CN105825344A - Nuclear power object protection effectiveness quantifying and evaluating method and device - Google Patents

Nuclear power object protection effectiveness quantifying and evaluating method and device Download PDF

Info

Publication number
CN105825344A
CN105825344A CN201610169579.3A CN201610169579A CN105825344A CN 105825344 A CN105825344 A CN 105825344A CN 201610169579 A CN201610169579 A CN 201610169579A CN 105825344 A CN105825344 A CN 105825344A
Authority
CN
China
Prior art keywords
information
module
invasion
outside
opponent
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610169579.3A
Other languages
Chinese (zh)
Inventor
付备荒
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHENZHEN NEWCROSS DIGITAL TECHNOLOGY Co Ltd
Original Assignee
SHENZHEN NEWCROSS DIGITAL TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHENZHEN NEWCROSS DIGITAL TECHNOLOGY Co Ltd filed Critical SHENZHEN NEWCROSS DIGITAL TECHNOLOGY Co Ltd
Priority to CN201610169579.3A priority Critical patent/CN105825344A/en
Publication of CN105825344A publication Critical patent/CN105825344A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0639Performance analysis of employees; Performance analysis of enterprise or organisation operations
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Economics (AREA)
  • Strategic Management (AREA)
  • General Physics & Mathematics (AREA)
  • Development Economics (AREA)
  • Health & Medical Sciences (AREA)
  • Educational Administration (AREA)
  • Marketing (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Theoretical Computer Science (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Game Theory and Decision Science (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Financial Or Insurance-Related Operations Such As Payment And Settlement (AREA)

Abstract

The present invention provides a nuclear power object protection effectiveness quantifying and evaluating method and device. The method comprises the steps of 1 establishing a two-dimensional facility description model of an object protection system environment; 2 carrying out the external invasion analysis according to the two-dimensional facility description model and aiming at the external enemy invasion situation; 3 according to the external invasion enemy information and the response power information, carrying out the prevention analysis on the external enemy invasion situation; 4 carrying out the insider crime analysis according to the two-dimensional facility description model and aiming at the nuclear material steal situations of the insiders; 5 calculating the risk value of the external enemy invasion according to the analysis results of the steps 2 and 3, and then calculating the risk value of the insider crime according to the analysis result of the step 4. According to the present invention, the object protection system effectiveness analysis accuracy is improved, and the nucleus accident possibility is reduced.

