CN105862544A - Two-layer stress absorption band and preparation method thereof - Google Patents

Two-layer stress absorption band and preparation method thereof Download PDF

Info

Publication number
CN105862544A
CN105862544A CN201610362684.9A CN201610362684A CN105862544A CN 105862544 A CN105862544 A CN 105862544A CN 201610362684 A CN201610362684 A CN 201610362684A CN 105862544 A CN105862544 A CN 105862544A
Authority
CN
China
Prior art keywords
stress absorption
asphalt
pulp layer
compound
layer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610362684.9A
Other languages
Chinese (zh)
Other versions
CN105862544B (en
Inventor
王慧
刘少文
沈佳
彭刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi Province Transport Science Research Institute
Shanxi Jiaoke Highway Survey and Design Institute
Original Assignee
Shanxi Province Transport Science Research Institute
Shanxi Jiaoke Highway Survey and Design Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanxi Province Transport Science Research Institute, Shanxi Jiaoke Highway Survey and Design Institute filed Critical Shanxi Province Transport Science Research Institute
Priority to CN201610362684.9A priority Critical patent/CN105862544B/en
Publication of CN105862544A publication Critical patent/CN105862544A/en
Application granted granted Critical
Publication of CN105862544B publication Critical patent/CN105862544B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C11/00Details of pavings
    • E01C11/02Arrangement or construction of joints; Methods of making joints; Packing for joints
    • E01C11/04Arrangement or construction of joints; Methods of making joints; Packing for joints for cement concrete paving
    • E01C11/10Packing of plastic or elastic materials, e.g. wood, resin
    • E01C11/103Joints with packings prepared only in situ; Materials therefor

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Road Paving Structures (AREA)

Abstract

The invention belongs to the technical field of road engineering, and relates to a two-layer stress absorption band and a preparation method thereof. The two-layer stress absorption band is paved with a stress absorption asphalt rubber paste layer, lower polyester glass fiber fabric, a high-elastic asphalt rubber paste layer and upper polyester glass fiber fabric from bottom to top in sequence. The invention aims at providing the two-layer stress absorption band capable of solving the problem that an asphalt pavement layer reflects and cracks and improving the durability of asphalt pavements and a preparation method of the two-layer stress absorption band.

