CN105844417A - Method for constructing long-distance water-conveying engineering operation supervision platform - Google Patents

Method for constructing long-distance water-conveying engineering operation supervision platform Download PDF

Info

Publication number
CN105844417A
CN105844417A CN201610183583.5A CN201610183583A CN105844417A CN 105844417 A CN105844417 A CN 105844417A CN 201610183583 A CN201610183583 A CN 201610183583A CN 105844417 A CN105844417 A CN 105844417A
Authority
CN
China
Prior art keywords
data
time
engineering
pel
axle
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610183583.5A
Other languages
Chinese (zh)
Other versions
CN105844417B (en
Inventor
王军良
张楠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yunhe (Henan) Information Technology Co.,Ltd.
Yellow River Engineering Consulting Co Ltd
Original Assignee
Yellow River Engineering Consulting Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yellow River Engineering Consulting Co Ltd filed Critical Yellow River Engineering Consulting Co Ltd
Priority to CN201610183583.5A priority Critical patent/CN105844417B/en
Publication of CN105844417A publication Critical patent/CN105844417A/en
Application granted granted Critical
Publication of CN105844417B publication Critical patent/CN105844417B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Economics (AREA)
  • Strategic Management (AREA)
  • Theoretical Computer Science (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Health & Medical Sciences (AREA)
  • Marketing (AREA)
  • General Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • Public Health (AREA)
  • Primary Health Care (AREA)
  • Water Supply & Treatment (AREA)
  • Development Economics (AREA)
  • Educational Administration (AREA)
  • General Health & Medical Sciences (AREA)
  • Game Theory and Decision Science (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Testing And Monitoring For Control Systems (AREA)

Abstract

The invention discloses a method for constructing a long-distance water-conveying engineering operation supervision platform. The method includes the steps of building a platform space system, preparing engineering basic data, establishing programmable primitives driven by engineering data, developing real-time data interfaces, displaying the water conveying state, and creating a time dragging axis. Digital generalization of hydraulic engineering of all types is made according to multiple years of practical experience and actual needs to form simple, elegant and data driving programmable primitives, and real-time drafting is conducted according to actual pile numbers, engineering design parameters and real-time conveying data to form a clear and accurate scheduling operation dynamic graph. A user can directly know the entire water conveying operation state from a global point of view, thereby effectively improving technical level of scheduling operation management.

Description

The building method of long distance water transfer project operation monitoring platform
Technical field
The present invention relates to long distance water transfer project operation monitoring platform, especially relate to the building method of long distance water transfer project operation monitoring platform.
Background technology
The operation monitoring visualization of long distance water transfer project is the important component part of water regulation.Due to factors such as its data message amount are big, data association is strong, it tends to be difficult to give expression to the logical relation between data comprehensively, intuitively.Such as use the chart such as broken line graph, cake chart, be only applicable to the logical relation performance of single data type, and existing solution is generally with the two-dimension GIS (abbreviation of English Geographic Information Systems;GIS-Geographic Information System) based on platform, by the way of vector marks, show relevant information.One open defect of this scheme is just the absence of globality, it is difficult to can be visually seen the mutual relation between each project data.
Summary of the invention
Present invention aim at providing the building method of a kind of long distance water transfer project operation monitoring platform.
For achieving the above object, the present invention takes following technical proposals:
The building method of long distance water transfer project operation monitoring platform of the present invention, comprises the steps:
One, platform space system is created
With the pile No. of water delivery engineering as abscissa, the height above sea level of described pile No. as vertical coordinate, create planar display interface;Display interface possesses to zoom in and out and automatically adjust and adapts to and laterally pull, to control the platform space system of display engineering completely;
Two, engineering foundation data prepare
The all types of hydraulic engineerings of long distance water transfer project are carried out numeral generalization according to engineering operation feature, forms programmable pel succinct, by data-driven;The data form of various water delivery engineerings is provided by described platform space system, prepares basic data according to water delivery engineering practical situation, build water delivery engineering environment;
Three, the programmable pel that project data drives is set up
Described pel is programmed by classification, sets up the function Ti=Fi(X of input data X and pel display state T), wherein: i is control unit, Fi(X) it is pel function of state;Being designed to the water body between each control engineering, each control engineering, bleeder door one programmable pel, and each pel carries out Unified coding, each pel gives the abbreviation of a data encoding ID(English IDentity, identity number);Each pel its state when receiving different input data changes therewith;
Four, exploitation Real-time data interface
Extract the data encoding ID dynamically changing pel, set up structural data interface and interface function, for accepting the calculating data of real-time data collection and scheduling scheme the most in the same time;
The displaying of five, water delivery state
Under described platform space system, by GPU(graphic process unit;The abbreviation of English Graphics Processing Unit) Synchronization Control of programming realization pel, the input data that all fronts engineering operation status information Batch conversion is pel able to programme that information monitoring system is sent, by data-driven pel state, it is achieved show the running status of engineering completely;
Six, the time that creates drags axle
The time that creates in described platform space system drags axle, dynamically controls the DS of dynamically change, it is achieved the analog simulation to long distance water transfer process;Platform space system interface shows current point in time, drags the axle display engineering state at current point in time by the time described in dragging;It is in real time display that the time arranged drags axle, the most back drags playback history data, or to arrange time dragging axle be some time period, thus checks a certain section of historical data or the analog data of scheme;When automatic reproduction time drags axle by automatic demonstrating engineering in the change of this time period, form the management and running animation of dynamically change;By using the time to drag axle, platform space system possesses the expressive ability that multidimensional is spanning space-time.
All types of hydraulic engineerings, based on years'experiences and actual demand, are carried out numeral generalization according to engineering operation feature by the present invention, form programmable pel the most graceful, by data-driven;Real-time rendering is carried out according to actual pile No., parameters of engineering design and real-time transmission data, form the clear management and running Dynamic Graph accurately of a width, allow users to hold from the overall situation the most intuitively the running status of whole water delivery line, thus be effectively improved the technical merit of power dispatch system operation and management.
Concrete real-time mode
The building method of long distance water transfer project operation monitoring platform of the present invention, comprises the steps:
One, platform space system is created
With the pile No. of water delivery engineering as abscissa, the height above sea level of described pile No. as vertical coordinate, create planar display interface;Display interface possesses to zoom in and out and automatically adjust and adapts to and laterally pull, to control the platform space system of display engineering completely;
Two, engineering foundation data prepare
The all types of hydraulic engineerings of long distance water transfer project are carried out numeral generalization according to engineering operation feature, forms programmable pel succinct, by data-driven;The data form of various water delivery engineerings is provided by described platform space system, prepares basic data according to water delivery engineering practical situation, build water delivery engineering environment;
Three, the programmable pel that project data drives is set up
Described pel is programmed by classification, sets up the function Ti=Fi(X of input data X and pel display state T), wherein: i is control unit, Fi(X) it is pel function of state;Being designed to the water body between each control engineering, each control engineering, bleeder door one programmable pel, and each pel carries out Unified coding, each pel gives the abbreviation of a data encoding ID(English IDentity, identity number);Each pel its state when receiving different input data changes therewith;
Four, exploitation Real-time data interface
Extract the data encoding ID dynamically changing pel, set up structural data interface and interface function, for accepting the calculating data of real-time data collection and scheduling scheme the most in the same time;
The displaying of five, water delivery state
Under described platform space system, by GPU(graphic process unit;The abbreviation of English Graphics Processing Unit) Synchronization Control of programming realization pel, the input data that all fronts engineering operation status information Batch conversion is pel able to programme that information monitoring system is sent, by data-driven pel state, it is achieved show the running status of engineering completely;
Six, the time that creates drags axle
The time that creates in described platform space system drags axle, dynamically controls the DS of dynamically change, it is achieved the analog simulation to long distance water transfer process;Platform space system interface shows current point in time, drags the axle display engineering state at current point in time by the time described in dragging;It is in real time display that the time arranged drags axle, the most back drags playback history data, or to arrange time dragging axle be some time period, thus checks a certain section of historical data or the analog data of scheme;When automatic reproduction time drags axle by automatic demonstrating engineering in the change of this time period, form the management and running animation of dynamically change;By using the time to drag axle, platform space system possesses the expressive ability that multidimensional is spanning space-time.

Claims (1)

1. the building method of a long distance water transfer project operation monitoring platform, it is characterised in that: comprise the steps:
One, platform space system is created
With the pile No. of water delivery engineering as abscissa, the height above sea level of described pile No. as vertical coordinate, create planar display interface;Display interface possesses to zoom in and out and automatically adjust and adapts to and laterally pull, to control the platform space system of display engineering completely;
Two, engineering foundation data prepare
The all types of hydraulic engineerings of long distance water transfer project are carried out numeral generalization according to engineering operation feature, forms the programmable pel by data-driven;The data form of various water delivery engineerings is provided by described platform space system, prepares basic data according to water delivery engineering practical situation, build water delivery engineering environment;
Three, the programmable pel that project data drives is set up
Described pel is programmed by classification, sets up the function Ti=Fi(X of input data X and pel display state T), wherein: i is control unit, Fi(X) it is pel function of state;Being designed to the water body between each control engineering, each control engineering, bleeder door one programmable pel, and each pel carries out Unified coding, each pel gives a data encoding ID;Each pel its state when receiving different input data changes therewith;
Four, exploitation Real-time data interface
Extract the data encoding ID dynamically changing pel, set up structural data interface and interface function, for accepting the calculating data of real-time data collection and scheduling scheme the most in the same time;
The displaying of five, water delivery state
Under described platform space system, by the Synchronization Control of GPU programming realization pel;The input data that all fronts engineering operation status information Batch conversion is pel able to programme sent by information monitoring system, by data-driven pel state, it is achieved show the running status of engineering completely;
Six, the time that creates drags axle
The time that creates in described platform space system drags axle, dynamically controls the DS of dynamically change, it is achieved the analog simulation to long distance water transfer process;Platform space system interface shows current point in time, drags the axle display engineering state at current point in time by the time described in dragging;It is in real time display that the time arranged drags axle, the most back drags playback history data, or to arrange time dragging axle be some time period, thus checks a certain section of historical data or the analog data of scheme;When automatic reproduction time drags axle by automatic demonstrating engineering in the change of this time period, form the management and running animation of dynamically change;By using the time to drag axle, platform space system possesses the expressive ability that multidimensional is spanning space-time.
CN201610183583.5A 2016-03-29 2016-03-29 The building method of long distance water transfer project operation monitoring platform Active CN105844417B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610183583.5A CN105844417B (en) 2016-03-29 2016-03-29 The building method of long distance water transfer project operation monitoring platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610183583.5A CN105844417B (en) 2016-03-29 2016-03-29 The building method of long distance water transfer project operation monitoring platform

Publications (2)

Publication Number Publication Date
CN105844417A true CN105844417A (en) 2016-08-10
CN105844417B CN105844417B (en) 2019-02-22

Family

ID=56584730

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610183583.5A Active CN105844417B (en) 2016-03-29 2016-03-29 The building method of long distance water transfer project operation monitoring platform

Country Status (1)

Country Link
CN (1) CN105844417B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110647039A (en) * 2019-10-08 2020-01-03 黄河勘测规划设计研究院有限公司 Synchronous control self-adaptive balance scheduling method for long-distance open channel water delivery project

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104166697A (en) * 2014-08-04 2014-11-26 上海国际航运服务中心开发有限公司 Three-dimensional interactive navigation lock monitoring system

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104166697A (en) * 2014-08-04 2014-11-26 上海国际航运服务中心开发有限公司 Three-dimensional interactive navigation lock monitoring system

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
赵令剑: "大伙房输水工程视频监控系统的高清化改造", 《黑龙江水利科技》 *
黄少华 等: "基于GIS的大型人工输水渠道供水调度管理系统", 《南水北调与水利科技》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110647039A (en) * 2019-10-08 2020-01-03 黄河勘测规划设计研究院有限公司 Synchronous control self-adaptive balance scheduling method for long-distance open channel water delivery project
CN110647039B (en) * 2019-10-08 2022-03-25 黄河勘测规划设计研究院有限公司 Synchronous control self-adaptive balance scheduling method for long-distance open channel water delivery project

Also Published As

Publication number Publication date
CN105844417B (en) 2019-02-22

Similar Documents

Publication Publication Date Title
CN110008648B (en) Intelligent building site integration implementation method based on BIM model
NZ599412A (en) Traffic signal control system and method
CN108280876A (en) A kind of industrial monitoring system based on dynamic 3 D model scene formula virtual show
CN103970109B (en) Flow reappearing visualization method based on industrial field data under Web environment
Song et al. Project dashboard: Concurrent visual representation method of project metrics on 3D building models
CN105844417A (en) Method for constructing long-distance water-conveying engineering operation supervision platform
CN110991997A (en) BIM technology-based comprehensive pipeline design construction method
CN105900025A (en) Control device, development device, and development program
CN111222234A (en) Pipe network unsteady flow calculation method of pressure-gravity coupling structure
CN113222225A (en) Digital twin system for container terminal
CN101702169A (en) Orthogonal section method and system for evolution analysis of digital shorelines
KR20220107409A (en) A Method for Inspection of Digital Twin-Based AR Water Treatment Facilities and Localization of Solutions
CN104907157A (en) Centralized intelligent crusher cluster control system
Kronberger et al. The Digitalization Journey of the Brage Digital Twin
US11934172B2 (en) Operator console with dynamic future representations for processing equipment
CN102446448A (en) Working condition simulation system of cutter-suction dredger
CN109710959B (en) Numerical simulation method for water resource drainage scheduling water body replacement effect
CN112464332A (en) Regional selective construction control method for prefabricated building
CN105259783A (en) Visual preview system for water-and-power engineering construction process
CN102592001A (en) Flash-based cutter-suction dredger dredging construction simulation system
CN101739858A (en) Multi-channel annular column curtain vignette suction type dredger dredging simulator
CN107885159A (en) A kind of method and system of plane machining path dynamic and visual
Alabi et al. Industry 4.0 and water industry: A South African perspective and readiness
Radić1 et al. TRENDS AND PERSPECTIVES TOWARDS" LEAN INDUSTRY 4.0
CN204044606U (en) A kind of Real Time Production Data in Petrochemical Plant display systems

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 450003 Zhengzhou Jinshui Road, Henan, No. 109

Patentee after: Yellow River Survey Planning and Design Research Institute Co., Ltd.

Address before: 450003 Zhengzhou Jinshui Road, Henan, No. 109

Patentee before: Yellow River Engineering Consulting Co., Ltd.

CP01 Change in the name or title of a patent holder
TR01 Transfer of patent right

Effective date of registration: 20210304

Address after: 450003 No. 109 Jinshui Road, Jinshui District, Henan, Zhengzhou

Patentee after: YELLOW RIVER ENGINEERING CONSULTING Co.,Ltd.

Patentee after: Yunhe (Henan) Information Technology Co.,Ltd.

Address before: 450003 No. 109 Jinshui Road, Henan, Zhengzhou

Patentee before: YELLOW RIVER ENGINEERING CONSULTING Co.,Ltd.

TR01 Transfer of patent right