Description

Nuclear power physical protection effectiveness quantitative estimation method and device
Technical field
The present invention relates to technical field of nuclear power, particularly to a kind of nuclear power physical protection effectiveness quantitative estimation method and device.
Background technology
The safety problem of nuclear material and nuclear facilities is the focal issue of international concern.Nuclear power physical protection system is intended to protect nuclear material and nuclear facilities safety, prevents the vandalism of malice.It is an important step in physical protection that physical protection system carries out efficiency assessment.Physical protection efficiency analysis is exactly to apply qualitative or quantitative technology to make whole real insurance system reach the architectural system process of effect level.
Qualitative evaluation is mainly based on material object, by observing in real time, relies on the experience of people judge the effectiveness of system and find weak link.Such as on-the-spot test, simulation invasion etc..Its shortcoming is to primarily focus on management and experience aspect, does not has reliable theory to the analysis doing in data, it is difficult to supports formation and the foundation of comprehensive physical protection system complete, efficient, does not ensures that the adequacy of assessment.Quantitative assessment is mainly element each to physical protection system and carries out correlation attribute value quantization, then uses the method for probability statistics to calculate Validity Index and nuclear material, the value-at-risk of nuclear facilities of reflection physical protection system effect.
Present stage, China mainly uses method qualitatively to evaluate the effectiveness of physical protection system, not to be suitable for the physical protection system efficiency analysis computational methods of China's national situation;The quantitative evaluating method lacking a set of comparatively perfect carries out science to effectiveness and the risk of real insurance system, objectively measures.
Summary of the invention
The invention provides a kind of nuclear power physical protection effectiveness quantitative estimation method and device, it, for improving the accuracy of physical protection system efficiency analysis, reduces the probability that nuclear accident occurs.
For solving the problems referred to above, as one aspect of the present invention, it is provided that a kind of nuclear power physical protection effectiveness quantitative estimation method, including: step 1, set up the two-dimentional facility descriptive model of physical protection system environment;This two dimension facility descriptive model includes the Environmental Map Information that the facility components information of physical protection system, nuclear material information and real insurance system are concrete;Step 2, invades situation according to described two dimension facility descriptive model for outside opponent, carries out outside invasion analysis;Step 3, according to outside invasion opponent's information and response force information, carries out preventing to outside opponent's situation of invading and analyzes;Step 4, steals nuclear material situation according to described two dimension facility descriptive model for internal staff and carries out internal staff and commit a crime analysis;Step 5, according to step 2 and the analysis result of 3, calculates the value-at-risk of outside opponent's invasion, further according to the analysis result of step 4, calculates the value-at-risk of internal staff's crime;Step 6, if the calculated value-at-risk of step 5 is higher, then according to the result of calculation of step 2-4 be analyzed finding out can improvement, and according to step 2-5, the physical protection system improved is re-started quantitative evaluation, until it reaches industry standard.
Preferably, described facility components information include detection probability, time delay, can traverse distance;Described nuclear material information includes nuclear material size, nuclear material grade, status information;The concrete Environmental Map Information of described real insurance system includes in system the two-dimensional position coordinate residing for each facility components, annexation.
Preferably, described step 2 includes: according to described two dimension facility descriptive model, uses Depth Priority Algorithm to list all feasible paths of outside opponent's invasion;To each feasible path, determine critical detection point according to outside invasion opponent's information and response force information;According to the facility components information on described critical detection point and intrusion path, calculate individual paths and stop probability;Stop probability calculation mode according to described single path, calculate the probability that stops of all feasible paths, and carry out ascending order arrangement by numerical values recited;Described minimum is stopped probit and industry standard compares, it is judged that whether described real insurance system reaches effect level.
Preferably, described step 3 includes: according to described outside invasion opponent's information and response force information, use PCA to determine weapon effectiveness value;According to described weapon effectiveness value, use blue Chester operation to injure theoretical model calculating and finally prevent probability;Described prevention probit and industry standard are compared, it is judged that whether the response strength of described real insurance system reaches effect level.
Preferably, described step 4 includes: according to described two dimension facility descriptive model information and internal work personal information, uses greedy algorithm to calculate the internal detection probability of internal staff's crime;Described internal detection probit and industry standard are compared, it is judged that whether the internal work personnel of described real insurance system reach effect level.
Present invention also offers a kind of nuclear power physical protection effectiveness quantitative evaluation device, including: facility describing module, for setting up the two-dimentional facility descriptive model of physical protection system environment;This two dimension facility descriptive model includes the Environmental Map Information that the facility components information of physical protection system, nuclear material information and real insurance system are concrete;Outside invasion analyzes module, for invading situation according to described two dimension facility descriptive model for outside opponent, carries out outside invasion analysis;Prevent module, for according to outside invasion opponent's information and response force information, carry out preventing to outside opponent's situation of invading and analyze;Internal staff commits a crime analysis module, carries out internal staff commit a crime analysis for stealing nuclear material situation according to described two dimension facility descriptive model for internal staff;Value-at-risk computing module, for analyzing module according to outside invasion and preventing the analysis result of module, calculates the value-at-risk of outside opponent's invasion, commits a crime further according to internal staff and analyze the analysis result of module, calculate the value-at-risk of internal staff's crime;Judge module; for when the calculated value-at-risk of step 5 is higher; according to outside invasion analyze module, prevent module and internal staff commit a crime analyze that the result of calculation of module is analyzed finding out can improvement; and analyze module according to outside invasion, prevent module, internal staff and commit a crime and analyze module and value-at-risk computing module the physical protection system improved is re-started quantitative evaluation, until it reaches industry standard.
Preferably, described facility components information include detection probability, time delay, can traverse distance;Described nuclear material information includes nuclear material size, nuclear material grade, status information;The concrete Environmental Map Information of described real insurance system includes in system the two-dimensional position coordinate residing for each facility components, annexation.
Preferably, described outside invasion is analyzed module and is included: feasible path computing module, for according to described two dimension facility descriptive model, uses Depth Priority Algorithm to list all feasible paths of outside opponent's invasion;Critical detection point determines module, for each feasible path, determining critical detection point according to outside invasion opponent's information and response force information;Stop probability evaluation entity, for according to the facility components information on described critical detection point and intrusion path, calculate individual paths and stop probability;Order module, for stopping probability calculation mode according to described single path, calculates the probability that stops of all feasible paths, and carries out ascending order arrangement by numerical values recited;Comparison module, is used for that described minimum is stopped probit and industry standard compares, it is judged that whether described real insurance system reaches effect level.
Preferably, described prevention module includes: weapon effectiveness value determines module, for according to described outside invasion opponent's information and response force information, using PCA to determine weapon effectiveness value;Finally prevent probability evaluation entity, for according to described weapon effectiveness value, use blue Chester operation to injure theoretical model calculating and finally prevent probability;First judge module, for comparing described prevention probit and industry standard, it is judged that whether the response strength of described real insurance system reaches effect level.
Preferably, described internal staff analysis module of committing a crime includes: internal detection probability evaluation entity, for according to described two dimension facility descriptive model information and internal work personal information, using greedy algorithm to calculate the internal detection probability of internal staff's crime;Second judge module, for comparing described internal detection probit and industry standard, it is judged that whether the internal work personnel of described real insurance system reach effect level.
The present invention uses the quantitative evaluation technology that a whole set of is complete that real insurance system is carried out quantitative analysis, adds the theory support to efficiency analysis science, improves the accuracy of physical protection system efficiency analysis, reduces the probability that nuclear accident occurs.
Accompanying drawing explanation
Fig. 1 schematically shows the flow chart of the present invention.
Detailed description of the invention
Below in conjunction with accompanying drawing, embodiments of the invention are described in detail, but the multitude of different ways that the present invention can be defined by the claims and cover is implemented.
Refer to Fig. 1, the invention provides a kind of nuclear power physical protection effectiveness quantitative estimation method, including: step 1, set up the two-dimentional facility descriptive model of physical protection system environment;This two dimension facility descriptive model includes the Environmental Map Information that the facility components information of physical protection system, nuclear material information and real insurance system are concrete;Step 2, invades situation according to described two dimension facility descriptive model for outside opponent, carries out outside invasion analysis;Step 3, according to outside invasion opponent's information and response force information, carries out preventing to outside opponent's situation of invading and analyzes;Step 4, steals nuclear material situation according to described two dimension facility descriptive model for internal staff and carries out internal staff and commit a crime analysis;Step 5, according to step 2 and the analysis result of 3, calculates the value-at-risk of outside opponent's invasion, further according to the analysis result of step 4, calculates the value-at-risk of internal staff's crime;Step 6, if the calculated value-at-risk of step 5 is higher, then according to the result of calculation of step 2-4 be analyzed finding out can improvement, and according to step 2-5, the physical protection system improved is re-started quantitative evaluation, until it reaches industry standard.
Compared to China's existing efficiency evaluation technology; the present invention uses the quantitative evaluation technology that a whole set of is complete that real insurance system is carried out quantitative analysis; add the theory support to efficiency analysis science; improve the accuracy of physical protection system efficiency analysis, reduce the probability that nuclear accident occurs.
Preferably, described facility components information include detection probability, time delay, can traverse distance;Described nuclear material information includes nuclear material size, nuclear material grade, status information;The concrete Environmental Map Information of described real insurance system includes in system the two-dimensional position coordinate residing for each facility components, annexation.
Preferably, described step 2 includes: according to described two dimension facility descriptive model, uses Depth Priority Algorithm to list all feasible paths of outside opponent's invasion;To each feasible path, determine critical detection point according to outside invasion opponent's information and response force information;According to the facility components information on described critical detection point and intrusion path, calculate individual paths and stop probability;Stop probability calculation mode according to described single path, calculate the probability that stops of all feasible paths, and carry out ascending order arrangement by numerical values recited;Described minimum is stopped probit and industry standard compares, it is judged that whether described real insurance system reaches effect level.
Preferably, described step 3 includes: according to described outside invasion opponent's information and response force information, use PCA to determine weapon effectiveness value;According to described weapon effectiveness value, use blue Chester operation to injure theoretical model calculating and finally prevent probability;Described prevention probit and industry standard are compared, it is judged that whether the response strength of described real insurance system reaches effect level.
Preferably, described step 4 includes: according to described two dimension facility descriptive model information and internal work personal information, uses greedy algorithm to calculate the internal detection probability of internal staff's crime;Described internal detection probit and industry standard are compared, it is judged that whether the internal work personnel of described real insurance system reach effect level.
Present invention also offers a kind of nuclear power physical protection effectiveness quantitative evaluation device, including: facility describing module, for setting up the two-dimentional facility descriptive model of physical protection system environment;This two dimension facility descriptive model includes the Environmental Map Information that the facility components information of physical protection system, nuclear material information and real insurance system are concrete;Outside invasion analyzes module, for invading situation according to described two dimension facility descriptive model for outside opponent, carries out outside invasion analysis;Prevent module, for according to outside invasion opponent's information and response force information, carry out preventing to outside opponent's situation of invading and analyze;Internal staff commits a crime analysis module, carries out internal staff commit a crime analysis for stealing nuclear material situation according to described two dimension facility descriptive model for internal staff;Value-at-risk computing module, for analyzing module according to outside invasion and preventing the analysis result of module, calculates the value-at-risk of outside opponent's invasion, commits a crime further according to internal staff and analyze the analysis result of module, calculate the value-at-risk of internal staff's crime;Judge module; for when the calculated value-at-risk of step 5 is higher; according to outside invasion analyze module, prevent module and internal staff commit a crime analyze that the result of calculation of module is analyzed finding out can improvement; and analyze module according to outside invasion, prevent module, internal staff and commit a crime and analyze module and value-at-risk computing module the physical protection system improved is re-started quantitative evaluation, until it reaches industry standard.
Preferably, described facility components information include detection probability, time delay, can traverse distance;Described nuclear material information includes nuclear material size, nuclear material grade, status information;The concrete Environmental Map Information of described real insurance system includes in system the two-dimensional position coordinate residing for each facility components, annexation.
Preferably, described outside invasion is analyzed module and is included: feasible path computing module, for according to described two dimension facility descriptive model, uses Depth Priority Algorithm to list all feasible paths of outside opponent's invasion;Critical detection point determines module, for each feasible path, determining critical detection point according to outside invasion opponent's information and response force information;Stop probability evaluation entity, for according to the facility components information on described critical detection point and intrusion path, calculate individual paths and stop probability;Order module, for stopping probability calculation mode according to described single path, calculates the probability that stops of all feasible paths, and carries out ascending order arrangement by numerical values recited;Comparison module, is used for that described minimum is stopped probit and industry standard compares, it is judged that whether described real insurance system reaches effect level.
Preferably, described prevention module includes: weapon effectiveness value determines module, for according to described outside invasion opponent's information and response force information, using PCA to determine weapon effectiveness value;Finally prevent probability evaluation entity, for according to described weapon effectiveness value, use blue Chester operation to injure theoretical model calculating and finally prevent probability;First judge module, for comparing described prevention probit and industry standard, it is judged that whether the response strength of described real insurance system reaches effect level.
Preferably, described internal staff analysis module of committing a crime includes: internal detection probability evaluation entity, for according to described two dimension facility descriptive model information and internal work personal information, using greedy algorithm to calculate the internal detection probability of internal staff's crime;Second judge module, for comparing described internal detection probit and industry standard, it is judged that whether the internal work personnel of described real insurance system reach effect level.
The foregoing is only the preferred embodiments of the present invention, be not limited to the present invention, for a person skilled in the art, the present invention can have various modifications and variations.All within the spirit and principles in the present invention, any modification, equivalent substitution and improvement etc. made, should be included within the scope of the present invention.

Claims (10)

1. a nuclear power physical protection effectiveness quantitative estimation method, it is characterised in that including:
Step 1, sets up the two-dimentional facility descriptive model of physical protection system environment;This two dimension facility descriptive model includes the Environmental Map Information that the facility components information of physical protection system, nuclear material information and real insurance system are concrete;
Step 2, invades situation according to described two dimension facility descriptive model for outside opponent, carries out outside invasion analysis;
Step 3, according to outside invasion opponent's information and response force information, carries out preventing to outside opponent's situation of invading and analyzes;
Step 4, steals nuclear material situation according to described two dimension facility descriptive model for internal staff and carries out internal staff and commit a crime analysis;
Step 5, according to step 2 and the analysis result of 3, calculates the value-at-risk of outside opponent's invasion, further according to the analysis result of step 4, calculates the value-at-risk of internal staff's crime;
Step 6, if the calculated value-at-risk of step 5 is higher, then according to the result of calculation of step 2-4 be analyzed finding out can improvement, and according to step 2-5, the physical protection system improved is re-started quantitative evaluation, until it reaches industry standard.
Nuclear power physical protection effectiveness quantitative estimation method the most according to claim 1, it is characterised in that described facility components information include detection probability, time delay, can traverse distance;Described nuclear material information includes nuclear material size, nuclear material grade, status information;The concrete Environmental Map Information of described real insurance system includes in system the two-dimensional position coordinate residing for each facility components, annexation.
Nuclear power physical protection effectiveness quantitative estimation method the most according to claim 1, it is characterised in that described step 2 includes:
According to described two dimension facility descriptive model, Depth Priority Algorithm is used to list all feasible paths of outside opponent's invasion;
To each feasible path, determine critical detection point according to outside invasion opponent's information and response force information;
According to the facility components information on described critical detection point and intrusion path, calculate individual paths and stop probability;
Stop probability calculation mode according to described single path, calculate the probability that stops of all feasible paths, and carry out ascending order arrangement by numerical values recited;
Described minimum is stopped probit and industry standard compares, it is judged that whether described real insurance system reaches effect level.
Nuclear power physical protection effectiveness quantitative estimation method the most according to claim 1, it is characterised in that described step 3 includes:
According to described outside invasion opponent's information and response force information, PCA is used to determine weapon effectiveness value;
According to described weapon effectiveness value, use blue Chester operation to injure theoretical model calculating and finally prevent probability;
Described prevention probit and industry standard are compared, it is judged that whether the response strength of described real insurance system reaches effect level.
Nuclear power physical protection effectiveness quantitative estimation method the most according to claim 1, it is characterised in that described step 4 includes:
According to described two dimension facility descriptive model information and internal work personal information, greedy algorithm is used to calculate the internal detection probability of internal staff's crime;
Described internal detection probit and industry standard are compared, it is judged that whether the internal work personnel of described real insurance system reach effect level.
6. a nuclear power physical protection effectiveness quantitative evaluation device, it is characterised in that including:
Facility describing module, for setting up the two-dimentional facility descriptive model of physical protection system environment;This two dimension facility descriptive model includes the Environmental Map Information that the facility components information of physical protection system, nuclear material information and real insurance system are concrete;
Outside invasion analyzes module, for invading situation according to described two dimension facility descriptive model for outside opponent, carries out outside invasion analysis;
Prevent module, for according to outside invasion opponent's information and response force information, carry out preventing to outside opponent's situation of invading and analyze;
Internal staff commits a crime analysis module, carries out internal staff commit a crime analysis for stealing nuclear material situation according to described two dimension facility descriptive model for internal staff;
Value-at-risk computing module, for analyzing module according to outside invasion and preventing the analysis result of module, calculates the value-at-risk of outside opponent's invasion, commits a crime further according to internal staff and analyze the analysis result of module, calculate the value-at-risk of internal staff's crime;
Judge module; for when the calculated value-at-risk of step 5 is higher; according to outside invasion analyze module, prevent module and internal staff commit a crime analyze that the result of calculation of module is analyzed finding out can improvement; and analyze module according to outside invasion, prevent module, internal staff and commit a crime and analyze module and value-at-risk computing module the physical protection system improved is re-started quantitative evaluation, until it reaches industry standard.
Nuclear power physical protection effectiveness quantitative evaluation device the most according to claim 6, it is characterised in that described facility components information include detection probability, time delay, can traverse distance;Described nuclear material information includes nuclear material size, nuclear material grade, status information;The concrete Environmental Map Information of described real insurance system includes in system the two-dimensional position coordinate residing for each facility components, annexation.
Nuclear power physical protection effectiveness quantitative evaluation device the most according to claim 6, it is characterised in that described outside invasion is analyzed module and included:
Feasible path computing module, for according to described two dimension facility descriptive model, uses Depth Priority Algorithm to list all feasible paths of outside opponent's invasion;
Critical detection point determines module, for each feasible path, determining critical detection point according to outside invasion opponent's information and response force information;
Stop probability evaluation entity, for according to the facility components information on described critical detection point and intrusion path, calculate individual paths and stop probability;
Order module, for stopping probability calculation mode according to described single path, calculates the probability that stops of all feasible paths, and carries out ascending order arrangement by numerical values recited;
Comparison module, is used for that described minimum is stopped probit and industry standard compares, it is judged that whether described real insurance system reaches effect level.
Nuclear power physical protection effectiveness quantitative evaluation device the most according to claim 6, it is characterised in that described prevention module includes:
Weapon effectiveness value determines module, for according to described outside invasion opponent's information and response force information, using PCA to determine weapon effectiveness value;
Finally prevent probability evaluation entity, for according to described weapon effectiveness value, use blue Chester operation to injure theoretical model calculating and finally prevent probability;
First judge module, for comparing described prevention probit and industry standard, it is judged that whether the response strength of described real insurance system reaches effect level.
Nuclear power physical protection effectiveness quantitative evaluation device the most according to claim 6, it is characterised in that described internal staff commit a crime analysis module include:
Internal detection probability evaluation entity, for according to described two dimension facility descriptive model information and internal work personal information, uses greedy algorithm to calculate the internal detection probability of internal staff's crime;
Second judge module, for comparing described internal detection probit and industry standard, it is judged that whether the internal work personnel of described real insurance system reach effect level.
CN201610169579.3A 2016-03-23 2016-03-23 Nuclear power object protection effectiveness quantifying and evaluating method and device Pending CN105825344A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610169579.3A CN105825344A (en) 2016-03-23 2016-03-23 Nuclear power object protection effectiveness quantifying and evaluating method and device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610169579.3A CN105825344A (en) 2016-03-23 2016-03-23 Nuclear power object protection effectiveness quantifying and evaluating method and device

