CN105839853A CN201610344202.7A CN201610344202A CN105839853A CN 105839853 A CN105839853 A CN 105839853A CN 201610344202 A CN201610344202 A CN 201610344202A CN 105839853 A CN105839853 A CN 105839853A
Authority
CN
China
Prior art keywords
steel pipe
rectangular steel
concrete
stiffener
column
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610344202.7A
Other languages
Chinese (zh)
Inventor
孙晓岭
郝际平
薛强
樊春雷
黄育琪
刘斌
陈永昌
王磊
刘瀚超
尹伟康
何梦楠
张峻铭
赵子健
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xian University of Architecture and Technology
Original Assignee
Xian University of Architecture and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xian University of Architecture and Technology filed Critical Xian University of Architecture and Technology
Priority to CN201610344202.7A priority Critical patent/CN105839853A/en
Publication of CN105839853A publication Critical patent/CN105839853A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C3/00Structural elongated elements designed for load-supporting
    • E04C3/30Columns; Pillars; Struts
    • E04C3/34Columns; Pillars; Struts of concrete other stone-like material, with or without permanent form elements, with or without internal or external reinforcement, e.g. metal coverings

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Rod-Shaped Construction Members (AREA)

Abstract

The invention discloses a multi-cavity steel pipe concrete composite column with a rectangular steel pipe end column and a method. The end column is a composite column of hot rolled rectangular steel pipes and side plates, and is as wide as a wall to avoid prominent edges and corners of an indoor column, so that the use area and beauty of a room can be increased, the hot rolled rectangular steel pipes are filled with concrete to be used as an edge constraint component for an entire steel pipe concrete column, so as to be capable of improving the bearing capacity and energy dissipation capacity of the steel pipe concrete column, a large chamber formed by each of the side plates and each of the hot rolled rectangular steel pipes is divided into two small chambers through a stiffened plate, so that the confining capability of the steel pipes for the concrete is improved, furthermore, the local buckling of a steel plate can be delayed or prevented to improve the bearing capacity and ductility of the component.

