CN105810093B - A kind of field investigation identifies binding device - Google Patents
A kind of field investigation identifies binding device Download PDFInfo
- Publication number
- CN105810093B CN105810093B CN201610350902.7A CN201610350902A CN105810093B CN 105810093 B CN105810093 B CN 105810093B CN 201610350902 A CN201610350902 A CN 201610350902A CN 105810093 B CN105810093 B CN 105810093B
- Authority
- CN
- China
- Prior art keywords
- control stick
- assembly
- magnetic patch
- component
- binding device
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Classifications
-
- G—PHYSICS
- G09—EDUCATION; CRYPTOGRAPHY; DISPLAY; ADVERTISING; SEALS
- G09F—DISPLAYING; ADVERTISING; SIGNS; LABELS OR NAME-PLATES; SEALS
- G09F7/00—Signs, name or number plates, letters, numerals, or symbols; Panels or boards
- G09F7/18—Means for attaching signs, plates, panels, or boards to a supporting structure
Landscapes
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Engineering & Computer Science (AREA)
- Theoretical Computer Science (AREA)
- Magnetic Treatment Devices (AREA)
- Sorting Of Articles (AREA)
Abstract
The present invention relates to a kind of field investigation to identify binding device, including U-shaped and inverted first assembly, the first groove for the insertion of nylon cable tie head is provided with the lower lateral rods of the first assembly, the upper bar front end of first assembly is provided with second component that can slide up and down, the second groove for the insertion of nylon cable tie afterbody is provided with second component, magnetic patch is provided with the lower face of second component, control stick is connected with the downside of the lower lateral rods of the first assembly, it is provided with the upper surface of the control stick and the corresponding lower magnetic patch of upper magnetic patch, the driving mechanism of the lower magnetic patch converted magnetic pole of driving is provided with control stick, the downside boom end of the first assembly is additionally provided with the haulage gear pricked afterbody for nylon and penetrate tension nylon cable tie behind nylon cable tie head.The device is not only simple in structure, and is conveniently used for the mark binding of arbor or high-rise trees.
Description
Technical field
The present invention relates to a kind of field investigation to identify binding device.
Background technology
At present, many scientific workers carry out field investigation and Dynamic Investigation for a long time, in order to more preferably observe wild environment
If static nature and behavioral characteristics that atural object is done, and field investigation mark binding function seems increasingly important.Known field mark
Note is more to be positioned using GPS, but this positioning is confined to geo-location and identifies, and can not be met to field jobbie into rower
Know, and since field inspection object has certain growth more, traditional positioning mark can not be realized to field jobbie
Privileged site is identified, and such as common positioning scale of the change for long-term dynamics monitoring phenology cannot meet scientific worker
Needs.
The content of the invention
It is an object of the invention to provide a kind of field investigation to identify binding device, is not only simple in structure, and conveniently use
In the mark binding of arbor or high-rise trees.
Technical program of the present invention lies in:A kind of field investigation identifies binding device, including U-shaped and first group inverted
Part, is provided with the first groove for the insertion of nylon cable tie head on the lower lateral rods of the first assembly, first assembly it is upper
Side lever front end is provided with second component that can slide up and down, and is provided with second component for the insertion of nylon cable tie afterbody
Second groove, magnetic patch is provided with the lower face of the second component, control stick is connected with the downside of the lower lateral rods of the first assembly,
Be provided with the upper surface of the control stick with the corresponding lower magnetic patch of upper magnetic patch, the lower magnetic patch conversion of driving is provided with control stick
The driving mechanism of magnetic pole, the downside boom end of the first assembly is additionally provided with penetrates nylon cable tie head for nylon bundle afterbody
The haulage gear of nylon cable tie is tensed afterwards.
Further, the driving mechanism includes the first rotating shaft that is connected with lower magnetic patch, the first rotating shaft it is another
End is connected through first bevel gear pair with the second shaft being longitudinally disposed in control stick, the lower end second of second shaft
Bevel gear pair is connected with being pierced by the driving handle of control stick side wall, and driving first assembly is additionally provided with the control stick and is laterally moved
Dynamic slipping mechanism.
Further, the slipping mechanism includes being meshed with first bevel gear pair through bevel gear and upper end is pierced by control stick
The 3rd shaft, the other end of the 3rd shaft be provided with the matched spur gear of the rack of first assembly lower part, it is described
Two sides of first assembly lower part are also respectively provided with and the matched sliding slot of two side of control stick.
Further, the haulage gear includes the frid for being longitudinally disposed at control stick upper end, is provided with the frid
For blocking the shrapnel of the double wedge on nylon cable tie afterbody, the drawing for penetrating control stick from top to bottom is connected with the downside of the shrapnel
Rope, the pulling rope are pierced by after bypassing the guide wheel being arranged in control stick by control stick side wall.
Further, resetting spring, the lower end of the resetting spring and the upper end of control stick are connected with the downside of the shrapnel
It is fixedly connected.
Further, a pair of of longitudinal chute is provided with the side wall that second component is connected with first assembly, it is described
The upper bar front end of first assembly is provided with the sliding block being slidably matched with longitudinal chute, is additionally provided with and is used on second component
Bind the removable structure of nylon cable tie afterbody.
Further, the removable structure includes being arranged at the sleeping of the lower sidewall that the second component is connected with first assembly
Formula limited block, one end of the horizontal limited block are fixedly connected with the second component, and the other end of horizontal limited block is provided with the 3rd
Magnetic patch, is correspondingly arranged on fourth magnetic patch attracting with the 3rd magnetic patch on second component.
Further, second groove is arranged between a pair of of longitudinal chute, and the first groove mutually hangs down with the second groove
Directly.
Further, the upper end of the control stick is provided with forwardly convex cantilever portion, and use is provided with the cantilever portion
In the cavity that lower magnetic patch is inserted.
Further, the side wall of the control stick is additionally provided with driving handle rotary spacing bar, is provided with the control stick
The clutch shaft bearing group that is used to support first rotating shaft, the second bearing group for being used to support the second shaft and it is used to support driving handle
3rd bearing group.
Compared with prior art, the present invention has the following advantages:Be not only simple in structure, and investigator do not have to by
In other instruments, it is possible to realize mark binding of the height in the arbor of below 10m or high-rise trees;Low manufacture cost, it is convenient
Use.
Brief description of the drawings
Fig. 1 is the structural formula schematic diagram of the present invention;
Fig. 2 is the A-A sectional views of Fig. 1 of the present invention;
Fig. 3 is the B areas enlarged drawing of Fig. 1 of the present invention;
Fig. 4 is the structure diagram of the second component of the present invention;
Fig. 5 is the closed configuration schematic diagram of the present invention;
Fig. 6 is the C areas enlarged drawing of Fig. 5 of the present invention;
In figure:10- first assemblies 11- the first groove 12- sliding block 13- rack 14- sliding slots the second components of 20- 21-
Magnetic patch 32- cantilever portion 33- cavitys 41- first under magnetic patch 23- longitudinal chute 30- control sticks 31- on second groove 22-
Shaft 42- first bevel gears secondary 43- the second shaft 44- second bevel gear secondary 45- driving handle 46- gag lever posts 47- first
Bearing group 48- second bearing group 49- 3rd bearing group 50- nylon cable tie 61- frid 62- shrapnel 63- pulling ropes 64-
The 3rd horizontal the 3rd magnetic patch of limited block 82- of shaft 73- spur gears 81- of guide wheel 65- resetting spring 71- bevel gears 72-.
Embodiment
To make the foregoing features and advantages of the present invention clearer and more comprehensible, special embodiment below, and coordinate attached drawing, make detailed
Carefully it is described as follows, but the present invention is not limited thereto.
Referring to figs. 1 to Fig. 6
A kind of field investigation identifies binding device, including U-shaped and inverted first assembly 10, under the first assembly
Be provided with the first groove 11 for the insertion of nylon cable tie head on side lever, the upper bar front end of first assembly be provided with can on
Second component 20 of lower slider, the second groove 21 for the insertion of 50 afterbody of nylon cable tie, institute are provided with second component
State the first groove to be oppositely arranged with the second groove, the second groove is in dovetail shaped, to clamp band afterbody, while is torn open easy to band
Unload.Magnetic patch 22 is provided with the lower face of second component, control stick 30, institute are connected with the downside of the lower lateral rods of the first assembly
State be provided with the upper surface of control stick with the corresponding lower magnetic patch 31 of upper magnetic patch, the lower magnetic patch of driving is additionally provided with control stick and is turned
The driving mechanism of magnetic pole is changed, so as to complete the lifting of the second component by the pole change for manipulating lower magnetic patch, and realizes that nylon is pricked
The afterbody of band penetrates its head, completes mark binding, realizes that nylon cable tie is firmly secured on the target branch of trees.It is described
The downside boom end of first assembly, which is additionally provided with to prick after afterbody penetrates nylon cable tie head for nylon, tenses leading for nylon cable tie
Draw mechanism, to complete the fastening of nylon cable tie.
In the present embodiment, the driving mechanism includes the first rotating shaft 41 being connected with lower magnetic patch, the first rotating shaft
The other end is connected through first bevel gear pair 42 with the second shaft 43 being longitudinally disposed in control stick, under second shaft
End is connected through second bevel gear pair 44 with being pierced by the driving handle 45 of control stick side wall, so as to drive lower magnetic patch to turn by driving handle
It is dynamic.
In the present embodiment, the haulage gear includes the frid 61 for being longitudinally disposed at control stick upper end, is set in the frid
Be equipped with and be slidably matched with it for the shrapnel 62 for blocking the double wedge on nylon cable tie afterbody, be connected with the downside of the shrapnel from upper and
Under penetrate the pulling rope 63 of control stick, the pulling rope is worn after bypassing the guide wheel 64 being arranged in control stick by control stick side wall
Go out, make shrapnel with nylon cable tie for afterbody downlink will pass through pulling rope, nylon cable tie is completed fastening.
In the present embodiment, the slipping mechanism of driving first assembly transverse shifting is additionally provided with the control stick, so as to Buddhist nun
After imperial band completes fastening, first assembly moves right with the second component, departs from the double wedge of shrapnel and nylon cable tie afterbody.
In the present embodiment, the slipping mechanism is included through bevel gear 71 and first bevel gear pair(The first rotating shaft other end
Bevel gear)It is meshed and upper end is pierced by the 3rd shaft 72 of control stick, the other end of the 3rd shaft is provided with and is installed on
The matched spur gear 73 of rack 13 of first assembly lower part, two sides of the first assembly lower part are also respectively provided with and grasp
The matched sliding slot 14 of two side of upper end of vertical pole.Resetting spring 65 is also associated with the downside of the shrapnel, the resetting spring
Lower end is fixedly connected with the upper end of control stick, is resetted to rise after shrapnel downlink.
In the present embodiment, a pair of of longitudinal chute 23 is provided with the side wall that second component is connected with first assembly,
The upper bar front end of the first assembly is provided with the sliding block 12 being slidably matched with longitudinal chute, realizes the slip of first assembly.
The longitudinal chute is T-slot or dovetail groove, the T-shaped shape of the sliding block or dovetail shaped.Use is additionally provided with second component
In the removable structure of binding nylon cable tie afterbody.
In the present embodiment, the removable structure includes being arranged at the lower sidewall that the second component is connected with first assembly
Horizontal limited block 81, one end of the horizontal limited block are fixedly connected with the second component, and the other end of horizontal limited block is provided with
3rd magnetic patch 82, is correspondingly arranged on fourth magnetic patch attracting with the 3rd magnetic patch on second component, so that nylon cable tie is completed
After binding, magnetic pole is converted, the second component rises(Flick), the 3rd magnetic patch is because suction is smaller and the 4th magnetic patch departs from, completion nylon
Band departs from from the second component.
In the present embodiment, second groove is arranged between a pair of of longitudinal chute, and the first groove mutually hangs down with the second groove
Directly.
In the present embodiment, the upper end of the control stick is provided with forwardly convex cantilever portion 32, is set in the cantilever portion
The cavity 33 that lower magnetic patch is inserted is useful for, to realize the rotation of lower magnetic patch.
In the present embodiment, the side wall of the control stick is additionally provided with driving handle rotary spacing bar 46, and control driving handle rotates
Angle.
In the present embodiment, it is provided with the control stick and is used to support the clutch shaft bearing group 47 of first rotating shaft, is used to support
The second bearing group 48 of second shaft and the 3rd bearing group 49 for being used to support driving handle.
The operation principle of the device:
Original state is upper magnetic patch and lower magnetic patch adjacent surface is homopolarity, so as to the second component uplink, makes the U-shaped of first assembly
Mouth is opened;Meanwhile the lower lateral rods of first assembly are away from haulage gear.The head of band is positioned in the first groove, and will be pricked
The afterbody of band is seated in the second groove, while the binding of nylon cable tie afterbody is completed by removable structure.Pass through driving mechanism
Make magnetic pole and the upper magnetic patch of lower magnetic patch different, make the second component downlink, and realize that the afterbody of band penetrates the slot on band head
It is interior, complete the binding of band.While second component downlink, first assembly, to left movement, blocks shrapnel with the second component
2-3 sawtooth of nylon cable tie, pulls pulling rope, shrapnel is blocked nylon cable tie downslide, to realize tension nylon cable tie.Lead to again
Mechanism of overdriving makes the magnetic pole of lower magnetic patch identical with the magnetic pole of upper magnetic patch, and controls the device to make branch from the U-shaped of first assembly
Depart from mouthful, band is fixed on the target branch of trees.
When also first assembly is not sleeved on branch, the second component downlink can be completed beforehand through driving mechanism, see lower bundle
Whether tail can be penetrated in band head, reduce the fault rate in actual mechanical process.
The foregoing is merely presently preferred embodiments of the present invention, for the ordinary skill in the art, according to this hair
Bright teaching, designs various forms of field investigation mark binding devices and performing creative labour is not required, do not departing from this
The all equivalent change made according to scope of the present invention patent, modification, replacement and modification in the case of the principle and spirit of invention,
The covering scope of the present invention should all be belonged to.
Claims (10)
1. a kind of field investigation identifies binding device, it is characterised in that including U-shaped and inverted first assembly, described first
The first groove for the insertion of nylon cable tie head is provided with the lower lateral rods of component, the upper bar front end of first assembly is provided with
Can slide up and down the second component, be provided with second component for nylon cable tie afterbody insertion the second groove, second
Magnetic patch is provided with the lower face of component, control stick is connected with the downside of the lower lateral rods of the first assembly, the control stick
Be provided with upper surface with the corresponding lower magnetic patch of upper magnetic patch, the driving machine of the lower magnetic patch converted magnetic pole of driving is provided with control stick
Structure, the downside boom end of the first assembly, which is additionally provided with to penetrate behind nylon cable tie head for nylon bundle afterbody, tenses nylon bundle
The haulage gear of band.
2. a kind of field investigation mark binding device according to claim 1, it is characterised in that the driving mechanism includes
The first rotating shaft being connected with lower magnetic patch, the other end of the first rotating shaft are secondary with being longitudinally disposed at control stick through first bevel gear
The second interior shaft is connected, and the lower end of second shaft is through the secondary driving handle phase with being pierced by control stick side wall of second bevel gear
Connect, the slipping mechanism of driving first assembly transverse shifting is additionally provided with the control stick.
3. a kind of field investigation mark binding device according to claim 2, it is characterised in that the slipping mechanism includes
It is meshed through bevel gear with first bevel gear pair and upper end is pierced by the 3rd shaft of control stick, the other end of the 3rd shaft is set
Be equipped with the matched spur gear of the rack of first assembly lower part, two sides of the first assembly lower part be also respectively provided with
The matched sliding slot of two side of control stick.
A kind of 4. field investigation mark binding device according to claim 1,2 or 3, it is characterised in that the dragger
Structure includes the frid for being arranged at control stick upper end, and the bullet for blocking the double wedge on nylon cable tie afterbody is provided with the frid
Piece, the shrapnel downside are connected with the pulling rope for penetrating control stick from top to bottom, and the pulling rope is bypassed and is arranged in control stick
Guide wheel after be pierced by by control stick side wall.
A kind of 5. field investigation mark binding device according to claim 4, it is characterised in that connection on the downside of the shrapnel
There is resetting spring, the lower end of the resetting spring is fixedly connected with the upper end of control stick.
6. a kind of field investigation mark binding device according to claim 1,3 or 5, it is characterised in that described second group
Be provided with a pair of of longitudinal chute on the side wall that part is connected with first assembly, the upper bar front end of the first assembly be provided with
The sliding block that longitudinal chute is slidably matched, the removable structure for binding nylon cable tie afterbody is additionally provided with second component.
7. a kind of field investigation mark binding device according to claim 6, it is characterised in that the removable structure includes
It is arranged at the horizontal limited block for the lower sidewall that the second component is connected with first assembly, one end of the horizontal limited block and the
Two components are fixedly connected, and the other end of horizontal limited block is provided with the 3rd magnetic patch, are correspondingly arranged on second component and the
The 4th attracting magnetic patch of three magnetic patch.
8. a kind of field investigation mark binding device according to claim 6, it is characterised in that second groove is set
Between a pair of of longitudinal chute, and the first groove and the second groove are perpendicular.
A kind of 9. field investigation mark binding device according to claim 1, it is characterised in that the upper end of the control stick
Forwardly convex cantilever portion is provided with, the cavity inserted for lower magnetic patch is provided with the cantilever portion.
A kind of 10. field investigation mark binding device according to claim 2, it is characterised in that the side of the control stick
Wall is additionally provided with driving handle rotary spacing bar, is provided with the control stick and is used to support the clutch shaft bearing group of first rotating shaft, uses
In the second bearing group for supporting the second shaft and it is used to support the 3rd bearing group of driving handle.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610350902.7A CN105810093B (en) | 2016-05-25 | 2016-05-25 | A kind of field investigation identifies binding device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610350902.7A CN105810093B (en) | 2016-05-25 | 2016-05-25 | A kind of field investigation identifies binding device |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105810093A CN105810093A (en) | 2016-07-27 |
CN105810093B true CN105810093B (en) | 2018-04-13 |
Family
ID=56451759
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610350902.7A Expired - Fee Related CN105810093B (en) | 2016-05-25 | 2016-05-25 | A kind of field investigation identifies binding device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105810093B (en) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106758928B (en) * | 2016-12-22 | 2018-11-30 | 泰兴市东城水处理工程有限公司 | A kind of road instruction board apparatus |
CN106996085B (en) * | 2016-12-22 | 2018-11-27 | 泰兴市东城水处理工程有限公司 | A kind of town road indication plate |
CN106996086B (en) * | 2016-12-22 | 2019-07-16 | 海南世能科技有限公司 | A kind of town road indication plate |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202897138U (en) * | 2012-11-06 | 2013-04-24 | 乐清市惠华电子有限公司 | Label bunching tape |
CN203465898U (en) * | 2013-09-13 | 2014-03-05 | 宿迁市嘉沭生态苗木有限公司 | Multifunctional tree information identification card device |
CN203746346U (en) * | 2013-11-28 | 2014-07-30 | 国家电网公司 | Combined type electric cable identification tape |
JP5583432B2 (en) * | 2010-02-26 | 2014-09-03 | 株式会社エスケイ工機 | Binding band and method for manufacturing the same |
CN105023508A (en) * | 2015-07-31 | 2015-11-04 | 国网山东省电力公司淄博供电公司 | Pole number board positioning and installing device |
CN205150449U (en) * | 2015-09-25 | 2016-04-13 | 三明学院 | Anti -fake keying of tying up of special sign of molded lines material constructs |
-
2016
- 2016-05-25 CN CN201610350902.7A patent/CN105810093B/en not_active Expired - Fee Related
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP5583432B2 (en) * | 2010-02-26 | 2014-09-03 | 株式会社エスケイ工機 | Binding band and method for manufacturing the same |
CN202897138U (en) * | 2012-11-06 | 2013-04-24 | 乐清市惠华电子有限公司 | Label bunching tape |
CN203465898U (en) * | 2013-09-13 | 2014-03-05 | 宿迁市嘉沭生态苗木有限公司 | Multifunctional tree information identification card device |
CN203746346U (en) * | 2013-11-28 | 2014-07-30 | 国家电网公司 | Combined type electric cable identification tape |
CN105023508A (en) * | 2015-07-31 | 2015-11-04 | 国网山东省电力公司淄博供电公司 | Pole number board positioning and installing device |
CN205150449U (en) * | 2015-09-25 | 2016-04-13 | 三明学院 | Anti -fake keying of tying up of special sign of molded lines material constructs |
Also Published As
Publication number | Publication date |
---|---|
CN105810093A (en) | 2016-07-27 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105810093B (en) | A kind of field investigation identifies binding device | |
CN103323199B (en) | Jig for testing dynamic impact strength of chain and rope | |
CN105258965B (en) | A kind of dynamic loading test equipment of tunnel dynamic experiment system | |
CN104359770B (en) | Rock structural face direct shear apparatus plane shear head corollary apparatus and direct shear test method for circular configuration interview sample | |
KR101434215B1 (en) | Steel Ball Falling Type Multi-point Impact Test Apparatus for Plate-form Sample | |
CN205977091U (en) | Fluorite mine exploration is bored and is got device | |
CN206920144U (en) | A kind of portable soil sampling instrument of effort-saving | |
CN104849116B (en) | A kind of soil sample for soil test cuts sample instrument | |
CN209230984U (en) | A kind of soil sample integrated apparatus | |
CN207717324U (en) | A kind of heavy impact experimental rig | |
CN207636111U (en) | A kind of artificial sight ice survey complete simulation guidewire apparatus of ice | |
CN206540779U (en) | Pressure testing machine | |
JP7298579B2 (en) | Measurement system, airborne mobile device and measurement method | |
CN203672644U (en) | Multifunctional safety lock test bench | |
CN108535044A (en) | Core clamping apparatus and the method for extracting measuring point core using this clamping apparatus | |
CN209132019U (en) | A kind of plant root system sampler | |
CN107700484A (en) | Building site machinery pile device | |
CN209144881U (en) | Dead load test on pile foundation pile pulling device | |
CN103364288B (en) | Test machine for durability of steel wire rope | |
CN207296942U (en) | Simple version drilled pile drill bit fishing device | |
CN101281167A (en) | Vertical shaft cable wire on-line detecting method | |
CN209584700U (en) | A kind of Cloth Cutting mechanism | |
JP2013160013A (en) | Construction management device, pile driving machine and pile driving method | |
CN208333338U (en) | A kind of pile body dimensional measuring instrument | |
CN106800072B (en) | Remove the device and its twister sweep-out method of buoying device heaving pile twister waterborne |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180413 Termination date: 20210525 |