Publications (1)

Publication Number Publication Date
CN105825344A true CN105825344A (en) 2016-08-03

Family

ID=56523560

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610169579.3A Pending CN105825344A (en) 2016-03-23 2016-03-23 Nuclear power object protection effectiveness quantifying and evaluating method and device

Country Status (1)

Country Link
CN (1) CN105825344A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108509590A (en) * 2018-03-29 2018-09-07 深圳市欣横纵技术股份有限公司 A kind of safety-protection system three-dimensional map display prevention method
CN108520346A (en) * 2018-03-29 2018-09-11 深圳市欣横纵技术股份有限公司 A kind of physical protection efficiency evaluation system
CN109598374A (en) * 2018-11-21 2019-04-09 华南理工大学 A kind of heuristic efficiency analysis method of key facility physical protection system
CN111178684A (en) * 2019-12-10 2020-05-19 中国人民解放军96901部队23分队 Weak path determination method for nuclear facility physical protection system
CN111553569A (en) * 2020-04-16 2020-08-18 国家核安保技术中心 Method, device and equipment for evaluating nuclear facility physical protection effectiveness and storage medium
CN112418544A (en) * 2020-12-01 2021-02-26 中国核电工程有限公司 Three-dimensional scene-based real object protection weakness analysis method
CN115438463A (en) * 2022-08-02 2022-12-06 国家核安保技术中心 Protection system evaluation method, evaluation device, and storage medium

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104463455A (en) * 2014-12-02 2015-03-25 中广核工程有限公司 Nuclear power physical protection effectiveness analysis method, device and system
CN105117526A (en) * 2015-07-31 2015-12-02 深圳市欣横纵数码科技有限公司 Measuring method for risk of physical protection system

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104463455A (en) * 2014-12-02 2015-03-25 中广核工程有限公司 Nuclear power physical protection effectiveness analysis method, device and system
CN105117526A (en) * 2015-07-31 2015-12-02 深圳市欣横纵数码科技有限公司 Measuring method for risk of physical protection system

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
张健: "核电站实物保护系统有效性分析", 《中国优秀硕士学位论文全文数据库 工程科技II辑》 *
陈航: "核电厂实物保护系统信息安全技术研究", 《中国核电》 *

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108509590A (en) * 2018-03-29 2018-09-07 深圳市欣横纵技术股份有限公司 A kind of safety-protection system three-dimensional map display prevention method
CN108520346A (en) * 2018-03-29 2018-09-11 深圳市欣横纵技术股份有限公司 A kind of physical protection efficiency evaluation system
CN109598374A (en) * 2018-11-21 2019-04-09 华南理工大学 A kind of heuristic efficiency analysis method of key facility physical protection system
CN111178684A (en) * 2019-12-10 2020-05-19 中国人民解放军96901部队23分队 Weak path determination method for nuclear facility physical protection system
CN111553569A (en) * 2020-04-16 2020-08-18 国家核安保技术中心 Method, device and equipment for evaluating nuclear facility physical protection effectiveness and storage medium
CN111553569B (en) * 2020-04-16 2024-02-02 国家核安保技术中心 Method, device, equipment and storage medium for evaluating physical protection effectiveness of nuclear facility
CN112418544A (en) * 2020-12-01 2021-02-26 中国核电工程有限公司 Three-dimensional scene-based real object protection weakness analysis method
CN112418544B (en) * 2020-12-01 2024-02-20 中国核电工程有限公司 Physical protection weakness analysis method based on three-dimensional scene
CN115438463A (en) * 2022-08-02 2022-12-06 国家核安保技术中心 Protection system evaluation method, evaluation device, and storage medium

Similar Documents

Publication Publication Date Title
CN105825344A (en) Nuclear power object protection effectiveness quantifying and evaluating method and device
Fang et al. A deep learning-based method for detecting non-certified work on construction sites
Fang et al. Computer vision aided inspection on falling prevention measures for steeplejacks in an aerial environment
Zhao et al. Bolt loosening angle detection technology using deep learning
CN103761748B (en) Anomaly detection method and device
JP6732806B2 (en) Account theft risk identification method, identification device, and prevention/control system
CN105376255B (en) A kind of Android platform intrusion detection method based on K-means cluster
CN106776214B (en) A kind of server health degree appraisal procedure
CN104636449A (en) Distributed type big data system risk recognition method based on LSA-GCC
CN109598374B (en) Heuristic effectiveness analysis method of key facility physical protection system
KR102114683B1 (en) Method for large sructures safety diagnosis using drone, device and computer readable medium for performing the method
Mei et al. Human intrusion detection in static hazardous areas at construction sites: Deep learning–based method
CN103500330A (en) Semi-supervised human detection method based on multi-sensor and multi-feature fusion
Ioannou et al. Use of regression analysis for the construction of empirical fragility curves
CN116405310A (en) Network data security monitoring method and system
CN105825130A (en) Information security early-warning method and device
Yu et al. Structural damage prognosis on truss bridges with end connector bolts
CN117350974A (en) Engineering quality determining method, device, equipment and medium
RU2536657C1 (en) System for evaluating safety and efficiency of design solutions to ensure safety of hazardous production facility
JP2015194385A (en) Computing system
CN113611029B (en) Monitoring method, device, access control system and readable storage medium
CN113936294A (en) Construction site personnel identification method, readable storage medium and electronic device
CN114495421A (en) Intelligent open type road construction operation monitoring and early warning method and system
Zhao et al. Video based crowd stability analysis used in emegency evacuation
CN113569637B (en) Personnel track positioning and supervising system based on Internet of things

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20160803

RJ01 Rejection of invention patent application after publication