CN105861770A - Injection tank pressure relief device for blast furnace coal injection system - Google Patents

Injection tank pressure relief device for blast furnace coal injection system Download PDF

Info

Publication number
CN105861770A
CN105861770A CN201610428523.5A CN201610428523A CN105861770A CN 105861770 A CN105861770 A CN 105861770A CN 201610428523 A CN201610428523 A CN 201610428523A CN 105861770 A CN105861770 A CN 105861770A
Authority
CN
China
Prior art keywords
pressure
pressure relief
valve
injection system
main exhaust
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610428523.5A
Other languages
Chinese (zh)
Inventor
周飞
俞金城
孙刘恒
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huatian Engineering and Technology Corp MCC
Original Assignee
Huatian Engineering and Technology Corp MCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huatian Engineering and Technology Corp MCC filed Critical Huatian Engineering and Technology Corp MCC
Priority to CN201610428523.5A priority Critical patent/CN105861770A/en
Publication of CN105861770A publication Critical patent/CN105861770A/en
Pending legal-status Critical Current

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21BMANUFACTURE OF IRON OR STEEL
    • C21B5/00Making pig-iron in the blast furnace
    • C21B5/001Injecting additional fuel or reducing agents
    • C21B5/003Injection of pulverulent coal
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21BMANUFACTURE OF IRON OR STEEL
    • C21B7/00Blast furnaces
    • C21B7/16Tuyéres

Abstract

The invention discloses an injection tank pressure relief device for a blast furnace coal injection system, and provides an injection tank pressure relief device with a good sealing property for the blast furnace coal injection system mainly for the problem that an existing blast furnace coal injection system is poor in sealing property. The injection tank pressure relief device comprises pressure relief pipelines, a bag-type powder collector and an air exhaust unit, an inlet and an outlet of each pressure relief pipeline are communicated with an injection tank and a dust hopper on the lower portion of the bag-type powder collector respectively, each pressure relief pipeline is provided with a pressure relief valve group, and an air outlet of the bag-type powder collector is communicated with the air exhaust unit. According to the injection tank pressure relief device for the blast furnace coal injection system, a bunker top dust remover does not need to be arranged on a coal powder bunker, therefore, the top of the coal powder bunker is completely sealed, air is prevented from entering the coal powder bunker, and extremely low oxygen content in the coal powder bunker is maintained.

Description

Bf coal injection system winding-up tank pressure relief device
Technical field
The present invention relates to a kind of bf coal injection system winding-up tank pressure relief device.
Background technology
In modern blast furnace ironmaking technology, pulverized coal injection in blast furnace is one of its energy-saving and cost-reducing important means, is also One of requisite technology of modern blast furnace.In conventional design, the relief pipeline of pulverized coal injection winding-up tank All it is directly accessed in Pulverized Coal Bin, a roof scrubber is set in this Pulverized Coal Bin simultaneously, for jetting tank Pressure release, purging.But in actual production, on the one hand the most usually because the tightness of this roof scrubber equipment not Foot causes the oxygen content in Pulverized Coal Bin higher, especially for when producing mixed coal, brings to normal production Potential safety hazard, on the other hand because the fault rate of this equipment is higher, repair and maintenance difficulty is big, has a strong impact on Normal production.
Additionally, for the setting of relief valve valve, Chinese patent CN201545860U on winding-up tank relief pipeline Disclose a kind of relief valve and the pressure release mode of restriction orifice (group), and in its bypass, be provided with pressure release tune Joint valve, in relief pipeline accesses Pulverized Coal Bin the most at last, the venting duration of this pressure release mode is longer, causes spray Blowing tank tank switching cycle stretch-out, the operation to large-blowing coal is unfavorable.Another way is only to arrange a relief valve, The speed when high pressure relief, relatively big to the impact of coal dust in Pulverized Coal Bin, roof scrubber is operated at full capacity, Often there will be coal dust to be discharged, dust removing effects is the best, also the most unfavorable to safety in production.
Summary of the invention
For the problems referred to above, the present invention provides the bf coal injection system winding-up tank pressure release of a kind of favorable sealing property Device.
For reaching above-mentioned purpose, bf coal injection system of the present invention winding-up tank pressure relief device, including pressure relief pipe, Bladder type powder recepting device and air draft unit, the entrance and exit of described pressure relief pipe respectively with winding-up tank and described pocket type Powder collector connects, and described pressure relief pipe is provided with relief valve group;Described bladder type powder recepting device and described exhaust blower Group connection.
Further, described relief valve group includes high-pressure decompression valve and low-voltage decompression valve, described high-pressure decompression valve In parallel with described low-voltage decompression valve.
Further, described air draft unit includes main exhaust fan and the pressure release blower fan being connected in parallel in pipeline, described The entrance of main exhaust fan is provided with valve, and outlet and the entrance of described pressure release blower fan are provided with valve.
Further, described air draft unit includes main exhaust fan and pressure release blower fan, described main exhaust fan and described The outlet of pressure release blower fan and atmosphere, the entrance of described main exhaust fan and described pressure release blower fan is provided with valve Door.
Filter mechanism that further, described pressure relief pipe includes being successively set on pipeline along airflow direction, First metal hose, relief valve group and the second metal hose.
Further, pressure measuring device, described pressure measuring device and control it are provided with in described winding-up tank Device communication connects, and the pressure signal that described controller transmits according to pressure measuring device controls described relief valve group.
Specifically, described main exhaust fan is provided with the monitor of monitoring main exhaust fan duty, described inspection Survey device to be connected with controller communication, the duty of the main exhaust fan that described controller monitors according to monitor Control the valve of main exhaust fan entrance, pressure release blower fan and the valve of pressure release blower fan entry and exit.
Need not arrange roof scrubber in the Pulverized Coal Bin of bf coal injection system of the present invention winding-up tank pressure relief device, So, whole Pulverized Coal Bin is exactly the equipment of an integral sealing, therefore, does not haves outside air and enters coal The situation of powder cabin, therefore, the oxygen content in the Pulverized Coal Bin of the present invention can be maintained at an extremely low ratio, Do not have danger.
The winding-up tank of bf coal injection system of the present invention winding-up tank pressure relief device is by pipeline with bladder type powder recepting device even Logical, bladder type powder recepting device connects with air draft unit, the outwardly air draft of air draft unit, and air will not pass through exhaust blower Group is back to bladder type powder recepting device, it is ensured that whole coal injection system has a relatively low oxygen content.
Bf coal injection system of the present invention winding-up tank pressure relief device takes full advantage of existing equipment, the investment of reconstruction Few, and, bf coal injection system of the present invention winding-up tank pressure relief device compact conformation, occupy little space.
Accompanying drawing explanation
Fig. 1 is bf coal injection system of the present invention winding-up tank pressure relief device.
Detailed description of the invention
Below in conjunction with Figure of description, the present invention will be further described.
Embodiment 1
As it is shown in figure 1, the present embodiment bf coal injection system winding-up tank pressure relief device, including pressure relief pipe 6, Bladder type powder recepting device 3 and air draft unit, the entrance and exit of described pressure relief pipe 6 respectively with winding-up tank 11,12 Connect with described bladder type powder recepting device 3, described pressure relief pipe 6 is provided with relief valve group, described relief valve group Including a relief valve;Described bladder type powder recepting device 3 connects with described air draft unit, and described air draft unit includes The main exhaust fan 4 being connected in parallel in pipeline and pressure release blower fan 5, the entrance of described main exhaust fan 4 is provided with valve, The outlet of described pressure release blower fan 5 and entrance are provided with valve 106,107.
Being provided with pressure measuring device in described winding-up tank 11,12, described pressure measuring device leads to controller News connect, and the pressure signal that described controller transmits according to pressure measuring device controls described relief valve group.
The monitor of monitoring main exhaust fan 4 duty, described detector it is provided with on described main exhaust fan 4 It is connected with controller communication, the duty control of the main exhaust fan 4 that described controller monitors according to monitor The valve 106,107 of the valve of main exhaust fan 4 entrance processed, pressure release blower fan 5 and pressure release blower fan 5 entry and exit.
The duty of the bf coal injection system winding-up tank pressure relief device of the present embodiment includes the following two kinds:
When pulverized coal preparation system is in and normally produces, keep main exhaust fan 4 normally to work, pressure release blower fan 5 is closed Close, after valve 106,107 before and after pressure release blower fan 5 closes, open relief valve, until winding-up tank 11,12 Interior pressure release is complete, subsequently enters filling puffing powder program, closes relief valve after powder to be installed.
When pulverized coal preparation system is not in production status, close the valve of main exhaust fan 4 import department, open pressure release Valve 106,107 before and after blower fan 5, opens pressure release blower fan 5, is then turned on relief valve, until winding-up tank 11,12 enter filling puffing powder program, close relief valve after powder to be installed, close pressure release wind the most successively Machine 5, valve 106 and valve 107.
Which kind of duty no matter above two duty it can be seen that be in, to winding-up tank 11,12 When carrying out pressure release, all bladder type powder recepting device 3 can be made to be in by the work of pressure release blower fan 5 or main exhaust fan 4 micro- The state of negative pressure, but, due to main exhaust fan 4 or the effect of pressure release blower fan 5, do not result in air along The situation of pipeline backflow, therefore, will not circulate with outside air in the space in bladder type powder recepting device 3.
Bf coal injection system winding-up tank pressure relief device Pulverized Coal Bin 2 top of the present invention need not arrange storehouse top dedusting Device, is set to Pulverized Coal Bin 2 top the most airtight top, so, Pulverized Coal Bin 2 is greatly improved Sealing property, effectively control the oxygen content in Pulverized Coal Bin 2, carry for injecting mixed coal and safety in production Supply favourable guarantee.
In the present embodiment, relief pipeline end accesses bag filter ash bucket, it is to avoid because winding-up tank 11,12 is let out Press and the impact of coal dust in Pulverized Coal Bin 2 is caused industrial accident.
In the present embodiment, the valve of pressure release blower fan 5 and main exhaust fan 4 porch is used for controlling pressure release blower fan 5 With whether connecting of main exhaust fan 4, and the blower fan in pressure release blower fan 5 exit, then it is owing to avoiding main air draft The air-flow that machine semi-finals is big produces impact to pressure release blower fan 5 bearing, it also avoid simultaneously and works at main exhaust fan 4 Time the gas discharged carry dust and enter in pressure release blower fan 5, accumulate dust in causing pressure release blower fan 5.
Certainly, when pulverized coal preparation system is under non-production status, if pressure release blower fan 5 breaks down, it is possible to With the valve 106,107 before and after closedown pressure release blower fan 5, open main exhaust fan 4 and carry out air draft.
Embodiment 2
As it is shown in figure 1, the present embodiment bf coal injection system winding-up tank pressure relief device, including pressure relief pipe 6, Bladder type powder recepting device 3 and air draft unit, the entrance and exit of described pressure relief pipe 6 respectively with winding-up tank 11,12 Connect with described bladder type powder recepting device 3, described pressure relief pipe 6 is provided with relief valve group, described relief valve group Including high-pressure decompression valve 103 and low-voltage decompression valve 104, described high-pressure decompression valve 103 and described low-voltage decompression valve 104 is in parallel;Described bladder type powder recepting device 3 connects with described air draft unit, and described air draft unit includes main exhaust fan 4 and pressure release blower fan 5, described main exhaust fan 4 and the outlet of described pressure release blower fan 5 and atmosphere, described master The entrance of exhaust blower 4 and described pressure release blower fan 5 is provided with valve 106,107.
Being provided with pressure measuring device in described winding-up tank 11,12, described pressure measuring device leads to controller News connect, and the pressure signal that described controller transmits according to pressure measuring device controls described relief valve group.
The monitor of monitoring main exhaust fan 4 duty, described detector it is provided with on described main exhaust fan 4 It is connected with controller communication, the duty control of the main exhaust fan 4 that described controller monitors according to monitor The valve 106,107 of the valve of main exhaust fan 4 entrance processed, pressure release blower fan 5 and pressure release blower fan 5 entry and exit.
The bf coal injection system winding-up tank pressure relief device of the present embodiment has two kinds of duties:
When pulverized coal preparation system normally produces, keep main exhaust fan 4 normally work, close pressure release blower fan 5 and Valve 106,107 before and after pressure release blower fan 5, opens high-pressure decompression valve 103, when letting out in winding-up tank 11,12 Low-voltage decompression valve 104 is opened, until pressure release is complete, with laggard in winding-up tank 11,12 when being pressed onto setting pressure Enter filling puffing powder program, after powder to be installed, simultaneously close off high-pressure decompression valve 103 and low-voltage decompression valve 104.
When pulverized coal preparation system is not in production status, close main exhaust fan 4, open the valve before and after pressure release blower fan 5 Door 106,107, opens pressure release blower fan 5, is then turned on high-pressure decompression valve 103, when in winding-up tank 11,12 Pressure release opens low-voltage decompression valve 104 to when setting pressure, until winding-up tank 11,12 enters filling puffing powder journey Sequence, simultaneously closes off high-pressure decompression valve 103 and low-voltage decompression valve 104, closes the most successively and let out after powder to be installed Pressure fan 5, valve 106 and valve 107.
The present embodiment is arranged in parallel high-pressure decompression valve 103 and low-voltage decompression valve 104, is conducive to tank of jetting 11, the quick pressure releasing of 12, shortens the tank switching cycle, and the large-blowing coal for blast furnace provides the time to ensure;
Pressure release blower fan 5 and main exhaust fan 4 are divided into two-way by the present embodiment, directly empty, so, and pressure release wind The work of machine 5 and main exhaust fan 4 is independent of each other, and also allows for maintenance.
Certainly, during in the present embodiment, the plan of establishment of air draft unit can also be applied to embodiment 1, and implement The plan of establishment of the air draft unit in example 1 can also be applied in the present embodiment.
Embodiment 3
On the basis of above-described embodiment, pressure relief pipe 6 described in the present embodiment includes along airflow direction successively Filter mechanism the 101, first metal hose 102, relief valve group and the second metal hose 105 being arranged on pipeline.
Due to winding-up tank 11,12 need weigh, in the present embodiment, by pressure relief pipe 6 near winding-up tank 11, one end of 12 arranges the first metal hose 102, uses connection by metal hose, claims winding-up tank 11,12 The impact of weight is very little, it is ensured that the title of winding-up tank 11,12 is not affected by relief pipeline and equipment, has It is beneficial to being precisely controlled of winding-up process;
Vibration operationally can be produced due to bladder type powder recepting device 3, in long vibration processes, connected Pipeline is susceptible to fatigue rupture, therefore, for the service life of extension device, by close for pressure relief pipe 6 One end of bladder type powder recepting device 3 arranges the second metal hose 105;
Further, since be the mixture of gas and powder in winding-up tank 11,12, when pressure release, if do not entered Row processes, and by pressure relief pipe 6 also can be the mixture of gas and powder, and this mixture passes through pipeline Time, pipeline is produced and washes away, cause the abrasion of pipeline, therefore, embodiment own is provided with filter mechanism 101 Setting, decrease in high-low pressure pressure leak process and because dust content is too high, pipeline washed away, extend pipeline Service life.
Above, only presently preferred embodiments of the present invention, but protection scope of the present invention is not limited thereto, and appoints How those familiar with the art is in the technical scope that the invention discloses, the change that can readily occur in Or replace, all should contain within protection scope of the present invention.Therefore, protection scope of the present invention should be with The protection domain that claim is defined is as the criterion.

Claims (7)

1. a bf coal injection system winding-up tank pressure relief device, including pressure relief pipe, bladder type powder recepting device and air draft Unit, it is characterised in that: the entrance and exit of described pressure relief pipe respectively with winding-up tank and described bladder type powder recepting Device connects, and described pressure relief pipe is provided with relief valve group;Described bladder type powder recepting device is with described air draft unit even Logical.
2. bf coal injection system winding-up tank pressure relief device as claimed in claim 1, it is characterised in that let out described in: Pressure valve group includes that high-pressure decompression valve and low-voltage decompression valve, described high-pressure decompression valve and described low-voltage decompression valve are in parallel.
3. bf coal injection system winding-up tank pressure relief device as claimed in claim 1, it is characterised in that: described row Blower fan group includes main exhaust fan and the pressure release blower fan being connected in parallel in pipeline, and the entrance of described main exhaust fan is provided with Valve, outlet and the entrance of described pressure release blower fan are provided with valve.
4. bf coal injection system winding-up tank pressure relief device as claimed in claim 1, it is characterised in that: described row Blower fan group includes main exhaust fan and pressure release blower fan, described main exhaust fan and the outlet of described pressure release blower fan and air Connection, the entrance of described main exhaust fan and described pressure release blower fan is provided with valve.
5. bf coal injection system winding-up tank pressure relief device as claimed in claim 1, it is characterised in that let out described in: Filter mechanism that pressure pipe road includes being successively set on pipeline along airflow direction, the first metal hose, relief valve Group and the second metal hose.
6. bf coal injection system winding-up tank pressure relief device as claimed in claim 1, it is characterised in that: described spray Being provided with pressure measuring device in blowing tank, described pressure measuring device is connected with controller communication, described control The pressure signal that device transmits according to pressure measuring device controls described relief valve group.
7. bf coal injection system winding-up tank pressure relief device as described in claim 3 or 4, it is characterised in that: institute Stating the monitor being provided with monitoring main exhaust fan duty on main exhaust fan, described detector leads to controller News connect, and the working state control main exhaust fan of the main exhaust fan that described controller monitors according to monitor enters Valve, pressure release blower fan and the valve of pressure release blower fan entry and exit of mouth.
CN201610428523.5A 2016-06-15 2016-06-15 Injection tank pressure relief device for blast furnace coal injection system Pending CN105861770A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610428523.5A CN105861770A (en) 2016-06-15 2016-06-15 Injection tank pressure relief device for blast furnace coal injection system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610428523.5A CN105861770A (en) 2016-06-15 2016-06-15 Injection tank pressure relief device for blast furnace coal injection system

Publications (1)

Publication Number Publication Date
CN105861770A true CN105861770A (en) 2016-08-17

Family

ID=56650702

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610428523.5A Pending CN105861770A (en) 2016-06-15 2016-06-15 Injection tank pressure relief device for blast furnace coal injection system

Country Status (1)

Country Link
CN (1) CN105861770A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110724777A (en) * 2019-11-18 2020-01-24 大峘集团有限公司 Coal powder injection tank pressure relief system and working method thereof
CN111500805A (en) * 2020-05-09 2020-08-07 中冶华天工程技术有限公司 Novel coal injection tank for blast furnace

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105624351A (en) * 2016-03-17 2016-06-01 中冶华天南京工程技术有限公司 Pulverized coal jetting, pressure releasing and powder returning technology and system
CN205893304U (en) * 2016-06-15 2017-01-18 中冶华天南京工程技术有限公司 Blast furnace coal injection system jetting jar pressure relief device

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105624351A (en) * 2016-03-17 2016-06-01 中冶华天南京工程技术有限公司 Pulverized coal jetting, pressure releasing and powder returning technology and system
CN205893304U (en) * 2016-06-15 2017-01-18 中冶华天南京工程技术有限公司 Blast furnace coal injection system jetting jar pressure relief device

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
金艳娟: "《高炉喷煤技术》", 31 March 2005, 冶金工业出版社 *
项钟庸: "《炼铁工艺设计理论与实践》", 30 November 2007, 冶金工业出版社 *
首钢钢铁研究所: "《高炉喷吹煤粉技术文集》", 30 November 1994 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110724777A (en) * 2019-11-18 2020-01-24 大峘集团有限公司 Coal powder injection tank pressure relief system and working method thereof
CN111500805A (en) * 2020-05-09 2020-08-07 中冶华天工程技术有限公司 Novel coal injection tank for blast furnace
CN111500805B (en) * 2020-05-09 2021-11-19 中冶华天工程技术有限公司 Blast furnace coal injection tank

Similar Documents

Publication Publication Date Title
CA2755863C (en) Method for feeding a burden to a blast furnace
CN105861770A (en) Injection tank pressure relief device for blast furnace coal injection system
CN202575416U (en) Pneumatic transmission and blast furnace injection device for coke oven fly ash
CN205893304U (en) Blast furnace coal injection system jetting jar pressure relief device
CN103057862A (en) Storage and discharge device for dust transfer and application method thereof
CN209481707U (en) A kind of blast furnace roof presses coal gas circulation and stress device
CN109234482A (en) A kind of full recovery system of furnace top material tank for blast furnace emission coal gas and its safety inspection method
CN202387562U (en) Dedusting and ash-conveying device of sintering machine head
CN112963734A (en) Hydrogenation station gas column system that unloads
CN205652833U (en) Pneumatic conveyor
CN109234481A (en) A kind of full recovery method of furnace top material tank for blast furnace emission coal gas and system
CN208632470U (en) A kind of clean type coal gasification system handling waste water
CA2755074C (en) Method for feeding a burden to a blast furnace
CN210114936U (en) On-line ash removal system for activated coke flue gas purification adsorption unit
CN212293632U (en) Blast furnace coal injection pipeline treatment and recovery device
CN207632831U (en) The dustless ash discharging system of converter dry
CN209050609U (en) A kind of sand-blasting machine of complete pneumatic more sand-blasting guns
CN201459172U (en) Pneumatic ash transmission device for dedusting for high furnace gas cloth bag
CN211546587U (en) Blast furnace damping down coal gas recovery system
CN208465883U (en) A kind of dustless automatic charging reactor tank
CN219073850U (en) Air-assisted tank pressure relief air valve dust collection and exhaust system
CN219469985U (en) Positive pressure gas dust remover arranges pressure purifier
CN217707938U (en) Adjustable energy-saving pneumatic conveying system
CN216337755U (en) Safe gas box that diffuses
KR0116083Y1 (en) Device for blind protecter with blast furnace pulverizer coal lance

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20160817

RJ01 Rejection of invention patent application after publication