CN105836553A CN201510014508.1A CN201510014508A CN105836553A CN 105836553 A CN105836553 A CN 105836553A CN 201510014508 A CN201510014508 A CN 201510014508A CN 105836553 A CN105836553 A CN 105836553A
Authority
CN
China
Prior art keywords
information
elevator
floor
building
traffic
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510014508.1A
Other languages
Chinese (zh)
Other versions
CN105836553B (en
Inventor
门马直秀
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toshiba Elevator and Building Systems Corp
Original Assignee
Toshiba Elevator Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toshiba Elevator Co Ltd filed Critical Toshiba Elevator Co Ltd
Publication of CN105836553A publication Critical patent/CN105836553A/en
Application granted granted Critical
Publication of CN105836553B publication Critical patent/CN105836553B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B50/00Energy efficient technologies in elevators, escalators and moving walkways, e.g. energy saving or recuperation technologies

Landscapes

  • Elevator Control (AREA)

Abstract

The invention provides an elevator group management control device. An elevator group management control device(50) according to an embodiment includes: an inside-building traffic demand prediction computation part(504), a car-to-be-allocated determination part(506) and a control command output part(507). The inside-building traffic demand prediction computation part(504) computes traffic demand prediction information for each floor on the basis of information on power consumption of each floor. When a hall call is registered, the car-to-be-allocated determination part(506) determines, as an elevator to respond to the hall call, an elevator that can deal with the traffic demand prediction information on a floor where the hall call is registered and reaches the floor with a short time on the basis of elevator operation state information and the computed traffic demand prediction information of each floor. The control command output part(507) outputs to the elevator determined to respond to the hall call a command for responding to the hall call.

Description

The group management control apparatus of elevator
Technical field
Embodiments of the present invention relate to the group management control apparatus of elevator.
Background technology
In the past, in the control of elevator, in order to tackle according to time period and/or what day and different building Build the traffic needs in thing, cut by the switch etc. in manager's operation control panel and/or cage It is changed to the suitable method of operation.
But, in as above control, and it is predicted as producing increase and decrease that traffic needs Time period and/or what day match incompatible switchover operation mode, exist and do not carry out and actual traffic needs The situation of control corresponding to change.It addition, for switchover operation mode, need to be carried out by manager Operation, there is also cost this problem time.
Then, the path of elevator hall leading to each floor arranges camera apparatus, thus to elevator profit User is counted by number, and number based on this elevator user counted out judges traffic The change needed the method for operation switching elevator such that it is able to realize needing corresponding with actual traffic Control.As such technology, there is the technology described in Japanese Unexamined Patent Publication 2007-31110 publication (hereinafter referred to as patent documentation 1).
Summary of the invention
The problem that invention is to be solved
But, there are the following problems: arranges camera apparatus on the path of each floor and can spend cost, And the time of setting can be spent.It addition, there is also following problem: cannot judge to pass through on path People be whether the user of elevator, the judgement precision that traffic needs can step-down.
The present invention completes in view of the foregoing, its object is to provide the group of a kind of elevator to manage Control device, in the building being provided with multiple elevator, it is possible to need pre-based on high-precision traffic Survey and carry out improve the control of transfer efficiency with low cost.
Means for solving the above
According to the embodiment for reaching above-mentioned purpose, the group management control apparatus of elevator has building Traffic demand forecast operational part, Distribution Unit determination section and control instruction output unit in thing.Building Interior traffic demand forecast operational part use based on each floor amount of power information carrys out the traffic of each floor of computing Need information of forecasting.Distribution Unit determination section register boarding place calling time, operating based on elevator Condition information and the traffic demand forecast information of each floor calculated, will cope with boarding place calling The traffic demand forecast information of operation layer and arrive time of this boarding place call operation layer short elevator It is determined as responding the elevator of this boarding place calling.Control instruction output unit is to being decided to be response boarding place The elevator output of calling is for making it respond the instruction of boarding place calling.
Accompanying drawing explanation
Fig. 1 is the elevator device of the group management control apparatus illustrating the elevator that make use of the 1st embodiment The overall diagram of structure.
Fig. 2 is to illustrate the traffic needs that the group management control apparatus of the elevator by the 1st embodiment performs The flow chart of the action of information of forecasting calculation process.
Fig. 3 is to illustrate the Distribution Unit that the group management control apparatus of the elevator by the 1st embodiment performs The flow chart of the action that decision processes.
Fig. 4 is to register boarding place calling at the group management control apparatus of the elevator by the 1st embodiment Time building in the explanatory diagram of situation.
Fig. 5 be the elevator being shown in the 1st embodiment group management control apparatus in use amount of power anxious The situation in building during drastic change is explanatory diagram.
Fig. 6 is the elevator device of the group management control apparatus illustrating the elevator that make use of the 2nd embodiment The overall diagram of structure.
Fig. 7 is to illustrate that the standby layer that the group management control apparatus of the elevator by the 2nd embodiment performs sets The flow chart of the fixed action processed.
Fig. 8 be the elevator being shown in the 2nd embodiment group management control apparatus in register boarding place The explanatory diagram of the situation in building during calling.
Fig. 9 be the elevator being shown in the 2nd embodiment group management control apparatus in use amount of power anxious The situation in building during drastic change is explanatory diagram.
Figure 10 is the elevator device of the group management control apparatus illustrating the elevator that make use of the 3rd embodiment The overall diagram of structure.
Figure 11 is to illustrate the traffic needs that the group management control apparatus of the elevator by the 3rd embodiment performs The flow chart of the action that prediction information operation processes.
Figure 12 is the elevator device of the group management control apparatus illustrating the elevator that make use of the 4th embodiment The overall diagram of structure.
Figure 13 is to illustrate the traffic needs that the group management control apparatus of the elevator by the 4th embodiment performs The flow chart of the action that confirmation processes.
Figure 14 is the elevator device of the group management control apparatus illustrating the elevator that make use of the 5th embodiment The overall diagram of structure.
Figure 15 is to illustrate the Distribution Unit that the group management control apparatus of the elevator by the 5th embodiment performs The flow chart of the action that decision processes.
Figure 16 is to illustrate that the standby layer that the group management control apparatus of the elevator by the 5th embodiment performs sets The flow chart of the fixed action processed.
Label declaration
1~5 ... elevator device, 10A~10C ... elevator, 12A~12C ... boarding place door, 13A~13C ... Control dish, 20A, 20B ... boarding place calling register button, 30 ... equipment machine, 40 ... building sets Standby use amount of power measuring device, 50 ... group management control apparatus, 111A~111C ... operation in car Dish, 112A~111C ... car door, 113A~111C ... load transducer, 131A~131C ... car Calling register, 132A~132C ... elevator operation information output unit, 133A~133C ... elevator runs Control portion, 501 ... elevator machine information maintaining part, 502 ... elevator operation information management department, 503 ... build Build thing equipment use amount of power input unit, 504 ... traffic demand forecast operational part in building, 505 ... Boarding place calling register, 506 ... Distribution Unit determination section, 507 ... elevator controlling instruction output unit, 508 ... standby layer configuration part, 509 ... in floor building number configuration part, 510 ... in building, traffic needs Confirmation portion, 511 ... floor information configuration part.
Detailed description of the invention
" the 1st embodiment "
In the 1st embodiment of the present invention, following group management control apparatus is illustrated, should Group management control apparatus use amount of power based on each floor in building or use amount of power Variable quantity predicts the traffic needs of each floor, and carries out group based on this and manage control.
<structure of the elevator device of the 1st embodiment>
With reference to Fig. 1, the structure to the elevator device of the group management control apparatus that make use of present embodiment Illustrate.
The elevator device 1 of present embodiment possesses: the A electromechanics arranged in the building of 7 floor heights Ladder 10A, No. B dynamo-electric ladder 10B and No. C dynamo-electric ladder these 3 elevator of 10C, at 1 floor~7 floor Each layer elevator riding at arrange boarding place calling register button 20-1A~20-7A and 20-1B~20-7B, the illumination to utilizing in each layer of 1 layer~7 layers, air-conditioning, multiple equipment such as PC Machine 30-1A~30-7A, 30-1B~30-7B ... the use amount of power building equipment that carries out measuring make The operating of electricity consumption strength measuring device 40 and ladder 10C dynamo-electric to No. A dynamo-electric ladder 10A~No. C is entered The group management control apparatus 50 that row controls.In the present embodiment, the boarding place of 1 layer~7 layers is called Register button 20-1A~20-7A are generically and collectively referred to as boarding place calling register button 20A, by 1 layer~7 layers take advantage of Call register button 20-1B at Ti~20-7B is generically and collectively referred to as boarding place calling register button 20B.It addition, By equipment machine 30-1A~30-7A, 30-1B~30-7B of 1 layer~7 layers ... be generically and collectively referred to as equipment machine 30.
No. A dynamo-electric ladder 10A has cage 11A, at 1 floor~the elevator riding of each floor of 7 floor Boarding place door 12-1A~12-7A that place is arranged and the action to the machine in No. A dynamo-electric ladder 10A The control dish 13A being controlled.Cage 11A has in the car including target zone register button Operation dish 111A, car door 112A and the detection arranged in bottom put on cage 11A The load transducer 113A of load capacity.Control dish 13A has registration by target zone register button Operate car call register 131A of the car call realized, manage control with predetermined time interval to group Device 50 processed export No. A dynamo-electric ladder 10A operational situation information (current location information, target zone, Rotation direction, car call register information, boarding place calling allocation situation, car internal load amount information Deng) elevator operation information output unit 132A and based on by car call register 131A register Car call information and from group management control apparatus 50 output control instruction control A machine The elevator motion control portion 133A of the action of the machine in elevator 10A.No. B dynamo-electric ladder 10B and C Number dynamo-electric ladder 10C also has the structure as No. A dynamo-electric ladder 10A.
In the present embodiment, boarding place door 12-1A~12-7A of 1 layer~7 layers is generically and collectively referred to as boarding place Door 12A, is generically and collectively referred to as boarding place door 12B by boarding place door 12-1B~12-7B, by boarding place door 12-1C~12-7C is generically and collectively referred to as boarding place door 12C.
It addition, in the present embodiment, at the elevator riding of each floor, boarding place door 12A it is provided with And boarding place calling register button 20A, boarding place door 12B and the boarding place between boarding place door 12B These 2 boarding place calling register button of boarding place calling register button 20B between door 12C, but also Number of units (1) less than 2 can be set, it is also possible to arranges more number of units (more than 3).
Group management control apparatus 50 has elevator machine information maintaining part 501, the management of elevator operation information Portion 502, building equipment use traffic demand forecast operational part in amount of power input unit 503, building 504, boarding place calling register 505, Distribution Unit determination section 506 and elevator controlling instruction are defeated Go out portion 507.
Elevator machine information maintaining part 501 keeps No. A dynamo-electric ladder 10A~No. C dynamo-electric ladder 10C each The staffing of cage, normal speed, purposes equal sign machine information.Elevator operation information management department 502 From No. A dynamo-electric ladder control dish 13A of 10A, control dish 13B and C of No. B dynamo-electric ladder 10B The control dish 13C of number dynamo-electric ladder 10C obtains the operational situation information of each elevator, and obtains by electricity Number machine information of each elevator that ladder machine information maintaining part 501 keeps, and passed out to Distribution Unit Determination section 506.Building equipment uses amount of power input unit 503 to input and is made electricity consumption by building equipment The use amount of power of the equipment machine 30 of each floor in the building that strength measuring device 40 measurement is arrived Information.In building, traffic demand forecast operational part 504 uses amount of power defeated based on from building equipment Entering the use amount of power information of each floor of portion 503 input, computing is by the time per unit of each floor Elevator utilizes the traffic demand forecast information of each floor that the information of forecasting of number represents, and is sent To Distribution Unit determination section 506.Boarding place calling register 505 obtains boarding place calling register button The operation information of 20A, 20B, registers the boarding place calling of each floor based on this.When by boarding When place's calling register 505 registers boarding place calling, Distribution Unit determination section 506 is based on from elevator The operational situation information of each elevator that operation information management department 502 sends out and number machine information, Yi Jiyou The traffic demand forecast information of each floor that traffic demand forecast operational part 504 calculates in building, The traffic demand forecast information of registered boarding place call operation layer will be coped with and arrive this and take advantage of The elevator that at Ti, the time of call operation layer is short is determined as responding the Distribution Unit of this boarding place calling.Electricity Ladder control instruction output unit 507 is to the control of the Distribution Unit determined by Distribution Unit determination section 506 Dish output responds the instruction of this boarding place calling.
<action of the elevator device of the 1st embodiment>
Then, the action to the elevator device 1 of present embodiment illustrates.In the present embodiment, In elevator machine information maintaining part 501, as No. A dynamo-electric ladder 10A, No. B dynamo-electric ladder 10B with And number machine information of No. C dynamo-electric ladder 10C, and maintain expression 3 and be same specification (staffing 20 people, normal speed 60/ point, typically by purposes) information.Further, at group management control apparatus In the elevator operation information management department 502 of 50, with predetermined time interval from each elevator 10A's~10C Control dish 13A~13C obtains the operational situation information of each elevator, and obtains by elevator machine information Number machine information of each elevator that maintaining part 501 keeps.It addition, set from building with predetermined time interval Standby use amount of power input unit 503 inputs and is used amount of power measuring device 40 to measure by building equipment Building in the use amount of power information of each floor of equipment machine 30 of each floor.
With reference to the flow chart of Fig. 2, to when achieving these information by group management control apparatus The process that in the building of 50, traffic demand forecast operational part 504 performs illustrates.
First, obtain from building equipment use amount of power measuring device 40 to building with predetermined time interval Build use amount of power information (S1) that thing equipment uses each floor of amount of power input unit 503 input.
Then, use amount of power information based on acquired each floor, the traffic of each floor of computing needs Want information of forecasting (S2).The traffic demand forecast information of each floor is utilized by the elevator of time per unit Number represents, by make the most by amount of power, then be predicted as elevator utilize number more to increase in the way of Carry out computing.
With reference to the flow chart of Fig. 3, to based on the traffic demand forecast information calculated by Distribution Unit The process that determination section 506 performs for boarding place calling registration illustrates.
First, when being called by boarding place by boarding place calling register button 20A or the operation of 20B When register 505 registers the boarding place calling of arbitrary floor, such as 4 layers and 6 layers ("Yes" of S11), In building, traffic demand forecast operational part 504 obtains the traffic demand forecast information of each floor, and And operational situation information and number machine information of each elevator is obtained from elevator operation information management department 502.Ginseng According to Fig. 4, acquired traffic demand forecast information and operational situation information are illustrated.
Here, in acquired traffic demand forecast information, it is shown that: due to 6 layers make electricity consumption Strength is fewer than other layers, so the traffic of 6 layers needs (boarding needs) to be " 2 people ", due to 4 layers Use amount of power than more than other layers, so the traffic of 4 layers needs (boarding needs) to be " 12 people ", Owing to the use amount of power of floor in addition is intermediate degree, so traffic needs for " 6 people ".
It addition, in acquired operational situation information, it is shown that: No. A dynamo-electric ladder 10A's is riding Current " 1 layer " place of car 11A travels upward, has 5 people in boarding in cage 11A. In addition it is shown that: place is upward for the cage 11B current " 3 floor " of No. B dynamo-electric ladder 10B Travel, have 15 people in cage 11B in boarding.In addition it is shown that: No. C dynamo-electric ladder 10C Current the most " 2 layers " place of cage 11C travel upward, have 10 people in cage 11C In boarding.
Then, based on these acquired information, registered boarding place call operation will be coped with The traffic of layer needs and arrives the elevator of time of this boarding place call operation layer short cage certainly It is set to the Distribution Unit (S12) responding the calling of this boarding place.
Such as, for the boarding place register call of 4 layers, need to be " 12 people " due to the traffic of 4 layers, The number of people boarding of B machine is 15 people, and the number of people boarding of C machine is 10 people, if so distribution B Machine or C machine, then in car, number can exceed 20 people of staffing.Therefore, although by 4 layers Predict the length time of advent (away from the distance of 4 floor) but cope with the A machine decision that boarding needs For Distribution Unit.It addition, for the boarding place register call of 6 layers, due to all numbers of A~C machine The boarding that machine can be tackled from 6 layers needs " 2 people ", so prediction is arrived shortest time (away from 6 The distance of floor is short) No. B dynamo-electric ladder 10B be determined as Distribution Unit.
Then, from elevator controlling instruction output unit 507 to the dynamo-electric ladder of be decided to be Distribution Unit No. A The control dish 13A output of 10A instructs to the response of the boarding place calling of 4 layers, it addition, to B machine The control dish 13B output of elevator 10B is to response instruction (S13) of the boarding place calling of 6 layers.? Achieve in each control dish 13A and 13B of response instruction, based on acquired instruction, pass through elevator Run control portion 133A and 133B and control the action of elevator, make cage 11A move to 4 Layer, makes cage 11B move to 6 layers.
Return Fig. 2, in step s3, after the traffic calculating each floor needs, Stall in office In the case of using amount of power to there occurs significantly change in Ceng, such as, using amount of power at 4 layers drastically Reduce, sharply increase at 5 layers in the case of ("Yes" of S3), use amount of power based on this layer Variable quantity carrys out the traffic demand forecast information (S4) of each floor of computing.With reference to the flow chart of Fig. 3, right Based on the traffic demand forecast information so calculated by Distribution Unit determination section 506 for boarding place The process that calling registration performs illustrates.
First, when by boarding place calling register 505 floor in office, such as registering at 4 layers and take advantage of At Ti during calling ("Yes" of S11), in building, traffic demand forecast operational part 504 obtains respectively The traffic demand forecast information of floor, and obtain each elevator from elevator operation information management department 502 Operational situation information and number machine information.With reference to Fig. 5, to acquired traffic demand forecast information and fortune Turn condition information to illustrate.
Here, in acquired traffic demand forecast information, it is shown that: due to 4 layers make electricity consumption Strength drastically reduces and the personnel in the building that 4 floor exit that are predicted as sharply increase, so the traffic of 4 layers Need (boarding needs) to increase to " 30 people ", predict owing to the use amount of power of 5 layers sharply increase For hereafter going to the user of 5 layers to sharply increase, so the traffic of 5 layers needs (fall ladder needs) to increase Add as " 30 people ".
It addition, in acquired operational situation information, it is shown that: No. A dynamo-electric ladder 10A's is riding Car 11A currently will set out downwards at " 7 layers " place, has 5 people in boarding in cage 11A. In addition it is shown that: the cage 11C of No. B dynamo-electric ladder 10B and No. C dynamo-electric ladder 10C is current Be in " 1 layer ", in cage 11B and 11C, there is no the people of boarding, be in directionless standby in.
Then, based on these acquired information, dividing of the boarding place register call of decision response 4 layers The number of joining machine (S12).
Such as, for the boarding place register call of 4 layers, it is judged that for only by No. A dynamo-electric ladder 10A~C 1 boarding needs that cannot tackle 4 floor in number dynamo-electric ladder 10C, and 2 elevators are determined as Distribution Unit.As the combination of 2 of distribution, have A machine and B machine, A machine and C machine, Or B machine and these the 3 kinds selections of C machine.It addition, about the cage away from 4 layers traveling away from From, No. A dynamo-electric ladder 10A, No. B dynamo-electric ladder 10B, No. C dynamo-electric ladder 10C are identical.? This, it is believed that: owing to A machine can need many 5 layers by fall ladder before arriving 4 layers, so May register, at A machine, the car call being of five storeys, and A machine is 5 layers of stopping, to 4 layers Prediction time delay of arrival.Then, by dynamo-electric to No. B dynamo-electric ladder 10B and No. C ladder 10C these 2 Elevator is determined as the Distribution Unit for the calling registration of this boarding place of 4 layers.
Then, from elevator controlling instruction output unit 507 to the dynamo-electric ladder of be decided to be Distribution Unit No. B The boarding of control dish 13C output response 4 floor of the control dish 13B of 10B and No. C dynamo-electric ladder 10C The instruction (S13) of place's calling.In each control dish 13B, the 13C achieving response instruction, based on Acquired instruction, the action controlling elevator by elevator motion control portion 133B, 133C, make Cage 11B and 11C moves to 4 layers.
Return Fig. 2, use amount of power significantly change and based on the traffic needs according to electric power variation amount Information of forecasting carried out control after (S4), use amount of power change diminish ("No" of S3), From last time use amount of power significantly change have passed through the scheduled time more than time ("Yes" of S5), it is determined that For using amount of power stable, return step S2 and transport according to the use amount of power of each floor as usual New traffic demand forecast information.It addition, from last time use amount of power significantly change not warp When spending the scheduled time ("No" of S5), return step S3, based on the friendship calculated in step s 4 Logical need information of forecasting to control the operating of each elevator, until through the scheduled time.
According to the 1st above embodiment, by use electric power based on each floor in building The variable quantity of amount or use amount of power predicts the traffic needs of each floor, and carries out group based on this Management controls, it is possible to the machines such as camera are newly set and with low cost to carry out the elevator that transfer efficiency is high Control.
" the 2nd embodiment "
In the 2nd embodiment of the present invention, following group management control apparatus is illustrated, should The merit that group management control apparatus is had except the group management control apparatus of explanation in the 1st embodiment Outside energy, also there is use amount of power based on each floor in building or use amount of power Variable quantity sets the function of standby layer when elevator becomes directionless holding state.
<structure of the elevator device of the 2nd embodiment>
With reference to Fig. 6, the knot to the elevator device 2 of the group management control apparatus that make use of present embodiment Structure illustrates.
The elevator device 2 of present embodiment sets except having standby layer in group management control apparatus 50 Outside portion 508, as with the structure of the elevator device 1 of the 1st embodiment being, therefore save somewhat There is the detailed description of the part of identical function.
Standby layer configuration part 508 is based on each elevator sent out from elevator operation information management department 502 Operational situation information and number machine information and by traffic demand forecast operational part 504 computing in building The traffic demand forecast information gone out, is set at least 1 passenger of cage 11A~11C from finishing Become standby layer during directionless holding state.
Elevator controlling instruction output unit 507 also is used for making riding sedan-chair to the output of the control dish of corresponding elevator Railway carriage or compartment moves to the standby layer by standby layer configuration part 508 new settings standby standby layer alteration command.
<action of the elevator device of the 2nd embodiment>
Then, the action to the elevator device 2 of present embodiment illustrates.In the present embodiment, In standby layer configuration part 508, as the default setting of standby layer, maintain passenger from finish and become Number machine of directionless holding state moves to 1 floor, 4 floor, 7 floor standby information successively.The most just It is to say, as the relative importance value of standby layer, is set to 1 layer, 4 layers, 7 layers of shape the most from high to low State.
With reference to the flow chart of Fig. 7, to when so setting standby layer, manage based on group Such as the step of the 1st embodiment in traffic demand forecast operational part 504 in the building of control device 50 Traffic demand forecast information that S2 calculates according to the use amount of power of each floor like that and by standby layer Process when configuration part 508 sets standby layer illustrates.
First, when having calculated the new traffic demand forecast information of each floor ("Yes" of S21), In building, traffic demand forecast operational part 504 obtains this traffic demand forecast information, and from electricity Ladder operation information management department 502 obtains operational situation information and number machine information of each elevator.With reference to Fig. 8, Acquired traffic demand forecast information and operational situation information are illustrated.
Here, in acquired transport information, it is shown that: owing to the use amount of power of 7 layers are than it His layer is few, thus 7 layers traffic need (boarding needs) be " 2 people ", due to 5 layers make electricity consumption Strength is than more than other layers, so the traffic of 5 layers needs (boarding needs) to be " 12 people ", due to except this The use amount of power of floor in addition is intermediate degree, so traffic needs for " 6 people ".
It addition, in acquired operational situation information, it is shown that: 3 equal passengers are in from finishing Directionless holding state, the cage 11A of No. A dynamo-electric ladder 10A is standby at 7 floor, B electromechanics The cage 11B of ladder 10B is standby at 4 layers, and the cage 11C of No. C dynamo-electric ladder 10C is 1 Layer is standby.
Then, based on these acquired information, new standby layer (S22) is determined.Such as, due to The traffic of 7 layers needs little, so getting rid of 7 floor from standby floor and making at the standby number machine of 7 floor to other Floor moves, owing to the traffic of 5 layers need big, so 5 layers are set to the highest standby of relative importance value Layer.
By so setting standby layer, the relative importance value of standby layer be followed successively by from high to low 5 layers, 1 layer, 4 Layer, as shown in Figure 8, from elevator controlling instruction output unit 507 to the control dish of No. A dynamo-electric ladder 10A 13A output is for making cage 11A move to 5 layers and standby standby layer alteration command from 7 layers (S23).In the control dish 13A achieving standby layer alteration command, based on acquired instruction, Controlled the action of elevator by elevator motion control portion 133A, make cage 11A from 7 layers of shifting Move 5 layers and become holding state.It addition, the cage 11B of No. B dynamo-electric ladder 10B and No. C The cage 11C of dynamo-electric ladder 10C continues respectively at 4 layers, the holding state of 1 layer.
As other examples, along the flow chart of Fig. 7, to step S4 such as the 1st embodiment Based on use amount of power to there occurs the electric power variation amount of the floor significantly changed and by standby layer configuration part Process during the 508 standby layer of setting illustrates.
First, when having calculated the new traffic demand forecast information of each floor ("Yes" of S21), In building, traffic demand forecast operational part 504 obtains this traffic demand forecast information, and from electricity Ladder operation information management department 502 obtains operational situation information and number machine information of each elevator.With reference to Fig. 9, Acquired traffic demand forecast information and operational situation information are illustrated.
Here, in acquired traffic demand forecast information, it is shown that: due to 3 layers make electricity consumption Strength drastically reduces and the personnel in the building that 3 floor exit that are predicted as sharply increase, so the traffic of 3 layers Need (boarding needs) to increase to " 30 people ", predict owing to the use amount of power of 5 layers sharply increase For hereafter going to the user of 5 layers to sharply increase, so the traffic of 5 layers needs (fall ladder needs) to increase Add as " 30 people ".
It addition, in acquired operational situation information, it is shown that: 3 equal passengers are in from finishing Directionless holding state, the cage 11A of No. A dynamo-electric ladder 10A is standby at 7 floor, B electromechanics The cage 11B of ladder 10B is standby at 4 layers, and the cage 11C of No. C dynamo-electric ladder 10C is 1 Layer is standby.
Then, based on these acquired information, new standby layer (S22) is determined.Such as, boarding Needing the 3 layers of relative importance value as standby layer sharply increased the highest, standby number of units is set to 2. Further, since the fall ladder being predicted as 5 layers needs to sharply increase, so 1 layer as datum layer is set Being set to standby layer, strengthening the traffic to 5 layers needs.
By so setting standby layer, the relative importance value of standby layer is followed successively by 3 layers, 1 layer from high to low, Standby logarithm is 2 at 3 layers, is 1 at 1 layer, as it is shown in figure 9, defeated from elevator controlling instruction Go out portion 507 to export for making cage 11A from 7 to the control dish 13A of No. A dynamo-electric ladder 10A Layer moves to 3 layers and standby standby layer alteration command, to the control dish 13A of No. B dynamo-electric ladder 10B Output is for making cage 11B move to 3 layers and standby standby layer alteration command from 4 layers (S13).In the control dish 13A and control dish 13B achieving standby layer alteration command, based on Acquired instruction, is controlled by elevator motion control portion 133A and elevator motion control portion 133B The action of elevator, cage 11A moves to 3 layers and cage 11B from 4 layers of shifting from 7 layers Move 3 layers, become holding state.It addition, the cage 11C of No. C dynamo-electric ladder 10C continues The holding state of 1 layer.
According to the 2nd above embodiment, in addition to the control performed by the 1st embodiment, The use amount of power of each floor being additionally based upon in building or the variable quantity of use amount of power set Elevator becomes standby layer during directionless holding state such that it is able to carry out group's management in hgher efficiency Control.
" the 3rd embodiment "
In the 3rd embodiment of the present invention, following group management control apparatus is illustrated, should Group management control apparatus manages control except the group illustrated in the 1st embodiment or the 2nd embodiment Outside the function that device is had, in also having the building considering each floor set in advance, number carrys out computing The traffic of each floor needs the function of information.
In the 1st embodiment and the 2nd embodiment, owing to being based only upon the use amount of power of each floor The traffic carrying out each floor of computing needs information, so often the elevator of certain unit of power amount utilizes number with solid Definite value (such as, be set to " every 1kw exists 1 elevator user ") presets, and transports based on this The traffic calculating each floor needs information.Each building is not reacted in the prediction computing that traffic in the case of Gai needs Number in the building of the script of floor, so at which floor being all only capable of with the pre-test cross of a certain amount of mode Logical needs.
On the other hand, in the present embodiment, in the building such as having preset 3 floor, number is 100 People, 5 floor building in the case of number is 300, about 3 layers, it is judged that for " every 1kw exists 1 Individual elevator user ", about 5 layers, it is judged that for " every 1kw exists 3 elevator users ", it is possible to Calculate the elevator of per unit amount of power by each floor and utilize number and computing more meets the essence of virtual condition Spend high traffic and need information.
<structure of the elevator device of the 3rd embodiment>
With reference to Figure 10, the knot to the elevator device 3 of the group management control apparatus that make use of present embodiment Structure illustrates.
The elevator device 3 of present embodiment is except having in each floor building in group management control apparatus 50 Outside number configuration part 509, as with the structure of the elevator device 2 of the 2nd embodiment being, because of This omits the detailed description of the part with identical function.
In in each floor building, number configuration part 509 presets building in building during each floor usual Number.In building, traffic demand forecast operational part 504 uses amount of power defeated based on from building equipment Enter the use amount of power information of each floor of portion 503 input and by number configuration part 509 in each floor building In the building of each floor set, number carrys out the traffic demand forecast information of each floor of computing, and is sent To Distribution Unit determination section 506.
<action of the elevator device of the 3rd embodiment>
Then, the action to the elevator device 3 of present embodiment illustrates.In the present embodiment, It is set as by number configuration part 509 in each floor building: floor (1 floor, 2 floor and 4 beyond 3 floor Floor~7 floor) building in number be 300 people, in the building of 3 floor, number is 100 people.
With reference to the flow chart of Figure 11, managed control to when so setting number in building by group The process that in the building of device 50, traffic demand forecast operational part 504 performs illustrates.
First, number letter in the building of each floor set by number configuration part 509 in each floor building is obtained Breath (S31).Amount of power measuring device is used from building equipment it addition, obtain with predetermined time interval 40 to the use amount of power information of each floor of building equipment use amount of power input unit 503 input (S32)。
Then, based on number information in the building of acquired each floor and use amount of power information, computing The traffic demand forecast information (S33) of each floor.When the traffic of each floor of computing needs information, close Floor beyond 3 layers, being set to " every 1kw exists 3 elevator users " carrys out computing traffic and needs letter Breath, about 3 layers, being set to " every 1kw exists 1 elevator user " carrys out computing traffic and needs information.
Hereafter, for carrying out the process of execution in step S34~S36, needing based on the traffic calculated The distribution for the cage of boarding place calling registration wanting information and perform processes and the setting of standby layer The action of the group management control apparatus 50 when surely processing, and at the 1st embodiment or the 2nd embodiment The process of middle explanation is same, therefore detailed.
According to the 3rd above embodiment, except being held by the 1st embodiment or the 2nd embodiment Outside the control of row, also preset number in the building of each floor such that it is able to calculate by each floor The elevator of per unit amount of power utilizes number and computing more meets the traffic needs that the precision of virtual condition is high Information.
" the 4th embodiment "
In the 4th embodiment of the present invention, following group management control apparatus is illustrated, should Group management control apparatus manages control dress except the group illustrated in the 1st embodiment~the 3rd embodiment Put outside had function, confirm whether reality creates friendship according further to traffic demand forecast information Logical need, when the traffic in prediction needs to need to deviate from actual traffic, be modified so that base Need to be controlled in actual traffic.
<structure of the elevator device of the 4th embodiment>
With reference to Figure 12, the knot to the elevator device 4 of the group management control apparatus that make use of present embodiment Structure illustrates.
The elevator device 4 of present embodiment is except handing in having building in group management control apparatus 50 Leading to needs outside confirmation portion 510, as with the structure of the elevator device 2 of the 2nd embodiment being, Therefore the detailed description of the part with identical function is omitted.
In building traffic need confirmation portion 510 from elevator controlling instruction output unit 507 output right After the response instruction or standby layer alteration command of boarding place calling registration, from elevator operation information pipe Reason portion 502 obtains No. A dynamo-electric ladder 10A of certain period, No. B dynamo-electric ladder 10B and C electromechanics (the boarding place calling of each floor produces number of times, car call registration to the operational situation information of ladder 10C Number and the car internal load information etc. of each cage), carry out computing based on acquired information and exist Boarding person's number of each floor, utilize number of times etc. in the reality of this period of each floor at the elevator of each floor Traffic need information.
The traffic demand forecast information that traffic demand forecast operational part 504 calculates in by building with When the actual traffic being needed confirmation portion 510 to calculate by traffic in building needs information to deviate from, distribution Number machine determination section 506 needs information again to determine to respond the distribution of boarding place calling based on actual traffic Number machine.
The traffic demand forecast information that traffic demand forecast operational part 504 calculates in by building with When the actual traffic being needed confirmation portion 510 to calculate by traffic in building needs information to deviate from, standby Layer configuration part 508 needs information again to set standby layer based on actual traffic.
Elevator controlling instruction output unit 507 is used for taking advantage of that response is registered to corresponding control dish output Call elevator at Ti and be changed to the Distribution Unit alteration command of the Distribution Unit again determined.It addition, Elevator controlling instruction output unit 507 becomes for the standby layer that will be set to corresponding control dish output The standby layer alteration command of the standby layer the most again set.
<action of the elevator device of the 4th embodiment>
Then, the action to the elevator device 4 of present embodiment illustrates.In the present embodiment, The calculation process of traffic demand forecast information, Distribution Unit decision process and standby layer setting process with In any embodiment of the 1st~the 3rd embodiment, the action of explanation is same, therefore omits in detail Describe in detail bright.
With reference to the flow chart of Figure 13, to when performing these and processing by building in traffic need Portion 510 to be confirmed, Distribution Unit determination section 506, standby layer configuration part 508 and elevator controlling instruction The process that output unit 507 performs illustrates.
First, during in building, traffic needs confirmation portion 510, from elevator operation information management department 502 The boarding place calling obtaining floor produces number of times, car call registration number and the sedan-chair of each cage Railway carriage or compartment internal load information etc., the traffic calculating reality with predetermined time interval needs information (S41).
When the traffic having calculated reality with predetermined time interval needs information, when from elevator control When system instruction output unit 507 outputs the response instruction for boarding place calling registration, in building The actual traffic that traffic needs confirmation portion 510 to obtain the certain period after instruction exports needs information, Traffic demand forecast information when judging this response instruction output needs letter with acquired actual traffic Whether breath deviates from (S42, S43, S44).Here, the traffic when response instruction output needs pre- Measurement information and actual traffic need information to exist when deviating from ("Yes" of S44), based on actual friendship Lead to and need information, again determine Distribution Unit (S45).Then, output unit is instructed from elevator controlling 507 are used for being changed to the elevator responding the boarding place calling registered to corresponding control dish output again The Distribution Unit alteration command (S46) of the secondary Distribution Unit determined.
It addition, when the traffic having calculated reality needs information, when defeated from elevator controlling instruction Going out portion 507 when outputing standby layer alteration command, in building, traffic needs confirmation portion 510 to obtain The actual traffic of the certain period after instruction output needs information, it is determined that this standby layer alteration command is defeated Traffic demand forecast information when going out and acquired actual traffic need information whether deviate from (S42, S43、S44).Here, the traffic demand forecast information when standby layer alteration command exports is with actual Traffic need information to there is ("Yes" of S44) when deviating from, need information again based on actual traffic The standby layer of secondary setting (S45).Then, from elevator controlling instruction output unit 507 to corresponding control dish Output for being changed to the standby layer alteration command of standby layer again set by the standby layer being set (S46)。
According to the 4th above embodiment, except by the 1st embodiment, the 2nd embodiment or Outside the control that person the 3rd embodiment performs, also outputing based on the decision of traffic demand forecast information The response instruction to boarding place calling or standby layer alteration command after, confirm that this traffic needs pre- With actual traffic, measurement information needs whether information deviates from, switch to based on reality in the case of deviating from Traffic need the command content of information such that it is able to more meet the group that the precision of virtual condition is high Management controls.
" the 5th embodiment "
In the 5th embodiment of the present invention, following group management control apparatus is illustrated, should Group management control apparatus is in addition to the control of explanation in the 1st embodiment~the 4th embodiment, also Consider that the distinctive information setting predetermined floor is controlled.
<structure of the elevator device of the 5th embodiment>
With reference to Figure 14, the knot to the elevator device 5 of the group management control apparatus that make use of present embodiment Structure illustrates.
The elevator device 5 of present embodiment sets except having floor information in group management control apparatus 50 Determine, outside portion 511, as with the structure of the elevator device 2 of the 2nd embodiment being, therefore to omit There is the detailed description of the part of identical function.
Floor information configuration part 511 sets the purposes of each floor in building, tenant's attribute, profit The distinctive information of each floor such as user's attribute.
When being registered boarding place calling by boarding place calling register 505, Distribution Unit determination section 506 Operational situation information based on each elevator sent out from elevator operation information management department 502 and number machine letter Breath, calculated by traffic demand forecast operational part 504 in building traffic demand forecast information, with And the floor information set by floor information configuration part 511, determine the distribution number of response boarding place calling Machine.
Standby layer configuration part 508 is based on each elevator sent out from elevator operation information management department 502 Operational situation information and number machine information, calculated by traffic demand forecast operational part 504 in building Traffic demand forecast information and the floor information set by floor information configuration part 511, setting is taken advantage of Standby layer during directionless holding state is become with car.
<action of the elevator device of the 5th embodiment>
Then, the action to the elevator device 5 of present embodiment illustrates.In the present embodiment, The information of the floor at 7 places, Ceng Shi director's room is set in floor information configuration part 511.
In the present embodiment, with reference to the flow chart of Figure 15, to based at group management control apparatus 50 Building in traffic demand forecast operational part 504 as step S2 of the 1st embodiment basis Traffic demand forecast information that the use amount of power of each floor calculates and by Distribution Unit determination section 506 process performed illustrate.
First, when being called by boarding place by boarding place calling register button 20A or the operation of 20B When register 505 registers the boarding place calling of 7 layers ("Yes" of S51), traffic in building Need to predict the traffic demand forecast information that operational part 504 obtains 7 layers, and from elevator operation information Management department 502 obtains operational situation information and number machine information of each elevator, and then obtains by floor information The floor information of 7 layers of configuration part 511 setting.
Then, based on these acquired information, the traffic coping with 7 layers is needed, arrives 7 The time of layer, short and the floor information that copes with 7 layers elevator was determined as responding the calling of this boarding place Distribution Unit (S52).
Here, according to the floor information of 7 layers, it was predicted that exit from the director's room being positioned at 7 layers for director, Make cage keep straight on run to 7 layers so that not taking advantage of altogether with other people, for this number machine, will be until The boarding place calling enabling to be not responding to other floors till arriving the target zone of car call is (so-called VIP operating) elevator be determined as coping with the elevator of this floor information of 7 layers.
Then, the output unit 507 control to the elevator being decided to be Distribution Unit is instructed from elevator controlling Dish output responds the instruction (S53) of this boarding place calling.
It addition, there occurs big amplitude variation based on use amount of power step S4 such as the 1st embodiment When the electric power variation amount of the floor changed determines Distribution Unit, it is also possible to similarly consider the building of each floor Layer information.
It addition, with reference to the flow chart of Figure 16, to root based on step S2 such as the 1st embodiment The traffic demand forecast information that calculates according to the use amount of power of each floor and by standby layer configuration part Process during the 508 standby layer of setting illustrates.
First, when having calculated the new traffic demand forecast information of each floor ("Yes" of S51), In building, traffic demand forecast operational part 504 obtains this traffic demand forecast information, and from electricity Ladder operation information management department 502 obtains operational situation information and number machine information of each elevator, and then obtains The floor information of each layer set by floor information configuration part 511.
Then, based on these acquired information, new standby layer (S52) is determined.Here, in advance When survey is determined as standby layer for traffic needs in 7 layers can increase, as it has been described above, can The elevator realizing VIP operating is determined as at 7 layers of standby elevator.
Then, the output unit 507 control to the elevator being decided to be standby elevator is instructed from elevator controlling Dish processed exports standby layer alteration command (S53).
It addition, there occurs big amplitude variation based on use amount of power step S4 such as the 1st embodiment When the electric power variation amount of the floor changed determines standby layer, it is possible to similarly consider the floor letter of each floor Breath.
According to the 5th above embodiment, except by the 1st embodiment, the 2nd embodiment, Outside the control that 3rd embodiment or the 4th embodiment perform, it is also contemplated that every in building The distinctive information that individual floor sets is controlled such that it is able to carry out convenience higher group management Control.
Although being illustrated several embodiments of the invention, but these embodiments are as example Son and illustrate, be not intended to limit invention scope.These new embodiments can be various with other The mode of various kinds is implemented, it is possible to carries out various omission in the range of the main idea without departing from invention, put Change, change.These embodiments and deformation thereof are contained in scope and/or the main idea of invention, and comprise In with the invention described in claims and with the scope of its equalization.

Claims (9)

1. the multiple elevators in building are carried out group's management by a group management control apparatus for elevator, It is characterized in that possessing:
Elevator operation information management department, it obtains the operational situation information of the plurality of elevator;
Using amount of power input unit, it inputs the use amount of power information of each floor in described building;
Traffic demand forecast operational part in building, it inputs based on from described use amount of power input unit The use amount of power information of each floor, carry out computing and utilized people by the elevator of the time per unit of each floor The traffic demand forecast information of each floor that the information of forecasting of number represents;
Boarding place calling register, at the elevator riding of its arbitrary floor being registered in described building Carry out the boarding place calling of log-on operation;
Distribution Unit determination section, it is when being registered boarding place calling by described boarding place calling register, Operational situation information based on the plurality of elevator obtained by described elevator operation information management department and by The traffic demand forecast information of each floor that traffic demand forecast operational part calculates in described building, The traffic demand forecast information of registered boarding place call operation layer will be coped with and arrive this and take advantage of The elevator that at Ti, the time of call operation layer is short is determined as responding the elevator of this boarding place calling;And
Control instruction output unit, it is to the described boarding of response determined by described Distribution Unit determination section The elevator output of place's calling is for responding the instruction of described boarding place calling.
The group management control apparatus of elevator the most according to claim 1, it is characterised in that
Traffic demand forecast operational part in described building, it was predicted that for from described use amount of power input unit The elevator of the floor that the use amount of power information of input drastically reduces or sharply increases utilizes number to increase, Carry out the traffic demand forecast information of this floor of computing.
The group management control apparatus of elevator the most according to claim 1 and 2, it is characterised in that
Being also equipped with standby layer configuration part, this standby layer configuration part manages based on by described elevator operation information The operational situation information of the plurality of elevator that portion obtains and being transported by traffic demand forecast in described building The traffic demand forecast information of each floor that calculation portion calculates, sets the arbitrary of the plurality of elevator and takes advantage of With the car passenger standby layer in time finishing and become directionless holding state,
Described control instruction output unit is used for being set by described standby layer configuration part to corresponding elevator output The instruction that fixed standby layer is standby.
The group management control apparatus of elevator the most according to claim 1 and 2, it is characterised in that
Being also equipped with number configuration part in each floor building, in this each floor building, number configuration part presets respectively Number information in building during floor usual,
Traffic demand forecast operational part in described building, based on defeated from described use amount of power input unit The use amount of power of each floor entered and each floor of being set by number configuration part in described each floor building Number information in building, carrys out the traffic demand forecast information of each floor of computing.
The group management control apparatus of elevator the most according to claim 1 and 2, it is characterised in that
In being also equipped with building, traffic needs confirmation portion, and in this building, traffic needs confirmation portion from institute State after control instruction output unit outputs instruction, obtain certain from described elevator operation information management department The operational situation information of the plurality of elevator of period, carrys out each floor of computing based on acquired information The actual traffic of this certain period needs information,
Described Distribution Unit determination section, in by described building, traffic demand forecast operational part calculates Traffic demand forecast information and the actual friendship being needed that confirmation portion calculates by traffic in described building Logical when needing information to deviate from, responding described boarding place exhales to need information again to determine based on actual traffic The elevator cried.
The group management control apparatus of elevator the most according to claim 3, it is characterised in that
In being also equipped with building, traffic needs confirmation portion, and in this building, traffic needs confirmation portion from institute State after control instruction output unit outputs instruction, obtain certain from described elevator operation information management department The operational situation information of the plurality of elevator of period, carrys out each floor of computing based on acquired information The actual traffic of this certain period needs information,
Described standby layer configuration part, in by described building, traffic demand forecast operational part calculates Traffic demand forecast information and the actual traffic being needed that confirmation portion calculates by traffic in described building When needing information to deviate from, information is needed again to set described standby layer based on actual traffic.
The group management control apparatus of elevator the most according to claim 1 and 2, it is characterised in that
Being also equipped with floor information configuration part, this floor information configuration part sets described building Nei Ge building The distinctive information of layer,
Described Distribution Unit determination section, is being registered boarding place calling by described boarding place calling register Time, operational situation information based on the plurality of elevator obtained by described elevator operation information management department, The traffic demand forecast letter of each floor calculated by traffic demand forecast operational part in described building Breath and the distinctive information of each floor set by described floor information configuration part, determine to respond institute State the elevator of boarding place calling.
The group management control apparatus of elevator the most according to claim 3, it is characterised in that
Being also equipped with floor information configuration part, this floor information configuration part sets described building Nei Ge building The distinctive information of layer,
Described standby layer configuration part, the plurality of based on obtained by described elevator operation information management department The operational situation information of elevator, each building calculated by traffic demand forecast operational part in described building The traffic demand forecast information of layer and each floor by the setting of described floor information configuration part are distinctive Information, sets described standby layer.
The group management control apparatus of elevator the most according to claim 6, it is characterised in that
Being also equipped with floor information configuration part, this floor information configuration part sets described building Nei Ge building The distinctive information of layer,
Described standby layer configuration part, the plurality of based on obtained by described elevator operation information management department The operational situation information of elevator, each building calculated by traffic demand forecast operational part in described building The traffic demand forecast information of layer and each floor by the setting of described floor information configuration part are distinctive Information, sets described standby layer.
CN201510014508.1A 2014-12-04 2015-01-12 The group management control apparatus of elevator Active CN105836553B (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2014-245698 2014-12-04
JP2014245698A JP5932003B1 (en) 2014-12-04 2014-12-04 Elevator group management control device

Publications (2)

Publication Number Publication Date
CN105836553A true CN105836553A (en) 2016-08-10
CN105836553B CN105836553B (en) 2017-12-19

Family

ID=56102994

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510014508.1A Active CN105836553B (en) 2014-12-04 2015-01-12 The group management control apparatus of elevator

Country Status (2)

Country Link
JP (1) JP5932003B1 (en)
CN (1) CN105836553B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109928291A (en) * 2017-12-18 2019-06-25 东芝电梯株式会社 User guides system and user's bootstrap technique
CN113023505A (en) * 2019-12-09 2021-06-25 东芝电梯株式会社 Group management control device for elevator
CN115108417A (en) * 2021-03-22 2022-09-27 东芝电梯株式会社 Elevator system and independent operation method of elevator

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008254886A (en) * 2007-04-05 2008-10-23 Mitsubishi Electric Corp Electric energy display device of elevator
CN101531301A (en) * 2008-03-13 2009-09-16 东芝电梯株式会社 Group management control device for elevator system
CN101683942A (en) * 2008-09-22 2010-03-31 东芝电梯株式会社 Group control system of elevators

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5869680A (en) * 1981-10-21 1983-04-25 三菱電機株式会社 Elevator system
JP2012229101A (en) * 2011-04-27 2012-11-22 Toshiba Elevator Co Ltd Group supervisory operation control system and method of elevator

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008254886A (en) * 2007-04-05 2008-10-23 Mitsubishi Electric Corp Electric energy display device of elevator
CN101531301A (en) * 2008-03-13 2009-09-16 东芝电梯株式会社 Group management control device for elevator system
CN101683942A (en) * 2008-09-22 2010-03-31 东芝电梯株式会社 Group control system of elevators

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109928291A (en) * 2017-12-18 2019-06-25 东芝电梯株式会社 User guides system and user's bootstrap technique
CN109928291B (en) * 2017-12-18 2020-08-11 东芝电梯株式会社 User guidance system and user guidance method
CN113023505A (en) * 2019-12-09 2021-06-25 东芝电梯株式会社 Group management control device for elevator
CN113023505B (en) * 2019-12-09 2023-02-24 东芝电梯株式会社 Group management control device for elevator
CN115108417A (en) * 2021-03-22 2022-09-27 东芝电梯株式会社 Elevator system and independent operation method of elevator
CN115108417B (en) * 2021-03-22 2023-09-29 东芝电梯株式会社 Elevator system

Also Published As

Publication number Publication date
CN105836553B (en) 2017-12-19
JP2016108074A (en) 2016-06-20
JP5932003B1 (en) 2016-06-08

Similar Documents

Publication Publication Date Title
JP5464979B2 (en) Elevator group management system
JP5351510B2 (en) Station destination floor reservation type group management elevator control device
JP6212290B2 (en) Group management control method for elevator system
CN101402427B (en) Elevator group management system
KR101153086B1 (en) Group management controller of elevator
CN104512774B (en) The group management system of elevator
CN105307963B (en) Assign the method and elevator device of elevator
KR20180008691A (en) A method of assigning a passenger car by military management elevator device and military management
CN103420233A (en) Group management control device and method of elevator
JP5535708B2 (en) Elevator group management control device
JP2017178474A (en) Elevator device and controlling method of elevator device
JP6269359B2 (en) Elevator group management system
CN105836553A (en) Elevator group management control device
JP2019142694A (en) Group management control device and group management control method
JP2012218898A (en) Group supervisory control system
JP6233529B2 (en) Elevator system
JP6018671B1 (en) Group management control device for two-way elevator
JPH0610069B2 (en) Elevator group management device
JP2004107046A (en) Group supervisory operation control device for elevator
JP2022169161A (en) Support system for robot operation plan decision
CN101903273B (en) Elevator group management system
CN101356106A (en) Control method and system for elevator
JP2015202950A (en) Group-controlled elevator device
JP4177627B2 (en) Elevator group management system and method
JP6799161B2 (en) Elevator device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant