Summary of the invention
For the actual demand in present digital product market, the present invention is intended to provide a kind of printing packaging box, espespecially a kind of
Using high-end print equipment, it is aided with moisture-proof packaging box and its manufacture craft that the moulding process appearance of optimization seems high-end and atmospheric.
The technical solution that the present invention mainly uses: a kind of moisture-proof packaging box, the packing box are integrally square, main to wrap
Include a day box, box and inside casing, wherein day box using hawk using beat angle molding and cross glue positioning;Hanging buckle and peace are pasted in ground box
Equipped with Internal baffle, the inside casing mounting has facial tissue, and inside casing is assembled in ground box by Internal baffle.
A kind of manufacture craft of moisture-proof packaging box, the manufacture craft mainly comprise the steps that
(1) it designs typesetting: according to the shape of product, packing box being designed with related software, moulding and typesetting;
(2) overlay film prints: will design typesetted pattern and is printed to paper, covers sub- film and silk-screen UV oil processing;
(3) branch cuts: packing box of the typesetting after printing on same printing paper being cut, resolves into one
Independent printing paper is opened to offhand;
(4) offhand: the packing box component part after cutting is decomposed carries out offhand and assembling;
(5) it examines vanning: the packing box of offhand being tested and is cased after qualification.
Main in step (4) include molding day box, box and inside casing, and assembled, main process flow is such as
Under:
(1) box hawk in day plays angle molding: taking hawk to infolding state first, then beats angle at finally estimating to hawk again
Check molding hawk box;
(2) box facial tissue in day crosses glue positioning: it takes 1pcs facial tissue to cross glue first, 1pcs box base is then taken to be positioned, operation
When pay attention to positioned in alignment line;
(3) day box wipes mould: both hands wipe flat box face simultaneously first, and then both hands wipe flat short side simultaneously, and last both hands are wiped simultaneously
Flat long side;
(4) day box bound edge: taking 1pcs to wipe real day box first and be placed into pressing mold, and then both hands are simultaneously first to internal pressure short side,
Subsequently both hands finally take bamboo to scrape corner line in reality simultaneously to internal pressure long side;
(5) day box mounting lining paper positioning: 1pcs first takes facial tissue to cross glue, and then facial tissue is centered about by both hands, then the right hand
Lining paper is compacted;
(6) box de-bubble in day forms: both hands put day box to defoaming machine mold first, and then both hands starting defoaming machine is opened
It closes, bamboo is finally taken to scrape solid horn side;
(7) inside casing crosses glue positioning bound edge: taking inside casing facial tissue to cross glue first, then both hands took glue surface paper to position, subsequently
Both hands take positioning inside casing pressing, and last both hands take positioning inside casing pressing;
(8) interior frame chaining scraping: the arm of angle is scraped reality by both hands first, and then reality is scraped in ridge position by both hands, and last both hands are by inside casing
Link molding;
(9) inside casing mounts facial tissue: taking 1pcs facial tissue to cross glue first, then both hands will determine facial tissue positioned in alignment, last both hands
Plane paper is wiped real;
(10) box draws glue hanging buckle: box draws short side glue with taking 1pcs first, then both hands location and installation hanging buckle, most
Hanging buckle is compacted by both hands afterwards;
(11) glue is drawn on four side of box: both hands draw long side glue first, and then both hands draw short side glue again;
(12) box and inside casing assembling de-bubble: both hands take inside casing and ground box first, and then both hands assemble inside casing and ground box,
Last both hands will assemble ground box de-bubble molding;
(13) Internal baffle draws glue: taking Internal baffle to be placed on auxiliary frame first, then the left hand auxiliary right hand draws gum forming;
(14) Internal baffle assembles: the right hand, which takes, first draws a gum forming Internal baffle, and then both hands install Internal baffle to ground box, most
Both hands are by Internal baffle by real afterwards;
(15) box and foxing assemble: both hands take foxing broken line to form first;Then foxing is assembled in ground box by both hands,
Last both hands will assemble foxing compacting.
In step (5) mainly includes that with examining the ground box after cleaning day box, assembling with inside casing, day box box cooperation assembles
At packing box, then carry out packaging shipment, main process flow is as follows:
(1) day box cleans full inspection: the upper surface of day box is named as A grades of faces, two relatively long symmetrical appearances of side length
Face is named as B grades of faces, and two shorter symmetrical outer surfaces of side length are named as C grades of faces, first full inspection A grades of faces, then cleans A grades
Face, B, C grades of faces of full inspection of then sequentially getting off and cleaning;
(2) box cleans full inspection: the bottom surface of ground box is named as A grade faces, side length relatively long two it is symmetrical outside
Surface is named as B grades of faces, and two shorter symmetrical outer surfaces of side length are named as C grades of faces, first full inspection A grades of faces, then clean A
Grade face, B, C grades of faces of the full inspection respectively and cleaning of then sequentially getting off;
(3) full inspection assembles: the upper surface of Internal baffle being named as D grades of faces, first full inspection A grades of faces, especially attention hanging buckle position;
Then D grades of faces are cleaned, especially attention baffle residue glue;Subsequently full inspection B grades of faces then clean C grades of faces, subsequently assemble the world
Box, the gap after last full inspection assembling;
(4) packaging vanning: it is first that world box is PE bags box-packed, it is packed into carton, is then taken every paper/pendulum with six/layer
It puts to carton, then up superposition occupies carton bilayer joint sealing, and the title that subsequently weighs fills in data adhesive label, last full inspection
Assemble gap.
Beneficial effects of the present invention: firstly, the present invention adds the moulding of Internal baffle using world box, structure is simple, and
There is the design of Internal baffle, suitable for numerous digital products;Secondly, using high-end German import Heidelberg in manufacture craft
Machine prints chipboard, then covers after sub- film silk-screen UV oil again, so that printed patterns are bright in luster, while UV belongs to environmentally friendly production
Product, adhesive force is good, and folding resistance is excellent;Hardness is high, and scratch resistance is good, and slipping is good;Be resistant to most organic solvents and water, acid,
Alkali etc.;Importantly, the present invention uses offhand and inspection, so that packing box forms more superior more stable, cleaning
More thoroughly, the flaw of macroscopic is not stayed, can more embody the surcharge of product.
Specific embodiment
A kind of moisture-proof packaging box, the packing box are integrally square, mainly include day box, box and inside casing, wherein day
Box forms and crosses glue positioning using angle is beaten using hawk;It is pasted with hanging buckle in ground box and Internal baffle is installed, the inside casing mounting
There is facial tissue, inside casing is assembled in ground box by Internal baffle.
A kind of manufacture craft of moisture-proof packaging box, the manufacture craft mainly comprise the steps that
(1) it designs typesetting: according to the shape of product, packing box being designed with related software, moulding and typesetting;With
Related software is designed packing box and to product three-dimensional contouring, is designed to packing box according to the pack environment that product needs
With top box, box and inside casing the box-packaged box in the world, packaging simulation then is carried out to product using software, which kind of is meeting
Parameter and it is aesthetic under conditions of finalize a text, then according to the packing box of final version carry out expansion carry out plane exterior design design and row
Version is able to achieve except operation printing guaranteeing the pattern that designs, also to guarantee that a printing paper can be utmostly
Utilization.
(2) overlay film prints: will design typesetted pattern and is printed to paper, covers sub- film and silk-screen UV oil processing;
(3) branch cuts: packing box of the typesetting after printing on same printing paper being cut, resolves into one
Independent printing paper is opened to offhand;
(4) offhand: the packing box component part after cutting is decomposed carries out offhand and assembling;
(5) it examines vanning: the packing box of offhand being tested and is cased after qualification.
Main in step (4) include molding day box, box and inside casing, and assembled, main process flow is such as
Under:
(1) box hawk in day plays angle molding: taking hawk to infolding state first, then beats angle at finally estimating to hawk again
Check molding hawk box.
It before operation, first takes and beats angle machine equipment point inspection list, beat angle equipment by the inspection of specified content point, check and beat the spare number of angle band
Amount, debugging beat whether equipment operation in angle is normal, and machine temperature is 150 ° ~ 180 ° or so, take hawk material to be neatly placed into and beat angle
Operation area, when operation, left hand takes 1pcs hawk to front, and both hands are put in simultaneously to infolding and beat angle machine patch corner bracket, check patch angle paper
Band is confirmed whether to walk, and whether bonding is secured, and the whether moderate right crus of diaphragm of paster size steps on switch, successively rotates counterclockwise, successively
Angle molding is beaten to other three angles, whether visual inspection bonding secured, if there are the angle of site, gummed paper whether rake angle etc., the right hand
It being placed in the hawk box of completion is neat on table top again, direction is unified wait deliver lower process, in the grey sheet metal forming angle of site, product
It is≤0.5mm that matter, which manages standard,.
(2) box facial tissue in day crosses glue positioning: it takes 1pcs facial tissue to cross glue first, 1pcs box base is then taken to be positioned, operation
When pay attention to positioned in alignment line.
Before operation, glue equipment point-detecting list is first taken, glue machine equipment is examined by specified content point, checks that white glue with vinyl is spare
Whether quantity, debugging glue machine equipment operation are normal;When operation, left hand takes 1pcs facial tissue to cross glue, and right hand overturning is placed in platform
Face, estimating on facial tissue does not have sundries, and whether glue is uniform, checks supplied materials, and facial tissue appearance cannot have a scratch, dirty, dim pattern,
Breakage etc. is obvious bad;Then left hand takes 1pcs days box hawks to be put in front, and both hands are taking day box hawk bottom and facial tissue just simultaneously
In wire alignment glue, both hands slightly firmly press box base bottom, make facial tissue and hawk cements and is not easy the movement that walks;Matter when inspection
Amount control is in LOGO salient point S≤0.3 mm2, edge sawtooth NG, A, B, C grades of face S≤1.0mm2 of glue sags and crests, N≤1, glue
Water wave is according to limit sample;Finally, both hands are placed into subsequent processing for the box day after tomorrow is positioned;Pay attention to when operation facial tissue positioning walk≤
1mm。
(3) day box wipes mould: both hands wipe flat box face simultaneously first, and then both hands wipe flat short side simultaneously, and last both hands are wiped simultaneously
Flat long side.
It is whether normal with the presence or absence of dirty, glue, function that die surface is first checked before operation, and 2H is kept to clean 1 mould
Tool appearance simultaneously checks whether functional die is normal;When operation, left hand takes 1pcs to cross glue and positions day box to the right hand, and both hands are by positioning box
Base, which is placed into, to be wiped on mould, and both hands simultaneously wipe box face (A grades of faces) bubble, and then short side (B grades of faces) is wiped flat and wipe reality by both hands
Beltloop side, last both hands wipe long side (C grades of faces) real;It includes A grades of face bubbles according to limit sample that mass parameter, which is examined, and quadrangle cannot
It is apparent to expose hawk≤1mm, it checks whether water chestnut side has and wipes mould bonding in place;Last both hands take out hawk box from mould is wiped
Come, is placed into subsequent processing;Check wipe mold forming surface whether scratch, glue etc..
(4) day box bound edge: taking 1pcs to wipe real day box first and be placed into pressing mold, and then both hands are simultaneously first to internal pressure short side,
Subsequently both hands finally take bamboo to scrape corner line in reality simultaneously to internal pressure long side.
Before operation, it is whether normal with the presence or absence of dirty, glue, function to first check for die surface;When operation, first checks and wipe
Mold forming box it is bad with the presence or absence of obvious quality, left hand takes wipe mold forming after quality qualification day box to the right hand, both hands are by day
Box is placed into edge mould, acted after both hands and meanwhile operate edge mould short side exert oneself crimping form, then both hands operate simultaneously
Edge mould long side is exerted oneself crimping molding, and the right hand takes bamboo to scrape and scrapes real day box flanging linea angulata using head and form, both hands pressure edge forming
Its box is placed into subsequent processing, and when work notices that checking that the facial tissue pasted intersects with side is necessary for right angle, can not have circular arc,
Steep, crumple, when scraping, which will put down, scrapes and cannot tiltedly scrape, each side need it is smooth, there can be no circular arc, crumple it is bad.
(5) day box mounting lining paper positioning: 1pcs first takes facial tissue to cross glue, and then facial tissue is centered about by both hands, then the right hand
Lining paper is compacted.
Before operation, first have to check white glue with vinyl inventory, whether debugging glue machine equipment operation is normal;Check that lining paper is standby
With quantity, lining paper is placed into work operations platform, when operation, first checks supplied materials, facial tissue appearance cannot have scratch, dirty, pattern
Fuzzy, breakage etc. is obvious bad, and have the defect is set to defective products, abandons.Left hand takes 1pcs lining paper to cross glue, and the right hand is from glue
The water dispenser age of a draught animal catches lining paper, and lining paper is centered about to day box by right hand auxiliary left hand, and both hands will position lining paper and wipe in fact, separately there is glue
Stain is cleaned out in time, and lining paper positioning molding day box is placed into subsequent processing by the right hand;The standard of quality inspection be glue sags and crests A,
B, C grades of face S≤1.0mm2, N≤1, glue line position the≤1mm that walks according to limit sample, lining paper, and check that glue positioned lining paper
With the presence or absence of walking, the qualities such as excessive glue are bad.
(6) box de-bubble in day forms: both hands put day box to defoaming machine mold first, and then both hands starting defoaming machine is opened
It closes, bamboo is finally taken to scrape solid horn side.
Before operation, bubble machine equipment point inspection list is removed first, examines de-bubble machine equipment by specified content point, and check mold table
Whether face is normal with the presence or absence of dirty, glue, function, and whether debugging de-bubble machine equipment operation is normal;When operation, both hands are by 1pcs
Its box is placed on defoaming machine de-bubble mold, double handed start switch de-bubble, and de-bubble completion will be placed into workbench the day after tomorrow by left hand, is removed
Steeping the time is two seconds, and bubble scrapes each side and needs smooth, there can be no circular arcs, bad, the then right hand of crumpling according to limit sample
It takes bamboo to scrape real day box box face angle side, de-bubble molding day box is finally placed into subsequent processing, quality inspection requires to be de-bubble molding ground
Box whether there is bubble, and fillet quick-fried angle, scratches, the obvious quality abnormal such as impression.
(7) inside casing crosses glue positioning bound edge: taking inside casing facial tissue to cross glue first, then both hands took glue surface paper to position, subsequently
Both hands take positioning inside casing pressing, and last both hands take positioning inside casing pressing.
Before operation, glue equipment point-detecting list is taken first, examines glue machine equipment by specified content point;And check white glue with vinyl
Whether inventory, debugging glue machine equipment operation are normal;The press apparatus point that also to make even examines list, examines by specified content point flat
Press apparatus, and check whether die surface is normal with the presence or absence of dirty, glue, function, debugging concora crush machine equipment operation is
It is no normal;It when operation, first has to check supplied materials, facial tissue appearance cannot have a scratch, dirty, dim pattern, and breakage etc. is obvious bad
Check fabric, hawk inventory;Fabric, hawk are placed into workbench;Left hand takes 1pcs fabric to cross glue, and the right hand is in glue
Glue surface paper was caught in age of a draught animal position, and both hands are by facial tissue positioned in alignment on hawk;Facial tissue positioning hawk is placed into mold by both hands,
Both hands operate mold pressing simultaneously;Pressing and forming inside casing is placed into spreader bar by the right hand, double handed start switch de-bubble;Pay attention to four
Angle cannot significantly expose hawk, and for glue line according to limit sample, lining paper positions the≤1mm that walks, and to check that positioning whether there is
It walks, glue excessive glue etc..
(8) interior frame chaining scraping: the arm of angle is scraped reality by both hands first, and then reality is scraped in ridge position by both hands, and last both hands are by inside casing
Link molding.
Wearing gloves before operation check hanging plate with the presence or absence of glue etc., and when operation, left hand takes 1pcs de-bubble out of spreader bar
Form inside casing;Inside casing face is scraped reality using scraper plate and scrapes real slot position by the right hand, and head is docked adhesion-molded, quality inspection with tail portion by both hands
Standard is that the facial tissue pasted intersects with side and is necessary for right angle, can not have circular arc, blister, crumples, and to put down when scraping that scrape cannot be oblique
It scrapes, each side needs smooth, there can be no circular arc, crumples bad, after the assay was approved, left hand puts next work for inside casing is formed
Sequence;Walk when in addition checking link molding, the obvious quality such as the angle of site it is bad.
(9) inside casing mounts facial tissue: taking 1pcs facial tissue to cross glue first, then both hands will determine facial tissue positioned in alignment, last both hands
Plane paper is wiped real.
Before operation, glue equipment point-detecting list is first taken, examines glue machine equipment by specified content point;And check that white glue with vinyl is standby
With quantity, whether normal the operation of glue machine equipment is debugged;It also to check fabric inventory, fabric is placed into workbench;Make
Before industry, left hand takes inside casing facial tissue to cross glue, and the right hand takes over glue surface material in glue age of a draught animal position, and both hands paste fabric alignment hawk
Inside casing facial tissue crimping, the right hand are scraped reality using scraper plate, to check that the facial tissue of stickup intersects with side at this time and be necessary for by molding, both hands
Right angle can not have circular arc, blister, crumple, and to put down when scraping and scrape and cannot tiltedly scrape, and each side needs are smooth, there can be no
Circular arc, crumple it is bad, check out rear both hands by form inside casing be placed into subsequent processing;Glue positioning lining paper was checked after operation is complete is
No presence walks, and the qualities such as excessive glue are bad.
(10) box draws glue hanging buckle: box draws short side glue with taking 1pcs first, then both hands location and installation hanging buckle, most
Hanging buckle is compacted by both hands afterwards.
Before operation, all-purpose adhesive inventory is first checked, whether normal try out glue smearing viscosity;And check the spare number of hanging buckle
Amount examines hanging buckle whether to deposit obvious quality bad;Before operation, left hand buttresses ground box, and the right hand holds glue pot and draws glue in ground box short side
Two, water, glue pot is placed into specified region by the right hand, and residence box is pressed in left and right, and the right hand takes broken line molding hanging buckle alignment installation to paste
Ground box is drawn on glue short side, and both hands firmly compress;Do not allow the portable money ring & carrying buckle of neglected loading, and need enough extension power, hangs
Position is anchored according to limit sample, the right hand will form ground box and be placed into subsequent processing;When paying attention to drawing glue when quality inspection the problems such as residue glue wire drawing
The problems such as using cloth cleaning treatment in time, avoiding glue, and check and draw whether glue amount reaches quality requirements, width≤1mm.
(11) glue is drawn on four side of box: both hands draw long side glue first, and then both hands draw short side glue again.
It before operation, first has to check all-purpose adhesive inventory, whether normal tries out glue smearing viscosity;When operation, left hand
It takes ground box and buttresses, the right hand holds glue pot and drawing 1 glue away from box mouth sides aligned parallel;Both hands operate simultaneously, successively rotatably box,
Draw other three sides glue;Gum forming will be drawn box is placed into subsequent processing to last left hand;Quality inspection, which pays attention to checking, draws whether glue amount reaches
To quality requirements, width≤1mm, and the problems such as the problems such as residue glue wire drawing use cloth cleaning treatment in time, avoid glue when drawing glue.
(12) box and inside casing assembling de-bubble: both hands take inside casing and ground box first, and then both hands assemble inside casing and ground box,
Last both hands will assemble ground box de-bubble molding.
Before operation, bubble machine equipment point inspection list is removed first, examines de-bubble machine equipment by specified content point, and to check mold
Whether surface is normal with the presence or absence of dirty, glue, function, and whether debugging de-bubble machine equipment operation is normal;When operation, left hand takes interior
Frame, the right hand take ground box, ground box are placed into operation post, inside casing and ground box are assembled stickup shaping by both hands, and then both hands are assembled into
Type box be placed into defoaming machine, double handed start switch de-bubble;Subsequently de-bubble is formed ground box and is placed into workbench, the right hand by left hand
Bamboo is taken to scrape real four sides;De-bubble is formed ground box and is placed into subsequent processing by last left hand;In operation process, the de-bubble time is two
Second, bubble scrapes each side and needs smooth, there can be no circular arc, crumple bad, when quality inspection checks de-bubble molding according to limit sample
Ground box whether there is bubble, and fillet quick-fried angle, scratches, the obvious quality abnormal such as impression.
(13) Internal baffle draws glue: taking Internal baffle to be placed on auxiliary frame first, then the left hand auxiliary right hand draws gum forming.
Before operation, baffle inventory is first looked at, is placed into designated position, and to check black stuck glue inventory, is tried
It is whether normal that viscosity is smeared with glue;Also to check whether die surface is normal with the presence or absence of dirty, glue, function;When operation,
Both hands take 14pcs baffle is smooth to be placed into detent mould, and then the right hand holds glue pot, and gum forming is successively drawn in left hand less important work
Last both hands will draw gum forming baffle and be placed into subsequent processing;In operation process, glue quantity is needed through reliability test, and
It is noted that checking supplied materials with the presence or absence of obvious quality abnormals such as deformation, rake angles;It to be checked when quality inspection and draw whether glue amount reaches quality
It is required that width≤1mm.
(14) Internal baffle assembles: the right hand, which takes, first draws a gum forming Internal baffle, and then both hands install Internal baffle to ground box, most
Both hands are by Internal baffle by real afterwards.
When operation, left hand takes 1pcs de-bubble molding ground box, and the right hand, which takes, draws gum forming baffle, successively takes 1pcs, amounts to 2 times;
Both hands will draw gum forming baffle positioned in alignment and install to ground box short side, and rotatably box successively installs stickup;The right hand will be assembled into
Type box be placed into subsequent processing;Interior attachment junction gap≤1mm is checked when operation;And to check for neglected loading,
Phenomena such as excessive glue.
(15) box and foxing assemble: both hands take foxing broken line to form first;Then foxing is assembled in ground box by both hands,
Last both hands will assemble foxing compacting.
Before operation, wearing gloves, and Inspection platform whether there is residue glue, and checks supplied materials with the presence or absence of obvious quality
It is bad, as beer cuts bad, flash etc.;It also to check foxing inventory, be placed into designated position, when operation, left hand is taken first
1pcs box to operation post, then the right hand takes foxing broken line, and the right hand installs foxing to ground box, left hand less important work, both hands
Foxing is compacted, by assembled formation box is placed into subsequent processing to last left hand;When quality inspection check inner foxing junction gap≤
0.2mm。
In step (5) mainly includes that with examining the ground box after cleaning day box, assembling with inside casing, day box box cooperation assembles
At packing box, then carry out packaging shipment, main process flow is as follows:
(1) day box cleans full inspection: the upper surface of day box is named as A grades of faces, two relatively long symmetrical appearances of side length
Face is named as B grades of faces, and two shorter symmetrical outer surfaces of side length are named as C grades of faces, first full inspection A grades of faces, then cleans A grades
Face, B, C grades of faces of full inspection of then sequentially getting off and cleaning.
Before operation, detergent inventory first being checked, being placed into designated position, when operation, both hands take 2pcs days boxes to making
Industry platform, visual full inspection A grades of faces walk with the presence or absence of scuffing, leakage ash, sags and crests, color spot, wrinkle, breakhead, LOGO color difference and UV
It is obvious bad, then both hands overturn day box to B grades of faces, and visual full inspection scratches, leaks ash, sags and crests, color spot, wrinkle, breakhead etc.
Quality is bad, and then both hands overturn day box to C grades of faces, and visual full inspection scratches, leaks ash, sags and crests, color spot, wrinkle, breakhead etc.
Quality is bad, and then both hands take alcohol, 3 face concave-convex surface point of quick short steps wiped clean A, B, C, color spot, glue stain, dust, last double
Hand will clean full inspection product placement to subsequent processing;" it is related to scratch when quality inspection, do not allow on LOGO, text and A grades of faces
Can not have;It is required in B grades of faces: L≤10mm, W≤1mm, N≤1;It is required in C grades of faces: L≤15mm, W≤1mm, N≤3;
In addition sags and crests: A, B, C grades of face S≤1.0mm2, N≤1;A grades of face S≤2.0mm2, N≤1;B grades of face S≤3.0mm2,
N≤3;C grades of face S≤3.0mm2, N≤5;Related wrinkle/breakhead: wrinkle: A grades of faces do not allow, B grades of faces: L≤10mm, C grades
Face: L≤15mm;It is not allow for breakhead (breakage);About color spot: not allowing on LOGO, character area;About dirty, glue stain:
Do not allow on LOGO, character pattern region.
(2) box cleans full inspection: the bottom surface of ground box is named as A grade faces, side length relatively long two it is symmetrical outside
Surface is named as B grades of faces, and two shorter symmetrical outer surfaces of side length are named as C grades of faces, first full inspection A grades of faces, then clean A
Grade face, B, C grades of faces of the full inspection respectively and cleaning of then sequentially getting off.
Before operation, full inspection operator need to wear the appliances for labor protection such as mask, gloves, and check detergent inventory, pendulum
It puts to designated position;When operation, for box to operation post, visual full inspection A grades of faces are grey, recessed with the presence or absence of scratching, leaking with taking 2pcs for both hands
Salient point, color spot, wrinkle, breakhead, LOGO color difference and UV walk etc. obvious bad, and then both hands overturn ground box to B grades of faces, visually
The qualities such as full inspection scuffing, leakage ash, sags and crests, color spot, wrinkle, breakhead are bad, and subsequently both hands overturn ground box to C grades of faces, mesh
Bad depending on qualities such as full inspection scuffing, leakage ash, sags and crests, color spot, wrinkle, breakheads, then both hands take alcohol, quick short steps formula wiped clean
A, 3 face concave-convex surface point of B, C, color spot, glue stain, dust, last both hands will clean full inspection product placement to subsequent processing;Quality inspection
Standard, it is related to scratch, do not allow on LOGO, text, A grades of faces can not have;B grades of faces: L≤10mm, W≤1mm, N≤1C grade
Face: L≤15mm, W≤1mm, N≤3;Related sags and crests: A, B, C grades of face S≤1.0mm2, N≤1;A grades of face S≤
2.0mm2 ,N≤1;B grades of face S≤3.0mm2, N≤3;C grades of face S≤3.0mm2, N≤5;Related wrinkle/breakhead: wrinkle: A
Grade face does not allow, B grades of faces: L≤10mm, C grades of faces: L≤15mm;It is not allow for breakhead (breakage), about color spot: not allowing
On LOGO, character area;About dirty, glue stain: not allowing on LOGO, character pattern region.
(3) full inspection assembles: the upper surface of Internal baffle being named as D grades of faces, first full inspection A grades of faces, especially attention hanging buckle position;
Then D grades of faces are cleaned, especially attention baffle residue glue;Subsequently full inspection B grades of faces then clean C grades of faces, subsequently assemble the world
Box, the gap after last full inspection assembling.
Before operation, first has to check detergent inventory, be placed into designated position;When operation, both hands take a day box first
Visual 3 face concave-convex surface point of full inspection A, B, C, color spot, glue stain, dust, leakage ash, quick-fried angle, LOGO color difference and UV such as walk at the obvious product
Matter is bad;Then both hands take the visual 3 face concave-convex surface point of full inspection A, B, C of ground box, color spot, glue stain, dust, leakage ash, quick-fried angle etc. bright
Aobvious quality is bad;Subsequently both hands are by world box assembled formation, and emphasis makes an inspection tour appearance with the presence or absence of obvious bad, such as ask the visitor in weight
Point is managed and is reported;Last both hands are placed into subsequent processing for full inspection completed knocked down products are cleaned;Quality testing standard is not permitted about scuffing
Perhaps on LOGO, text, A grades of faces can not have;On B grades of faces: L≤10mm, W≤1mm, N≤1.
On C grades of faces: L≤15mm, W≤1mm, N≤3;About sags and crests: A, S≤1.0mm2, N on B, C grades of faces
≤1;S≤2.0mm2 on A grades of faces, N≤1;S≤3.0mm2 on B grades of faces, N≤3, S≤3.0mm2, N on C grades of faces
≤5;About wrinkle/breakhead, wherein A grades of faces are not allow for wrinkle, on B grades of faces: L≤10mm, on C grades of faces: L≤15mm,
It is not allow for breakhead (breakage), about color spot: not allowing on LOGO, character area, about dirty, glue stain: not allowing
On LOGO, character pattern region
(4) packaging vanning: it is first that world box is PE bags box-packed, it is packed into carton, is then taken every paper/pendulum with six/layer
It puts to carton, then up superposition occupies carton bilayer joint sealing, and the title that subsequently weighs fills in data adhesive label, last full inspection
Assemble gap.
Before operation, first looks at carton, adhesive tape, PE bags, every paper quantity, spare carton is then placed into specified region,
When operation, both hands take carton to strut bottom first, are sealed using cartoning sealing machine into I-shaped shape, take and be placed into bottom every paper;Then
Both hands take finished product to be placed into operation post, and finished product is covered in people PE bags, lay flat cartonning, and one layer of six pcs adds up to three layers;It is subsequently double
Hand takes to be put into carton every paper, and both hands pin carton using cartoning sealing machine joint sealing, is sealed into I-shaped shape;Most all both hands put carton