Description

A kind of newel post is multi-cavity steel tube concrete coupled column and the method for rectangular steel pipe
Technical field
The invention belongs to the concrete filled steel tube coupled column field of multilayer structure, being specifically related to a kind of newel post is that rectangular steel pipe is many Chamber concrete filled steel tube coupled column and method.
Background technology
Along with economic globalization, the raising of the level of urbanization, urban population closeness is gradually increased so that a large amount of high levels continue to bring out. This just high-rise in the urgent need to new technical support and design of tier building and construction.
Concrete filled steel tube utilizes steel pipe and the interaction in loading process of the concrete bi-material, the i.e. steel pipe constraint to concrete Effect makes concrete be in complex stress condition, so that the intensity of concrete is improved, plasticity and toughness greatly improve.Meanwhile, After steel duct fill concrete, due to the supporting role of concrete, can avoid or delay the flexing of steel pipe walls.Bi-material Combination compensate for respective shortcoming so that material property gives full play to.
Along with development and the growth in the living standard of society, people are more and more higher to usable floor area and the cosmetic requirements of house.Tradition Circle or Concrete Filled Square Steel Tubes post, be generally not capable of being surrounded by body of wall completely, suspension column greatly prominent house interior, Take certain interior space so that furnishings and room are arranged by a definite limitation.Employing concrete filled steel rectangular tubes combines Post, can accomplish with wall with wide, solve the problem that post highlights corner angle.
Research shows, the concrete-filled rectangular steel tube coupled column of general type, and steel pipe is only limitted to angle point to the constraint of core concrete, Periphery is more weak, and bearing capacity is relatively low.Newel post be the multi-cavity steel tube concrete coupled column of rectangular steel pipe arrange at edge confining part with Improving its bearing capacity and energy dissipation capacity, horizontally set is put more energy into box construct, shaft is divided into some chambers, makes steel plate to concrete Effect of contraction strengthen, reduce the flakiness ratio of steel plate simultaneously, prevent or delay the cripling of steel plate.
Summary of the invention
It is an object of the invention to overcome above-mentioned deficiency, it is provided that a kind of newel post is multi-cavity steel tube concrete coupled column and the side of rectangular steel pipe Method, solves conventional post indoor and highlights the problem of corner angle, improves bearing capacity and the ductility of Multicarity concrete filled steel tube coupled column, delays Or avoid stiffness of structural member bearing capacity and the reduction of ductility caused due to steel pipe wallboard cripling, give full play to the performance of material.
In order to achieve the above object, a kind of newel post is the multi-cavity steel tube concrete coupled column of rectangular steel pipe, including two pieces be arranged in parallel Side plate, two pieces of side sheet rooms are vertically installed with stiffener composition " work " font, and the opening part of two pieces of side plate both sides is all welded with hot rolling square Shape steel pipe, makes two hot rolling rectangular steel pipes and two blocks of side plates and stiffener two inner chambers of composition, two inner chambers and two hot rolling rectangles Steel pipe is all filled with concrete.
The steel using identical strength classes of structural steel of described hot rolling rectangular steel pipe, side plate and stiffener.
A strength classes of structural steel grade lower than the strength classes of structural steel of hot rolling rectangular steel pipe of described side plate and stiffener.
The thickness that thickness is 8-16mm, side plate and stiffener of described hot rolling rectangular steel pipe is 6-10mm.
Described concrete is normal concrete or high-strength concrete.
The length of described two blocks of side plates is equal, and stiffener is vertically fixed on the centrage of two blocks of side plates.
A kind of newel post is the manufacture method of the multi-cavity steel tube concrete coupled column of rectangular steel pipe, comprises the following steps:
Step one, is vertically welded in stiffener on two side plates, forms " work " font cross section;
The both sides of the edge of two hot rolling rectangular steel pipes with " work " font cross section are welded by step 2 respectively, form two inner chambers;
Step 3, concrete perfusion in two inner chambers and two hot rolling rectangular steel pipes, becoming newel post after molding is rectangular steel pipe Multi-cavity steel tube concrete coupled column.
In described step one, stiffener is vertically welded on the centrage of two blocks of side plates.
In described step 3, after concrete perfusion, carry out periodic maintenance.
Compared with prior art, the newel post of the present invention is the coupled column of hot rolling rectangular steel pipe and side plate, and with wall with wide, it is to avoid room Inner prop highlights corner angle, it is possible to increase room usable floor area and aesthetic property, mixes as whole steel pipe in hot rolling rectangular steel pipe after fill concrete The edge constraint component of solidifying earth pillar, can improve its bearing capacity and energy dissipation capacity, and stiffener is big with what hot rolling rectangular steel pipe was formed by side plate Chamber is divided into two little chambers, improves the steel pipe restriction ability to concrete, can delay or prevent the cripling of steel plate simultaneously, Improve bearing capacity and the ductility of component.
Accompanying drawing explanation
Fig. 1 is the top view of the multi-cavity steel tube concrete coupled column of rectangular steel pipe of the present invention;
Fig. 2 is the structural representation of the multi-cavity steel tube concrete coupled column of rectangular steel pipe of the present invention;
Fig. 3 is the manufacture method flow chart of the present invention.
Detailed description of the invention
The present invention will be further described below in conjunction with the accompanying drawings.
Seeing Fig. 1 and Fig. 2, a kind of newel post is the multi-cavity steel tube concrete coupled column of rectangular steel pipe, including the two pieces of sides be arrangeding in parallel Plate 2, is vertically installed with stiffener 3 and forms " work " font between two blocks of side plates 2, the opening part of two pieces of side plate 2 both sides is provided with Hot rolling rectangular steel pipe 1, makes two hot rolling rectangular steel pipes 1 and two blocks of side plates 2 and stiffener 3 form two inner chambers, two inner chambers With two hot rolling rectangular steel pipes 1 are all filled with concrete 4, hot rolling rectangular steel pipe 1, side plate 2 are identical with the employing of stiffener 3 The steel of strength classes of structural steel, or the strength classes of structural steel of described side plate 2 and stiffener 3 is than the steel strength of hot rolling rectangular steel pipe 1 The low grade of grade, the thickness of hot rolling rectangular steel pipe 1 is 8-16mm, and the thickness of side plate 2 and stiffener 3 is 6-10mm, Concrete 4 is normal concrete or high-strength concrete, and the length of two blocks of side plates 2 is equal, and stiffener 3 is vertically fixed on two blocks of side plates On the centrage of 2.
Seeing Fig. 3, a kind of newel post is the manufacture method of the multi-cavity steel tube concrete coupled column of rectangular steel pipe, comprises the following steps:
Step one, is vertically welded in stiffener 3 on two side plates 2, forms " work " font cross section, stiffener 3 vertical welding On the centrage of two blocks of side plates 2;
The both sides of the edge of two hot rolling rectangular steel pipes 1 with " work " font cross section are welded by step 2 respectively, form two inner chambers;
Step 3, concrete perfusion 4 in two inner chambers and two hot rolling rectangular steel pipes 1, carry out after concrete perfusion 4 periodically Maintenance, becomes the multi-cavity steel tube concrete coupled column that newel post is rectangular steel pipe after molding.

Claims (9)

1. a newel post is the multi-cavity steel tube concrete coupled column of rectangular steel pipe, it is characterised in that include the two pieces of sides be arrangeding in parallel Plate (2), is vertically installed with stiffener (3) composition " work " font, opening of two pieces of side plate (2) both sides between two pieces of side plates (2) All it is welded with hot rolling rectangular steel pipe (1) at Kou, makes two hot rolling rectangular steel pipes (1) and two pieces of side plates (2) and stiffener (3) Form in two inner chambers, two inner chambers and two hot rolling rectangular steel pipes (1) and be all filled with concrete (4).
A kind of newel post the most according to claim 1 is the multi-cavity steel tube concrete coupled column of rectangular steel pipe, it is characterised in that The steel using identical strength classes of structural steel of described hot rolling rectangular steel pipe (1), side plate (2) and stiffener (3).
A kind of newel post the most according to claim 1 is the multi-cavity steel tube concrete coupled column of rectangular steel pipe, it is characterised in that A strength classes of structural steel grade lower than the strength classes of structural steel of hot rolling rectangular steel pipe (1) of described side plate (2) and stiffener (3).
A kind of newel post the most according to claim 1 is the multi-cavity steel tube concrete coupled column of rectangular steel pipe, it is characterised in that The thickness of described hot rolling rectangular steel pipe (1) is 8-16mm, and the thickness of side plate (2) and stiffener (3) is 6-10mm.
A kind of newel post the most according to claim 1 is the multi-cavity steel tube concrete coupled column of rectangular steel pipe, it is characterised in that Described concrete (4) is normal concrete or high-strength concrete.
A kind of newel post the most according to claim 1 is the multi-cavity steel tube concrete coupled column of rectangular steel pipe, it is characterised in that The length of described two pieces of side plates (2) is equal, and stiffener (3) is vertically fixed on the centrage of two pieces of side plates (2).
7. the manufacture method of the multi-cavity steel tube concrete coupled column that a kind of newel post is rectangular steel pipe described in claim 1, its feature It is, comprises the following steps:
Step one, is vertically welded in stiffener (3) on two side plates (2), forms " work " font cross section;
The both sides of the edge of two hot rolling rectangular steel pipes (1) with " work " font cross section are welded by step 2 respectively, in forming two Chamber;
Step 3, concrete perfusion (4) in two inner chambers and two hot rolling rectangular steel pipes (1), become newel post after molding Multi-cavity steel tube concrete coupled column for rectangular steel pipe.
A kind of newel post the most according to claim 7 is the manufacture method of the multi-cavity steel tube concrete coupled column of rectangular steel pipe, its Being characterised by, in described step one, stiffener (3) is vertically welded on the centrage of two pieces of side plates (2).
A kind of newel post the most according to claim 7 is the manufacture method of the multi-cavity steel tube concrete coupled column of rectangular steel pipe, its It is characterised by, in described step 3, after concrete perfusion (4), carries out periodic maintenance.
CN201610344202.7A 2016-05-20 2016-05-20 Multi-cavity steel pipe concrete composite column with rectangular steel pipe end column and method Pending CN105839853A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610344202.7A CN105839853A (en) 2016-05-20 2016-05-20 Multi-cavity steel pipe concrete composite column with rectangular steel pipe end column and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610344202.7A CN105839853A (en) 2016-05-20 2016-05-20 Multi-cavity steel pipe concrete composite column with rectangular steel pipe end column and method

Publications (1)

Publication Number Publication Date
CN105839853A true CN105839853A (en) 2016-08-10

Family

ID=56593119

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610344202.7A Pending CN105839853A (en) 2016-05-20 2016-05-20 Multi-cavity steel pipe concrete composite column with rectangular steel pipe end column and method

Country Status (1)

Country Link
CN (1) CN105839853A (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20030029111A1 (en) * 2001-08-07 2003-02-13 Akio Yabuuchi Joint structure of steel plate concrete structure
CN2895592Y (en) * 2006-04-06 2007-05-02 沈阳建筑大学 Steel-tube concrete special-shape column
JP2007204953A (en) * 2006-01-31 2007-08-16 Toshiba Corp Steel plate concrete structure, nuclear reactor storage vessel and nuclear reactor storage vessel inside structure
CN101555721A (en) * 2009-05-06 2009-10-14 北京航空航天大学 Multi-chamber type steel tube concrete special-shaped column
CN201598774U (en) * 2009-10-29 2010-10-06 武汉大学 Improved special steel tube concrete combination column
CN102587577A (en) * 2012-03-15 2012-07-18 天津大学 Steel tube-I beam combination steel tube concrete special-shaped columns and manufacture method thereof
CN103850391A (en) * 2014-01-15 2014-06-11 浙江杭萧钢构股份有限公司 Linear steel tube bundle composite structure

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20030029111A1 (en) * 2001-08-07 2003-02-13 Akio Yabuuchi Joint structure of steel plate concrete structure
JP2007204953A (en) * 2006-01-31 2007-08-16 Toshiba Corp Steel plate concrete structure, nuclear reactor storage vessel and nuclear reactor storage vessel inside structure
CN2895592Y (en) * 2006-04-06 2007-05-02 沈阳建筑大学 Steel-tube concrete special-shape column
CN101555721A (en) * 2009-05-06 2009-10-14 北京航空航天大学 Multi-chamber type steel tube concrete special-shaped column
CN201598774U (en) * 2009-10-29 2010-10-06 武汉大学 Improved special steel tube concrete combination column
CN102587577A (en) * 2012-03-15 2012-07-18 天津大学 Steel tube-I beam combination steel tube concrete special-shaped columns and manufacture method thereof
CN103850391A (en) * 2014-01-15 2014-06-11 浙江杭萧钢构股份有限公司 Linear steel tube bundle composite structure

Similar Documents

Publication Publication Date Title
CN202467240U (en) Assembled steel structure hollow building
CN206091045U (en) Antinode core precast concrete assembled composite wall
CN107060096B (en) The Super High turret structure system of honeycomb boundling arrangement hexagon cylinder
CN105696730A (en) Concrete-filled steel tube frame column-steel plate shear wall system and construction method
CN105822020A (en) Multi-cavity concrete filled steel tube combined column with C-type steel and manufacturing method
CN205577262U (en) Steel pipe concrete special -shaped column
CN202023275U (en) Cold bent thin wall section steel bearing wall body structure
CN202530570U (en) Integral lightweight steel construction case-type combined house
CN205557906U (en) Steel pipe concrete frame post - steel sheet shear force wall body system
CN205822591U (en) A kind of multi-cavity steel tube concrete coupled column of band C-type steel
CN105839853A (en) Multi-cavity steel pipe concrete composite column with rectangular steel pipe end column and method
CN106049756A (en) Multi-cavity concrete filled steel tube composite column adopting rectangular steel tubes and manufacturing method
CN205822593U (en) A kind of band ribbed stiffener multi-cavity steel tube concrete coupled column
CN106013607A (en) Multi-cavity concrete-filled steel pipe combination column with stiffening ribs and manufacturing method
CN202284359U (en) Steel structure concrete support beam
CN215760640U (en) Short-limb shear wall frame structure for adding floor to existing building
CN205776787U (en) A kind of support plug-in type beam column supporting bilateral plate node
CN105839791B (en) A kind of supporting bilateral plate node of overhanging cover board
CN104818784A (en) Thin-wall steel pipe concrete frame-light steel light concrete combined shear wall and construction method thereof
CN105971127B (en) A kind of support plug-in type beam column supporting bilateral plate node
CN204609046U (en) Thin wall steel tube concrete frame-light-steel light-concrete compound shear wall
CN104088400A (en) T-shaped steel pipe-steel rib recycled concrete combination column
CN205637338U (en) Multi -chamber concatenation type steel pipe -concrete composite post
CN204098355U (en) Cellular steel web-H-shaped cross section, concrete filled steel tube edge of a wing coupled column
CN205822592U (en) Use the multi-cavity steel tube concrete coupled column of built-in connecting plate

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20160810

WD01 Invention patent application deemed withdrawn after publication