CN105840185B - A kind of consistent electric field fractured horizontal well Crack Monitoring method - Google Patents

A kind of consistent electric field fractured horizontal well Crack Monitoring method Download PDF

Info

Publication number
CN105840185B
CN105840185B CN201610196964.7A CN201610196964A CN105840185B CN 105840185 B CN105840185 B CN 105840185B CN 201610196964 A CN201610196964 A CN 201610196964A CN 105840185 B CN105840185 B CN 105840185B
Authority
CN
China
Prior art keywords
well
pit shaft
power supply
fracture
crack
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610196964.7A
Other languages
Chinese (zh)
Other versions
CN105840185A (en
Inventor
王爱国
单桂栋
张胜传
余洲
张金成
曾晓辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China National Petroleum Corp
Dagang Oilfield Group Co Ltd
Original Assignee
Dagang Oilfield Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dagang Oilfield Group Co Ltd filed Critical Dagang Oilfield Group Co Ltd
Priority to CN201610196964.7A priority Critical patent/CN105840185B/en
Publication of CN105840185A publication Critical patent/CN105840185A/en
Application granted granted Critical
Publication of CN105840185B publication Critical patent/CN105840185B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B47/00Survey of boreholes or wells
    • E21B47/10Locating fluid leaks, intrusions or movements
    • E21B47/113Locating fluid leaks, intrusions or movements using electrical indications; using light radiations
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/25Methods for stimulating production
    • E21B43/26Methods for stimulating production by forming crevices or fractures

Abstract

The present invention provides a kind of consistent electric field fractured horizontal well Crack Monitoring methods, include the following steps: step 1, by charging system in pressing crack construction well power supply pit shaft A and fracturing fluid be filled with positive charge, to distance power supply pit shaft A 1000m or more the negatively charged lotus of power supply pit shaft B with casing;Step 2, the point information of pit shaft potential-measuring electrode and ground survey electrode system is received by receiving system;Wherein the pit shaft potential-measuring electrode is the measuring electrode of terminal potential before the fracturing fracture introduced by signal wire and power supply pit shaft A.Present invention has the advantage that energy real time monitoring fractured horizontal well fracture development process, using well observation system it can measure potential data, interpretation level well and vertical well fracture fracture development overall process, energy accurate judgement fracture initiation point and crack initiation moment, in fracturing process, according to monitoring data, the variation of fracture orientation and length is constantly explained, show fracture development overall process.

Description

A kind of consistent electric field fractured horizontal well Crack Monitoring method
Technical field
The invention belongs to wellfracturing Crack Monitoring method and technology fields, more particularly, to a kind of consistent electric field horizontal well pressure Split Crack Monitoring method.
Background technique
Fracture orientation monitoring is required after the producing well in oil field substantially pressure break, and deep gas well is also required to carry out now Induced fracture monitoring, vertical well fracture Crack Monitoring mainly has potentiometry, micro seismic method and dipmeter method both at home and abroad at present.With surveying It visits development difficulty to increase, be developed especially for the production capacity and shale gas for improving low-permeability oilfield, fractured horizontal well and volume fracturing skill Art is quickly grown, and almost each horizontal well requires carry out pressing crack construction, meanwhile, need to be apparent from horizontal segment pressure break Fracture intensity provides data foundation for the production of subsequent oil field.
Currently, the development of fractured horizontal well fracture monitoring technique falls behind, mainly by development abroad micro seismic method monitoring method, And it is at high cost, field conduct is difficult, and monitoring data point compares diverging, and explanation results are undesirable, cannot distinguish between single crack and net Shape crack.
Potentiometry and dipmeter method can be monitored straight well, but all cannot directly monitor to horizontal well, and now this Two methods and technology are all monitored using ground configuration measuring point merely, can not underground and ground monitor simultaneously, monitoring data do not have There is real-time, can not judge to have monitored knick point and crack initiation time, can only could be monitored when fracturing fracture develops to certain scale To data, and the data monitored all have multi-solution.
Summary of the invention
In view of this, the present invention is directed to propose a kind of consistent electric field fractured horizontal well Crack Monitoring method, energy scene is in real time Level monitoring well and vertical well fracture fracture development process, can monitor fracturing fracture crack initiation point position and crack initiation time, can be in pressure break Each moment monitors fracturing fracture orientation, length and width.
In order to achieve the above objectives, the technical scheme of the present invention is realized as follows:
A kind of consistent electric field fractured horizontal well Crack Monitoring method, includes the following steps:
Step 1, by charging system in pressing crack construction well power supply pit shaft A and fracturing fluid be filled with positive charge, give distance Power supply pit shaft B negatively charged lotus with casing of the power supply pit shaft A in 1000m or more;
Step 2, the point information of pit shaft potential-measuring electrode and ground survey electrode system is received by receiving system;Its Described in pit shaft potential-measuring electrode be by signal wire and power supply pit shaft A introduce fracturing fracture before terminal potential measurement electricity Pole, the ground survey electrode system are laid in earth's surface;
When logging well is fractured horizontal well, the ground survey electrode system refer to by with horizontal segment pit shaft to be measured track The test macro for several measuring points composition that floor projection is laid in parallel;
When logging well is vertical well fracture, the ground survey electrode system refers to centered on straight well wellbore centre, with Annulus or several measuring points laid using wellbore centre as the ray of starting point.
When logging well is Deviated Well Fracturing, the ground survey electrode system, which refers to, to be thrown with pressure break shooting point position on ground Centered on shadow, using annulus or several measuring points laid using wellbore centre as the ray of starting point;
Step 3, the measured value that can be obtained according to step 2 calculates fracture orientation, the length and width at each pressure break moment.
Further, in step 3, pressure break length LtIt is calculated by each moment potential difference, calculation formula are as follows:In formula: M is test point, UMARefer to a certain measuring point M in ground and power supply pit shaft A Between measurement potential difference, LtFor the development length in t moment crack, h is vertical distance of the test point away from crack front;
Using the measurement potential difference between ground measuring point and power supply pit shaft A as ordinate, to be parallel to horizontal well pit shaft water The measuring point point number of flat section floor projection is the test curve figure that abscissa makes several measuring points, and the peak value of the curve at each moment connects Line just specifies the development direction in crack;The spike width of curve i.e. the width of chicken-wire cracking.
Further, the charging system generates the square wave direct current electricity of burning voltage, to power supply pit shaft A and power supply pit shaft B It charges, forms stable charging electric field in power supply process.
Further, when logging well is fractured horizontal well, need to lay 2 or more surveys line, the measuring point number of laying according to Fractured well segment length and perforation number of clusters design;Measuring point spacing is with a distance from general between 2-10m.
Further, when logging well is vertical well fracture or Deviated Well Fracturing, the angle of general two measuring points be 7.5 ° or 48 measuring points or 24 measuring points are arranged on 15 °, that is, each annulus.
Further, the measuring point spacing of the pit shaft potential-measuring electrode and ground survey electrode system is from can be Away from being also possible to Unequal distance.
Compared with the existing technology, present invention has the advantage that
(1) present invention energy real time monitoring fractured horizontal well fracture development process using well observation system can measure Potential data, interpretation level well and vertical well fracture fracture development overall process, energy accurate judgement fracture initiation point and crack initiation moment, In fracturing process, according to monitoring data, constantly explains the variation of fracture orientation and length, show fracture development overall process;
(2) present invention can explain monolete, multiple cracking and region chicken-wire cracking, solve monitored over time oilfield horizontal well and The problem of vertical well fracture fracture development process, can instruct pressure break, scene adjustment fracturing parameter, it is ensured that pressure break is obtained with live assistance Good effect, monitoring result can also be applied in capability forecasting after oil field is pressed.
Detailed description of the invention
The attached drawing for constituting a part of the invention is used to provide further understanding of the present invention, schematic reality of the invention It applies example and its explanation is used to explain the present invention, do not constitute improper limitations of the present invention.In the accompanying drawings:
Fig. 1 is consistent electric field test schematic of the invention;
Fig. 2 is horizontal well Hydrographic General Line figure of the present invention;
Fig. 3 is straight well and inclined shaft Hydrographic General Line figure of the present invention;
Fig. 4 is the horizontal well first segment measured signal curve of one embodiment of the invention;
Fig. 5 is the horizontal well second segment measured signal curve of one embodiment of the invention.
In figure, A, B respectively represent power supply pit shaft A and power supply pit shaft B,
1,2,3,4,5 in Fig. 2 be the serial number of horizontal well fracturing.
Specific embodiment
It should be noted that in the absence of conflict, the feature in embodiment and embodiment in the present invention can phase Mutually combination.
The principle of the method for the present invention are as follows: when charging to conductive ground plastid, if the resistivity of conductive ground plastid is far small When shoulder-bed resistivity (SBR) (< 200 times), it approximatively can be regarded as perfact conductor by we.When perfact conductor is located at general conduction When in medium, after powering (or " charging ") to any point thereon, electric current just spreads entire perfact conductor, then perpendicular to leading Body surface surface current is to surrounding medium.When electric current flows through in perfact conductor, potential drop is not generated, conductor inner potential is equal everywhere, therefore Also known as perfact conductor is equipotential body.The charging electric field of perfact conductor and the position of charge point are unrelated, are only determined by charging current Size, the shape of charge conductor, occurrence, size, the Electrical distribution situation of position and surrounding medium.
When we carry out fracturing work, for these solution with electrolyte of fracturing fluid are with respect to its surrounding rock, electricity Resistance rate is very low (10000 times of <), can regard perfact conductor as.In this way, and observing charging electric field if charged to these electrolyte Distribution, the Electrical distribution situation of entire subsurface fracture fluid Yu its surrounding rock can be inferred accordingly, to explain that pressure break is split Seam promotes developmental state.Therefore, the present invention forms constant charge electric field using the good conductor of fracturing process, before can monitoring crack The potential change at end and ground, to explain fracture development process.
The present invention will be described in detail below with reference to the accompanying drawings and embodiments.
A kind of consistent electric field fractured horizontal well Crack Monitoring method, includes the following steps:
Step 1, by charging system in pressing crack construction well power supply pit shaft A and fracturing fluid be filled with positive charge, give distance Power supply pit shaft B negatively charged lotus with casing of the power supply pit shaft A in 1000m or more;
The charging system generates the square wave direct current electricity of burning voltage, to power supply pit shaft A and power supply pit shaft B charging, power supply Stable charging electric field is formed in the process, wherein charging pit shaft A is construction pit shaft, really utilizes the casing and pressure break of pit shaft Electric field is introduced directly into fracturing fracture front end by liquid;
Step 2, the point information that pit shaft potential-measuring electrode and ground survey electrode system are received by receiving system, from And the potential change on crack front and ground is monitored, explain fracture development process;Wherein the pit shaft potential-measuring electrode is logical The measuring electrode of terminal potential, the ground survey electrode system are laid before crossing signal wire and the fracturing fracture that pit shaft A is introduced of powering In earth's surface;
When logging well is fractured horizontal well, the ground survey electrode system refer to by with horizontal segment pit shaft to be measured track The test macro for several measuring points composition that floor projection is laid in parallel, as shown in Fig. 2, needing to lay 2 according to on-the-spot test needs The measuring point number of the above survey line of item, laying is designed according to fractured well segment length and perforation number of clusters;Measuring point spacing is from can be according to reality Border requires and designs to lay, and general distance is between 2-10m;
When logging well is vertical well fracture, as shown in figure 3, the ground survey electrode system refers to straight well wellbore centre Centered on, using annulus or several measuring points laid using wellbore centre as the ray of starting point.
When logging well is Deviated Well Fracturing, as shown in figure 3, the ground survey electrode system refers to pressure break perforation point It sets centered on floor projection, using annulus or several measuring points laid using wellbore centre as the ray of starting point.
When logging well is vertical well fracture or Deviated Well Fracturing, as shown in figure 3, the angle of general two measuring points be 7.5 ° or 48 measuring points or 24 measuring points are arranged on 15 °, that is, each annulus, certainly, according to actual needs, can also be appointed on each annulus Meaning lays measuring point, and the angle between two measuring points can also be adjusted arbitrarily.
The measuring point spacing of the measuring point of pit shaft potential-measuring electrode and ground survey electrode system described above is from can be Away from being also possible to Unequal distance.
Step 3, fracture orientation, the length and width that each pressure break moment can be calculated according to measured value realize in real time Monitoring, specifically,
Pressure break length LtIt is calculated by each moment potential difference, calculation formula are as follows:In formula: I is supply current, and ρ is shoulder-bed resistivity (SBR), and M is test point, UMA Refer to a certain measuring point M in ground with power pit shaft A between measurement potential difference (due to power supply pit shaft A and crack current potential as, so The namely potential difference of ground a certain measuring point and crack), LtFor the development length in t moment crack, h is test point away from crack front Vertical distance, r is at a distance from measuring point and pressure break knick point (namely shooting point);
Using the measurement potential difference between ground measuring point and power supply pit shaft A as ordinate, to be parallel to horizontal well pit shaft water The measuring point point number of flat section floor projection is that abscissa makes the test curve figures of several measuring points, the two neighboring measuring point of the present embodiment away from From being 5 meters, the peak value line of the curve at each moment just specifies the development direction in crack;The spike width i.e. net of curve The width in shape crack;
Because for single crack, fracture width very little is several millimeters, general not have to calculate, netted for chicken-wire cracking Fracture width is provided by measured curve spike width;Because for the chicken-wire cracking developed in stratum, when fracturing fluid is charged therein, Also corresponding band charging charge enters the mesh-like area, then ground mutually should measurement current potential between multiple measuring points and pit shaft A in region Difference all increases, and reaction is that peak of curve width increases on curve, the width of the peak of curve width namely chicken-wire cracking (in Fig. 5 curve reaction be exactly chicken-wire cracking).
The power supply pit shaft A is to pass through the confession of the burning voltage on ground using pit shaft and fracturing fluid the two good conductors Electric system is that square wave direct current electricity is filled in well;After fracturing fracture starts cracking, do not stop to power with burning voltage, since pressure break is split Seam constantly extends, and charge constantly feeds crack front with fracturing fluid;Due to for good conductor, the current potential and crack front of pit shaft electrode Potential value is equal, and therefore, monitoring data are crack front current potential and ground status, monitors with realizing well.
On-the-spot test signal has reacted entire fracturing fracture growth course in real time, and can clearly indicate single crack And chicken-wire cracking.
The present embodiment wait log well as horizontal well, test philosophy is as shown in Figure 1, the design of its observation system and lay as schemed Shown in 2, survey line, two, every side survey line are laid due to for horizontal well, being parallel to horizontal well well section track.
The power supply system that the present embodiment uses is patent;For CN201020157269.8, patent name be " can load puppet with The controllable signal transmitter of machine coding ";The reception system that the present embodiment uses is Patent No. 201010147421.9, proprietary term Referred to as receiver disclosed in " controllable signal receiver of energy loading pseudo random code "
With the system of reception, power supply system is shown in that Patent No. CN201020157269.8, patent name are that " can load puppet respectively The controllable signal transmitter of random coded " and Patent No. 201010147421.9, patent name is " can loading pseudo random code Controllable signal receiver ";By this-reception system dynamically receives measurement data in real time, scene tests 5 sections altogether, continuous to survey Each measuring point electric potential signal, every two and half measurement data, monitoring curve clearly show the fracture initiation time and Crack starter location.
Fig. 4 and Fig. 5 is respectively the signal of the first segment measured and second segment staged fracturing, and curve is each measuring point prison in figure The potential difference measured, each measuring point two, which divides in half, monitors a data, so every two and half draw a curve, the song Line is exactly the induced fracture monitoring curve at moment instantly, and peak value expression develops crack in the stratum under the monitoring point, because only There is crack occurrence, fluid just can just concentrate on the region along crack flow forward, the charging charge of response, and charge concentration is just made Increase at the potential difference of ground corresponding measuring point.The peak value line at each moment just represents the development of the crack at any time Journey, certainly, the peak value line also just specify the development direction in crack.
Signal reaction first segment pressure break forms two cracks, and data are shown as monolete, and second segment pressure break forms 3 pressure breaks Crack, data are shown as netted fracturing fracture, and the width of each fracturing fracture is different, can be calculated according to measured value Fracture orientation, the length and width at each pressure break moment, realize real-time monitoring.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all in essence of the invention Within mind and principle, any modification, equivalent replacement, improvement and so on be should all be included in the protection scope of the present invention.

Claims (5)

1. a kind of consistent electric field fractured horizontal well Crack Monitoring method, it is characterised in that include the following steps:
Step 1, by charging system in pressing crack construction well power supply pit shaft A and fracturing fluid be filled with positive charge, to distance power supply Power supply pit shaft B negatively charged lotus with casing of the pit shaft A in 1000m or more;
Step 2, the electrical potential information of pit shaft potential-measuring electrode and ground survey electrode system is received by receiving system;Wherein institute State the measuring electrode that pit shaft potential-measuring electrode is terminal potential before the fracturing fracture introduced by signal wire and power supply pit shaft A, institute It states ground survey electrode system and is laid in earth's surface;
When logging well is fractured horizontal well, the ground survey electrode system refer to by with horizontal segment pit shaft to be measured track ground Project the test macro for several measuring points composition laid in parallel;
When logging well is vertical well fracture, the ground survey electrode system refers to centered on straight well wellbore centre, with annulus Or several using wellbore centre as starting point ray lay measuring point;
When logging well is Deviated Well Fracturing, the ground survey electrode system refers to is in floor projection with pressure break shooting point position Center, using annulus or several measuring points laid using wellbore centre as the ray of starting point;
Step 3, the measured value that can be obtained according to step 2 obtains fracture orientation, the length and width at each pressure break moment;
In step 3, pressure break length ltIt is calculated by each moment potential difference, calculation formula are as follows:In formula: I is supply current, and ρ is shoulder-bed resistivity (SBR), and M is measuring point, UMARefer to Measurement potential difference between a certain measuring point M in ground and power supply pit shaft A, ltFor the development length, that is, pressure break length in t moment crack, h Vertical distance for test point away from crack front;
Using the measurement potential difference between ground measuring point and power supply pit shaft A as ordinate, to be parallel to horizontal well pit shaft horizontal segment The measuring point point number of floor projection is the test curve figure that abscissa makes several measuring points, and the peak value line of the curve at each moment is just Specify the development direction in crack;The spike width of curve i.e. the width of chicken-wire cracking.
2. consistent electric field fractured horizontal well Crack Monitoring method according to claim 1, it is characterised in that: the Charging System generates the square wave direct current electricity of burning voltage, to power supply pit shaft A and power supply pit shaft B charging, forms stable fill in power supply process Electric field.
3. consistent electric field fractured horizontal well Crack Monitoring method according to claim 1, it is characterised in that: when being wait log well When fractured horizontal well, need to lay 2 or more surveys line, the measuring point number of laying is set according to fractured well segment length and perforation number of clusters Meter;Measuring point spacing is with a distance from general between 2-10m.
4. consistent electric field fractured horizontal well Crack Monitoring method according to claim 1, it is characterised in that: when being wait log well When vertical well fracture or Deviated Well Fracturing, the angle of general two measuring points be 7.5 ° or 15 °, that is, each annulus on arrangement 48 survey Point or 24 measuring points.
5. consistent electric field fractured horizontal well Crack Monitoring method according to claim 1, it is characterised in that: the pit shaft electricity Position measuring electrode and the measuring point spacing of ground survey electrode system are equidistant from can be, and are also possible to Unequal distance.
CN201610196964.7A 2016-03-30 2016-03-30 A kind of consistent electric field fractured horizontal well Crack Monitoring method Active CN105840185B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610196964.7A CN105840185B (en) 2016-03-30 2016-03-30 A kind of consistent electric field fractured horizontal well Crack Monitoring method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610196964.7A CN105840185B (en) 2016-03-30 2016-03-30 A kind of consistent electric field fractured horizontal well Crack Monitoring method

Publications (2)

Publication Number Publication Date
CN105840185A CN105840185A (en) 2016-08-10
CN105840185B true CN105840185B (en) 2019-02-05

Family

ID=56597688

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610196964.7A Active CN105840185B (en) 2016-03-30 2016-03-30 A kind of consistent electric field fractured horizontal well Crack Monitoring method

Country Status (1)

Country Link
CN (1) CN105840185B (en)

Families Citing this family (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106094018A (en) * 2016-08-25 2016-11-09 中国电建集团贵阳勘测设计研究院有限公司 The point layout structure of a kind of earth's surface Fracturing Monitoring and method for arranging
CN108387444B (en) * 2018-04-02 2020-06-30 东方华隆(北京)石油技术有限公司 Cased well fracturing continuous monitoring control method based on well-to-ground potential imaging
CN108868751B (en) * 2018-05-31 2019-07-30 湖南继善高科技有限公司 Four-dimensional electromagnetic monitoring method and system in real time is influenced between a kind of oil gas fracturing section
CN108983298B (en) * 2018-05-31 2020-04-07 湖南继善高科技有限公司 Oil-gas fracturing four-dimensional real-time electromagnetic monitoring method and system
CN108873081B (en) * 2018-05-31 2020-01-03 湖南继善高科技有限公司 Four-dimensional electromagnetic real-time monitoring method and system for main seam and mesh seam of oil-gas fracturing
CN108646306B (en) * 2018-05-31 2020-01-03 湖南继善高科技有限公司 Real-time monitoring method and system for four-dimensional geometric characteristics of oil-gas fracturing fracture
CN111948720B (en) * 2020-07-15 2021-09-28 中南大学 Underground conductor antenna effect fracturing monitoring method
CN112412334A (en) * 2020-11-03 2021-02-26 山西晋城无烟煤矿业集团有限责任公司 Potential method-based coal bed gas radial well construction track monitoring method
CN114459912B (en) * 2022-01-24 2023-08-08 湖南继善高科技有限公司 Method and system for determining volume of oil and gas fracturing cracks
CN114459911B (en) * 2022-01-24 2023-06-20 湖南继善高科技有限公司 Direction interpretation method for oil-gas fracturing cracks

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3496768A (en) * 1968-07-09 1970-02-24 Exxon Production Research Co Detection of movement of liquids in the earth
CN1148132A (en) * 1994-08-31 1997-04-23 大港石油管理局钻采工艺研究院 Dynamic method for monitoring the advanced direction of injected water into water injection well
CN1536373A (en) * 2003-04-10 2004-10-13 中国石油集团东方地球物理勘探有限责 Network charging potential monitoring method
CN101942993A (en) * 2010-09-01 2011-01-12 大港油田集团有限责任公司 Inter-well potential tomography imaging system and method while drilling
CN101949973A (en) * 2010-09-15 2011-01-19 吉林大学 Method for measuring ground potential
CN102768370A (en) * 2012-08-11 2012-11-07 吉林大学 Hydrofracture fracture monitoring device and monitoring method based on electrokinetic coupling
CN103244103A (en) * 2013-05-20 2013-08-14 中国石油大学(华东) Nano-magnetic-fluid-based hydraulic fracturing fracture real-time monitoring system and nano-magnetic-fluid-based hydraulic fracturing fracture real-timemonitoring method

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3496768A (en) * 1968-07-09 1970-02-24 Exxon Production Research Co Detection of movement of liquids in the earth
CN1148132A (en) * 1994-08-31 1997-04-23 大港石油管理局钻采工艺研究院 Dynamic method for monitoring the advanced direction of injected water into water injection well
CN1536373A (en) * 2003-04-10 2004-10-13 中国石油集团东方地球物理勘探有限责 Network charging potential monitoring method
CN101942993A (en) * 2010-09-01 2011-01-12 大港油田集团有限责任公司 Inter-well potential tomography imaging system and method while drilling
CN101949973A (en) * 2010-09-15 2011-01-19 吉林大学 Method for measuring ground potential
CN102768370A (en) * 2012-08-11 2012-11-07 吉林大学 Hydrofracture fracture monitoring device and monitoring method based on electrokinetic coupling
CN103244103A (en) * 2013-05-20 2013-08-14 中国石油大学(华东) Nano-magnetic-fluid-based hydraulic fracturing fracture real-time monitoring system and nano-magnetic-fluid-based hydraulic fracturing fracture real-timemonitoring method

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
电位法井间监测技术;张金成;《地震地质》;20010630;第23卷(第2期);第292-300页
电位法井间监测技术在油田开发中的应用;王爱国 等;《油气藏监测与管理国际会议论文集》;20111020;全文
裂缝监测技术在水平井中的应用;邵茂华 等;《内蒙古石油化工》;20140215(第3期);第97-100页

Also Published As

Publication number Publication date
CN105840185A (en) 2016-08-10

Similar Documents

Publication Publication Date Title
CN105840185B (en) A kind of consistent electric field fractured horizontal well Crack Monitoring method
RU2650434C9 (en) System and method to induce electromagnetic field within earth
CN102768369B (en) Roadway drivage drilling induced polarization advance water probing forecasting method, device and probe
CN100337130C (en) Integrated borehole system for reservoir detection and monitoring
CN101706585B (en) Method for electrically forecasting danger in underground tunneling engineering
RU2302019C1 (en) Method for electrical logging of cased wells
CN101949973B (en) Method for measuring ground potential
CN106460506A (en) Interwell tomography methods and systems employing a casing segment with at least one transmission crossover arrangement
CN104360402B (en) Well-to-ground joint electrical-method testing method and system
CN102419455A (en) Interwell parallel resistivity CT (computed tomography) testing method
WO2021073421A1 (en) Concealed resource prediction method and rock electromagnetic logging system
CN104360399A (en) Method and device for detecting underground transient electromagnetism in grounded source through long wire
CN102749653A (en) Electrode transmission device for high-resolution three-dimensional (3D) CT (computerized tomography) imaging in underground engineering
BRPI0408590B1 (en) METHODS FOR MONITORING A HIGH RESISTANCE RESERVE ROCK FORMATION UNDER ONE OR MORE LESS RESISTANT FORMATION AND A UNDERGROUND OIL FORMATION
CN103235344B (en) Two lanes multi-electrode electricity perspective detection system
CN103487843B (en) Underwater amount measuring method based on resistivity imaging technology
CN102767363A (en) Electric communication drill rod and method for increasing transmission distance of electromagnetic wave measurement while drilling signal
CN107346037B (en) Three-dimensional underground piping accurately detecting method
CN106646635A (en) Modified line source resistivity continuous measurement method
CN101942993A (en) Inter-well potential tomography imaging system and method while drilling
CN103499838A (en) Transient electromagnetic measuring device and recognizing method for anomalous body orientation recognition
CN205643736U (en) A exploration testing equipment for gallery forward probe
CN103135139A (en) Method for measuring stratum resistivity outside drivepipe through metal drivepipe
CN110501746A (en) Roller three-dimensional controllable source electrical method monitoring and evaluation drilling fracturing method
CN216767359U (en) Fracturing monitoring experiment device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20201104

Address after: 300000 No. three, Dagang Oilfield, Binhai New Area, Tianjin

Patentee after: DAGANG OILFIELD GROUP Co.,Ltd.

Patentee after: CHINA NATIONAL PETROLEUM Corp.

Address before: 300280 Dagang three, Binhai New Area, Tianjin

Patentee before: DAGANG OILFIELD GROUP Co.,Ltd.