CN105839836A - Precast concrete shear wall component and construction method thereof - Google Patents

Precast concrete shear wall component and construction method thereof Download PDF

Info

Publication number
CN105839836A
CN105839836A CN201610367668.9A CN201610367668A CN105839836A CN 105839836 A CN105839836 A CN 105839836A CN 201610367668 A CN201610367668 A CN 201610367668A CN 105839836 A CN105839836 A CN 105839836A
Authority
CN
China
Prior art keywords
precast concrete
shear wall
reserved
wall panel
concrete shear
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610367668.9A
Other languages
Chinese (zh)
Other versions
CN105839836B (en
Inventor
马跃强
龙莉波
何飞
赵波
成炜
于大都
武玉琼
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Construction No 2 Group Co Ltd
Original Assignee
Shanghai Construction No 2 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Construction No 2 Group Co Ltd filed Critical Shanghai Construction No 2 Group Co Ltd
Priority to CN201610367668.9A priority Critical patent/CN105839836B/en
Publication of CN105839836A publication Critical patent/CN105839836A/en
Application granted granted Critical
Publication of CN105839836B publication Critical patent/CN105839836B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C2/00Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels
    • E04C2/02Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by specified materials
    • E04C2/04Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by specified materials of concrete or other stone-like material; of asbestos cement; of cement and other mineral fibres
    • E04C2/044Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by specified materials of concrete or other stone-like material; of asbestos cement; of cement and other mineral fibres of concrete
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/56Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members
    • E04B2/64Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members with elongated members of concrete
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C2/00Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels
    • E04C2/44Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by the purpose
    • E04C2/46Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by the purpose specially adapted for making walls

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Load-Bearing And Curtain Walls (AREA)

Abstract

The invention discloses a precast concrete shear wall component and a construction method thereof. The precast concrete shear wall component comprises a precast concrete wall panel, embedded column reinforcement cages and protecting shells, wherein the embedded column reinforcement cages are positioned on two sides of the precast concrete wall panel, and the protecting shells sleeve the embedded column reinforcement cages. A plurality of reserved joint bars are arranged above the precast concrete wall panel, and a plurality of reserved bolt holes matched with the reserved joint bars in position are formed below the precast concrete wall panel. Compared with the prior art, the precast concrete shear wall component and the construction method thereof have the advantages that binding the embedded column reinforcement cages on two sides of the precast concrete wall panel on site is omitted, so that on-site construction process steps are decreased and on-site construction time is shortened; on-site connection between the precast concrete wall panel and the bound embedded column reinforcement cages is omitted, so that construction efficiency is improved and construction space is reduced; a construction period is shortened and labor and time costs are saved; construction industrialization and mechanization degree is enhanced, and dependency on increasingly intense labor resource is reduced.

