CN105825274A - 针对工程机械产品进行基于可靠性维修性优化设计方法 - Google Patents
针对工程机械产品进行基于可靠性维修性优化设计方法 Download PDFInfo
- Publication number
- CN105825274A CN105825274A CN201610163489.3A CN201610163489A CN105825274A CN 105825274 A CN105825274 A CN 105825274A CN 201610163489 A CN201610163489 A CN 201610163489A CN 105825274 A CN105825274 A CN 105825274A
- Authority
- CN
- China
- Prior art keywords
- reliability
- maintainability
- design
- product
- described step
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/20—Administration of product repair or maintenance
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Engineering & Computer Science (AREA)
- Economics (AREA)
- Entrepreneurship & Innovation (AREA)
- Marketing (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Strategic Management (AREA)
- Tourism & Hospitality (AREA)
- Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- General Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
本发明公开了一种针对工程机械产品进行基于可靠性维修性优化设计方法,包括以下步骤:(1)对工程机械产品设计方案进行可靠性、维修性优化分配;(2)对所述步骤(1)中优化分配后的方案进行产品结构设计;(3)对所述步骤(2)中的产品结构设计方案进行可靠性、维修性预估;(4)若是满足设计目标,则进行产品试验或者使用;若是不满足设计目标,调整结构参数,重复所述步骤(2)和(3);(5)进行数据统计分析,所述数据统计分析包括进行实际可靠度计算和实际维修度计算;(6)根据所述步骤(5)中计算得到的实际可靠度和实际维修度结果,若是满足设计目标,则结束;若是不满足设计目前,则返回所述步骤(1),重复后续步骤。
Description
技术领域
本发明属于物联网技术领域,尤其是涉及一种针对工程机械产品进行基于可靠性维修性优化设计方法。
背景技术
随着市场竞争的加剧,消费者要求设计和生产出来的设备,除满足性能要求外,应是故障少即可靠性好,保养维修方便即维修性好。产品的属性在设计完成时即决定了70%左右,因此,要提高产品的可靠性、维修性,首先要从设计入手。
(1)通过对影响产品生命周期可靠性的各因素和影响程度的分析,可知设计是决定性因素,产品的可靠性、维修性是产品的固有属性,在产品设计时即已经赋予,并在产品使用和维护中保证,因此传统的只满足产品性能的设计方法需要进行改进,要对可靠性、维修性设计方法进行研究。
(2)基于全生命周期投资——效益准则,研究工程机械全生命周期的费用组成,分析给出工程机械全生命周期内各项费用与可靠性之间的函数关系,研究各项费用之间的关系,以此为基础,提出机械可靠性、维修性综合优化设计方法。
当通过优化模型完成总可靠性维修性目标优化后,还要将设计目标分配到零件级全生命周期产品可靠性维修性优化的设计流程。
发明内容
本发明要解决的技术问题是,提供一种提高工程机械产品的可靠性维修性的优化设计方法。
为解决上述技术问题,本发明采用的技术方案是,该针对工程机械产品进行基于可靠性维修性优化设计方法,包括以下步骤:
(1)对工程机械产品设计方案进行可靠性、维修性优化分配;
(2)对所述步骤(1)中优化分配后的方案进行产品结构设计;
(3)对所述步骤(2)中的产品结构设计方案进行可靠性、维修性预估;
(4)根据所述步骤(3)中预估的情况,若是满足设计目标,则进行产品试验或者使用;若是不满足设计目标,调整结构参数,重复所述步骤(2)和(3);
(5)对产品实验或者使用情况进行数据统计分析,所述数据统计分析包括进行实际可靠度计算和实际维修度计算;
(6)根据所述步骤(5)中计算得到的实际可靠度和实际维修度结果,若是满足设计目标,则结束;若是不满足设计目前,则返回所述步骤(1),重复后续步骤。
优选的,在所述步骤(1)中,采用模糊层次分析法进行可靠度分配的方法,建立层次结构模型,构建模糊评判矩阵,将模糊三角数应用到可靠度分配中的专家打分中,体现专家评判的模糊性。
优选的,在所述步骤(1)中,对维修度分配方法进行研究,对适合产品创新设计加权因子分配法进行研究,建立适合工程机械的加权因子分配模型;从全生命周期费用角度出发,建立维修费用最少的维修度分配方法,通过对维修费用与单元维修性的关系研究,建立优化分配模型,采用外点惩罚函数法,将约束条件和目标函数构造新目标函数,从而将约束优化问题转化为无约束优化问题,最终完成求解。
附图说明
下面结合附图和本发明的实施方式进一步详细说明:
图1是本发明针对工程机械产品进行基于可靠性维修性优化设计方法流程结构示意图。
具体实施方式
如图1所示,该针对工程机械产品进行基于可靠性维修性优化设计方法,包括以下步骤:
(1)对工程机械产品设计方案进行可靠性、维修性优化分配;
(2)对所述步骤(1)中优化分配后的方案进行产品结构设计;
(3)对所述步骤(2)中的产品结构设计方案进行可靠性、维修性预估;
(4)根据所述步骤(3)中预估的情况,若是满足设计目标,则进行产品试验或者使用;若是不满足设计目标,调整结构参数,重复所述步骤(2)和(3);
(5)对产品实验或者使用情况进行数据统计分析,所述数据统计分析包括进行实际可靠度计算和实际维修度计算;
(6)根据所述步骤(5)中计算得到的实际可靠度和实际维修度结果,若是满足设计目标,则结束;若是不满足设计目前,则返回所述步骤(1),重复后续步骤。
优选的,在所述步骤(1)中,采用模糊层次分析法进行可靠度分配的方法,建立层次结构模型,构建模糊评判矩阵,将模糊三角数应用到可靠度分配中的专家打分中,体现专家评判的模糊性。
优选的,在所述步骤(1)中,对维修度分配方法进行研究,对适合产品创新设计加权因子分配法进行研究,建立适合工程机械的加权因子分配模型;从全生命周期费用角度出发,建立维修费用最少的维修度分配方法,通过对维修费用与单元维修性的关系研究,建立优化分配模型,采用外点惩罚函数法,将约束条件和目标函数构造新目标函数,从而将约束优化问题转化为无约束优化问题,最终完成求解。
以上显示和描述了本发明的基本原理、主要特征及优点。本行业的技术人员应该了解,本发明不受上述实施例的限制,上述实施例和说明书中描述的只是说明本发明的原理,在不脱离本发明精神和范围的前提下,本发明还会有各种变化和改进,这些变化和改进都落入要求保护的本发明范围内。本发明要求保护范围由所附的权利要求书及其等效物界定。
Claims (3)
1.一种针对工程机械产品进行基于可靠性维修性优化设计方法,其特征在于,包括以下步骤:
(1)对工程机械产品设计方案进行可靠性、维修性优化分配;
(2)对所述步骤(1)中优化分配后的方案进行产品结构设计;
(3)对所述步骤(2)中的产品结构设计方案进行可靠性、维修性预估;
(4)根据所述步骤(3)中预估的情况,若是满足设计目标,则进行产品试验或者使用;若是不满足设计目标,调整结构参数,重复所述步骤(2)和(3);
(5)对产品实验或者使用情况进行数据统计分析,所述数据统计分析包括进行实际可靠度计算和实际维修度计算;
(6)根据所述步骤(5)中计算得到的实际可靠度和实际维修度结果,若是满足设计目标,则结束;若是不满足设计目前,则返回所述步骤(1),重复后续步骤。
2.根据权利要求1所述的针对工程机械产品进行基于可靠性维修性优化设计方法,其特征在于,在所述步骤(1)中,采用模糊层次分析法进行可靠度分配的方法,建立层次结构模型,构建模糊评判矩阵,将模糊三角数应用到可靠度分配中的专家打分中,体现专家评判的模糊性。
3.根据权利要求2所述的针对工程机械产品进行基于可靠性维修性优化设计方法,其特征在于,在所述步骤(1)中,对维修度分配方法进行研究,对适合产品创新设计加权因子分配法进行研究,建立适合工程机械的加权因子分配模型;从全生命周期费用角度出发,建立维修费用最少的维修度分配方法,通过对维修费用与单元维修性的关系研究,建立优化分配模型,采用外点惩罚函数法,将约束条件和目标函数构造新目标函数,从而将约束优化问题转化为无约束优化问题,最终完成求解。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610163489.3A CN105825274A (zh) | 2016-03-19 | 2016-03-19 | 针对工程机械产品进行基于可靠性维修性优化设计方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610163489.3A CN105825274A (zh) | 2016-03-19 | 2016-03-19 | 针对工程机械产品进行基于可靠性维修性优化设计方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN105825274A true CN105825274A (zh) | 2016-08-03 |
Family
ID=56524247
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610163489.3A Pending CN105825274A (zh) | 2016-03-19 | 2016-03-19 | 针对工程机械产品进行基于可靠性维修性优化设计方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105825274A (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107016190A (zh) * | 2017-04-05 | 2017-08-04 | 北京航空航天大学 | 一种产品维修性和功能结构的关联关系建模与量化方法 |
CN112699496A (zh) * | 2021-01-08 | 2021-04-23 | 北京空间飞行器总体设计部 | 一种用于航天器的维修性设计与分析集成系统 |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20070023515A1 (en) * | 2003-09-29 | 2007-02-01 | The Trustees Of The Stevens Institute Of Technology | System and method for overcoming decision making and communications errors to produce expedited and accurate group choices |
CN104182796A (zh) * | 2014-08-14 | 2014-12-03 | 南京理工大学 | 一种城市轨道交通车辆维修方式的确定方法 |
CN104573275A (zh) * | 2015-01-28 | 2015-04-29 | 太原重工股份有限公司 | 一种基于故障维修数据的大型矿用挖掘机可靠性分配方法 |
-
2016
- 2016-03-19 CN CN201610163489.3A patent/CN105825274A/zh active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20070023515A1 (en) * | 2003-09-29 | 2007-02-01 | The Trustees Of The Stevens Institute Of Technology | System and method for overcoming decision making and communications errors to produce expedited and accurate group choices |
CN104182796A (zh) * | 2014-08-14 | 2014-12-03 | 南京理工大学 | 一种城市轨道交通车辆维修方式的确定方法 |
CN104573275A (zh) * | 2015-01-28 | 2015-04-29 | 太原重工股份有限公司 | 一种基于故障维修数据的大型矿用挖掘机可靠性分配方法 |
Non-Patent Citations (1)
Title |
---|
王玉玲: "机械产品可靠性维修性优化设计方法及其在工程机械中的应用", 《中国博士学位论文全文数据库工程科技辑》 * |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107016190A (zh) * | 2017-04-05 | 2017-08-04 | 北京航空航天大学 | 一种产品维修性和功能结构的关联关系建模与量化方法 |
CN107016190B (zh) * | 2017-04-05 | 2021-02-23 | 北京航空航天大学 | 一种产品维修性和功能结构的关联关系建模与量化方法 |
CN112699496A (zh) * | 2021-01-08 | 2021-04-23 | 北京空间飞行器总体设计部 | 一种用于航天器的维修性设计与分析集成系统 |
CN112699496B (zh) * | 2021-01-08 | 2024-05-03 | 北京空间飞行器总体设计部 | 一种用于航天器的维修性设计与分析集成系统 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP2520994A3 (en) | Automated system and method for implementing statistical comparison of power plant operations | |
CN107145720B (zh) | 连续退化和未知冲击共同作用下的设备剩余寿命预测方法 | |
CN109388888B (zh) | 一种基于车辆荷载空间分布的桥梁结构使用性能预测方法 | |
CN108304348A (zh) | 一种基于二元维纳过程的轴承剩余寿命预测方法 | |
CN105825274A (zh) | 针对工程机械产品进行基于可靠性维修性优化设计方法 | |
CN109491709A (zh) | 一种基于ahp与神经网络的软件代码可控度综合评价方法 | |
CN109635372B (zh) | 基于改进先验概率的贝叶斯模型的设计洪水方法 | |
CN108564228A (zh) | 一种基于时序特征预测轨道交通od客流量的方法 | |
CN107978147A (zh) | 一种基于knn算法的交通流异常数据双向检测修复方法 | |
CN107527117A (zh) | 基于d‑s证据理论的水库适应性调度方法 | |
CN105068928A (zh) | 一种基于复杂网络理论的软件测试用例生成方法 | |
CN112883549A (zh) | 一种考虑随机冲击影响的视情维护模型的建立方法 | |
CN109376937B (zh) | 基于集合经验模态分解的自适应调度期末水位预测方法 | |
CN117708625B (zh) | 一种乏数据背景下大坝监测历史数据填补方法 | |
CN105224801B (zh) | 一种多因子水库入库流量短期预报评价方法 | |
CN107180229A (zh) | 一种监控视频中基于运动方向的异常行为检测方法 | |
CN104112204A (zh) | 供电品质高效运行的评价方法 | |
CN103984832B (zh) | 一种铝电解槽电场仿真分析方法 | |
CN113359435A (zh) | 用于火电机组动态工况数据的修正方法 | |
Premkumar et al. | Implementation of quality function deployment in pump industry | |
CN105183612B (zh) | 服务器可用内存异常增长及运行状况的评估方法 | |
CN114548739A (zh) | 一种变电站防汛风险组合评估方法 | |
CN108170974A (zh) | 一种抽油机井系统效率寿命分析方法 | |
Gharehchopogh et al. | A novel hybrid artificial immune system with genetic algorithm for software cost estimation | |
CN107766290A (zh) | 收敛的多元回归工程统计新方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB03 | Change of inventor or designer information | ||
CB03 | Change of inventor or designer information |
Inventor after: Wang Yixiang Inventor after: Sun Fei Inventor before: Sun Fei |
|
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20160803 |