CN105809374A - Cement building material logistics management system and method - Google Patents

Cement building material logistics management system and method Download PDF

Info

Publication number
CN105809374A
CN105809374A CN201610337647.2A CN201610337647A CN105809374A CN 105809374 A CN105809374 A CN 105809374A CN 201610337647 A CN201610337647 A CN 201610337647A CN 105809374 A CN105809374 A CN 105809374A
Authority
CN
China
Prior art keywords
data
module
data processing
processing module
receive
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610337647.2A
Other languages
Chinese (zh)
Other versions
CN105809374B (en
Inventor
杨洋
杨滔
彭海波
李桂雄
王合宽
匡胜徽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yunnan Kungang Group Electronic Information Engineering Co Ltd
Original Assignee
Yunnan Kungang Group Electronic Information Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yunnan Kungang Group Electronic Information Engineering Co Ltd filed Critical Yunnan Kungang Group Electronic Information Engineering Co Ltd
Priority to CN201610337647.2A priority Critical patent/CN105809374B/en
Publication of CN105809374A publication Critical patent/CN105809374A/en
Application granted granted Critical
Publication of CN105809374B publication Critical patent/CN105809374B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0633Workflow analysis
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/08Logistics, e.g. warehousing, loading or distribution; Inventory or stock management

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Human Resources & Organizations (AREA)
  • Economics (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Quality & Reliability (AREA)
  • Operations Research (AREA)
  • Marketing (AREA)
  • Development Economics (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Educational Administration (AREA)
  • Game Theory and Decision Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention relates to a cement building material logistics management system and method, and belongs to the technical field of industrial automatic recognition and data collection intersection.The system comprises a data collection system, a master control system, a dealer terminal system, a point-of-sale terminal system, a loading terminal system, a display module, a voice prompter, a printing device, a back brake and other structures.The system can meet the requirement for increasingly-developed logistics management of a cement company, increase the logistics speed, and lower the logistics cost and the personnel cost, more importantly, information transfer is rapider, and possibilities are provided for immediate data inquiry and statistical analysis; according to the technological process, not only is the pure metering function achieved, but also the overall logistics process is controlled, the informationalized level is greatly improved, and supports are provided for scientific management.Meanwhile, the system can help an enterprise fundamentally solve the problems appearing in the processes of delivery planning, door control, metering and delivery and economic losses caused by the problems are avoided.

Description

A kind of cement building material logistic management system and method
Technical field
The invention belongs to industry automatically to identify and data acquisition interleaving techniques field, be specifically related to a kind of cement building material logistic management system and method.
Background technology
Cement industry belongs to main building material manufacturing industry, and yield is big, and selling operation amount is big, depends merely on artificial control measure, it is easy to start a leak, and error rate is high, manages difficulty big.Electronic information sale management system, based on information sharing, multidisciplinary common participative management is also supervised mutually, under the premise that security is guaranteed, making Dispatching efficiency increase substantially, miswork rate greatly reduces, simultaneously can in time, accurately, quickly and easily for enterprise's various information of acquisition, so that company executives grasps the operation situation of enterprise at any time, make decision-making fast and accurately.Enterprise information management is an inexorable trend of Modern Enterprise Administration.
At present, being directed to the sale of cement building material, the link such as dispatch from the factory, but without a unified logistic management system, therefore how overcoming the deficiencies in the prior art is that industry identifies the problem needing solution badly with data acquisition interleaving techniques field automatically at present.
Summary of the invention
The invention aims to solve the deficiencies in the prior art, a kind of cement building material logistic management system and method are provided, this system can realize being sold to, from cement, pick up goods with the client management and control and tracking that control overall flow, accelerate the rate flow of flow of information, logistics and cash flow, promote the realization of three stream unifications.
For achieving the above object, the technical solution used in the present invention is as follows:
A kind of cement building material logistic management system, including data collecting system, master control system, distributor's terminal system, point-of-sale systems, freight terminals system, display module, voice prompting device, printing device and back brake;
Described data collecting system includes the first code reader, the second code reader, the 3rd code reader, platform scale, location detecting apparatus and image capture device;
Described distributor's terminal system includes the 2nd CPU control chip, the second data processing module, the second data memory module, the second data transmit-receive module and the second display input equipment;
Described point-of-sale systems includes the 3rd CPU control chip, the 3rd data processing module, the 3rd data memory module, the 3rd data transmit-receive module and the 3rd display input equipment;
Described freight terminals system includes the 4th CPU control chip, the 4th data processing module, the 4th data memory module, the 4th data transmit-receive module and the 4th display device;
Described master control system includes a CPU control chip, the first data processing module, the first data memory module and the first data transmit-receive module;
A described CPU control chip is connected with the first data processing module, the first data memory module, display module, voice prompting device, printing device, back brake respectively, for controlling the work of the first data processing module, the first data memory module, display module, voice prompting device, printing device, back brake;
First data processing module is also connected with the first code reader, the second code reader, the 3rd code reader, platform scale, location detecting apparatus, image capture device, the first data transmit-receive module respectively;First data processing module for by data acquisition system to data and the digital signal that receives of the first data transmit-receive module change into analogue signal after an incoming CPU control chip, incoming first data transmit-receive module after being additionally operable to convert the control signal that a CPU control chip transmits to analogue signal;
The first described data memory module controls, by a CPU control chip, the data that the first data processing module process obtains for storing;
The first described data transmit-receive module is also connected with the second data transmit-receive module, the 3rd data transmit-receive module, the 4th data transmit-receive module respectively;The first described data transmit-receive module sends to the second data transmit-receive module, the 3rd data transmit-receive module or the 4th data transmit-receive module for the analogue signal that the first data processing module transmits converts to radiofrequency signal;It is additionally operable to that the radiofrequency signal that the second data transmit-receive module, the 3rd data transmit-receive module, the 4th data transmit-receive module transmit converts to digital signal send to the first data processing module;
First code reader is located at Factory Building and is imported and exported;Second code reader is located at embarkation area;3rd code reader, platform scale, location detecting apparatus and image capture device are located at metering zone;Location detecting apparatus is used for monitoring whether vehicle goes up platform scale completely;Image capture device is for gathering the image of the vehicle entering metering zone;
2nd CPU control chip is connected with the second data processing module, the second data memory module respectively, for controlling the work of the second data processing module, the second data memory module;
Second data processing module is also connected with the second data transmit-receive module and the second display input equipment respectively;Second data processing module change into analogue signal for the data and the digital signal that receives of the second data transmit-receive module showing input equipment input by second after incoming 2nd CPU control chip, incoming second data transmit-receive module after being additionally operable to convert the control signal that the 2nd CPU control chip transmits to analogue signal;
The second described data transmit-receive module sends to the first data transmit-receive module for the analogue signal that the second data processing module transmits converts to radiofrequency signal, is additionally operable to that the radiofrequency signal that the first data transmit-receive module transmits converts to analogue signal and sends to the second data processing module;
The second described data memory module controls, by the 2nd CPU control chip, the data that the second data processing module process obtains for storing;
3rd CPU control chip is connected with the 3rd data processing module, the 3rd data memory module respectively, for controlling the work of the 3rd data processing module, the 3rd data memory module;
3rd data processing module is also connected with the 3rd data transmit-receive module and the 3rd display input equipment respectively;3rd data processing module change into analogue signal for the data and the digital signal that receives of the 3rd data transmit-receive module showing input equipment input by the 3rd after incoming 3rd CPU control chip, incoming 3rd data transmit-receive module after being additionally operable to convert the control signal that the 3rd CPU control chip transmits to analogue signal;
The 3rd described data transmit-receive module sends to the first data transmit-receive module for the analogue signal that the 3rd data processing module transmits converts to radiofrequency signal;It is additionally operable to that the radiofrequency signal that the first data transmit-receive module transmits converts to analogue signal send to the 3rd data processing module;
The 3rd described data memory module controls, by the 3rd CPU control chip, the data that the 3rd data processing module process obtains for storing;
4th CPU control chip is connected with the 4th data processing module, the 4th data memory module respectively, for controlling the work of the 4th data processing module, the 4th data memory module;
4th data processing module is also connected with the 4th data transmit-receive module and the 4th display device respectively;4th data processing module for incoming 4th CPU control chip after the data of the 4th display device input and the digital signal that receives of the 4th data transmit-receive module are changed into analogue signal, incoming 4th data transmit-receive module after being additionally operable to convert the control signal that the 4th CPU control chip transmits to analogue signal;
The 4th described data transmit-receive module sends to the first data transmit-receive module for the analogue signal that the 4th data processing module transmits converts to radiofrequency signal;It is additionally operable to that the radiofrequency signal that the first data transmit-receive module transmits converts to analogue signal send to the 4th data processing module;
The 4th described data memory module controls, by the 4th CPU control chip, the data that the 4th data processing module process obtains for storing.
It is further preferred that described display module is LCD display.
It is further preferred that described image capture device is photographing unit.
A kind of cement building material commodity distribution control method, adopts above-mentioned cement building material logistic management system, it is characterised in that comprise the steps:
Step (1), salesman inputs the information containing cement building material of for sale and the sales slip offer of price by the 3rd display input equipment of point-of-sale systems, or by calling the sales slip offer of the information containing cement building material and the price being pre-stored in the 3rd data memory module, then will send the first data transmit-receive module to master control system by the 3rd data transmit-receive module, and be stored in the first data memory module;If can sell, by the first data transmit-receive module, this sales slip offer is sent the 3rd data transmit-receive module to distributor's terminal system;
Step (2), distributor checks sales slip offer by distributor's terminal system, if needing to buy, showing the input equipment input promise containing the amount of buying and delivery of cargo information by second, then passing through the second data transmit-receive module and send to master control system;First data processing module of master control system can generate unique Quick Response Code and send to distributor's terminal system of this distributor;
Promise containing the amount of buying and delivery of cargo information also should can be stored in the second data memory module and the first data memory module;
Step (3), when distributor is according to the date delivery of cargo promised to undertake, arrival Factory Building is imported and exported, then pass through the first code reader unique Quick Response Code of scanning to be identified, if it is consistent with information stored in the first data memory module, oneth CPU control chip of master control system can control back brake and rise, it is allowed to delivery of cargo vehicle enters;If inconsistent with information stored in the first data memory module, a CPU control chip of master control system then will not control back brake and rise, and does not namely allow delivery of cargo vehicle to enter;
Step (4), enters the vehicle after factory and enters metering zone, weigh vehicle weight by platform scale, and vehicle is carried out image acquisition by image capture device;If location detecting apparatus monitors vehicle and do not go up completely on platform scale, then a CPU control chip can control voice prompting device and points out;Embarkation area is entered into by the vehicle of metering zone;
Step (5), second code reader of embarkation area scans unique Quick Response Code and is identified, if consistent with information stored in the first data memory module, then can pass through the first data processing module and sales slip offer and the promise containing the amount of buying and delivery of cargo information are processed into shipping order;Then pass through the first data transmit-receive module to send shipping order to the 4th data transmit-receive module through freight terminals system;Then it is shown on the 4th display device;Loading personnel freight according to the shipping order on the 4th display device;
These shipping order also can be stored in the 4th data memory module;
Step (6), after goods installs, vehicle returns to metering zone, weighs now vehicle weight by platform scale, and vehicle is carried out image acquisition by image capture device, and the data collected is passed in the first data processing module and processes;
If location detecting apparatus monitors vehicle and do not go up completely on platform scale, then a CPU control chip can control voice prompting device and points out;
Then the 3rd code reader unique Quick Response Code of scanning is identified, stored sales slip offer and the promise phase comparison containing the amount of buying and delivery of cargo information with the first data memory module;If information is consistent, then a CPU control chip can control the first data processing module and generates manifest, controls printing device simultaneously and prints manifest, and packing slip includes the unique Quick Response Code of this packing slip;Packing slip also can be stored in the first data memory module;
Step (7), the vehicle taking packing slip sails to Factory Building import and export, first code reader scans unique Quick Response Code on manifest, if the information shown by this Quick Response Code is consistent with the packing slip being stored in master control system the first data memory module, then a CPU control chip can control back brake rise, it is allowed to vehicle rolls away from;If inconsistent with information stored in the first data memory module, a CPU control chip of master control system then will not control back brake and rise, and does not namely allow delivery of cargo vehicle to roll away from.
Compared with prior art, it has the beneficial effect that the present invention
Cement building material logistic management system of the present invention is for enterprise's cement products selling operation and control of product quality, in line with controlling cost, minimizing personnel, the principle increased the benefit, realize the integrated management of company's supply and marketing business, make flow process in order, avert risks, embody " fair, just, quick " better, accelerate business operational paradigm, improve the satisfaction of supplier and client.
Being capable of, by present system, the logistics management requirement that cement company is growing, improve logistics speed, reduce logistics cost and personnel cost, what is more important makes information transmission more quick, provides possibility for the immediate inquiring of data, statistical analysis;
The present invention is not limited solely to realize pure function of measuring in flow process, but entirety Logistics Process has been carried out management and control, substantially increases the level of IT application, provides support for scientific management.
Present system can help enterprise fundamentally to solve produced problem in delivery of cargo plan, gate inhibition, metering, releases, it is to avoid the economic loss thus resulted in, and can directly and ERP system fully-integrated.
Accompanying drawing explanation
In order to be illustrated more clearly that the embodiment of the present invention or technical scheme of the prior art, the accompanying drawing used required in embodiment or description of the prior art will be briefly described below, apparently, accompanying drawing in the following describes is only some embodiments of the present invention, for those of ordinary skill in the art, under the premise not paying creative work, it is also possible to obtain other accompanying drawing according to these accompanying drawings.
Fig. 1 is the structural representation of cement building material logistic management system of the present invention;
Wherein, 1, data collecting system;2, master control system;3, the 4th data transmit-receive module;4, the 4th display device;5, distributor's terminal system;6, point-of-sale systems;7, freight terminals system;8, display module;9, voice prompting device;10, printing device;11, back brake;12, the first code reader;13, the second code reader;14, the 3rd code reader;15, platform scale;16, location detecting apparatus;17, image capture device;18, a CPU control chip;19, the first data processing module;20, the first data memory module;21, the first data transmit-receive module;22, the 2nd CPU control chip;23, the second data processing module;24, the second data memory module;25, the second data transmit-receive module;26, the second display input equipment;27, the 3rd CPU control chip;28, the 3rd data processing module;29, the 3rd data memory module;30, the 3rd data transmit-receive module;31, the 3rd display input equipment;32, the 4th CPU control chip;33, the 4th data processing module;34, the 4th data memory module;The direction of arrow is data or signal transfer direction.
Detailed description of the invention
Below in conjunction with embodiment, the present invention is described in further detail.
It will be understood to those of skill in the art that the following example is merely to illustrate the present invention, and should not be taken as limiting the scope of the invention.Unreceipted concrete technology or condition person in embodiment, technology or condition described by the document in this area or carry out according to product description
Those skilled in the art of the present technique are understandable that, the correlation module related in the present invention and the function of realization thereof are that the hardware after improvement and the computer software programs carrying routine in prior art in the device of composition, device or system or relevant agreement thereof achieve that, are not that computer software programs of the prior art or relevant agreement are improved.Such as, the computer hardware system after improvement still can realize the specific function of this hardware system by loading existing operation system of software.It is understood, therefore, that the innovation of the present invention be in that in prior art hardware module improvement and connect syntagmatic, but not be only in hardware module for realizing the improvement of software or the agreement carried about function.
Those skilled in the art of the present technique are it is understood that the correlation module mentioned in the present invention one or more hardware device that is performed in the step in operation described herein, method, flow process, measure, scheme.Described hardware device can specialized designs and manufacture for required purpose, or the known device in general purpose computer or other known hardware devices can also be adopted.Described general purpose computer activates or reconstructs with having storage procedure Selection within it.
Those skilled in the art of the present technique are appreciated that unless expressly stated, and singulative used herein " ", " one ", " described " and " being somebody's turn to do " may also comprise plural form.Should be further understood that, the wording " including " used in the description of the present invention refers to there is described feature, integer, step, operation, element and/or assembly, but it is not excluded that existence or adds other features one or more, integer, step, operation, element, assembly and/or their group.It should be understood that when we claim element to be " connected " or during " coupled " to another element, it can be directly connected or coupled to other elements, or can also there is intermediary element.Additionally, " connection " used herein or " coupling " can include wireless connections or couple.Wording "and/or" used herein includes one or more any cell listing item being associated and all combinations.
Those skilled in the art of the present technique are appreciated that unless otherwise defined, all terms used herein (include technical term and scientific terminology) and have with the those of ordinary skill in art of the present invention be commonly understood by identical meaning.Should also be understood that in such as general dictionary, those terms of definition should be understood that have the meaning consistent with the meaning in the context of prior art, and unless defined as here, will not explain by idealization or excessively formal implication.
Those skilled in the art of the present technique are appreciated that unless otherwise defined, and annexation used herein, without special explanation, can realize the function of the present invention, and with the those of ordinary skill in art of the present invention be commonly understood by identical.
As it is shown in figure 1, a kind of cement building material logistic management system, including data collecting system 1, master control system 2, distributor's terminal system 5, point-of-sale systems 6, freight terminals system 7, display module 8, voice prompting device 9, printing device 10 and back brake 11;
Described data collecting system 1 includes first code reader the 12, second code reader the 13, the 3rd code reader 14, platform scale 15, location detecting apparatus 16 and image capture device 17;
Described distributor's terminal system 5 includes the 2nd CPU control chip the 22, second data processing module the 23, second data memory module the 24, second data transmit-receive module 25 and the second display input equipment 26;
Described point-of-sale systems 6 includes the 3rd CPU control chip the 27, the 3rd data processing module the 28, the 3rd data memory module the 29, the 3rd data transmit-receive module 30 and the 3rd display input equipment 31;
Described freight terminals system 7 includes the 4th CPU control chip the 32, the 4th data processing module the 33, the 4th data memory module the 34, the 4th data transmit-receive module 3 and the 4th display device 4;
Described master control system 2 includes CPU control chip the 18, first data processing module the 19, first data memory module 20 and first data transmit-receive module 21;
A described CPU control chip 18 is connected with first data processing module the 19, first data memory module 20, display module 8, voice prompting device 9, printing device 10, back brake 11 respectively, for controlling the work of first data processing module the 19, first data memory module 20, display module 8, voice prompting device 9, printing device 10, back brake 11;
First data processing module 19 is also connected with first code reader the 12, second code reader the 13, the 3rd code reader 14, platform scale 15, location detecting apparatus 16, image capture device the 17, first data transmit-receive module 21 respectively;First data processing module 19 change into analogue signal for the digital signal that data data collecting system 1 collected and the first data transmit-receive module 21 receive after an incoming CPU control chip 18, incoming first data transmit-receive module 21 after being additionally operable to convert the control signal that a CPU control chip 18 transmits to analogue signal;
The first described data memory module 20 controls, by a CPU control chip 18, the data that the first data processing module 19 process obtains for storing;
The first described data transmit-receive module 21 is also connected with the second data transmit-receive module the 25, the 3rd data transmit-receive module the 30, the 4th data transmit-receive module 3 respectively;The first described data transmit-receive module 21 sends to the second data transmit-receive module the 25, the 3rd data transmit-receive module 30 or the 4th data transmit-receive module 3 for the analogue signal that the first data processing module 19 transmits converts to radiofrequency signal;It is additionally operable to that the radiofrequency signal that the second data transmit-receive module the 25, the 3rd data transmit-receive module the 30, the 4th data transmit-receive module 3 transmits converts to digital signal send to the first data processing module 19;
First code reader 12 is located at Factory Building and is imported and exported;Second code reader 13 is located at embarkation area;3rd code reader 14, platform scale 15, location detecting apparatus 16 and image capture device 17 are located at metering zone;Location detecting apparatus 16 is used for monitoring whether vehicle goes up platform scale 15 completely;Image capture device 17 is for gathering the image of the vehicle entering metering zone;Platform scale 15 enters the weight of metering zone vehicle for weighing;The image of the vehicle that display module 8 collects for showing image capture device 17, is additionally operable to the weight that display platform scale 15 claims;
Voice prompting device 9 is used for pointing out whether vehicle goes up platform scale 15 completely;
2nd CPU control chip 22 is connected with second data processing module the 23, second data memory module 24 respectively, for controlling the work of second data processing module the 23, second data memory module 24;
Second data processing module 23 is also connected with the second data transmit-receive module 25 and the second display input equipment 26 respectively;Data that second data processing module 23 inputs for showing input equipment 26 by second and the digital signal that the second data transmit-receive module 25 receives change into analogue signal after incoming 2nd CPU control chip 22, incoming second data transmit-receive module 25 after being additionally operable to convert the control signal that the 2nd CPU control chip 22 transmits to analogue signal;
The second described data transmit-receive module 25 sends to the first data transmit-receive module 21 for the analogue signal that the second data processing module 23 transmits converts to radiofrequency signal, is additionally operable to that the radiofrequency signal that the first data transmit-receive module 21 transmits converts to analogue signal and sends to the second data processing module 23;
The second described data memory module 24 controls, by the 2nd CPU control chip 22, the data that the second data processing module 23 process obtains for storing;
3rd CPU control chip 27 is connected with the 3rd data processing module the 28, the 3rd data memory module 29 respectively, for controlling the work of the 3rd data processing module the 28, the 3rd data memory module 29;
3rd data processing module 28 is also connected with the 3rd data transmit-receive module 30 and the 3rd display input equipment 31 respectively;Data that 3rd data processing module 28 inputs for showing input equipment 31 by the 3rd and the digital signal that the 3rd data transmit-receive module 30 receives change into analogue signal after incoming 3rd CPU control chip 27, incoming 3rd data transmit-receive module 30 after being additionally operable to convert the control signal that the 3rd CPU control chip 27 transmits to analogue signal;
The 3rd described data transmit-receive module 30 sends to the first data transmit-receive module 21 for the analogue signal that the 3rd data processing module 28 transmits converts to radiofrequency signal;It is additionally operable to that the radiofrequency signal that the first data transmit-receive module 21 transmits converts to analogue signal send to the 3rd data processing module 28;
The 3rd described data memory module 29 controls, by the 3rd CPU control chip 27, the data that the 3rd data processing module 28 process obtains for storing;
4th CPU control chip 32 is connected with the 4th data processing module the 33, the 4th data memory module 34 respectively, for controlling the work of the 4th data processing module the 33, the 4th data memory module 34;
4th data processing module 33 is also connected with the 4th data transmit-receive module 3 and the 4th display device 4 respectively;4th data processing module 33 change into analogue signal for the digital signal that the data inputted by the 4th display device 4 and the 4th data transmit-receive module 3 receive after incoming 4th CPU control chip 32, incoming 4th data transmit-receive module 3 after being additionally operable to convert the control signal that the 4th CPU control chip 32 transmits to analogue signal;
The 4th described data transmit-receive module 3 sends to the first data transmit-receive module 21 for the analogue signal that the 4th data processing module 33 transmits converts to radiofrequency signal;It is additionally operable to that the radiofrequency signal that the first data transmit-receive module 21 transmits converts to analogue signal send to the 4th data processing module 33;
The 4th described data memory module 34 controls, by the 4th CPU control chip 32, the data that the 4th data processing module 33 process obtains for storing.
Preferably described display module 8 is LCD display.
Preferably described image capture device 17 is photographing unit.
In master control system 2 of the present invention, the data handled by all first data processing modules 19 all can be saved in the first data memory module 20;And the data that first handled by data transmit-receive module 21 also can be saved in the first data memory module 20.
In distributor's terminal system 5 of the present invention, the data handled by all second data processing modules 23 all can be saved in the second data memory module 24;And the data that second handled by data transmit-receive module 25 also can be saved in the second data memory module 24.Second display input equipment 26, for showing the information received by the second data transmit-receive module 25, is additionally operable to display the second data processing module 23 and processes the data obtained and the data of the second data memory module 24 storage, be additionally operable to the input operation of distributor;
In point-of-sale systems 6 of the present invention, the data handled by all 3rd data processing modules 28 all can be saved in the 3rd data memory module 29;And the data that the 3rd handled by data transmit-receive module 30 also can be saved in the 3rd data memory module 29.3rd display input equipment 31 is for showing the information received by the 3rd data transmit-receive module 30, it is additionally operable to display the 3rd data processing module 29 and processes the data obtained and the data of the second data memory module 29 storage, be additionally operable to the input operation through salesman;
In freight terminals system 7 of the present invention, the data handled by all 4th data processing modules 33 all can be saved in the 4th data memory module 34;And the data that the 4th handled by data transmit-receive module 3 also can be saved in the 4th data memory module 34.4th display device 4, for showing the information received by the 4th data transmit-receive module 3, is additionally operable to display the 4th data processing module 33 and processes the data obtained and the data of the 4th data memory module 34 storage;
A kind of cement building material commodity distribution control method, adopts above-mentioned cement building material logistic management system, comprises the steps:
Step (1), salesman inputs the information containing cement building material of for sale and the sales slip offer of price by the 3rd display input equipment 31 of point-of-sale systems 6, or by calling the sales slip offer of the information containing cement building material and the price being pre-stored in the 3rd data memory module 29, then will send the first data transmit-receive module 21 to master control system 2 by the 3rd data transmit-receive module 30, and be stored in the first data memory module 20;If can sell, by the first data transmit-receive module 21, this sales slip offer is sent the 3rd data transmit-receive module 30 to distributor's terminal system 5;
Step (2), distributor checks sales slip offer by distributor's terminal system 5, if needing to buy, show input equipment 26 input promise containing the amount of buying and delivery of cargo information by second, then pass through the second data transmit-receive module 25 and send to the first data transmit-receive module 21 of master control system 2;First data processing module 19 of master control system 2 can generate unique Quick Response Code and send to distributor's terminal system 5 of this distributor;
Promise containing the amount of buying and delivery of cargo information also should can be stored in the second data memory module 24 and the first data memory module 20;
Step (3), when distributor is according to the date delivery of cargo promised to undertake, arrival Factory Building is imported and exported, then pass through the first code reader 12 to scan unique Quick Response Code and be identified, if it is consistent with stored information in the first data memory module 20, oneth CPU control chip 18 of master control system 2 can control back brake 11 and rise, it is allowed to delivery of cargo vehicle enters;If consistent with stored information in the first data memory module 20, a CPU control chip 18 of master control system 2 then will not control back brake 11 and rise, and does not namely allow delivery of cargo vehicle to enter;
Step (4), enters the vehicle after factory and enters metering zone, weigh vehicle weight by platform scale 15, and vehicle is carried out image acquisition by image capture device 17, and meanwhile, the image collected and weight are shown on display module 8;If location detecting apparatus 16 monitors vehicle and do not go up completely on platform scale 15, then a CPU control chip 18 can control voice prompting device 9 and points out;Embarkation area is entered into by the vehicle of metering zone;
Step (5), second code reader 13 of embarkation area scans unique Quick Response Code and is identified, if consistent with stored information in the first data memory module 20, then can pass through the first data processing module 19 and sales slip offer and the promise containing the amount of buying and delivery of cargo information are processed into shipping order;Then pass through the first data transmit-receive module 21 to send shipping order to the 4th data transmit-receive module 3 through freight terminals system 7;Then it is shown on the 4th display device 4;Loading personnel freight according to the shipping order on the 4th display device 4;
These shipping order also can be stored in the 4th data memory module 34;
Step (6), after goods installs, vehicle returns to metering zone, now vehicle weight is weighed by platform scale 15, and vehicle is carried out image acquisition by image capture device 17, and the data collected are passed in the first data processing module 19 and process, meanwhile, the image collected and weight are shown on display module 8;
If location detecting apparatus 16 monitors vehicle and do not go up completely on platform scale 15, then a CPU control chip 18 can control voice prompting device 9 and points out;
Then the 3rd code reader 14 scans unique Quick Response Code and is identified, with sales slip offer stored in the first data memory module 20 and the promise phase comparison containing the amount of buying and delivery of cargo information;If information is consistent, then a CPU control chip 18 can control the first data processing module 19 and generates manifest, controls printing device 10 simultaneously and prints manifest, and packing slip includes the unique Quick Response Code of this packing slip;Packing slip also can be stored in the first data memory module 20;
Step (7), the vehicle taking packing slip sails to Factory Building import and export, first code reader 12 scans unique Quick Response Code on manifest, if the information shown by this Quick Response Code is consistent with the packing slip being stored in master control system 2 first data memory module 20, then a CPU control chip 18 can control back brake 11 and rises, it is allowed to vehicle rolls away from;If inconsistent with stored information in the first data memory module 20, a CPU control chip 18 of master control system 2 then will not control back brake 11 and rise, and does not namely allow delivery of cargo vehicle to roll away from.
The detailed signal transduction process of above-mentioned part steps: salesman inputs information and the price of the cement building material of for sale by the 3rd display input equipment of point-of-sale systems, then pass sequentially through the 3rd data processing module and form sales slip offer, then pass through the 3rd CPU control chip control the 3rd data memory module and store this sales slip offer, control the 3rd data processing module simultaneously and this sales slip offer is sent the first data transmit-receive module to master control system by the 3rd data transmit-receive module;
The radiofrequency signal received containing sales slip offer is converted to digital data transmission to the first data processing module by the first data transmit-receive module, transmit after the first data processing module changes into and changes analogue signal into a CPU control chip, then a CPU control chip controls the first data memory module and stores this sales slip offer, if can sell, a CPU control chip controls the first data processing module and by the first data transmit-receive module, this sales slip offer is sent the second data transmit-receive module to distributor's terminal system;
Second data transmit-receive module receives the radiofrequency signal containing sales slip offer and converts digital data transmission to the second data processing module, transmitting to the 2nd CPU control chip after the second data processing module changes into and changes analogue signal into, then the 2nd CPU control chip controls the first data memory module and stores this sales slip offer;As needed to buy, then show that this sales slip offer checked by input equipment by second, the input amount of buying and delivery of cargo information, it is processed into the promise containing the amount of buying and delivery of cargo information through the second data processing module, then passing through the second data transmit-receive module 25 and send the radiofrequency signal of this promise containing the amount of buying and delivery of cargo information to the first data transmit-receive module of master control system 2, then this radiofrequency signal is converted into data signal by the first data transmit-receive module;First data processing module of master control system receives the digital signal that the first data transmit-receive module transmits, can be incoming to storage in the first data memory module by a CPU control chip, also can pass through to send to distributor's terminal system of this distributor by the first data processing module unique Quick Response Code of generation;This Quick Response Code also can store in the second data memory module and the first data memory module.
Other system, the data of module or signal transmit in like manner.
Delivery of cargo information can include the type and manner of packing etc. of license number, car;
In the present invention, the means of payment can adopt the usual manner such as pay in cash, transfer accounts on the net to carry out.
The ultimate principle of the present invention, principal character and advantages of the present invention have more than been shown and described.Skilled person will appreciate that of the industry; the present invention is not restricted to the described embodiments; described in above-described embodiment and description is that principles of the invention is described; without departing from the spirit and scope of the present invention; the present invention also has various changes and modifications, and these changes and improvements both fall within the claimed scope of the invention.Claimed scope is defined by appending claims and equivalent thereof.

Claims (4)

1. a cement building material logistic management system, it is characterized in that, including data collecting system (1), master control system (2), distributor's terminal system (5), point-of-sale systems (6), freight terminals system (7), display module (8), voice prompting device (9), printing device (10) and back brake (11);
Described data collecting system (1) includes the first code reader (12), the second code reader (13), the 3rd code reader (14), platform scale (15), location detecting apparatus (16) and image capture device (17);
Described distributor's terminal system (5) includes the 2nd CPU control chip (22), the second data processing module (23), the second data memory module (24), the second data transmit-receive module (25) and the second display input equipment (26);
Described point-of-sale systems (6) includes the 3rd CPU control chip (27), the 3rd data processing module (28), the 3rd data memory module (29), the 3rd data transmit-receive module (30) and the 3rd display input equipment (31);
Described freight terminals system (7) includes the 4th CPU control chip (32), the 4th data processing module (33), the 4th data memory module (34), the 4th data transmit-receive module (3) and the 4th display device (4);
Described master control system (2) includes a CPU control chip (18), the first data processing module (19), the first data memory module (20) and the first data transmit-receive module (21);
A described CPU control chip (18) is connected with the first data processing module (19), the first data memory module (20), display module (8), voice prompting device (9), printing device (10), back brake (11) respectively, is used for controlling the work of the first data processing module (19), the first data memory module (20), display module (8), voice prompting device (9), printing device (10), back brake (11);
First data processing module (19) is also connected with the first code reader (12), the second code reader (13), the 3rd code reader (14), platform scale (15), location detecting apparatus (16), image capture device (17), the first data transmit-receive module (21) respectively;First data processing module (19) change into analogue signal for the digital signal that the data that data collecting system (1) collected and the first data transmit-receive module (21) receive after an incoming CPU control chip (18), incoming first data transmit-receive module (21) after being additionally operable to convert the control signal that a CPU control chip (18) transmits to analogue signal;
Described the first data memory module (20) controls the first data processing module (19) for storage by a CPU control chip (18) and processes the data obtained;
Described the first data transmit-receive module (21) is also connected with the second data transmit-receive module (25), the 3rd data transmit-receive module (30), the 4th data transmit-receive module (3) respectively;Described the first data transmit-receive module (21) sends to the second data transmit-receive module (25), the 3rd data transmit-receive module (30) or the 4th data transmit-receive module (3) for the analogue signal that the first data processing module (19) transmits converts to radiofrequency signal;It is additionally operable to that the radiofrequency signal that the second data transmit-receive module (25), the 3rd data transmit-receive module (30), the 4th data transmit-receive module (3) transmit converts to digital signal send to the first data processing module (19);
First code reader (12) is located at Factory Building and is imported and exported;Second code reader (13) is located at embarkation area;3rd code reader (14), platform scale (15), location detecting apparatus (16) and image capture device (17) are located at metering zone;Whether location detecting apparatus (16) is used for monitoring vehicle completely upper to platform scale (15);Image capture device (17) is for gathering the image of the vehicle entering metering zone;
2nd CPU control chip (22) is connected with the second data processing module (23), the second data memory module (24) respectively, is used for controlling the work of the second data processing module (23), the second data memory module (24);
Second data processing module (23) is also connected with the second data transmit-receive module (25) and the second display input equipment (26) respectively;Second data processing module (23) for incoming 2nd CPU control chip (22) after showing the digital signal that input equipment (26) data that input and the second data transmit-receive module (25) receive by second and changing into analogue signal, incoming second data transmit-receive module (25) after being additionally operable to convert the control signal that the 2nd CPU control chip (22) transmits to analogue signal;
Described the second data transmit-receive module (25) sends to the first data transmit-receive module (21) for the analogue signal that the second data processing module (23) transmits converts to radiofrequency signal, is additionally operable to that the radiofrequency signal that the first data transmit-receive module (21) transmits converts to analogue signal and sends to the second data processing module (23);
Described the second data memory module (24) controls the second data processing module (23) for storage by the 2nd CPU control chip (22) and processes the data obtained;
3rd CPU control chip (27) is connected with the 3rd data processing module (28), the 3rd data memory module (29) respectively, is used for controlling the work of the 3rd data processing module (28), the 3rd data memory module (29);
3rd data processing module (28) is also connected with the 3rd data transmit-receive module (30) and the 3rd display input equipment (31) respectively;3rd data processing module (28) for incoming 3rd CPU control chip (27) after showing the digital signal that input equipment (31) data that input and the 3rd data transmit-receive module (30) receive by the 3rd and changing into analogue signal, incoming 3rd data transmit-receive module (30) after being additionally operable to convert the control signal that the 3rd CPU control chip (27) transmits to analogue signal;
The 3rd described data transmit-receive module (30) sends to the first data transmit-receive module (21) for the analogue signal that the 3rd data processing module (28) transmits converts to radiofrequency signal;It is additionally operable to that the radiofrequency signal that the first data transmit-receive module (21) transmits converts to analogue signal send to the 3rd data processing module (28);
The 3rd described data memory module (29) controls the 3rd data processing module (28) for storage by the 3rd CPU control chip (27) and processes the data obtained;
4th CPU control chip (32) is connected with the 4th data processing module (33), the 4th data memory module (34) respectively, is used for controlling the work of the 4th data processing module (33), the 4th data memory module (34);
4th data processing module (33) is also connected with the 4th data transmit-receive module (3) and the 4th display device (4) respectively;4th data processing module (33) change into analogue signal for the digital signal that the data that inputted by the 4th display device (4) and the 4th data transmit-receive module (3) receive after incoming 4th CPU control chip (32), incoming 4th data transmit-receive module (3) after being additionally operable to convert the control signal that the 4th CPU control chip (32) transmits to analogue signal;
The 4th described data transmit-receive module (3) sends to the first data transmit-receive module (21) for the analogue signal that the 4th data processing module (33) transmits converts to radiofrequency signal;It is additionally operable to that the radiofrequency signal that the first data transmit-receive module (21) transmits converts to analogue signal send to the 4th data processing module (33);
The 4th described data memory module (34) controls the 4th data processing module (33) for storage by the 4th CPU control chip (32) and processes the data obtained.
2. cement building material logistic management system according to claim 1, it is characterised in that described display module (8) is LCD display.
3. cement building material logistic management system according to claim 1, it is characterised in that described image capture device (17) is photographing unit.
4. a cement building material commodity distribution control method, based on the cement building material logistic management system described in claim 1-3, it is characterised in that comprise the steps:
Step (1), salesman inputs the information containing cement building material of for sale and the sales slip offer of price by the 3rd display input equipment of point-of-sale systems, or by calling the sales slip offer of the information containing cement building material and the price being pre-stored in the 3rd data memory module, then will send the first data transmit-receive module to master control system by the 3rd data transmit-receive module, and be stored in the first data memory module;If can sell, by the first data transmit-receive module, this sales slip offer is sent the 3rd data transmit-receive module to distributor's terminal system;
Step (2), distributor checks sales slip offer by distributor's terminal system, if needing to buy, showing the input equipment input promise containing the amount of buying and delivery of cargo information by second, then passing through the second data transmit-receive module and send to master control system;First data processing module of master control system can generate unique Quick Response Code and send to distributor's terminal system of this distributor;
Promise containing the amount of buying and delivery of cargo information also should can be stored in the second data memory module and the first data memory module;
Step (3), when distributor is according to the date delivery of cargo promised to undertake, arrival Factory Building is imported and exported, then pass through the first code reader unique Quick Response Code of scanning to be identified, if it is consistent with information stored in the first data memory module, oneth CPU control chip of master control system can control back brake and rise, it is allowed to delivery of cargo vehicle enters;If inconsistent with information stored in the first data memory module, a CPU control chip of master control system then will not control back brake and rise, and does not namely allow delivery of cargo vehicle to enter;
Step (4), enters the vehicle after factory and enters metering zone, weigh vehicle weight by platform scale, and vehicle is carried out image acquisition by image capture device;If location detecting apparatus monitors vehicle and do not go up completely on platform scale, then a CPU control chip can control voice prompting device and points out;Embarkation area is entered into by the vehicle of metering zone;
Step (5), second code reader of embarkation area scans unique Quick Response Code and is identified, if consistent with information stored in the first data memory module, then can pass through the first data processing module and sales slip offer and the promise containing the amount of buying and delivery of cargo information are processed into shipping order;Then pass through the first data transmit-receive module to send shipping order to the 4th data transmit-receive module through freight terminals system;Then it is shown on the 4th display device;Loading personnel freight according to the shipping order on the 4th display device;
These shipping order also can be stored in the 4th data memory module;
Step (6), after goods installs, vehicle returns to metering zone, weighs now vehicle weight by platform scale, and vehicle is carried out image acquisition by image capture device, and the data collected is passed in the first data processing module and processes;
If location detecting apparatus monitors vehicle and do not go up completely on platform scale, then a CPU control chip can control voice prompting device and points out;
Then the 3rd code reader unique Quick Response Code of scanning is identified, stored sales slip offer and the promise phase comparison containing the amount of buying and delivery of cargo information with the first data memory module;If information is consistent, then a CPU control chip can control the first data processing module and generates manifest, controls printing device simultaneously and prints manifest, and packing slip includes the unique Quick Response Code of this packing slip;Packing slip also can be stored in the first data memory module;
Step (7), the vehicle taking packing slip sails to Factory Building import and export, first code reader scans unique Quick Response Code on manifest, if the information shown by this Quick Response Code is consistent with the packing slip being stored in master control system the first data memory module, then a CPU control chip can control back brake rise, it is allowed to vehicle rolls away from;If inconsistent with information stored in the first data memory module, a CPU control chip of master control system then will not control back brake and rise, and does not namely allow delivery of cargo vehicle to roll away from.
CN201610337647.2A 2016-05-22 2016-05-22 Cement building material logistics management system and method Active CN105809374B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610337647.2A CN105809374B (en) 2016-05-22 2016-05-22 Cement building material logistics management system and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610337647.2A CN105809374B (en) 2016-05-22 2016-05-22 Cement building material logistics management system and method

Publications (2)

Publication Number Publication Date
CN105809374A true CN105809374A (en) 2016-07-27
CN105809374B CN105809374B (en) 2022-04-05

Family

ID=56451652

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610337647.2A Active CN105809374B (en) 2016-05-22 2016-05-22 Cement building material logistics management system and method

Country Status (1)

Country Link
CN (1) CN105809374B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106845571A (en) * 2016-12-28 2017-06-13 云南昆船设计研究院 A kind of quick-fried product life cycle overall process managing and control system of the people
CN109531820A (en) * 2018-11-19 2019-03-29 杭州江润科技有限公司 Powder is put in storage intelligent fail-safe system and operating method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102496094A (en) * 2011-11-14 2012-06-13 武钢集团昆明钢铁股份有限公司 Automobile card reading measurement control system and use method
JP2014529125A (en) * 2012-03-27 2014-10-30 珠海森宏▲軟▼件科技有限公司Zhuhai Sunhome Information Co., Ltd. Automated logistics system using trigger transfer device
CN104134135A (en) * 2014-07-31 2014-11-05 武钢集团昆明钢铁股份有限公司 Enterprise warehousing localization management system and method
CN204331801U (en) * 2015-01-15 2015-05-13 重庆三峡学院 A kind of articles from the storeroom management devices
CN105184539A (en) * 2015-09-30 2015-12-23 华北水利水电大学 Internet logistic service system

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102496094A (en) * 2011-11-14 2012-06-13 武钢集团昆明钢铁股份有限公司 Automobile card reading measurement control system and use method
JP2014529125A (en) * 2012-03-27 2014-10-30 珠海森宏▲軟▼件科技有限公司Zhuhai Sunhome Information Co., Ltd. Automated logistics system using trigger transfer device
CN104134135A (en) * 2014-07-31 2014-11-05 武钢集团昆明钢铁股份有限公司 Enterprise warehousing localization management system and method
CN204331801U (en) * 2015-01-15 2015-05-13 重庆三峡学院 A kind of articles from the storeroom management devices
CN105184539A (en) * 2015-09-30 2015-12-23 华北水利水电大学 Internet logistic service system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106845571A (en) * 2016-12-28 2017-06-13 云南昆船设计研究院 A kind of quick-fried product life cycle overall process managing and control system of the people
CN109531820A (en) * 2018-11-19 2019-03-29 杭州江润科技有限公司 Powder is put in storage intelligent fail-safe system and operating method

Also Published As

Publication number Publication date
CN105809374B (en) 2022-04-05

Similar Documents

Publication Publication Date Title
US7058596B1 (en) System for managing customer orders and methods of implementation
US5666493A (en) System for managing customer orders and method of implementation
US7066315B2 (en) Sorting method and apparatus
CN111489116A (en) E-commerce management system
CN107248096A (en) Order processing method and system
CN107239986A (en) Order settlement method, order processing client, order management platform
CN112749937A (en) TMS SaaS supply chain logistics information platform
CN104867035A (en) Linked inquiry and quotation system and method of network or electronic commerce
US20150213402A1 (en) Logistics management system and methods of operating the same
CN110310069A (en) A kind of logistics supply chain information management system
CN106022876A (en) Agricultural wholesale electronic trading system and method
KR20170087700A (en) Platform for open logistics export import international transportation delivery and return process of global electronic commerce
CN111967815A (en) Warehouse distribution management system
CN105629941A (en) Real-time quality management system for steel pipe transfer process by using RFID
CN105809374A (en) Cement building material logistics management system and method
CN112016818A (en) Commercial concrete management system
CN205845089U (en) A kind of cement building material logistic management system
CN111222941B (en) Online purchase information classification system based on big data and handheld operation terminal
CN114037588A (en) Remote centralized metering management and control system and method for truck scale
CN103253515B (en) Pipeline type logistics ultrasound conveying control method
KR100658912B1 (en) A delivering system using a pos system and a method thereof
JP2003532202A (en) Method, system and storage medium for analyzing product delivery
KR102527677B1 (en) Forklift Sales Relay System and the method thereof
KR102508617B1 (en) Method and system to manage freight transport
CN116029649A (en) Big data-based supply chain management platform

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: 650302 Kun steel Chaoyang Road, Anning City, Kunming, Yunnan

Applicant after: YUNNAN KUNGANG ELECTRONIC INFORMATION TECHNOLOGY Co.,Ltd.

Address before: 650302 Kun steel Chaoyang Road, Anning City, Kunming, Yunnan

Applicant before: YUNNAN KISC ELECTRONIC INFORMATION ENGINEERING CO.,LTD.

CB02 Change of applicant information
GR01 Patent grant
GR01 Patent grant