CN105804756A - Disturbance-resistant pipe jacking construction scheme - Google Patents

Disturbance-resistant pipe jacking construction scheme Download PDF

Info

Publication number
CN105804756A
CN105804756A CN201610008150.6A CN201610008150A CN105804756A CN 105804756 A CN105804756 A CN 105804756A CN 201610008150 A CN201610008150 A CN 201610008150A CN 105804756 A CN105804756 A CN 105804756A
Authority
CN
China
Prior art keywords
locking gear
strip
soil
disturbance
prefabricated pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610008150.6A
Other languages
Chinese (zh)
Inventor
葛维民
张宇霆
张晶
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Yusuitong Tunnel Equipment Co Ltd
Original Assignee
Jiangsu Yusuitong Tunnel Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Yusuitong Tunnel Equipment Co Ltd filed Critical Jiangsu Yusuitong Tunnel Equipment Co Ltd
Priority to CN201610008150.6A priority Critical patent/CN105804756A/en
Publication of CN105804756A publication Critical patent/CN105804756A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/005Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries by forcing prefabricated elements through the ground, e.g. by pushing lining from an access pit

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Environmental & Geological Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

A disturbance-resistant pipe jacking construction scheme is suitable for construction of urban underground passages over streets and other underground projects. A thin steel plate is laid between a prefabricated pipe and soil, so that friction between the prefabricated pipe and the soil is reduced, disturbance on the soil is lowered, and thus road surface damage and building settlement are prevented.

Description

Disturbance rejection jacking construction scheme
Technical field
The present invention is a kind of disturbance rejection jacking construction scheme, it is adaptable to the construction of the construction of Urban Underground underpass and other underground engineerings.
Background technology
Underpass often adopts Rectangular Tunnel, when taking the method construction of no-dig technique, uses rectangular pipe jacking machine driving, following closely, is a rectangle prefabricated pipe successively.
Most rectangle prefabricated pipe is by cast in concrete, and surface ratio is rougher.The soil friction peripheral with prefabricated pipe is very big.During constructing tunnel, prefabricated pipe constantly travels forward along with pipe jacking tunnelling machine, and the soil disturbance that prefabricated pipe is peripheral is very big.
Underpass often ratio is shallower, and the soil buried regions above passage is relatively thin, by easily producing after disturbance to subside and swell, makes ground road surface be damaged, or the matters of aggravation such as building settlement occur.
Summary of the invention
It is an object of the invention to provide a kind of disturbance rejection jacking construction scheme, by laying thin steel plate between prefabricated pipe and soil, reduce the friction of prefabricated pipe and soil, reduce the disturbance to soil, and then prevent road surface to be damaged and building settlement.
Accompanying drawing explanation
Fig. 1 is the schematic diagram of the present invention:
Detailed description of the invention
As shown in Figure 1: disturbance rejection jacking construction scheme provided by the invention, including the strip steel laying apparatus arranged in push-bench, and to the locking device implementing to compress with coil of strip.
Strip steel laying apparatus is support band coil of strip 7 by hanger 6, and the head of strip steel passes through guide wheel 8, inserts between prefabricated pipe 9 and soil.Along with prefabricated pipe constantly travels forward, strip steel is just by being sent between prefabricated pipe and soil successively.
In order to prevent strip steel unwinding from opening, being provided with locking gear 3 in development machine, locking gear is by seat supports on development machine 1, and locking gear is provided with briquetting 5, and briquetting 5 is pressed on band coil of strip, prevents strip steel unwinding and opens.
Locking gear 3 is provided with counterweight 2, and band coil of strip, by the briquetting 5 above locking gear 3, is applied pressure by counterweight 2.
Having laid strip steel between prefabricated pipe and soil, strip steel separated, the friction between prefabricated pipe and soil converts the friction of prefabricated pipe and strip steel to.Owing to the surface of strip steel is very smooth, the friction of prefabricated pipe and strip steel reduces, and then reduces the disturbance to soil.
Along with prefabricated pipe extends the strip steel laid, the protection to the Zinc fractions above prefabricated pipe, it is therefore prevented that road surface is damaged, it is to avoid building settlement.

Claims (5)

1. a disturbance rejection jacking construction scheme, construction suitable in the construction of Urban Underground underpass and other underground engineerings, band coil of strip (7) is support by hanger (6), the head of strip steel passes through guide wheel (8), insert between prefabricated pipe (9) and soil, in order to prevent strip steel unwinding from opening, locking gear (3) it is provided with in development machine, locking gear by seat supports on development machine (1), locking gear is provided with briquetting (5), briquetting (5) is pressed on band coil of strip, prevents strip steel unwinding and opens.Locking gear (3) is provided with counterweight (2), and band coil of strip, by the above briquetting (5) of locking gear (3), is applied pressure by counterweight (2).
2. cutter head support device according to claim 1, it is characterised in that described hanger (6) supports band coil of strip (7).
3. cutter head support device according to claim 1, it is characterised in that the head of strip steel passes through guide wheel (8), inserts between prefabricated pipe (9) and soil.
4. cutter head support device according to claim 1, it is characterised in that described locking gear by seat supports on development machine (1).
5. cutter head support device according to claim 1, it is characterised in that described locking gear (3) is provided with counterweight (2).
CN201610008150.6A 2016-05-16 2016-05-16 Disturbance-resistant pipe jacking construction scheme Pending CN105804756A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610008150.6A CN105804756A (en) 2016-05-16 2016-05-16 Disturbance-resistant pipe jacking construction scheme

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610008150.6A CN105804756A (en) 2016-05-16 2016-05-16 Disturbance-resistant pipe jacking construction scheme

Publications (1)

Publication Number Publication Date
CN105804756A true CN105804756A (en) 2016-07-27

Family

ID=56465642

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610008150.6A Pending CN105804756A (en) 2016-05-16 2016-05-16 Disturbance-resistant pipe jacking construction scheme

Country Status (1)

Country Link
CN (1) CN105804756A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108868808A (en) * 2018-08-08 2018-11-23 淮南中泰矿山装备制造有限公司 The anti-bias mechanism of pipe jacking tunnelling machine
CN109555529A (en) * 2018-11-06 2019-04-02 山东大学 The construction method of support without interruption in open type TBM driving

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20020028967A (en) * 2002-03-06 2002-04-17 건양씨앤이 주식회사 The method for construction using pressure-input propulsion of ecosystem travel load
CN102042020A (en) * 2010-12-30 2011-05-04 上海交通大学 Construction device and construction method for preventing push bench and pipeline from sinking
CN103422867A (en) * 2013-08-21 2013-12-04 国家电网公司 Tunnel construction perturbation control method based on digitization
CN104110265A (en) * 2014-07-24 2014-10-22 中铁隧道集团有限公司 Thixotropic slurry grouting system for large-section rectangular pipe-jacking pipeline
CN203905954U (en) * 2014-06-06 2014-10-29 中铁工程装备集团有限公司 Super-large shield pipe push bench with rectangular cross section

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20020028967A (en) * 2002-03-06 2002-04-17 건양씨앤이 주식회사 The method for construction using pressure-input propulsion of ecosystem travel load
CN102042020A (en) * 2010-12-30 2011-05-04 上海交通大学 Construction device and construction method for preventing push bench and pipeline from sinking
CN103422867A (en) * 2013-08-21 2013-12-04 国家电网公司 Tunnel construction perturbation control method based on digitization
CN203905954U (en) * 2014-06-06 2014-10-29 中铁工程装备集团有限公司 Super-large shield pipe push bench with rectangular cross section
CN104110265A (en) * 2014-07-24 2014-10-22 中铁隧道集团有限公司 Thixotropic slurry grouting system for large-section rectangular pipe-jacking pipeline

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108868808A (en) * 2018-08-08 2018-11-23 淮南中泰矿山装备制造有限公司 The anti-bias mechanism of pipe jacking tunnelling machine
CN108868808B (en) * 2018-08-08 2023-11-17 淮南中泰矿山装备制造有限公司 Deviation prevention mechanism of pipe-jacking tunneling machine
CN109555529A (en) * 2018-11-06 2019-04-02 山东大学 The construction method of support without interruption in open type TBM driving

Similar Documents

Publication Publication Date Title
CN101899977B (en) Ultra-shallow earth-covered subway shield traversing operation tunnel construction method of
CN103031837B (en) Well-points dewatering combined stack-load ground preloading deep soft soil foundation method
CN104404983B (en) A kind of ride well device and construction method thereof for jacking construction
CN103485790A (en) Shallow tunneling method for pipe-proof-supporting structure combined system
CN108547639B (en) Tunnel closes on the advanced same more conduit delamination pour slurry construction methods in hole of existing buildings
CN205479706U (en) Push pipe work jing ding advances structure
CN103114857A (en) Shield tunnel construction method
CN108915698A (en) A kind of complex condition large diameter pipe curtain construction method
CN105570534A (en) Shallow-burial-depth pipe-jacking equipment capable of controlling ground structural deformation and construction method
CN105804756A (en) Disturbance-resistant pipe jacking construction scheme
CN112281810A (en) Construction method of underground diaphragm wall with water-rich fine sand layer
CN108590752B (en) Drainage repair system after lining of underdrain type tunnel and construction method thereof
CN205000325U (en) Urban road ground that tubular pile was handled
CN204919528U (en) A go out membrane structure for detecting vacuum pre -compaction in -process reinforcement effect
CN207453976U (en) A kind of miniature tube curtain push-bench originates water stop device for opening
CN212656294U (en) Groove grooving equipment
CN105970910B (en) Well point plastic strip overlay film vacuum pre-pressed joint precipitating, pre-pressing dynamic consolidation method
CN105970961B (en) A kind of bored concrete pile goes along with sb. to guard him deep pit monitor and cuts piling method
CN105862716B (en) Integral type well point plastic strip pipe
CN204532379U (en) The pre-buried gutter structure of subway sectional tunnel waste water pump house
JP7357517B2 (en) Pipe construction method using propulsion method
CN203114292U (en) Up-and-down separation type underground excavation station construction passageway structure provided with muck transporting equipment
CN104405412A (en) Construction member for subway underground running tunnel transverse channel
CN205371804U (en) Equipment that shallow buried depth push pipe control ground structure warp
CN204849582U (en) Overpass prevention and cure ponding system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20160727