Description

A kind of precast concrete shear wall component and construction method thereof
Technical field
The present invention relates to precast shear wall technical field of construction, be specifically related to a kind of precast concrete shear wall structure Part and construction method thereof.
Background technology
In the work progress of prefabrication, precast plant it is processed into the reinforcement for building assembling It is more and more that concrete panel uses, and uses precast concrete wall panel can improve the batch production of construction, machine Tool degree, reduces situ wet operation, saves on-the-spot recruitment, it is to avoid by seasonal effect, shortens building and executes The work cycle.
At present, usual technology with bolts between upper and lower layer precast shear wall.During installation, by lower floor Reserved joint bar above precast concrete wall panel stretches in the prepared screw-bolt hole of upper strata precast concrete wall panel, and From prepared screw-bolt hole, pour into cement mortar grouting material, upper and lower layer precast shear wall is connected into the most whole Body.But in above-mentioned work progress, need sleeper reinforcing bar to precast concrete wall panel both sides at the scene Connection work between the sleeper framework of steel reinforcement that colligation work and precast concrete wall panel and colligation are formed, manpower Many with time consumption, occupy more construction space, prolongation can construction period, improve construction cost, Fail conscientiously to meet practice of construction needs.
Summary of the invention
The present invention is directed to the above-mentioned problems in the prior art, it is provided that a kind of effectively minimizing manpower and time Expend, cost-effective, shorten construction period, improve the concrete of the degree of building industrialization and mechanization Soil shear wall component and construction method thereof.
In order to solve above-mentioned technical problem, the technical scheme is that a kind of precast concrete shear wall structure Part, including precast concrete wall panel, the sleeper framework of steel reinforcement that is positioned at described precast concrete wall panel both sides, with And it being sheathed on the containment vessel of described sleeper framework of steel reinforcement periphery, described precast concrete wall panel is arranged over some Reserved joint bar, is provided with some reserved corresponding with described reserved joint bar in position below described precast concrete wall panel Bolt hole.
Further, by some tension ribs between described precast concrete wall panel and described sleeper framework of steel reinforcement Fixing connection.
Further, described sleeper framework of steel reinforcement is by some vertically arranged main muscle and some stirrup colligations The rectangular structure become, described tension rib is fixing with main ribs to be connected.
Further, the top of described precast concrete wall panel is provided with at least two suspension ring.
Further, one of them side of described precast concrete wall panel is provided with at least two diagonal brace point.
Further, the top of each described prepared screw-bolt hole is provided with a groove, described groove and reserved bolt Hole is additionally provided with a strengthening stud.
The present invention also provides for the construction method of a kind of precast concrete shear wall component, comprises the following steps:
S1: the sleeper framework of steel reinforcement of precast concrete wall panel and both sides is formed integrally in the factory, at sleeper steel The sheathed containment vessel in muscles and bones frame periphery, is transported to job site and constructs;
S2: pour understructure beam, and be respectively provided with on understructure beam with in described precast concrete wall panel The suitable reserved joint bar of some prepared screw-bolt holes and the reserved steel bar corresponding with described sleeper framework of steel reinforcement;
S3: above the precast concrete shear wall lifting component that completes in step S1 to understructure beam, with Reserved joint bar and reserved steel bar above described understructure beam dock;
S4: this precast concrete shear wall component is positioned;
S5: casting concrete becomes structural column in sleeper framework of steel reinforcement, and at precast concrete shear wall structure Pour horizontal structure beam above part so that it is in precast concrete wall panel in reserved joint bar and sleeper reinforcing bar Main muscle in frame exposes to become above described horizontal structure beam installs upper strata precast concrete shear wall component Reserved joint bar and reserved steel bar;
S6: the precast concrete will constructed in upper strata precast concrete shear wall lifting component to step S5 Above shear wall component, complete with described horizontal structure beam above the reserved joint bar that exposes and reserved steel bar carry out Docking;
S7: repeat step S4-S6, until terminating.
Further, in described step S3 or S6, described precast concrete shear wall component is pre-with corresponding The method staying joint bar and reserved steel bar skeleton to carry out docking is: make reserved joint bar stretch into the precast concrete of correspondence In prepared screw-bolt hole below wallboard, in prepared screw-bolt hole, pour into cement slurry, simultaneously by reserved steel bar bone Main muscle in frame and reserved steel bar carry out colligation overlap joint.
Further, it is additionally included in described prepared screw-bolt hole to be inserted into strengthening stud and be fixed.
Further, in described step S4, the method that described precast concrete shear wall component is positioned For: at least two is installed between one of them side and understructure beam of described precast concrete wall panel oblique Support.
The invention provides a kind of precast concrete shear wall component and construction method thereof, deposit compared to existing technology In following several respects advantage:
(1) eliminate the colligation work of the on-the-spot sleeper reinforcing bar to precast concrete wall panel both sides, decrease existing Field working procedure, reduces on-site construction time;
(2) connection between the on-the-spot sleeper framework of steel reinforcement that precast concrete wall panel and colligation are formed is eliminated Work, improves efficiency of construction, decreases construction and take up room;
(3) shorten construction period, save artificial and time cost;
(4) improve building industrialization and mechanization degree, decrease the human resources to growing tension Rely on.
Accompanying drawing explanation
Fig. 1 is the structural representation of precast concrete shear wall component of the present invention;
Fig. 2 is the top view of precast concrete shear wall component of the present invention;
Fig. 3 is the side view of precast concrete shear wall component of the present invention;
Fig. 4 is the structural representation of understructure beam of the present invention;
Fig. 5 is the scheme of installation of precast concrete shear wall component of the present invention and understructure beam;
Fig. 6 is the construction schematic diagram of precast concrete shear wall component of the present invention and horizontal structure beam.
Shown in figure: 1, precast concrete wall panel;11, reserved joint bar;12, prepared screw-bolt hole;13, oblique Support point;14, groove;15, reserved steel bar;2, sleeper framework of steel reinforcement;21, main muscle;22, stirrup;3、 Tension rib;4, suspension ring;5, understructure beam;6, diagonal brace;7, horizontal structure beam.
Detailed description of the invention
The present invention is described in detail below in conjunction with the accompanying drawings:
As Figure 1-3, the invention provides a kind of precast concrete shear wall component, including precast concrete Wallboard 1, it is positioned at the sleeper framework of steel reinforcement 2 of described precast concrete wall panel 1 both sides and is sheathed on described sleeper The containment vessel (not marking in figure) of framework of steel reinforcement 2 periphery, described precast concrete wall panel 1 is arranged over some Reserved joint bar 11, if it is with described reserved joint bar 11 corresponding to be provided with position below described precast concrete wall panel 1 Dry prepared screw-bolt hole 12.Concrete, described reserved joint bar 11 is located at above precast concrete wall panel 1, and from Precast concrete wall panel 1 top is exposed, and quantity and the position of prepared screw-bolt hole 12 are corresponding with reserved joint bar 11, When mounted, the reserved joint bar 11 above lower floor's precast concrete wall panel 1 is stretched into upper strata pre-cast concrete walling In the prepared screw-bolt hole 12 of plate 1, and from prepared screw-bolt hole 12, pour into cement mortar grouting material, make, Lower floor's precast concrete shear wall component connects into reliable entirety.
As it is shown on figure 3, by some between described precast concrete wall panel 1 and described sleeper framework of steel reinforcement 2 Tension rib 3 is fixing to be connected, and described sleeper framework of steel reinforcement 2 is by some vertically arranged main muscle 21 and some hoops The rectangular structure of muscle 22 colligation, described tension rib 2 is fixing with main ribs 21 to be connected.Concrete, Tension rib 3 horizontal clearance is arranged, and wherein to horizontally extend into precast concrete wall panel 1 internal in one end, the other end with The main muscle 21 of sleeper framework of steel reinforcement 2 is fixing to be connected, and makes precast concrete wall panel 1 and described sleeper framework of steel reinforcement 2 are connected in one, and in the present embodiment, each sleeper framework of steel reinforcement 2 is passed through some hoops by 6 main muscle 21 Muscle 22 colligation forms, and the width along precast concrete wall panel 1 sets two rows, and often row is provided with 3, drawknot Muscle 3 is arranged in pairs, and corresponding with often arranging main muscle 21 respectively, wherein one end is stretched from precast concrete wall panel 1 After going out, muscle 21 main with 3 of a corresponding row is sequentially connected with respectively.
Preferably, the top of described precast concrete wall panel 1 is provided with at least two suspension ring 4, in the present embodiment, Suspension ring 4 are provided with two, are respectively arranged on precast concrete wall panel 1 both sides along its length, concrete, hang The lower end of ring 4 is fixed in precast concrete wall panel 1, and upper end is exposed from the top of precast concrete wall panel 1, For hoisting prefabricated concrete shear wall member.
Preferably, one of them side of described precast concrete wall panel 1 is provided with at least two diagonal brace point 13, In the present embodiment, diagonal brace point 13 is provided with two, is respectively arranged on precast concrete wall panel 1 leading flank near top Position, and spacing arrange, in installation process, precast concrete shear wall component is positioned.
Preferably, the top of each described prepared screw-bolt hole 12 is provided with a groove 14, and described groove 14 is with pre- Stay and bolt hole 12 is additionally provided with a strengthening stud, from prepared screw-bolt hole 12, pouring into cement mortar grouting material After, strengthening stud is inserted in prepared screw-bolt hole 12 from groove 14, improves upper and lower layer further pre- Bonding strength between concrete shear wall member processed, and more more reliable than slurry anchor sleeve connection, convenient.
The present invention also provides for the construction method of a kind of precast concrete shear wall component, comprises the following steps:
S1: the sleeper framework of steel reinforcement 2 of precast concrete wall panel 1 and both sides is formed integrally in the factory, secretly The sheathed containment vessel in post framework of steel reinforcement 2 periphery, is transported to job site and constructs;Concrete, described prefabricated Concrete panel 1 is arranged over some reserved joint bars 11, is provided with position below described precast concrete wall panel 1 The some prepared screw-bolt holes 12 suitable with described reserved joint bar 11.
S2: pour understructure beam 5, and be respectively provided with on understructure beam 5 and described pre-cast concrete walling Some reserved joint bars 11 that prepared screw-bolt hole 12 in plate 1 is suitable and right with described sleeper framework of steel reinforcement 2 The reserved steel bar 15 answered, as shown in Figure 4.
S3: above the precast concrete shear wall lifting component that completes in step S1 to understructure beam 5, Dock with the reserved joint bar 11 above described understructure beam 5 and reserved steel bar 15, though base knot Reserved joint bar on structure beam 5 inserts the prepared screw-bolt hole 12 below 11 precast concrete wall panels 1 stretching into correspondence In, pour in prepared screw-bolt hole 12 in cement slurry, and the groove 14 from prepared screw-bolt hole 12 and insert Strengthening stud, carries out colligation overlap joint by the main muscle 21 in reserved steel bar skeleton 2 with reserved steel bar 16 simultaneously.
S4: this precast concrete shear wall component is positioned, concrete, at described precast concrete wall panel At least two diagonal brace 6 is installed, i.e. at pre-cast concrete walling between one of them side and the understructure beam 5 of 1 On plate 1, the diagonal brace point 13 of two spacing settings respectively and arranges a diagonal brace between the upper surface of understructure beam 5 6, precast concrete shear wall component is positioned, as shown in Figure 5.
S5: as shown in Figure 6, in sleeper framework of steel reinforcement 2, casting concrete becomes structural column, and prefabricated Pour horizontal structure beam 7 above concrete shear wall member so that it is in precast concrete wall panel 1 in reserved Main muscle 21 in joint bar 11 and sleeper framework of steel reinforcement 2 exposes above described horizontal structure beam 7 becomes installation The reserved joint bar 11 of upper strata precast concrete shear wall component and reserved steel bar 15, in the present embodiment, pouring Diagonal brace 6 has been removed after horizontal structure beam 7.
S6: the precast concrete will constructed in upper strata precast concrete shear wall lifting component to step S5 Above shear wall component, complete with described horizontal structure beam 7 above the reserved joint bar 11 that exposes and reserved steel bar 15 dock, even if the reserved joint bar exposed above horizontal structure beam 7 inserts 11 stretches into corresponding precast concrete In prepared screw-bolt hole 12 below wallboard 1, in prepared screw-bolt hole 12, pour into cement slurry, and from reserved Groove 14 on bolt hole 12 inserts strengthening stud, simultaneously by pre-for upper strata precast concrete shear wall component Stay the main muscle 21 in framework of steel reinforcement 2 to carry out colligation overlap joint with reserved steel bar 16, make upper and lower layer concrete Soil shear wall component is mounted for one.
S7: repeat step S4-S6, until terminating.
The invention provides a kind of precast concrete shear wall component and construction method thereof, deposit compared to existing technology In following several respects advantage:
(1) eliminate the colligation work of the on-the-spot sleeper reinforcing bar to precast concrete wall panel 1 both sides, decrease On-site construction processes, reduces on-site construction time;
(2) eliminate between the on-the-spot sleeper framework of steel reinforcement 2 that precast concrete wall panel 1 and colligation are formed Connect work, improve efficiency of construction, decrease construction and take up room;
(3) shorten construction period, save artificial and time cost;
(4) improve building industrialization and mechanization degree, decrease the human resources to growing tension Rely on.
Although in specification being illustrated embodiments of the present invention, but these embodiments are intended only as Prompting, should not limit protection scope of the present invention.Carry out various province without departing from the spirit and scope of the present invention Slightly, replace and change should be included in protection scope of the present invention.

Claims (10)

1. a precast concrete shear wall component, it is characterised in that include precast concrete wall panel, be located at The sleeper framework of steel reinforcement of described precast concrete wall panel both sides, and it is sheathed on described sleeper framework of steel reinforcement periphery Containment vessel, described precast concrete wall panel is arranged over some reserved joint bars, described precast concrete wall panel Lower section is provided with some prepared screw-bolt holes that position is corresponding with described reserved joint bar.
Precast concrete shear wall component the most according to claim 1, it is characterised in that described prefabricated It is connected by some tension ribs are fixing between concrete panel with described sleeper framework of steel reinforcement.
Precast concrete shear wall component the most according to claim 2, it is characterised in that described sleeper Framework of steel reinforcement is by some vertically arranged main muscle and the rectangular structure of some stirrup colligations, described in draw Knot muscle is fixing with main ribs to be connected.
Precast concrete shear wall component the most according to claim 1, it is characterised in that described prefabricated The top of concrete panel is provided with at least two suspension ring.
Precast concrete shear wall component the most according to claim 1, it is characterised in that described prefabricated One of them side of concrete panel is provided with at least two diagonal brace point.
Precast concrete shear wall component the most according to claim 1, it is characterised in that each described The top of prepared screw-bolt hole is provided with a groove, is additionally provided with a strengthening stud in described groove and prepared screw-bolt hole.
7. the construction method of a precast concrete shear wall component, it is characterised in that comprise the following steps:
S1: the sleeper framework of steel reinforcement of precast concrete wall panel and both sides is formed integrally in the factory, at sleeper steel The sheathed containment vessel in muscles and bones frame periphery, is transported to job site and constructs;
S2: pour understructure beam, and be respectively provided with on understructure beam with in described precast concrete wall panel The suitable reserved joint bar of some prepared screw-bolt holes and the reserved steel bar corresponding with described sleeper framework of steel reinforcement;
S3: above the precast concrete shear wall lifting component that completes in step S1 to understructure beam, with Reserved joint bar and reserved steel bar above described understructure beam dock;
S4: this precast concrete shear wall component is positioned;
S5: casting concrete becomes structural column in sleeper framework of steel reinforcement, and at precast concrete shear wall structure Pour horizontal structure beam above part so that it is in precast concrete wall panel in reserved joint bar and sleeper reinforcing bar Main muscle in frame exposes to become above described horizontal structure beam installs upper strata precast concrete shear wall component Reserved joint bar and reserved steel bar;
S6: the precast concrete will constructed in upper strata precast concrete shear wall lifting component to step S5 Above shear wall component, complete with described horizontal structure beam above the reserved joint bar that exposes and reserved steel bar carry out Docking;
S7: repeat step S4-S6, until terminating.
Construction method the most according to claim 7, it is characterised in that in described step S3 or S6, The method that described precast concrete shear wall component carries out docking with corresponding reserved joint bar and reserved steel bar skeleton For: make reserved joint bar stretch in the prepared screw-bolt hole below the precast concrete wall panel of correspondence, from reserved bolt Pour into cement slurry in hole, the main muscle in reserved steel bar skeleton and reserved steel bar are carried out colligation overlap joint simultaneously.
Construction method the most according to claim 8, it is characterised in that be additionally included in described reserved bolt Hole is inserted into strengthening stud and is fixed.
Construction method the most according to claim 7, it is characterised in that in described step S4, right The method that described precast concrete shear wall component carries out positioning is: at described precast concrete wall panel wherein At least two diagonal brace is installed between one side and understructure beam.
CN201610367668.9A 2016-05-30 2016-05-30 A kind of precast concrete shear wall component and its construction method Active CN105839836B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610367668.9A CN105839836B (en) 2016-05-30 2016-05-30 A kind of precast concrete shear wall component and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610367668.9A CN105839836B (en) 2016-05-30 2016-05-30 A kind of precast concrete shear wall component and its construction method

Publications (2)

Publication Number Publication Date
CN105839836A true CN105839836A (en) 2016-08-10
CN105839836B CN105839836B (en) 2018-08-21

Family

ID=56595130

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610367668.9A Active CN105839836B (en) 2016-05-30 2016-05-30 A kind of precast concrete shear wall component and its construction method

Country Status (1)

Country Link
CN (1) CN105839836B (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106436895A (en) * 2016-10-26 2017-02-22 曲周县和盛新型建筑材料有限公司 Steel column-shear wall combined assembled residential building system and construction method thereof
CN106639046A (en) * 2016-12-30 2017-05-10 上海建工四建集团有限公司 Entirely prefabricated monolayer steel plate-concrete composite shear wall and assembly method thereof
CN107938856A (en) * 2017-12-29 2018-04-20 三筑工科技有限公司 Walling system
CN108756012A (en) * 2018-06-06 2018-11-06 中国建材国际工程集团有限公司 Tensioning rope connection component for connecting concrete panel and its application method
CN108951955A (en) * 2018-02-06 2018-12-07 中国建筑第八工程局有限公司 A kind of assembled integral reinforced concrete band keyway Coupled Shear Wall structure
CN109162375A (en) * 2018-10-16 2019-01-08 东北石油大学 Light steel phase transformation energy conservation Combined concrete wall of assembled and preparation method thereof
CN109723140A (en) * 2017-10-30 2019-05-07 李聪 A kind of construction method between precast stair
CN110094010A (en) * 2019-05-30 2019-08-06 湖南工学院 A kind of mixing wallboard of assembled architecture plate and preparation method thereof

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10131353A (en) * 1996-10-31 1998-05-19 Ando Corp Precast reinforced concrete made continuous layer earthquake resisting wall
CN203097016U (en) * 2013-03-08 2013-07-31 沈阳建筑大学建筑设计研究院 Assembled-type concrete frame shear wall structure
CN203307961U (en) * 2013-06-05 2013-11-27 南京工业大学 Section steel hidden post precast concrete dual-board shear wall structure
CN105507459A (en) * 2016-01-13 2016-04-20 天津大学 Assembled type shear wall upper-layer and lower-layer combined connection structure
CN205804745U (en) * 2016-05-30 2016-12-14 上海建工二建集团有限公司 A kind of precast concrete shear wall component

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10131353A (en) * 1996-10-31 1998-05-19 Ando Corp Precast reinforced concrete made continuous layer earthquake resisting wall
CN203097016U (en) * 2013-03-08 2013-07-31 沈阳建筑大学建筑设计研究院 Assembled-type concrete frame shear wall structure
CN203307961U (en) * 2013-06-05 2013-11-27 南京工业大学 Section steel hidden post precast concrete dual-board shear wall structure
CN105507459A (en) * 2016-01-13 2016-04-20 天津大学 Assembled type shear wall upper-layer and lower-layer combined connection structure
CN205804745U (en) * 2016-05-30 2016-12-14 上海建工二建集团有限公司 A kind of precast concrete shear wall component

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106436895A (en) * 2016-10-26 2017-02-22 曲周县和盛新型建筑材料有限公司 Steel column-shear wall combined assembled residential building system and construction method thereof
CN106639046A (en) * 2016-12-30 2017-05-10 上海建工四建集团有限公司 Entirely prefabricated monolayer steel plate-concrete composite shear wall and assembly method thereof
CN109723140A (en) * 2017-10-30 2019-05-07 李聪 A kind of construction method between precast stair
CN107938856A (en) * 2017-12-29 2018-04-20 三筑工科技有限公司 Walling system
CN107938856B (en) * 2017-12-29 2023-10-27 三一筑工科技股份有限公司 wall system
CN108951955A (en) * 2018-02-06 2018-12-07 中国建筑第八工程局有限公司 A kind of assembled integral reinforced concrete band keyway Coupled Shear Wall structure
CN108756012A (en) * 2018-06-06 2018-11-06 中国建材国际工程集团有限公司 Tensioning rope connection component for connecting concrete panel and its application method
CN108756012B (en) * 2018-06-06 2024-01-26 中国建材国际工程集团有限公司 Tensioning rope connection assembly for connecting concrete wall panels and method of use thereof
CN109162375A (en) * 2018-10-16 2019-01-08 东北石油大学 Light steel phase transformation energy conservation Combined concrete wall of assembled and preparation method thereof
CN110094010A (en) * 2019-05-30 2019-08-06 湖南工学院 A kind of mixing wallboard of assembled architecture plate and preparation method thereof

Also Published As

Publication number Publication date
CN105839836B (en) 2018-08-21

Similar Documents

Publication Publication Date Title
CN105839836A (en) Precast concrete shear wall component and construction method thereof
CN108005387B (en) Synchronous construction method for cast-in-place main body of assembled wallboard and short-limb shear wall
CN101818570B (en) Method for constructing girder structure conversion layer of high-rise building
CN102251667B (en) Construction method for reinforced concrete arched roof of grain store
CN102979221B (en) Shear wall structure configured with crossed slant internal prestress and construction method of shear wall structure
CN106245678B (en) Outer wall of basement single side formwork construction method based on steel pipe truss
CN104947831A (en) Prefabricated assembly type profile steel concrete shear wall and construction method thereof
CN103088942A (en) Building structure without form removal
CN107476470A (en) Steel pipe built in assembled and GFRP pipe regeneration concrete compound shear walls and its construction method
CN105133755A (en) Method for construction of steel bar welding net rack composite shear wall and shear wall structure
CN205804745U (en) A kind of precast concrete shear wall component
CN112049236A (en) Construction method for hanging decoration construction platform under high-altitude large cantilever structure of high-rise building
CN102605883A (en) Light steel joist partition connecting structure and construction method thereof
CN114592688A (en) Construction method of oblique reinforced concrete shear wall based on equivalent rod piece model
CN108385869B (en) Construction method using wall unit for superposed shear wall
CN206769199U (en) After wear formula post stretching vertical prestressing cast-in-place concrete rod structure
CN206769200U (en) First wear formula post stretching vertical prestressing cast-in-place concrete rod structure
CN107100322B (en) Post stretching vertical prestressing cast-in-place concrete rod structure and construction method
CN108130889B (en) Manufacturing method of stepped construction joint between main bottom plate of pump brake and side wall of runner layer
CN106400960A (en) Building framework
CN207672745U (en) A kind of node structure of precast prestressed assembled composite beam-prefabricated post
CN216664766U (en) Assembled parapet that cornices
CN106592827A (en) Integral poured wall body and pouring technique thereof
CN114135116A (en) Construction method for enlarging and reinforcing cross section of existing structural beam and reinforcing device
CN109680852B (en) Composite floor slab and construction method and splicing method thereof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant