CN105838836B - A kind of row's arrangement technology of dust pelletizing system - Google Patents

A kind of row's arrangement technology of dust pelletizing system Download PDF

Info

Publication number
CN105838836B
CN105838836B CN201610172452.7A CN201610172452A CN105838836B CN 105838836 B CN105838836 B CN 105838836B CN 201610172452 A CN201610172452 A CN 201610172452A CN 105838836 B CN105838836 B CN 105838836B
Authority
CN
China
Prior art keywords
coke oven
main pipeline
raw coke
crane
oven gas
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610172452.7A
Other languages
Chinese (zh)
Other versions
CN105838836A (en
Inventor
李艳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ansteel Engineering Technology Corp Ltd
Original Assignee
Ansteel Engineering Technology Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ansteel Engineering Technology Corp Ltd filed Critical Ansteel Engineering Technology Corp Ltd
Priority to CN201610172452.7A priority Critical patent/CN105838836B/en
Publication of CN105838836A publication Critical patent/CN105838836A/en
Application granted granted Critical
Publication of CN105838836B publication Critical patent/CN105838836B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21BMANUFACTURE OF IRON OR STEEL
    • C21B7/00Blast furnaces
    • C21B7/22Dust arresters
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21BMANUFACTURE OF IRON OR STEEL
    • C21B7/00Blast furnaces
    • C21B7/002Evacuating and treating of exhaust gases

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Manufacturing & Machinery (AREA)
  • Materials Engineering (AREA)
  • Metallurgy (AREA)
  • Organic Chemistry (AREA)
  • Coke Industry (AREA)

Abstract

One row's arrangement technology of a kind of dust pelletizing system, including deduster, raw coke oven gas main pipeline, purified gas main pipeline, raw coke oven gas branch pipe(tube), purified gas branch pipe(tube), steel structure frame, lower floor's crane, upper strata crane;Deduster arrangement in a row;Purified gas main pipeline is in alignment, is vertically arranged with the purified gas branch pipe(tube) of deduster upper end;Raw coke oven gas main pipeline is in alignment, is vertically arranged with the raw coke oven gas branch pipe(tube) of deduster lower end;Deduster, raw coke oven gas main pipeline, purified gas main pipeline, raw coke oven gas branch pipe(tube) and purified gas branch pipe(tube) are fixed by steel structure frame and supported;Upper strata crane is arranged on the upper end of purified gas outlet, and lower floor's crane is arranged on the upper end of raw coke oven gas entrance.The present invention is using one row's arrangement technology of deduster, and pipeline rout is single, and piping support structure is simple, and floor-type support is few;Crane unidirectionally slides, and mounting structure is simple;Floor space can be reduced, reduces the consumption of steel, reduces cost of investment.

Description

A kind of row's arrangement technology of dust pelletizing system
Technical field
The present invention relates to the technical field of dust pelletizing system more particularly to a kind of row's arrangement technologies of dust pelletizing system.
Background technology
The dedusting of blast furnace gas is generally using two rows of arrangements, and the pipeline rout of this arrangement technology is more, the connection of pipeline Structure is also very complicated, so corresponding need to configure more and complicated steel structure support, and required floor stand is also more.Separately Outside, due to being double setting, crane needs are slided all around on four direction, it is therefore desirable to hoist ceiling crane integrated stand If not only increase the steel structure support of crane, and the integral load of crane is also very big.
In conclusion this double dedusting arrangement technology has the defects of taking up a large area, consumption steel material is big, it is being transformed Property project in be difficult find rational Placement of general layout.
Invention content
The object of the present invention is to provide a kind of row's arrangement technology of dust pelletizing system, using one row's arrangement technology of deduster, Pipeline rout is single, and piping support structure is simple, and floor-type support is few;Crane unidirectionally slides, and mounting structure is simple;It can reduce and account for Ground area reduces the consumption of steel, reduces cost of investment.
To achieve the above object, the present invention is realized using following technical scheme:
One row's arrangement technology of a kind of dust pelletizing system, including deduster, raw coke oven gas main pipeline, purified gas main pipeline, waste coal Gas branch pipe road, purified gas branch pipe(tube), steel structure frame, lower floor's crane, upper strata crane;The deduster arrangement in a row;Clean coal Gas main pipeline is in alignment, is vertically arranged with the purified gas branch pipe(tube) of deduster upper end, purified gas branch pipe(tube) one end and clean coal Gas supervisor's connection, the other end are connected with the outlet of deduster purified gas;Raw coke oven gas main pipeline is in alignment, with deduster lower end Raw coke oven gas branch pipe(tube) is vertically arranged, and raw coke oven gas branch pipe(tube) one end is connect with raw coke oven gas main pipeline, the other end and deduster raw coke oven gas Entrance connects;Deduster, raw coke oven gas main pipeline, purified gas main pipeline, raw coke oven gas branch pipe(tube) and purified gas branch pipe(tube) pass through steel knot Structure frame fixes support;Upper strata crane is arranged on the upper end of purified gas outlet, and lower floor's crane is arranged on the upper end of raw coke oven gas entrance.
The steel structure frame top is provided with crane sliding rail, for installing upper strata crane;On steel structure frame, famine The upper end of gas entry is provided with lower floor's crane stent, crane sliding rail is fixed on lower floor's crane stent, for installing lower floor Crane.
The crane sliding rail is set along the arranged direction of deduster.
On the steel structure frame, the bottom of purified gas main pipeline be provided with several bearing diagonals as purified gas be responsible for The stent in road is used to support purified gas main pipeline.
On the steel structure frame, the bottom of raw coke oven gas main pipeline be provided with several bearing diagonals as raw coke oven gas be responsible for The stent in road is used to support raw coke oven gas main pipeline.
Compared with prior art, the beneficial effects of the invention are as follows:
1) using one row's arrangement technology of deduster, pipeline rout is single, and piping support structure is simple, and floor-type support is few, whole The floor space of body frame is few, reduces steel consumption.
2) crane unidirectionally slides, and unidirectional sliding rail is set on steel structure frame, and the mounting structure of crane is simple, reduces Itself load reduces the consumption of steel, reduces cost of investment.
Description of the drawings
Fig. 1 is the front view that artwork is put in an a kind of arrangement of dust pelletizing system of the present invention;
Fig. 2 is the A-A direction views of Fig. 1;
Fig. 3 is the B-B direction view of Fig. 1;
Fig. 4 is the side view that artwork is put in an a kind of arrangement of dust pelletizing system of the present invention;
In figure:1- raw coke oven gas main pipeline, 2- purified gas main pipeline, 3- raw coke oven gas branch pipe(tube), 4- purified gas branch pipe(tube), 5- are waste Coal gas main pipeline fixing bracket, 6- purified gas main pipelines fixing bracket, 7- lower floors crane stent, 8- lower floors crane, 9- upper stratas are hung Vehicle, 10- raw coke oven gas main pipelines stent, 11- purified gas main pipelines stent, 12- dedusters, the compound big pull rod type compensators of 13-, 14- operating platforms, 15- crossbeams, 16- pillars, 17- cat ladders.
Specific embodiment
Embodiments of the present invention are further illustrated with reference to the accompanying drawings of the specification:
A kind of row's arrangement technology of dust pelletizing system, including deduster 12, raw coke oven gas main pipeline 1, purified gas main pipeline 2, Raw coke oven gas branch pipe(tube) 3, purified gas branch pipe(tube) 4, steel structure frame, lower floor's crane 8, upper strata crane 9;The deduster 12 is in a row Arrangement;Purified gas main pipeline 2 is in alignment, is vertically arranged with the purified gas branch pipe(tube) 4 of 12 upper end of deduster, clean coal gas branch pipe 4 one end of road is connect with purified gas main pipeline 2, and the other end is connected with the outlet of 12 purified gas of deduster;Raw coke oven gas main pipeline 1 is into one Straight line is vertically arranged with the raw coke oven gas branch pipe(tube) 3 of 12 lower end of deduster, and 3 one end of raw coke oven gas branch pipe(tube) connects with raw coke oven gas main pipeline 1 It connects, the other end is connect with 12 raw coke oven gas entrance of deduster;Deduster 12, raw coke oven gas main pipeline 1, purified gas main pipeline 2, raw coke oven gas Branch pipe(tube) 3 and purified gas branch pipe(tube) 4 are fixed by steel structure frame to be supported;Upper strata crane 9 is arranged on the upper end of purified gas outlet, Lower floor's crane 8 is arranged on the upper end of raw coke oven gas entrance.It is equipped on raw coke oven gas branch pipe(tube) 3 and purified gas branch pipe(tube) 4 compound big Pull rod type compensator 13.
Steel structure frame is the frame structure being formed by connecting by pillar 16 and crossbeam 15, is provided with support on the frame structure With the steel structure support of fixed deduster 12.Cat ladder 17 is further fixed on steel structure frame, in raw coke oven gas layer and clean coal gas-bearing formation Each active section on be both provided with operating platform 14, operating platform 14 is connected by cat ladder 17.
The steel structure frame top is provided with crane sliding rail, for installing upper strata crane 9;On steel structure frame, The upper end of raw coke oven gas entrance is provided with lower floor's crane stent 7, crane sliding rail is fixed on lower floor's crane stent 7, for installing Lower floor's crane 8.
The crane sliding rail is set along the arranged direction of deduster 12.Since the traffic direction of crane is with removing One row's arranged direction of dirt device 12 is consistent, is all uniline trend, therefore two layers of crane all only sets one of sliding rail.
Upper strata crane 9 is directly by the use of the top of steel structure frame as the sliding rail rack of crane, it is not necessary to still further be increased Crane carriage.Lower floor's crane 8 is to set up the crane stent 7 that a uniline moves towards again in the front side of main body frame, lower floor's crane stent 7 It is to be set up using a part for main body frame.
Upper strata crane 9 is used to allocate and transport valve required during purified gas tubular service, filter bag of dust collector, cage bone etc..Lower floor hangs Vehicle 8 is used to allocate and transport valve required during raw coke oven gas pipeline maintenance etc..
On the steel structure frame, the bottom of purified gas main pipeline 2 be provided with several bearing diagonals as purified gas master Support of pipelines 11 is used to support purified gas main pipeline 2.Purified gas main pipeline stent 11 is fixed on steel knot by the way of bearing diagonal On the pillar 16 of structure frame, it is possible to reduce the floor stand of purified gas main pipeline 2.The present invention going out in purified gas main pipeline 2 Mouthful piece purified gas main pipeline fixing bracket 6 of end set, purified gas main pipeline fixing bracket 6 are erected from ground, top with it is net Coal gas main pipeline 2 is welded and fixed, for the fixed support of purified gas main pipeline 2.The other parts of purified gas main pipeline 2 are overlapped on On purified gas main pipeline stent 11, due to expanding with heat and contract with cold, purified gas main pipeline 2 can generate one on purified gas main pipeline stent 11 Quantitative telescopic displacement.
On the steel structure frame, the bottom of raw coke oven gas main pipeline 1 be provided with several bearing diagonals as raw coke oven gas master Support of pipelines 10 is used to support raw coke oven gas main pipeline 1.It is identical with the support construction of purified gas main pipeline, raw coke oven gas main pipeline stent 10 are equally fixed on by the way of bearing diagonal on the pillar 16 of steel structure frame, it is possible to reduce the landing of raw coke oven gas main pipeline 1 Stent.A piece raw coke oven gas main pipeline fixing bracket 5 only is set in the outlet end of raw coke oven gas main pipeline 1, raw coke oven gas main pipeline is consolidated Fixed rack 5 is erected from ground, and top is welded and fixed with raw coke oven gas main pipeline 1, for the fixed support of raw coke oven gas main pipeline 1.It is waste The other parts of coal gas main pipeline 1 are overlapped on raw coke oven gas main pipeline stent 10, due to expanding with heat and contract with cold, 1 meeting of raw coke oven gas main pipeline A certain amount of telescopic displacement is generated on raw coke oven gas main pipeline stent 10.
The present invention puts the arrangement of deduster 12 1, and the purified gas being connected with the outlet of its purified gas and raw coke oven gas entrance is responsible for Also point-blank, this arrangement can be directly sharp for setting in the same direction with deduster 12 respectively for road 2 and raw coke oven gas main pipeline 1 By the use of the steel structure frame for setting up deduster as steel structure base, bearing diagonal is fixed on its pillar 16 and is responsible for as purified gas In addition the stent in road 2 and raw coke oven gas main pipeline 1 need to only set up the fixed pillar 5,6 of two landings, can save a large amount of again Steel consume, and reduce floor space.
Meanwhile row's arrangement of deduster so that crane moves towards unification, and upper strata crane 9 directly utilizes steel knot Structure frame sets up sliding rail, and the sliding rail rack of lower floor's crane 8 is set up using a part for main body frame.With it is of the prior art The double arrangement of deduster is compared, itself load of crane is small, and the steel consumption of stent is small.
The present invention can effectively reduce the floor space of blast-furnace gas dedusting system in summary, reduce the consumption of steel Amount reduces cost of investment.
Described above is only the basic principle of the present invention, and not the present invention is imposed any restrictions, every right according to the present invention It carries out equivalent variations and modification, within the scope of the art of this patent protection scheme.

Claims (4)

1. a kind of row's arrangement technology of dust pelletizing system, including deduster, raw coke oven gas main pipeline, purified gas main pipeline, raw coke oven gas Branch pipe(tube), purified gas branch pipe(tube), steel structure frame, lower floor's crane, upper strata crane;The deduster arrangement in a row;Purified gas Main pipeline is in alignment, is vertically arranged with the purified gas branch pipe(tube) of deduster upper end, purified gas branch pipe(tube) one end and purified gas Supervisor's connection, the other end are connected with the outlet of deduster purified gas;Raw coke oven gas branch pipe(tube) one end is connect with raw coke oven gas main pipeline, another End is connect with deduster raw coke oven gas entrance;Deduster, raw coke oven gas main pipeline, purified gas main pipeline, raw coke oven gas branch pipe(tube) and clean coal Gas branch pipe road is fixed by steel structure frame and supported;Upper strata crane is arranged on the upper end of purified gas outlet, and lower floor's crane is arranged on The upper end of raw coke oven gas entrance;It is characterized in that, raw coke oven gas main pipeline is in alignment, the raw coke oven gas branch pipe(tube) with deduster lower end It is vertically arranged in same level;The steel structure frame top is provided with crane sliding rail, for installing upper strata crane; On steel structure frame, the upper end of raw coke oven gas entrance be provided with lower floor's crane stent, be fixed on lower floor's crane stent crane cunning Rail, for installing lower floor's crane.
2. row's arrangement technology of a kind of dust pelletizing system according to claim 1, which is characterized in that the crane sliding rail is It is set along the arranged direction of deduster.
3. row's arrangement technology of a kind of dust pelletizing system according to claim 1, which is characterized in that in the steel construction frame On frame, the bottom of purified gas main pipeline is provided with several bearing diagonals and is used to support purified gas as the stent of purified gas main pipeline Main pipeline.
4. row's arrangement technology of a kind of dust pelletizing system according to claim 1, which is characterized in that in the steel construction frame On frame, the bottom of raw coke oven gas main pipeline is provided with several bearing diagonals and is used to support raw coke oven gas as the stent of raw coke oven gas main pipeline Main pipeline.
CN201610172452.7A 2016-03-24 2016-03-24 A kind of row's arrangement technology of dust pelletizing system Active CN105838836B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610172452.7A CN105838836B (en) 2016-03-24 2016-03-24 A kind of row's arrangement technology of dust pelletizing system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610172452.7A CN105838836B (en) 2016-03-24 2016-03-24 A kind of row's arrangement technology of dust pelletizing system

Publications (2)

Publication Number Publication Date
CN105838836A CN105838836A (en) 2016-08-10
CN105838836B true CN105838836B (en) 2018-06-26

Family

ID=56583168

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610172452.7A Active CN105838836B (en) 2016-03-24 2016-03-24 A kind of row's arrangement technology of dust pelletizing system

Country Status (1)

Country Link
CN (1) CN105838836B (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2905187Y (en) * 2006-04-29 2007-05-30 江苏科林集团有限公司 Converter coal gas dry-process purifying bag type dust collector
CN201581097U (en) * 2009-12-30 2010-09-15 中冶南方工程技术有限公司 Group control device of blast furnace gas bag dedusting system for cone pump ash conveying
CN202492532U (en) * 2012-03-14 2012-10-17 沃晓枫 Gas dry-method bag dust removal device for blast furnace

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2905187Y (en) * 2006-04-29 2007-05-30 江苏科林集团有限公司 Converter coal gas dry-process purifying bag type dust collector
CN201581097U (en) * 2009-12-30 2010-09-15 中冶南方工程技术有限公司 Group control device of blast furnace gas bag dedusting system for cone pump ash conveying
CN202492532U (en) * 2012-03-14 2012-10-17 沃晓枫 Gas dry-method bag dust removal device for blast furnace

Also Published As

Publication number Publication date
CN105838836A (en) 2016-08-10

Similar Documents

Publication Publication Date Title
CN104074358B (en) The construction method of prefabricated building
CN104179090B (en) A kind of subway is laid a railway track system
CN207453859U (en) A kind of constructing tunnel foldable lifting Operation Van
CN105838836B (en) A kind of row's arrangement technology of dust pelletizing system
CN107740352A (en) The isolating and protecting platform and construction method of bridge maintaining transformation are shared applied to rail-road
CN205955766U (en) A simple and easy multi -functional dolly that is used for tunnel no. 2 lining concrete maintenance dust falls
CN102126561B (en) Boarding bridge
CN209039945U (en) A kind of trapezoidal bracket simple beam structure used under the conditions of heavy grade
CN206783160U (en) Tunnel inner spout group is to hydraulic pressure portal frame
CN204023325U (en) A kind of subway system of laying a railway track
CN202430242U (en) Pot-string type blast furnace bell-less top charging device
CN207619864U (en) Frame lookum
CN206888671U (en) A kind of convenient guard rail set up of rail construction
CN207266750U (en) A kind of roof of train job safety ensures equipment and system
CN205556728U (en) Combination rack is built by laying to converter lining
CN207405845U (en) It is a kind of to be used to carry out large-scale component transport, the device having bad luck on light roof
CN207536962U (en) A kind of car external passenger elevators
CN207159256U (en) A kind of blast furnace top gearbox overhauls Lift-on/Lift-off System
CN202508767U (en) Round pipe-shaped telescopic lifting appliance mounting rod
CN207275602U (en) The sliding platform removed for pipeline under the conditions of complex space
CN205739979U (en) Inclined ladder platform
CN206360391U (en) A kind of architectural stair temporary guard rail
CN102498978B (en) Canvas type protective shed for building coke oven and manufacturing method thereof
CN209652975U (en) A kind of hypogee structure that low layer is high
CN212361225U (en) Combined anti-seismic support

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant