CN105839663B - 上翻垫层圈梁结合竖向锚管加固软土基坑方法 - Google Patents
上翻垫层圈梁结合竖向锚管加固软土基坑方法 Download PDFInfo
- Publication number
- CN105839663B CN105839663B CN201510015674.3A CN201510015674A CN105839663B CN 105839663 B CN105839663 B CN 105839663B CN 201510015674 A CN201510015674 A CN 201510015674A CN 105839663 B CN105839663 B CN 105839663B
- Authority
- CN
- China
- Prior art keywords
- collar tie
- tie beam
- bed course
- cushion cap
- hole
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Foundations (AREA)
Abstract
本发明提供一种上翻垫层圈梁(暗梁)结合竖向锚管加固软土基坑方法,主要包括以下步骤:(1)土方开挖至垫层底标高;(2)竖向锚管沉管与注浆施工;(3)承台、坑中坑土方开挖;(4)坑底垫层及砖胎膜施工;(5)垫层、承台圈梁、坑中坑周边圈梁以及上翻圈梁钢筋绑扎;(6)上翻圈梁模板支设;(7)上翻圈梁、加筋垫层、承台、承台圈梁以及坑中坑周边圈梁的混凝土浇筑。本发明的有益效果是:不仅加强了结构体系的整体性,增加了围护的脚边土体强度,提高了坑底土体的稳定性,减少基坑支护的暴露时间,保证了软土基坑的安全,有效控制软土深基坑支护体系的位移与变形,还能降低经济成本、减少对周围环境的影响。
Description
技术领域
本发明涉及一种基坑加固方法,尤其是一种上翻垫层圈梁结合竖向锚管加固软土基坑方法。
背景技术
随着城市建设的迅速发展,建筑物地下室空间的需求日益增加,深基坑工程的数量不断增多。软土深基坑的土体开挖不仅仅是一项简单的土方工程,它更关系到基坑工程的安全和建设成本,因此,软土深基坑的围护加固非常重要。传统的软土深基坑围护加固方法,虽然也能起到加固软土深基坑的效果,但加固的施工周期长、成本高,且缺少适用于基坑位移明显过大时的应急抢险措施。
发明内容
为了克服上述现有技术的不足,本发明提供了一种上翻垫层圈梁结合竖向锚管加固软土基坑方法,不仅能有效加固基坑围护、增强围护体系的稳定性、减小基坑的位移变形,还能结合竖向锚管注浆,提高坑中坑部位土体的强度,保证坑底土体的稳定性,有效简化施工工艺、缩短工期,降低施工成本,同时也减少了对周围环境的影响。
本发明采用的技术方案是:采用上翻垫层圈梁结合竖向锚管加固软土基坑方法,将垫层、竖向锚管以及围护桩结合在一起,利用上翻圈梁和承台圈梁加强结构体系的整体性,具体操作步骤如下:
(1)土方开挖至垫层底标高;
(2)竖向锚管沉管与注浆施工;
(3)承台、坑中坑土方开挖;
(4)坑底垫层及砖胎膜施工;
(5)垫层、承台圈梁、坑中坑周边圈梁以及上翻圈梁钢筋绑扎;
(6)上翻圈梁模板支设;
(7)同时进行上翻圈梁、加筋垫层、承台、承台圈梁以及坑中坑周边圈梁的混凝土浇筑。
优选的,所述的步骤(2)中,竖向锚管在临近承台、坑中坑处一排间距适当加密,锚管注浆时采用先外围后内部的注浆方式,注浆顺序采用跳孔间隔注浆方式进行。
优选的,所述的步骤(5)中,垫层钢筋伸至基坑围护边及承台、坑中坑周边设置的圈梁内,注浆钢管锚入承台圈梁和坑中坑周边圈梁内,且承台圈梁顶面标高同垫层面标高。
优选的,所述的步骤(5)中,底板垫层钢筋绑扎完毕后,随即进行上翻圈梁的钢筋绑扎,上翻圈梁外侧贴至围护桩边,内边线在地下室外墙外,上翻圈梁底标高与垫层底标高相同,宽度为底板至围护边的距离。
与现有技术相比,本发明的有益效果是:本发明的上翻垫层圈梁结合竖向锚管加固软土基坑方法,利用圈梁将底板垫层、竖向锚管以及围护桩结合在一起,不仅加强了结构体系的整体性,增加了围护的脚边土体强度,提高了坑底土体的稳定性,减少基坑支护的暴露时间,保证了软土基坑的安全,有效控制软土深基坑支护体系的位移与变形,还能降低经济成本、减少对周围环境的影响。
附图说明
图1是上翻垫层圈梁结合竖向锚管加固软土基坑体系的示意图。
图2是上翻垫层圈梁的示意图。
图3是承台圈梁的示意图。
其中1-竖向注浆锚管;2-承台;21-上翻圈梁;22-承台圈梁;23-坑中坑圈梁;3-围护桩;4-底板垫层;5-底板。
具体实施方式
下面结合附图和实施例对本发明做进一步的说明。
如图1至图3所示,本发明上翻垫层圈梁结合竖向锚管加固软土基坑方法,具体操作步骤如下:
(1)严格按照施工图纸和规范要求进行软土基坑的土方开挖,对称、平衡、分层、分段开挖至设计垫层标高,严禁基坑土方超挖;
(2)及时进行竖向锚管的沉管与注浆施工,钢管间距为800mm×800mm,在临近承台、坑中坑处一排加密至400mm,锚管采用先外围后内部的注浆方式跳孔间隔注浆,水泥浆液在注浆时压力控制在0.4~0.6MPa,坑底2m范围内不注浆;
(3)待竖向锚管养护达到设计强度后,进行承台、坑中坑的土方开挖,采用人工配合小挖机的方式进行,减小对基坑土体的扰动;
(4)及时浇筑承台、坑中坑垫层,减小软土深基坑暴露时间,并进行砖胎膜施工;
(5)在软土基坑加固部位设置200mm厚C30配筋垫层,垫层采用14@200的钢筋进行绑扎,垫层钢筋伸至基坑围护边,承台、坑中坑周边设置400mm×500mm的圈梁,垫层钢筋及注浆钢管伸入圈梁内,承台四周圈梁顶面标高同垫层面标高,再进行上翻圈梁的钢筋绑扎,上翻圈梁外侧贴至围护桩边,内边线在地下室外墙外,上翻圈梁高为1000mm,宽为底板至围护边的距离,上翻圈梁底标高同垫层底标高;
(6)支设上翻垫层圈梁模板,支设工艺与普通翻梁的模板支设工艺相同;
(7)同时进行上翻圈梁、加筋垫层、承台圈梁、坑中坑周边圈梁的混凝土浇筑,拆除上翻圈梁模板后,即可进行底板的施工。
以上所述仅为本发明的具体实施例,但本发明的技术特征并不局限于此,上翻垫层圈梁或者暗梁结合竖向锚管加固软土基坑方法也在本领域的技术人员在本发明的领域内,所作的变化或修饰皆涵盖在本发明的专利范围之中。
Claims (4)
1.上翻垫层圈梁结合竖向锚管加固软土基坑方法,其特征在于,包括以下步骤:
(1)土方开挖至垫层底标高;
(2)竖向锚管沉管与注浆施工;
(3)承台、坑中坑土方开挖;
(4)坑底垫层及砖胎膜施工;
(5)垫层、承台圈梁、坑中坑周边圈梁以及上翻圈梁钢筋绑扎;
(6)上翻圈梁模板支设;
(7)同时进行上翻圈梁、加筋垫层、承台、承台圈梁以及坑中坑周边圈梁的混凝土浇筑。
2.根据权利要求1所述的上翻垫层圈梁结合竖向锚管加固软土基坑方法,其特征在于,在步骤(2)中,竖向锚管在临近承台、坑中坑处一排间距加密处理,锚管注浆时采用先外围后内部的注浆方式,注浆顺序采用跳孔间隔注浆方式进行。
3.根据权利要求1所述的上翻垫层圈梁结合竖向锚管加固软土基坑方法,其特征在于,在步骤(5)中,垫层钢筋伸至基坑围护边及承台、坑中坑周边设置的圈梁内,注浆钢管锚入承台圈梁和坑中坑周边圈梁内,且承台圈梁顶面标高同垫层上表面标高。
4.根据权利要求1所述的上翻垫层圈梁结合竖向锚管加固软土基坑方法,其特征在于,在步骤(5)中,底板垫层钢筋绑扎完毕后,随即进行上翻圈梁的钢筋绑扎,上翻圈梁外侧贴至围护桩边,内边线在地下室外墙外,上翻圈梁底标高与垫层底标高相同,宽度为底板至围护边的距离。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510015674.3A CN105839663B (zh) | 2015-01-13 | 2015-01-13 | 上翻垫层圈梁结合竖向锚管加固软土基坑方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510015674.3A CN105839663B (zh) | 2015-01-13 | 2015-01-13 | 上翻垫层圈梁结合竖向锚管加固软土基坑方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105839663A CN105839663A (zh) | 2016-08-10 |
CN105839663B true CN105839663B (zh) | 2018-03-13 |
Family
ID=57177984
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510015674.3A Active CN105839663B (zh) | 2015-01-13 | 2015-01-13 | 上翻垫层圈梁结合竖向锚管加固软土基坑方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105839663B (zh) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108374425B (zh) * | 2018-02-09 | 2023-12-22 | 中交二航局第四工程有限公司 | 承台及其基坑垫层施工结构和浇筑方法 |
CN110130356A (zh) * | 2019-06-05 | 2019-08-16 | 汕头市建筑工程总公司 | 一种淤泥质软土区地下室坑底整体式封底施工方法 |
CN110439272B (zh) * | 2019-07-30 | 2021-11-30 | 浙江恒鸿建设有限公司 | 现浇钢筋混凝土水池底板支模体系及施工方法 |
Family Cites Families (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0567640U (ja) * | 1992-02-14 | 1993-09-07 | 大成建設株式会社 | 地下式タンク |
CN201627207U (zh) * | 2010-03-10 | 2010-11-10 | 浙江金典建设有限公司 | 电梯井基坑松木桩支护结构 |
CN202644542U (zh) * | 2012-05-17 | 2013-01-02 | 华升建设集团有限公司 | 软土深基坑中坑结构 |
CN203383508U (zh) * | 2013-08-13 | 2014-01-08 | 宁波建工股份有限公司 | 一种背靠砖混挡土墙的单侧支模体结构 |
-
2015
- 2015-01-13 CN CN201510015674.3A patent/CN105839663B/zh active Active
Also Published As
Publication number | Publication date |
---|---|
CN105839663A (zh) | 2016-08-10 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105089061B (zh) | 一种超深基坑支护方法 | |
CN102182325B (zh) | 一种框架结构独立基础既有建筑物地下室增层方法 | |
CN105239586B (zh) | 一种采用支撑结构支护基坑的方法 | |
CN205742213U (zh) | 基坑支护结构 | |
CN105951848B (zh) | 超深基坑支撑无间歇复合式转换结构及施工方法 | |
CN105220703B (zh) | 一种基于回砂平衡法条件下围挡式深水承台施工方法 | |
CN104947682A (zh) | 一种基坑支护施工方法及其装置 | |
CN103938634B (zh) | 一种深基坑支护结构及施工方法 | |
CN103452120B (zh) | 一种用于基坑支护的高强预应力管桩的桩顶冠梁结构及其施工方法 | |
CN105064381B (zh) | 一种高低刃脚双壁钢围堰钢筋混凝土一次封底施工方法 | |
CN102162258A (zh) | 一种塔吊钢管混凝土高桩塔基结构及构建方法 | |
CN105839663B (zh) | 上翻垫层圈梁结合竖向锚管加固软土基坑方法 | |
CN208267862U (zh) | 一种隧道路面裂缝处的加固装置 | |
CN102071698A (zh) | 基础下翻梁、承台垫层的施工方法 | |
CN106193047A (zh) | 大宽度基坑支护施工方法 | |
CN203160254U (zh) | 一种基坑围护结构 | |
CN206448285U (zh) | 岩层地质条件下无封底混凝土组合式围堰 | |
CN204435407U (zh) | 一种斜柱群锚式岩石基础 | |
CN109252676A (zh) | 一种地下室承台的生产工艺及其安全施工方法 | |
CN106400814A (zh) | 一种基坑支护方法 | |
CN102605801A (zh) | 一种地下圆形水池悬挂半逆作施工方法 | |
CN203821399U (zh) | 一种深基坑支护结构 | |
CN106120853B (zh) | 一种框架桥的逆序施工方法 | |
CN212175798U (zh) | 一种深基坑整体支撑装置 | |
CN210530848U (zh) | 黄土地区大跨小净距非对称断面隧道支护结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB03 | Change of inventor or designer information | ||
CB03 | Change of inventor or designer information |
Inventor after: Bao Chunnan Inventor after: Wu Ningqing Inventor after: Zhang Jingli Inventor after: Xiao Ting Inventor before: Bao Chunnan Inventor before: Wu Ningqing Inventor before: Fu Jing Inventor before: Chen Zhengli |
|
GR01 | Patent grant | ||
GR01 | Patent grant |