig. 5 is the rearview of convex rectangular head rig;
Fig. 6 is the B B view of Fig. 4;
Fig. 7 is recessed rectangular head stake and convex rectangular head stake is combined into the cross-sectional view (1. for recessed rectangular head stake, 2. for convex rectangular head stake) of piling wall.
In figure: 1, drilling rod one, 2, steel pipe support one, 3, steel plate support one, 4, steel plate support two, 5, steel plate support three, 6, motor one, 7, motor two, 8, motor three, 9, first half recessed rectangle tool post one, 10, front semi-convex rectangle tool post, 11, first half recessed rectangle tool post two, 12, cutter head, 13, later half recessed rectangle tool post one, 14, rear semi-convex rectangle tool post, 15, later half recessed rectangle tool post two, 16, output shaft;21, drilling rod two, 22, steel pipe support two, 23, steel support one, 24, steel support two, 25, steel support three, 26, motor one, 27, motor two, 28, motor three, 29, front semi-convex rectangle cutter hub one, 30, first half recessed rectangle cutter hub, 31, front semi-convex rectangle cutter hub two, 33, rear semi-convex rectangle cutter hub one, 34, later half recessed rectangle cutter hub, 35, rear semi-convex rectangle cutter hub two.
Detailed description of the invention
A kind of rectangular receptacle connects piling wall equipment, including recessed rectangular head rig and convex rectangular head rig.
Recessed rectangular head rig includes the structure in Fig. 1, Fig. 2, Fig. 3, concrete structure includes: the middle upper portion of steel pipe support 1 is fixed in the lower end of drilling rod 1, the middle lower portion of steel pipe support one is fixed on the upper end of steel plate support 24, the shell middle upper portion of motor 27 is fixed in the lower end of steel plate support two, the front end output shaft 16 of motor two is fixed with front semi-convex rectangle tool post 10, and the rear end output shaft of motor two is fixed with rear semi-convex rectangle tool post 14;The upper end of steel plate support 1 is fixed in the left end bottom of steel pipe support one, the shell middle upper portion of motor 1 is fixed in the lower end of steel plate support one, the front end output shaft 16 of motor one is fixed with first half recessed rectangle tool post 1, and the rear end output shaft of motor one is fixed with later half recessed rectangle tool post 1;The upper end of steel plate support 35 is fixed in the right-hand member bottom of steel pipe support one, the shell middle upper portion of motor 38 is fixed in the lower end of steel plate support three, the front end output shaft of motor three is fixed with first half recessed rectangle tool post 2 11, and the rear end output shaft of motor three is fixed with later half recessed rectangle tool post 2 15;First half recessed rectangle tool post one and later half recessed rectangle tool post one form a umbilicate recessed rectangle tool post, first half recessed rectangle tool post two and later half recessed rectangle tool post two form another umbilicate recessed rectangle tool post, and the side surface of each recessed rectangle tool post is separately installed with multiple cutter head 12;Front semi-convex rectangle tool post and rear semi-convex rectangle tool post form the convex rectangle tool post that a centre is convex, and the side surface of convex rectangle tool post is provided with multiple cutter head 12;The recessed rectangle of recessed rectangle tool post cross section coincide with the convex rectangle of convex rectangle tool post cross section.
The working method of recessed rectangular head rig is: during work, the position between grouting pump rectangle recessed to left side tool post and centre convex rectangle tool post and between the right recessed rectangle tool post and centre convex rectangle tool post irrigates water under high pressure respectively, motor one drives first half recessed rectangle tool post one and the rotating forward of later half recessed rectangle tool post one, motor three drives first half recessed rectangle tool post two and the reversion of later half recessed rectangle tool post two, motor two drives front semi-convex rectangle tool post to rotate forward, after motor two drives, semi-convex rectangle tool post inverts, first half recessed rectangle tool post one, later half recessed rectangle tool post one, first half recessed rectangle tool post two, later half recessed rectangle tool post two and front semi-convex rectangle tool post, rear semi-convex rectangle tool post in rotation by the soil cutting of its lower end;Left end is cut into recessed rectangular head in rotation by first half recessed rectangle tool post one, later half recessed rectangle tool post one, and right-hand member is cut into recessed rectangular head in rotation by first half recessed rectangle tool post two, later half recessed rectangle tool post two;The soil body machined away is mixed in mud, water under high pressure constantly fills, mud constantly flows out from hole, and drilling rod one forms about one two ends during being pressed into downwards and is respectively provided with the hole body of recessed rectangular head, casting concrete, formation concrete recessed rectangular head stake in this hole body.
Convex rectangular head rig includes the structure in Fig. 4, Fig. 5, Fig. 6, concrete structure includes: the middle upper portion of steel pipe support 2 22 is fixed in the lower end of drilling rod 2 21, the middle lower portion of steel pipe support two is fixed on the upper end of steel support 2 24, the shell middle upper portion of motor 2 27 is fixed in the lower end of steel support two, the front end output shaft 16 of motor two is fixed with first half recessed rectangle cutter hub 30, and the rear end output shaft of motor two is fixed with later half recessed rectangle cutter hub 34;The upper end of steel support 1 is fixed in the left end bottom of steel pipe support two, the shell middle upper portion of motor 1 is fixed in the lower end of steel support one, the front end output shaft 16 of motor one is fixed with front semi-convex rectangle cutter hub 1, and the rear end output shaft of motor one is fixed with rear semi-convex rectangle cutter hub 1;The upper end of steel support 3 25 is fixed in the right-hand member bottom of steel pipe support two, the shell middle upper portion of motor 3 28 is fixed in the lower end of steel support three, the front end output shaft of motor three is fixed with front semi-convex rectangle cutter hub 2 31, and the rear end output shaft of motor three is fixed with rear semi-convex rectangle cutter hub 2 35;Front semi-convex rectangle cutter hub one and rear semi-convex rectangle cutter hub one form a convex convex rectangle cutter hub in centre, front semi-convex rectangle cutter hub two and rear semi-convex rectangle cutter hub two form convex rectangle cutter hub convex in the middle of another, and the side surface of each convex rectangle cutter hub is separately installed with multiple cutter head 12;First half recessed rectangle cutter hub and later half recessed rectangle cutter hub one umbilicate recessed rectangle cutter hub of composition, the side surface of recessed rectangle cutter hub is provided with multiple cutter head 12;The convex rectangle of convex rectangle cutter hub cross section coincide with the recessed rectangle of recessed rectangle cutter hub cross section.
The working method of convex rectangular head rig is: during work, grout injection is distinguished at the position between grouting pump rectangle convex to left side cutter hub and middle concave rectangle cutter hub and between the right convex rectangle cutter hub and middle concave rectangle cutter hub, motor one drives front semi-convex rectangle cutter hub one and the rotating forward of rear semi-convex rectangle cutter hub one, motor three drives front semi-convex rectangle cutter hub two and the reversion of rear semi-convex rectangle cutter hub two, motor two drives first half recessed rectangle cutter hub to rotate forward, motor two drives later half recessed rectangle cutter hub to invert, front semi-convex rectangle cutter hub one, rear semi-convex rectangle cutter hub one, front semi-convex rectangle cutter hub two, rear semi-convex rectangle cutter hub two and first half recessed rectangle cutter hub, the soil cutting of its lower end is stirred in rotation by later half recessed rectangle cutter hub with cement mortar;Left end cutting is stirred into convex rectangular head in rotation by front semi-convex rectangle cutter hub one, rear semi-convex rectangle cutter hub one, and right-hand member cutting is stirred into convex rectangular head in rotation by front semi-convex rectangle cutter hub two, rear semi-convex rectangle cutter hub two;Drilling rod two forms, during being pressed into downwards, the soil cement convex rectangular head pile body that about one two ends are respectively provided with convex rectangular head.
The convex rectangular head of convex rectangular head stake coincide with the recessed rectangular head of recessed rectangular head stake.
The process that recessed rectangular head stake rig is connected piling wall with convex rectangular head stake rig associated working manufacture socket is as follows: in the original position needing into wall axis, a concrete recessed rectangular head stake is manufactured according to the working method of above-mentioned recessed rectangular head stake rig with recessed rectangular head stake rig, at this, the right side of recessed rectangular head stake, the distance of one the convex rectangular head stake in interval remanufacture second concrete recessed rectangular head stake, so manufacture the convex rectangular head pilespacing in one, multiple intervals from the recessed rectangular head stake of multiple concrete;When the concrete strength of the recessed rectangular head stake on both sides reaches a timing, again in the spacing between each two recessed rectangular head stake, a soil cement convex rectangular head stake is manufactured according to the working method of above-mentioned convex rectangular head stake rig with convex rectangular head stake rig, the convex rectangular head making the soil cement convex rectangular head stake left end between the recessed rectangular head stake of each two concrete is fit to the recessed rectangular head of the left side recessed rectangular head stake right-hand member, the convex rectangular head of soil cement convex rectangular head stake right-hand member is fit to the recessed rectangular head of the right concrete recessed rectangular head stake left end, the piling wall that the soil cement convex rectangular head mutual socket of stake being thusly-formed between multiple concrete recessed rectangular head stake rectangular head recessed with each two stake is connected, gear soil for building basis, antiseep.
Claims (4)
1. rectangular receptacle connects a piling wall equipment, including recessed rectangular head rig and convex rectangular head rig, it is characterised in that:
The concrete structure of described recessed rectangular head rig includes: the middle upper portion of steel pipe support one (2) is fixed in the lower end of drilling rod one (1), the middle lower portion of steel pipe support one is fixed on the upper end of steel plate support two (4), the shell middle upper portion of motor two (7) is fixed in the lower end of steel plate support two, the front end output shaft (16) of motor two is fixed with front semi-convex rectangle tool post (10), and the rear end output shaft of motor two is fixed with rear semi-convex rectangle tool post (14);The upper end of steel plate support one (3) is fixed in the left end bottom of steel pipe support one, the shell middle upper portion of motor one (6) is fixed in the lower end of steel plate support one, the front end output shaft (16) of motor one is fixed with first half recessed rectangle tool post one (9), and the rear end output shaft of motor one is fixed with later half recessed rectangle tool post one (13);The upper end of steel plate support three (5) is fixed in the right-hand member bottom of steel pipe support one, the shell middle upper portion of motor three (8) is fixed in the lower end of steel plate support three, the front end output shaft of motor three is fixed with first half recessed rectangle tool post two (11), and the rear end output shaft of motor three is fixed with later half recessed rectangle tool post two (15);First half recessed rectangle tool post one and later half recessed rectangle tool post one form a umbilicate recessed rectangle tool post, first half recessed rectangle tool post two and later half recessed rectangle tool post two form another umbilicate recessed rectangle tool post, and the side surface of each recessed rectangle tool post is separately installed with multiple cutter head (12);Front semi-convex rectangle tool post and rear semi-convex rectangle tool post form the convex rectangle tool post that a centre is convex, and the side surface of convex rectangle tool post is provided with multiple cutter head (12);
The working method of described recessed rectangular head rig is: during the work of recessed rectangular head rig, the position between grouting pump rectangle recessed to left side tool post and centre convex rectangle tool post and between the right recessed rectangle tool post and centre convex rectangle tool post irrigates water under high pressure respectively, motor one drives first half recessed rectangle tool post one and the rotating forward of later half recessed rectangle tool post one, motor three drives first half recessed rectangle tool post two and the reversion of later half recessed rectangle tool post two, motor two drives front semi-convex rectangle tool post to rotate forward, after motor two drives, semi-convex rectangle tool post inverts, first half recessed rectangle tool post one, later half recessed rectangle tool post one, first half recessed rectangle tool post two, later half recessed rectangle tool post two and front semi-convex rectangle tool post, rear semi-convex rectangle tool post in rotation by the soil cutting of its lower end;Left end is cut into recessed rectangular head in rotation by first half recessed rectangle tool post one, later half recessed rectangle tool post one, and right-hand member is cut into recessed rectangular head in rotation by first half recessed rectangle tool post two, later half recessed rectangle tool post two;The soil body machined away is mixed in mud, water under high pressure constantly fills, mud constantly flows out from hole, and drilling rod one forms about one two ends during being pressed into downwards and is respectively provided with the hole body of recessed rectangular head, casting concrete, formation concrete recessed rectangular head stake in this hole body;
The concrete structure of described convex rectangular head rig includes: the middle upper portion of steel pipe support two (22) is fixed in the lower end of drilling rod two (21), the middle lower portion of steel pipe support two is fixed on the upper end of steel support two (24), the shell middle upper portion of motor two (27) is fixed in the lower end of steel support two, the front end output shaft (16) of motor two is fixed with first half recessed rectangle cutter hub (30), and the rear end output shaft of motor two is fixed with later half recessed rectangle cutter hub (34);The upper end of steel support one (23) is fixed in the left end bottom of steel pipe support two, the shell middle upper portion of motor one (26) is fixed in the lower end of steel support one, the front end output shaft (16) of motor one is fixed with front semi-convex rectangle cutter hub one (29), and the rear end output shaft of motor one is fixed with rear semi-convex rectangle cutter hub one (33);The upper end of steel support three (25) is fixed in the right-hand member bottom of steel pipe support two, the shell middle upper portion of motor three (28) is fixed in the lower end of steel support three, the front end output shaft of motor three is fixed with front semi-convex rectangle cutter hub two (31), and the rear end output shaft of motor three is fixed with rear semi-convex rectangle cutter hub two (35);Front semi-convex rectangle cutter hub one and rear semi-convex rectangle cutter hub one form a convex convex rectangle cutter hub in centre, front semi-convex rectangle cutter hub two and rear semi-convex rectangle cutter hub two form convex rectangle cutter hub convex in the middle of another, and the side surface of each convex rectangle cutter hub is separately installed with multiple cutter head 12;First half recessed rectangle cutter hub and later half recessed rectangle cutter hub one umbilicate recessed rectangle cutter hub of composition, the side surface of recessed rectangle cutter hub is provided with multiple cutter head 12;
The working method of described convex rectangular head rig is: during the work of convex rectangular head rig, grout injection is distinguished at the position between grouting pump rectangle convex to left side cutter hub and middle concave rectangle cutter hub and between the right convex rectangle cutter hub and middle concave rectangle cutter hub, motor one drives front semi-convex rectangle cutter hub one and the rotating forward of rear semi-convex rectangle cutter hub one, motor three drives front semi-convex rectangle cutter hub two and the reversion of rear semi-convex rectangle cutter hub two, motor two drives first half recessed rectangle cutter hub to rotate forward, motor two drives later half recessed rectangle cutter hub to invert, front semi-convex rectangle cutter hub one, rear semi-convex rectangle cutter hub one, front semi-convex rectangle cutter hub two, rear semi-convex rectangle cutter hub two and first half recessed rectangle cutter hub, the soil cutting of its lower end is stirred in rotation by later half recessed rectangle cutter hub with cement mortar;Left end cutting is stirred into convex rectangular head in rotation by front semi-convex rectangle cutter hub one, rear semi-convex rectangle cutter hub one, and right-hand member cutting is stirred into convex rectangular head in rotation by front semi-convex rectangle cutter hub two, rear semi-convex rectangle cutter hub two;Drilling rod two forms, during being pressed into downwards, the soil cement convex rectangular head pile body that about one two ends are respectively provided with convex rectangular head;
Described recessed rectangular head stake rig manufactures socket with convex rectangular head stake rig associated working and is connected the process of piling wall: in the original position needing into wall axis, a concrete recessed rectangular head stake is manufactured according to the working method of above-mentioned recessed rectangular head stake rig with recessed rectangular head stake rig, at this, the right side of recessed rectangular head stake, the distance of one the convex rectangular head stake in interval remanufacture second concrete recessed rectangular head stake, so manufacture the convex rectangular head pilespacing in one, multiple intervals from the recessed rectangular head stake of multiple concrete;When the concrete strength of the recessed rectangular head stake on both sides reaches a timing, again in the spacing between each two recessed rectangular head stake, a soil cement convex rectangular head stake is manufactured according to the working method of above-mentioned convex rectangular head stake rig with convex rectangular head stake rig, the convex rectangular head making the soil cement convex rectangular head stake left end between the recessed rectangular head stake of each two concrete is fit to the recessed rectangular head of the left side recessed rectangular head stake right-hand member, the convex rectangular head of soil cement convex rectangular head stake right-hand member is fit to the recessed rectangular head of the right concrete recessed rectangular head stake left end, the piling wall that the soil cement convex rectangular head mutual socket of stake being thusly-formed between multiple concrete recessed rectangular head stake rectangular head recessed with each two stake is connected, gear soil for building basis, antiseep.
A kind of rectangular receptacle the most according to claim 1 connects piling wall equipment, it is characterised in that: the recessed rectangle of the recessed rectangle tool post cross section of described recessed rectangular head rig coincide with the convex rectangle of convex rectangle tool post cross section.
A kind of rectangular receptacle the most according to claim 1 connects piling wall equipment, it is characterised in that: the convex rectangle of the convex rectangle cutter hub cross section of described convex rectangular head rig coincide with the recessed rectangle of recessed rectangle cutter hub cross section.
A kind of rectangular receptacle the most according to claim 1 connects piling wall equipment, it is characterised in that: the recessed rectangular head of the recessed rectangular head stake that the convex rectangular head of the convex rectangular head stake that described convex rectangular head rig manufactures manufactures with recessed rectangular head rig coincide.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610254079.XA CN105862802A (en) | 2016-04-23 | 2016-04-23 | Rectangular opening inserting connecting pile wall |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610254079.XA CN105862802A (en) | 2016-04-23 | 2016-04-23 | Rectangular opening inserting connecting pile wall |
Publications (1)
Publication Number | Publication Date |
---|---|
CN105862802A true CN105862802A (en) | 2016-08-17 |
Family
ID=56632728
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610254079.XA Withdrawn CN105862802A (en) | 2016-04-23 | 2016-04-23 | Rectangular opening inserting connecting pile wall |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105862802A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105862803A (en) * | 2016-04-23 | 2016-08-17 | 刘兰花 | Rectangular locking and buckling connecting pile wall |
CN105862801A (en) * | 2016-04-23 | 2016-08-17 | 刘兰花 | Rectangular engagement connecting pile wall |
CN105862804A (en) * | 2016-04-23 | 2016-08-17 | 刘兰花 | Rectangular inserting connecting pile wall |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101619572A (en) * | 2009-06-30 | 2010-01-06 | 孙刚 | Hydraulic pressure milling deep-mixing underground-wall machine |
US20110031017A1 (en) * | 2009-08-04 | 2011-02-10 | Kawasaki Jukogyo Kabushiki Kaisha | Abrasion detecting apparatus detecting abrasion of component of cutter head and tunnel boring machine including abrasion detecting apparatus |
CN102261100A (en) * | 2011-02-11 | 2011-11-30 | 张永忠 | Joint milling cutter of semicircular hydraulic motor |
CN105862804A (en) * | 2016-04-23 | 2016-08-17 | 刘兰花 | Rectangular inserting connecting pile wall |
CN105862803A (en) * | 2016-04-23 | 2016-08-17 | 刘兰花 | Rectangular locking and buckling connecting pile wall |
CN105862801A (en) * | 2016-04-23 | 2016-08-17 | 刘兰花 | Rectangular engagement connecting pile wall |
-
2016
- 2016-04-23 CN CN201610254079.XA patent/CN105862802A/en not_active Withdrawn
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101619572A (en) * | 2009-06-30 | 2010-01-06 | 孙刚 | Hydraulic pressure milling deep-mixing underground-wall machine |
US20110031017A1 (en) * | 2009-08-04 | 2011-02-10 | Kawasaki Jukogyo Kabushiki Kaisha | Abrasion detecting apparatus detecting abrasion of component of cutter head and tunnel boring machine including abrasion detecting apparatus |
CN102261100A (en) * | 2011-02-11 | 2011-11-30 | 张永忠 | Joint milling cutter of semicircular hydraulic motor |
CN105862804A (en) * | 2016-04-23 | 2016-08-17 | 刘兰花 | Rectangular inserting connecting pile wall |
CN105862803A (en) * | 2016-04-23 | 2016-08-17 | 刘兰花 | Rectangular locking and buckling connecting pile wall |
CN105862801A (en) * | 2016-04-23 | 2016-08-17 | 刘兰花 | Rectangular engagement connecting pile wall |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105862803A (en) * | 2016-04-23 | 2016-08-17 | 刘兰花 | Rectangular locking and buckling connecting pile wall |
CN105862801A (en) * | 2016-04-23 | 2016-08-17 | 刘兰花 | Rectangular engagement connecting pile wall |
CN105862804A (en) * | 2016-04-23 | 2016-08-17 | 刘兰花 | Rectangular inserting connecting pile wall |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105735298A (en) | Inserting cross-shaped pile wall | |
CN105862743A (en) | Arc buckling pile wall manufacturing equipment | |
CN105735306A (en) | Pile wall manufacturing device | |
CN105862822A (en) | V-shaped fold line piling wall through latching connection | |
CN105862821A (en) | Y-shaped latching connection piling wall | |
CN105887849A (en) | Socket-connection V-shaped folded line pile wall | |
CN105821872A (en) | Pile wall manufacturing equipment | |
CN105887838A (en) | Socket T-shaped pile wall manufacturing machine | |
CN105862815A (en) | Manufacturing machine tool for buckling T-shaped pile wall | |
CN105887839A (en) | Connection crossed pile wall | |
CN105887844A (en) | Y-shaped plugged retaining wall manufacturing equipment | |
CN105804648A (en) | Y-shaped plugging blocking wall manufacturing equipment | |
CN105862820A (en) | Y-shaped locking connection piling wall | |
CN105821865A (en) | Buckled T-shaped pile wall manufacturing machine tool | |
CN105862816A (en) | Manufacturing machine tool for latching T-shaped pile wall | |
CN105821869A (en) | Locking type T-shaped pile wall manufacturing machine | |
CN105926604A (en) | Manufacturing equipment for Y-shaped lock catch retaining wall | |
CN105887845A (en) | Y-shaped socket connection pile wall | |
CN105926605A (en) | Lock catch connection V-shaped broken line pile wall | |
CN105887850A (en) | Pile wall | |
CN105862802A (en) | Rectangular opening inserting connecting pile wall | |
CN105862803A (en) | Rectangular locking and buckling connecting pile wall | |
CN105862801A (en) | Rectangular engagement connecting pile wall | |
CN105862804A (en) | Rectangular inserting connecting pile wall | |
CN105862825A (en) | Y-shaped socket buckling connection piling wall |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WW01 | Invention patent application withdrawn after publication | ||
WW01 | Invention patent application withdrawn after publication |
Application publication date: 20160817 |