Description

A kind of double-layer stress absorption band and preparation method thereof
Technical field
The invention belongs to road engineering technical field, relate to a kind of double-layer stress absorption band and preparation method thereof.
Background technology
The reconstruction technology of " paracetamol " refers to keep old pavement globality, takes grouting reinforcement under plate, locally The measures such as displacement or repairing, then directly overlay the technology of skin coat on Old cement concrete.This Mode can make full use of the structure residual intensity of Old cement concrete, thinning thickness.But this skill One of difficult problem that overlay reflection crack problem always highway circle that art faces is faced.Depositing of reflection crack , not only break up the bulk strength of pavement structure, and owing to surface water permeates downwards along reflection crack, made Surface layer is the most inharmonious to come off, and subgrade strength reduces, and has a strong impact on the service life on road surface.
In order to prevent or delay the early reflection crack problem of old cement concrete road Laying Asphalt Surface Course, research worker exists Stress absorbing layer, geotextile interlayer, grid interlayer it is provided with between existing cement-concrete pavement plate and asphalt overlay, But the processing method of this full paving formula significantly increases construction costs.Proposition is awarded to penetrating judgment in conjunction with Tongji University's what is said or talked about The soft interlayer in local is set and can effectively reduce the achievement in research of overlay temperature stress, develop high elastic rubber agate Hoof fat stress absorption carrying material, for disposing, through making for many years the local in old concrete plate seam and crack With, although find this material can the generation in delayed reflex crack to a certain extent, can root but do not have Control reflection crack, the most do not reverse the development trend of reflection crack.After using a period of time, due to material itself Defect, stress absorption band comes off with bitumen layer, this most largely have impact on stress absorption band effect send out Wave.
Summary of the invention
In order to solve above-mentioned technical problem present in background technology, it is an object of the invention to provide one can solve Certainly Reflective Crack in Asphalt Overlays problem and can promote durability of asphalt pavement double-layer stress absorption band and Its preparation method.
For achieving the above object, the present invention adopts the following technical scheme that
A kind of double-layer stress absorption band, it is characterised in that: described double-layer stress absorption band is laid the most successively There are stress absorption asphalt adhesive pulp layer, bottom Fibergrass polyester mat, high resiliency asphalt adhesive pulp layer and top polyester glass fibre Cloth.
As preferably, stress absorption asphalt adhesive pulp layer of the present invention is by stress absorption asphalt binder, ore deposit Powder and fine aggregate are prepared from;The weight ratio of described stress absorption asphalt binder, breeze and fine aggregate is 9:15:76;The compression rebound modulu of described stress absorption asphalt adhesive pulp layer is 200MPa~400MPa, and thickness is 3mm, width is 0.3~0.4m;The particle diameter of the fine aggregate employed in described stress absorption asphalt adhesive pulp layer does not surpasses Cross 5mm.
As preferably, stress absorption asphalt binder of the present invention be by 110# matrix pitch, PE, SBS, Montmorillonite, stabilizer and compatilizer are prepared from;Described 110# matrix pitch, PE, SBS, montmorillonite, The weight ratio of stabilizer and compatilizer is 100:3.2:1.1:10.3:0.2:0.3.
As preferably, high resiliency asphalt adhesive pulp layer of the present invention is fine by high resiliency asphalt binder, polyester Dimension, lignin fibre, breeze and fine aggregate are prepared from, described high resiliency asphalt binder, polyester fiber, The weight ratio of lignin fibre, breeze and fine aggregate is 13:0.25:0.1:15:71.65;Described high-elastic The compression rebound modulu of property asphalt adhesive pulp layer is 300~500MPa, and thickness is 3mm, and width is 0.3~0.4m;Institute The particle diameter stating the fine aggregate employed in high resiliency asphalt adhesive pulp layer is less than 5mm.
As preferably, high resiliency asphalt binder high resiliency asphalt binder of the present invention is by 110# substrate Colophonium, rubber powder, SBS, kir, epoxy resin, stabilizer and compatilizer are prepared from;Described 110# The weight ratio of matrix pitch, rubber powder, SBS, kir, epoxy resin, stabilizer and compatilizer is 100: 25:3:0.5:0.5:0.3:0.3;Described rubber powder is the rubber powder of 200 mesh.
A kind of method for preparing foregoing double-layer stress absorption band, it is characterised in that: described method bag Include following steps:
1) stress absorption asphalt adhesive pulp layer is prepared:
1.1) stress absorption asphalt binder is prepared:
1.1.1) 110# matrix pitch is heated to 150 DEG C~160 DEG C;
1.1.2) montmorillonite adds: montmorillonite 100 DEG C, vacuum environment is dried 3h, after drying in exsiccator Cool down standby;Under conditions of 150 DEG C~160 DEG C, montmorillonite is added step 1.1.1) in heating after 110# In matrix pitch, under conditions of stir speed (S.S.) is 500r/min, add montmorillonite while stirring, it is ensured that Montmorillonite is added within 10min;Carrying out high speed shear with high-speed shearing emulsion machine the most again, temperature controls 150 DEG C~160 DEG C, shear rate is 5000r/min, shears 10min and obtains the first compound;
1.1.3) SBS adds: under conditions of 165 DEG C~175 DEG C, SBS is joined 1.1.2) prepare The first compound in, use emulsification pretreatment machine carry out high speed shear, be the bar of 5000r/min in shear rate Stir 15min under part, obtain the second compound;
1.1.4) PE adds: under the conditions of 165 DEG C~175 DEG C, PE is joined 1.1.3) prepare the In two compounds, emulsification pretreatment machine is used to carry out high speed shear, under conditions of shear rate is 5000r/min Stirring 20min, obtains the 3rd compound;
1.1.5) stabilizer adds: under the conditions of 165 DEG C~175 DEG C, stabilizer is joined 1.1.4) prepare In the 3rd compound obtained, use emulsification pretreatment machine to carry out high speed shear, be 5000r/min in shear rate Under conditions of stir 15min, obtain the 4th compound;
1.1.6) compatilizer adds: under the conditions of 165 DEG C~175 DEG C, compatilizer is joined 1.1.5) prepare In the 4th compound obtained, use emulsification pretreatment machine to carry out high speed shear, be 5000r/min in shear rate Under conditions of stir 15min, then under conditions of stir speed (S.S.) is 1000r/min, stir 30min, obtain Stress absorption asphalt binder;
1.2) by step 1.1) the stress absorption asphalt binder for preparing is heated to 165 DEG C~175 DEG C, and will Fine aggregate is heated to 180 DEG C~190 DEG C, by step 1.1) the stress absorption asphalt binder for preparing adds thin Mix and stir 1min in gathering materials, be subsequently adding breeze and mix and stir 1min, obtain stress absorption asphalt adhesive pulp layer, will be prepared into The stress absorption asphalt adhesive pulp layer arrived is incubated under conditions of 165 DEG C~175 DEG C;
2) high resiliency asphalt adhesive pulp layer is prepared:
2.1) high resiliency asphalt binder is prepared;
2.1.1) 110# matrix pitch is heated to 175 DEG C~185 DEG C;
2.1.2) rubber powder adds: under the conditions of 175 DEG C~185 DEG C, rubber powder is added step 2.1.1) in In 110# matrix pitch after heating, use emulsification pretreatment machine to carry out high speed shear, in shear rate be Stir 60min under conditions of 3000r/min, obtain the 5th compound;
2.1.3) kir adds: the temperature of the 5th compound is maintained at 180 DEG C~190 DEG C, in step 2.1.2) The 5th compound prepared adds kir, uses electrodeless constant speed to stir under conditions of 180 DEG C~190 DEG C Mixing instrument stirring, stir speed (S.S.) is 2000r/min, and stirring 20min obtains the 6th compound;
2.1.4) SBS adds: under conditions of 180 DEG C~190 DEG C, SBS is joined step 2.1.3) prepare In the 6th compound obtained, use emulsification pretreatment machine to carry out high speed shear, be 5000r/min in shear rate Under conditions of stir 15min, obtain seven compounds;
2.1.5) epoxy resin adds: under the conditions of 180 DEG C~190 DEG C, epoxy resin is joined step 2.1.4) In the 7th compound prepared, use emulsification pretreatment machine to carry out high speed shear, in shear rate be Stir 20min under conditions of 5000r/min, obtain the 8th compound;
2.1.6) stabilizer adds: under the conditions of 180 DEG C~190 DEG C, stabilizer is joined step 2.1.5) In the 8th compound prepared, use emulsification pretreatment machine to carry out high speed shear, in shear rate be Stir 15min under conditions of 5000r/min, obtain the 9th compound;
2.1.7) compatilizer adds: under the conditions of 180 DEG C~190 DEG C, compatilizer is joined step 2.1.6) In in the 9th compound, use emulsification pretreatment machine to carry out high speed shear, be the bar of 5000r/min in shear rate Stir 15min under part, then use electrodeless constant speed stirring instrument under conditions of stir speed (S.S.) is 1000r/min, stir Mix 30min, obtain high resiliency asphalt binder;
2.2) by step 2.1) the high resiliency asphalt binder for preparing is heated to 180 DEG C~190 DEG C, and will be thin Gather materials and be heated to 180 DEG C~190 DEG C, polyester fiber is joined in fine aggregate and mix and stir 30s, be subsequently adding lignin Fiber mixes and stirs 1min, is subsequently adding high resiliency asphalt binder and mixes and stirs 1min, is subsequently adding breeze and mixes and stirs 1min, Obtain high resiliency asphalt adhesive pulp layer;By the high resiliency asphalt adhesive pulp layer for preparing 180 DEG C~the condition of 190 DEG C Lower insulation;
3) double-layer stress absorption band is prepared
3.1) at the seam of Deteriorated concrete pavement plate and/or the gap in crack, step 1.1 is poured into) prepare Stress absorption asphalt binder, after gap is filled and led up, spread in the range of seam and fracture faces wide 0.3~0.4m Cloth stress absorption asphalt adhesive pulp layer, the thickness of described stress absorption asphalt adhesive pulp layer is 3mm;
3.2) upper surface in stress absorption asphalt adhesive pulp layer is laid and stress absorption asphalt adhesive pulp layer respective width Bottom Fibergrass polyester mat, utilize small-sized rolling apparatus to roll at the upper surface of bottom Fibergrass polyester mat, form the One ply stress absorption band;Small-sized rolling apparatus is when the upper surface of bottom Fibergrass polyester mat rolls, and stress absorption drips The temperature of blue or green mucilage layer is not less than 150 DEG C;
3.3) the upper surface continuation at ground floor stress absorption band dispenses corresponding wide to stress absorption asphalt adhesive pulp layer The high resiliency asphalt adhesive pulp layer of degree, the thickness of described high resiliency asphalt adhesive pulp layer is 3mm;
3.4) what the upper surface in high resiliency asphalt adhesive pulp layer was laid with high resiliency asphalt adhesive pulp layer respective width is upper Portion's Fibergrass polyester mat, utilizes small-sized rolling apparatus to roll at the upper surface of top Fibergrass polyester mat, forms the second layer Stress absorption band;Small-sized rolling apparatus when the upper surface of top Fibergrass polyester mat rolls, high resiliency asphalt mastic The temperature of layer should be not less than 170 DEG C.
The present invention has the advantage that compared with the prior art
1) the double-layer stress absorption band low cost used and preparation simplicity, needed raw material kind is few.
2) the double-layer stress absorption band function admirable used, has that high temperature stability performance is good, Reflection Cracking The advantages such as fatigue behaviour is good, can effectively alleviate bad adhesion, stress absorption effect that existing stress absorption band exists The problems such as the best and durability is poor.Further, preparation process is simple, and device therefor cost is relatively low, can be effective Reduce construction costs.
3) the stress absorption asphalt mastic that double-layer stress absorption band uses belongs to the modified asphalt material of soft stick nature, It directly contacts with Deteriorated concrete pavement plate seam and crack, it is possible to effectively alleviate stress concentration phenomenon.Bilayer should The high resiliency asphalt mastic that power absorption band uses belongs to elastic compared with the modified asphalt material big, tensile strength is big, it Jointly act on two layers polyester glass-fiber-fabric, it is possible to the overall tensile strength of stress absorption band is effectively ensured, stoped The continuation having reflection crack develops.
4) the preparation method step used is simple, reasonable in design and operation is simple, and prepared double-layer stress is inhaled Take-up is excellent, including preparation stress absorption asphalt binder, preparation stress absorption asphalt mastic, prepares high resiliency Asphalt binder, preparing four steps of high resiliency asphalt mastic, the process parameters design of each step rationally and realizes Convenient, control simple, the performance of prepared Biological asphalt can be effectively ensured, and safe preparation process, reliable.
Accompanying drawing explanation
Fig. 1 is the structural representation of double-layer stress absorption band provided by the present invention;
Wherein:
1-stress absorption asphalt adhesive pulp layer;2-bottom Fibergrass polyester mat;3-high resiliency asphalt adhesive pulp layer;4-top Fibergrass polyester mat;5-Deteriorated concrete pavement plate.
Detailed description of the invention
Below by drawings and Examples, the technical solution adopted in the present invention is described in further detail, But invention is not limited only to embodiment disclosed below.
See Fig. 1, the invention provides a kind of double-layer stress absorption band, include the most successively: stress is inhaled Receive asphalt adhesive pulp layer 1, bottom Fibergrass polyester mat 2, high resiliency asphalt adhesive pulp layer 3 and top Fibergrass polyester mat 4.
Stress absorption asphalt adhesive pulp layer 1 is coated at seam and the crack of Deteriorated concrete pavement plate 5, is on the one hand used for Playing the effect of joint seal, on the one hand being used for absorbing stress (often has stress above old concrete plate seam and crack The phenomenon concentrated), compression rebound modulu is 200MPa~400MPa, and thickness is 3mm, and width is 0.3~0.4m.
Stress absorption asphalt adhesive pulp layer 1 is combined by stress absorption asphalt binder, breeze and fine aggregate, should It is stress absorption asphalt binder that power absorbs the proportioning of asphalt adhesive pulp layer 1: breeze: fine aggregate=9:15:76, Fine aggregate is substantially suspended between the rubber cement that stress absorption Colophonium and breeze are formed, with the caking property of levels all The best.
The proportioning of stress absorption asphalt binder is, 110# matrix pitch: PE:SBS: montmorillonite: stabilizer: Compatilizer=100:3.2:1.1:10.3:0.2:0.3.Wherein, PE is called for short polyethylene, is that ethylene is aggregated A kind of thermoplastic resin prepared;SBS is a kind of asphalt modifier finished product, i.e. Styrene-Butadiene block copolymerization Thing;Stabilizer is sulfur, and compatilizer is aromatic naphtha.
The particle size range of fine aggregate is 0~5mm.
High resiliency asphalt adhesive pulp layer 3 is coated in the top of bottom Fibergrass polyester mat 2, and compression rebound modulu is 300~500MPa, thickness is 3mm, and width is 0.3~0.4m.
High resiliency asphalt adhesive pulp layer 3 is combined by high resiliency asphalt binder, breeze and fine aggregate, high resiliency The proportioning of asphalt adhesive pulp layer 3 is high resiliency asphalt binder: polyester fiber: lignin fibre: breeze: carefully collect Material=13:0.25:0.1:15:71.65.Wherein, to be that limestone is levigate obtain breeze;Fine aggregate is 0~5mm Limestone aggregates.
The proportioning of high resiliency asphalt binder is, 110# matrix pitch: rubber powder: SBS: kir: epoxy Resin: stabilizer: compatilizer=100:25:3:0.5:0.5:0.3:0.3.Rubber powder is the rubber of 200 mesh Rubber powder.
The particle size range of fine aggregate is 0~5mm.
It addition, it is simple, reasonable in design and operate simple, prepared double to the invention also discloses a kind of method step The stress absorption band preparation method of ply stress absorption band function admirable, the method comprises the following steps:
Stress absorption asphalt adhesive pulp layer 1 is combined by stress absorption asphalt binder, breeze and fine aggregate, should It is stress absorption asphalt binder that power absorbs the proportioning of asphalt adhesive pulp layer 1: breeze: fine aggregate=9:15:76, Fine aggregate is substantially suspended between the rubber cement that stress absorption Colophonium and breeze are formed, with the caking property of levels all The best.
The proportioning of stress absorption asphalt binder is, 110# matrix pitch: PE:SBS: montmorillonite: stabilizer: Compatilizer=100:3.2:1.1:5.3:0.2:0.3.Wherein, stabilizer is sulfur, and compatilizer is aromatic hydrocarbons Oil.
Step one, preparation stress absorption asphalt binder.
1.1) matrix pitch heating: matrix pitch is heated to temperature T1, wherein T1=150 DEG C~160 DEG C.
1.2) montmorillonite adds:
Montmorillonite 100 DEG C, the vacuum environment of-0.1MPa dries 3h, cool down standby after drying in exsiccator.
Under the conditions of temperature T1, by montmorillonite add 1.1) in heating after matrix pitch in, use electrodeless perseverance Speed stirring instrument, under conditions of stir speed (S.S.) is 500r/min, adds montmorillonite, it is ensured that while stirring at 10min Within add montmorillonite;Carrying out high speed shear with high-speed shearing emulsion machine the most again, temperature controls at T1, shears Speed is 5000r/min, shears 10min and obtains the first compound.
1.3) SBS adds: under the conditions of temperature T2, wherein T2=165 DEG C~175 DEG C, SBS is joined 1.2) In in the first compound, use emulsification pretreatment machine to carry out high speed shear, be the bar of 5000r/min in shear rate Stir 15min under part, obtain the second compound;
1.4) PE adds: under the conditions of temperature T2, PE is joined 1.3) in the second compound, employing is cut Cut mulser and carry out high speed shear, under conditions of shear rate is 5000r/min, stirs 20min, obtains the 3rd Compound.
1.5) stabilizer adds: under the conditions of temperature T2, stabilizer is joined 1.4) in the 3rd compound, Use emulsification pretreatment machine to carry out high speed shear, under conditions of shear rate is 5000r/min, stirs 15min, To the 4th compound.
1.6) compatilizer adds: under the conditions of temperature T2, compatilizer is joined 1.5) in the 4th compound, Use emulsification pretreatment machine to carry out high speed shear, under conditions of shear rate is 5000r/min, stir 15min, so Rear employing electrodeless constant speed stirring instrument, under conditions of stir speed (S.S.) is 1000r/min, stirs 30min, obtains stress Absorb asphalt binder.
Step 2, preparation stress absorption asphalt adhesive pulp layer 1
Stress absorption asphalt binder is heated to temperature T2, fine aggregate is heated to temperature T4, wherein T4=180 DEG C~190 DEG C, stress absorption asphalt binder is added in fine aggregate and mixes and stirs 1min, be subsequently adding breeze Mix and stir 1min, obtain stress absorption asphalt adhesive pulp layer 1.
Step 3, prepare high resiliency asphalt binder.
3.1) matrix pitch heating: matrix pitch is heated to temperature T3, wherein T3=175 DEG C~185 DEG C.
3.2) rubber powder add: under the conditions of temperature T3, by rubber powder add 3.1) in heating after substrate drip In green grass or young crops, use emulsification pretreatment machine to carry out high speed shear, stir under conditions of shear rate is 3000r/min 60min, obtains the 5th compound;
3.3) kir adds: the 5th mixture temperature is maintained at T4, by predetermined ratio 3.2) in the 5th Adding kir in compound, use the stirring instrument stirring of electrodeless constant speed under the conditions of temperature T4, stir speed (S.S.) is 2000r/min, stirring 20min obtain the 6th compound;
3.4) SBS adds: under the conditions of temperature T4, SBS is joined 3.3) in the 6th compound, use Emulsification pretreatment machine carries out high speed shear, stirs 15min, obtain seven under conditions of shear rate is 5000r/min Compound;
3.5) epoxy resin add: under the conditions of temperature T4, epoxy resin is joined 3.4) in the 7th mixing In material, use emulsification pretreatment machine to carry out high speed shear, stir under conditions of shear rate is 5000r/min 20min, obtains the 8th compound.
3.6) stabilizer adds: under the conditions of temperature T4, stabilizer is joined 3.5) in the 8th compound, Use emulsification pretreatment machine to carry out high speed shear, under conditions of shear rate is 5000r/min, stirs 15min, To the 9th compound.
3.7) compatilizer adds: under the conditions of temperature T4, compatilizer is joined 3.6) in the 9th compound, Use emulsification pretreatment machine to carry out high speed shear, under conditions of shear rate is 5000r/min, stir 15min, so Rear employing electrodeless constant speed stirring instrument, under conditions of stir speed (S.S.) is 1000r/min, stirs 30min, obtains high-elastic Property asphalt binder.
Step 4, prepare high resiliency asphalt adhesive pulp layer 3
High resiliency asphalt binder is heated to temperature T4, fine aggregate is heated to temperature T4, polyester fiber is added Enter in fine aggregate, mix and stir 30s, be subsequently adding lignin fibre and mix and stir 1min, be subsequently adding high resiliency Colophonium knot Close material and mix and stir 1min, be subsequently adding breeze and mix and stir 1min, obtain high resiliency asphalt adhesive pulp layer 3.
Step 5, prepare double-layer stress absorption band
5.1) preparation
The stress absorption asphalt adhesive pulp layer 1 prepared is incubated under the conditions of temperature T2, the high resiliency that will prepare Asphalt adhesive pulp layer 3 is incubated under the conditions of temperature T4.
5.2) double-layer stress absorption band making
Pouring into stress absorption asphalt binder at the seam of Deteriorated concrete pavement plate and the gap in crack, gap is filled out After Ping, in the range of seam and fracture faces wide 0.3~0.4m, dispense stress absorption asphalt adhesive pulp layer 1, control Thickness is 3mm.Following closely, the bottom polyester of respective width is laid on the surface of stress absorption asphalt adhesive pulp layer 1 Glass-fiber-fabric 2, and then small-sized rolling apparatus rolls on bottom Fibergrass polyester mat 2 surface, forms ground floor stress and inhales Take-up.
Small-sized rolling apparatus when bottom Fibergrass polyester mat 2 surface is rolled, the temperature of stress absorption asphalt adhesive pulp layer 1 150 DEG C should be not less than.
Continue to dispense the high resiliency asphalt adhesive pulp layer 3 of respective width on the surface of ground floor stress absorption band, control Thickness is 3mm.Following closely, the top polyester glass of respective width is laid on the surface of high resiliency asphalt adhesive pulp layer 3 Fine cloth 4, and then small-sized rolling apparatus rolls on top Fibergrass polyester mat 4 surface, forms second layer stress absorption Band.
Small-sized rolling apparatus is when top Fibergrass polyester mat 4 surface is rolled, and the temperature of high resiliency asphalt adhesive pulp layer 3 should It is not less than 170 DEG C.
In order to verify the present invention further, carry out large scale reflection crack fatigue test, compared for tradition single Ply stress absorption band, double-layer stress absorption band of the present invention and the Reflection Cracking fatigue behaviour of stress absorbing layer, bag Include load fatigue behaviour and temperature fatigue performance.The bitumen layer structure used and material type are shown in Table 1.Test knot Fruit is as shown in table 2 and table 3.
Table 1 asphalt overlaying Rotating fields and material type
Table 2 asphalt overlay large scale temperature fatigue finder charge effect number of times
Structure type Just split number of times/time Split eventually number of times/time Fracture width/mm
Structure 1 224 895 1.2
Structure 2 305 1217 0.9
Structure 3 278 956 1.0
Table 3 asphalt overlay large scale load Fatigue Test Loads effect number of times
Structure type Just split number of times/ten thousand time Split number of times/ten thousand time eventually Fracture width/mm
Structure 1 12.68 16.92 1.1
Structure 2 14.25 18.11 0.8
Structure 3 11.70 14.63 1.5
From table 2 and table 3, use the overlay knot of double-layer stress absorption band local punishment Old cement concrete The temperature fatigue performance of structure and load fatigue behaviour are all optimum, have been even more than adding of full paving stress absorbing layer Paving structure.

Claims (6)

1. a double-layer stress absorption band, it is characterised in that: described double-layer stress absorption band is equipped with stress absorption asphalt adhesive pulp layer, bottom Fibergrass polyester mat, high resiliency asphalt adhesive pulp layer and top Fibergrass polyester mat the most successively.
Double-layer stress absorption band the most according to claim 1, it is characterised in that: described stress absorption asphalt adhesive pulp layer is prepared from by stress absorption asphalt binder, breeze and fine aggregate;The weight ratio of described stress absorption asphalt binder, breeze and fine aggregate is 9:15:76;The compression rebound modulu of described stress absorption asphalt adhesive pulp layer is 200MPa ~ 400MPa, and thickness is 3mm, and width is 0.3 ~ 0.4m;The particle diameter of the fine aggregate employed in described stress absorption asphalt adhesive pulp layer is less than 5mm.
Double-layer stress absorption band the most according to claim 2, it is characterised in that: described stress absorption asphalt binder is to be prepared from by 110# matrix pitch, PE, SBS, montmorillonite, stabilizer and compatilizer;The weight ratio of described 110# matrix pitch, PE, SBS, montmorillonite, stabilizer and compatilizer is 100:3.2:1.1:10.3:0.2:0.3.
4. according to the double-layer stress absorption band described in claim 1 or 2 or 3, it is characterized in that: described high resiliency asphalt adhesive pulp layer is prepared from by high resiliency asphalt binder, polyester fiber, lignin fibre, breeze and fine aggregate, and the weight ratio of described high resiliency asphalt binder, polyester fiber, lignin fibre, breeze and fine aggregate is 13:0.25:0.1:15:71.65;The compression rebound modulu of described high resiliency asphalt adhesive pulp layer is 300 ~ 500MPa, and thickness is 3mm, and width is 0.3 ~ 0.4m;The particle diameter of the fine aggregate employed in described high resiliency asphalt adhesive pulp layer is less than 5mm.
Double-layer stress absorption band the most according to claim 4, it is characterised in that: described high resiliency asphalt binder high resiliency asphalt binder is prepared from by 110# matrix pitch, rubber powder, SBS, kir, epoxy resin, stabilizer and compatilizer;The weight ratio of described 110# matrix pitch, rubber powder, SBS, kir, epoxy resin, stabilizer and compatilizer is 100:25:3:0.5:0.5:0.3:0.3;Described rubber powder is the rubber powder of 200 mesh.
6. the method being used for preparing the double-layer stress absorption band described in claim 5, it is characterised in that: said method comprising the steps of:
1) stress absorption asphalt adhesive pulp layer is prepared:
1.1) stress absorption asphalt binder is prepared:
1.1.1) 110# matrix pitch is heated to 150 DEG C ~ 160 DEG C;
1.1.2) montmorillonite adds: montmorillonite 100 DEG C, vacuum environment is dried 3h, cool down standby after drying in exsiccator;Under conditions of 150 DEG C ~ 160 DEG C, montmorillonite is added step 1.1.1) in heating after 110# matrix pitch in, under conditions of stir speed (S.S.) is 500r/min, add montmorillonite while stirring, it is ensured that within 10min, add montmorillonite;Carrying out high speed shear with high-speed shearing emulsion machine the most again, temperature controls at 150 DEG C ~ 160 DEG C, and shear rate is 5000r/min, shears 10min and obtains the first compound;
1.1.3) SBS adds: under conditions of 165 DEG C ~ 175 DEG C, SBS is joined 1.1.2) in the first compound of preparing, use emulsification pretreatment machine to carry out high speed shear, under conditions of shear rate is 5000r/min, stirs 15min, obtains the second compound;
1.1.4) PE adds: under the conditions of 165 DEG C ~ 175 DEG C, PE is joined 1.1.3) in the second compound of preparing, use emulsification pretreatment machine to carry out high speed shear, under conditions of shear rate is 5000r/min, stirs 20min, obtains the 3rd compound;
1.1.5) stabilizer adds: under the conditions of 165 DEG C ~ 175 DEG C, stabilizer is joined 1.1.4) in the 3rd compound for preparing, use emulsification pretreatment machine to carry out high speed shear, under conditions of shear rate is 5000r/min, stirs 15min, obtains the 4th compound;
1.1.6) compatilizer adds: under the conditions of 165 DEG C ~ 175 DEG C, compatilizer is joined 1.1.5) in the 4th compound for preparing, emulsification pretreatment machine is used to carry out high speed shear, 15min is stirred under conditions of shear rate is 5000r/min, then under conditions of stir speed (S.S.) is 1000r/min, stirring 30min, obtains stress absorption asphalt binder;
1.2) by step 1.1) the stress absorption asphalt binder for preparing is heated to 165 DEG C ~ 175 DEG C, fine aggregate is heated to 180 DEG C ~ 190 DEG C, by step 1.1) the stress absorption asphalt binder for preparing adds in fine aggregate and mixes and stirs 1min, it is subsequently adding breeze and mixes and stirs 1min, obtain stress absorption asphalt adhesive pulp layer, the stress absorption asphalt adhesive pulp layer prepared is incubated under conditions of 165 DEG C ~ 175 DEG C;
2) high resiliency asphalt adhesive pulp layer is prepared:
2.1) high resiliency asphalt binder is prepared;
2.1.1) 110# matrix pitch is heated to 175 DEG C ~ 185 DEG C;
2.1.2) rubber powder adds: under the conditions of 175 DEG C ~ 185 DEG C, rubber powder is added step 2.1.1) in heating after 110# matrix pitch in, use emulsification pretreatment machine to carry out high speed shear, under conditions of shear rate is 3000r/min, stirs 60min, obtains the 5th compound;
2.1.3) kir adds: the temperature of the 5th compound is maintained at 180 DEG C ~ 190 DEG C, in step 2.1.2) the 5th compound for preparing adds kir, the stirring instrument stirring of electrodeless constant speed is used under conditions of 180 DEG C ~ 190 DEG C, stir speed (S.S.) is 2000r/min, and stirring 20min obtains the 6th compound;
2.1.4) SBS adds: under conditions of 180 DEG C ~ 190 DEG C, SBS is joined step 2.1.3) in the 6th compound for preparing, use emulsification pretreatment machine to carry out high speed shear, under conditions of shear rate is 5000r/min, stirs 15min, obtains seven compounds;
2.1.5) epoxy resin adds: under the conditions of 180 DEG C ~ 190 DEG C, epoxy resin is joined step 2.1.4) in the 7th compound for preparing, use emulsification pretreatment machine to carry out high speed shear, under conditions of shear rate is 5000r/min, stirs 20min, obtains the 8th compound;
2.1.6) stabilizer adds: under the conditions of 180 DEG C ~ 190 DEG C, stabilizer is joined step 2.1.5) in the 8th compound for preparing, use emulsification pretreatment machine to carry out high speed shear, under conditions of shear rate is 5000r/min, stirs 15min, obtains the 9th compound;
2.1.7) compatilizer adds: under the conditions of 180 DEG C ~ 190 DEG C, compatilizer is joined step 2.1.6) in the 9th compound, emulsification pretreatment machine is used to carry out high speed shear, 15min is stirred under conditions of shear rate is 5000r/min, then use electrodeless constant speed stirring instrument under conditions of stir speed (S.S.) is 1000r/min, stirring 30min, obtains high resiliency asphalt binder;
2.2) by step 2.1) the high resiliency asphalt binder for preparing is heated to 180 DEG C ~ 190 DEG C, fine aggregate is heated to 180 DEG C ~ 190 DEG C, polyester fiber is joined in fine aggregate and mix and stir 30s, it is subsequently adding lignin fibre and mixes and stirs 1min, it is subsequently adding high resiliency asphalt binder and mixes and stirs 1min, it is subsequently adding breeze and mixes and stirs 1min, obtain high resiliency asphalt adhesive pulp layer;The high resiliency asphalt adhesive pulp layer prepared is incubated under conditions of 180 DEG C ~ 190 DEG C;
3) double-layer stress absorption band is prepared
3.1) at the seam of Deteriorated concrete pavement plate and/or the gap in crack, step 1.1 is poured into) the stress absorption asphalt binder for preparing, after gap is filled and led up, dispensing stress absorption asphalt adhesive pulp layer in the range of the wide 0.3 ~ 0.4m of seam and fracture faces, the thickness of described stress absorption asphalt adhesive pulp layer is 3mm;
3.2) upper surface in stress absorption asphalt adhesive pulp layer lays the bottom Fibergrass polyester mat with stress absorption asphalt adhesive pulp layer respective width, utilizes small-sized rolling apparatus to roll at the upper surface of bottom Fibergrass polyester mat, forms ground floor stress absorption band;Small-sized rolling apparatus is when the upper surface of bottom Fibergrass polyester mat rolls, and the temperature of stress absorption asphalt adhesive pulp layer is not less than 150 DEG C;
3.3) upper surface at ground floor stress absorption band continues to dispense the high resiliency asphalt adhesive pulp layer with stress absorption asphalt adhesive pulp layer respective width, and the thickness of described high resiliency asphalt adhesive pulp layer is 3mm;
3.4) upper surface in high resiliency asphalt adhesive pulp layer lays the top Fibergrass polyester mat with high resiliency asphalt adhesive pulp layer respective width, utilizes small-sized rolling apparatus to roll at the upper surface of top Fibergrass polyester mat, forms second layer stress absorption band;Small-sized rolling apparatus is when the upper surface of top Fibergrass polyester mat rolls, and the temperature of high resiliency asphalt adhesive pulp layer should be not less than 170 DEG C.
CN201610362684.9A 2016-05-26 2016-05-26 A kind of double-layer stress absorption band and preparation method thereof Active CN105862544B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610362684.9A CN105862544B (en) 2016-05-26 2016-05-26 A kind of double-layer stress absorption band and preparation method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610362684.9A CN105862544B (en) 2016-05-26 2016-05-26 A kind of double-layer stress absorption band and preparation method thereof

Publications (2)

Publication Number Publication Date
CN105862544A true CN105862544A (en) 2016-08-17
CN105862544B CN105862544B (en) 2018-03-02

Family

ID=56641553

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610362684.9A Active CN105862544B (en) 2016-05-26 2016-05-26 A kind of double-layer stress absorption band and preparation method thereof

Country Status (1)

Country Link
CN (1) CN105862544B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107270986A (en) * 2017-07-06 2017-10-20 张仲来 A kind of anti-crack water gauge shell structure
CN110965422A (en) * 2019-12-13 2020-04-07 江苏中路工程技术研究院有限公司 Flexible splicing paving structure and construction method thereof

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN204898456U (en) * 2015-09-02 2015-12-23 南京同安道路工程有限公司 Asphalt pavement containing rubber asphalt stress absorbing layer
CN205839518U (en) * 2016-05-26 2016-12-28 山西省交通科学研究院 A kind of double-layer stress absorption band

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN204898456U (en) * 2015-09-02 2015-12-23 南京同安道路工程有限公司 Asphalt pavement containing rubber asphalt stress absorbing layer
CN205839518U (en) * 2016-05-26 2016-12-28 山西省交通科学研究院 A kind of double-layer stress absorption band

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
刘大梁等: ""有机化蒙脱土改善SBS改性沥青性能的研究"", 《建筑材料学报》 *
王慧等: ""高弹性橡胶玛蹄脂应力吸收带的抗反射裂缝疲劳性能研究"", 《武汉理工大学学报》 *
郜业强等: ""半刚性路边反射裂缝的应力吸收复合夹层防治技术研究"", 《交通科技》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107270986A (en) * 2017-07-06 2017-10-20 张仲来 A kind of anti-crack water gauge shell structure
CN110965422A (en) * 2019-12-13 2020-04-07 江苏中路工程技术研究院有限公司 Flexible splicing paving structure and construction method thereof
CN110965422B (en) * 2019-12-13 2021-11-05 江苏中路工程技术研究院有限公司 Flexible splicing paving structure and construction method thereof

Also Published As

Publication number Publication date
CN105862544B (en) 2018-03-02

Similar Documents

Publication Publication Date Title
CN103952958B (en) A kind of town road rut maintenance method for paving
CN105803885A (en) Rubber modified asphalt fiber chip seal and pavement method thereof
CN105924988A (en) Wheel-sticking-free emulsified asphalt, preparing method, construction technology and application of wheel-sticking-free emulsified asphalt
CN206736657U (en) A kind of cracking resistance rubber asphalt composite seal coat
CN106587744B (en) A kind of CPC-AC composite pavement Fiber Asphalt Mixture and preparation method thereof
CN103469714A (en) Ultra-thin wearing course and construction method thereof
CN105586819B (en) A kind of bituminous paving stress reflexion crack patching material and method for repairing and mending
CN105802267A (en) Wheel non-stick emulsified asphalt as well as preparation method, construction technology and application thereof
CN106046809A (en) Asphalt concrete for ultra-thin wearing course with easily-compactable skeleton and thickness of 1 to 1.5 cm
CN207685618U (en) A kind of Old cement concrete transform asphalt pavement structure as
CN105862544A (en) Two-layer stress absorption band and preparation method thereof
CN103540147A (en) High-strength and anti-stripping elastomer modified asphalt waterproof coiled material and production process
CN109736161A (en) A kind of composite construction Sub-sealing Course for the road face between the cement road face on airport and semi-rigid type base
CN107419635A (en) A kind of composite pavement sealing method
CN205501757U (en) Asphalt pavement
CN110284390A (en) A kind of asphalt pavement structure and its method for paving for city tunnel deformation joint
CN205917559U (en) Anti type road surface structure of splitting suitable for semi rigid base course
CN103334364B (en) Micro-table pavement structure and micro-table pavement construction method
CN213625024U (en) Cold regeneration road surface structure of emulsified asphalt
CN205839518U (en) A kind of double-layer stress absorption band
CN105755922A (en) Asphalt pavement and construction method thereof
CN108468280A (en) Old bridge floor repair materials height glues mute micro-surface area superthin layer and its application method
CN208917613U (en) A kind of white based on polymer modified asphalt changes black pavement structure
CN104233918B (en) Large-particle-size rubber block modified asphalt mastic macadam seal and manufacturing method thereof
CN215051920U (en) Anti-reflection crack additional paving structure for old asphalt pavement of airport runway

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant