CN105804016A - Urban river sluice suitable for water conservancy project - Google Patents
Urban river sluice suitable for water conservancy project Download PDFInfo
- Publication number
- CN105804016A CN105804016A CN201610204877.1A CN201610204877A CN105804016A CN 105804016 A CN105804016 A CN 105804016A CN 201610204877 A CN201610204877 A CN 201610204877A CN 105804016 A CN105804016 A CN 105804016A
- Authority
- CN
- China
- Prior art keywords
- main
- wall
- headstock gear
- keying
- stay cord
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B7/00—Barrages or weirs; Layout, construction, methods of, or devices for, making same
- E02B7/20—Movable barrages; Lock or dry-dock gates
- E02B7/26—Vertical-lift gates
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B7/00—Barrages or weirs; Layout, construction, methods of, or devices for, making same
- E02B7/20—Movable barrages; Lock or dry-dock gates
- E02B7/26—Vertical-lift gates
- E02B7/34—Flash- boards for vertical-lift gates
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B8/00—Details of barrages or weirs ; Energy dissipating devices carried by lock or dry-dock gates
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Barrages (AREA)
Abstract
The invention discloses an urban river sluice suitable for a water conservancy project. The urban river sluice comprises a left bank wall and a right bank wall, the left bank wall and the right bank wall are located on the two sides of a riverway, and a middle wall is further arranged between the left bank wall and the right bank wall. The top of the left bank wall and the top of the right bank wall are connected through a cross beam body, and an arch bridge body is fixed to the top of the cross beam body. A main gate and an auxiliary gate are arranged between the left bank wall and the middle wall, and a main gate and an auxiliary gate are arranged between the right bank wall and the middle wall. The middle wall is further provided with a water level and water flow sensor. The urban river sluice is reasonable and simple in structure and can effectively solve the problems that an existing river sluice is not good in landscape and practicability and has no water level and water flow monitoring function. The water level and water flow sensor can effectively monitor water level and water flow conditions, and thus safety of lives and properties of people is effectively guaranteed. The main gates and the auxiliary gates are arranged, each main gate is provided with a plurality of through holes, the using effect is not affected, and fountains can be conveniently formed so that people can enjoy the sight.
Description
Technical field
The invention belongs to hydraulic engineering capital construction technical field, particularly to a kind of city regulating dam being suitable in hydraulic engineering.
Background technology
Raising along with the development of national economy and living standards of the people, people are after base substance life is met, demand for spirit level also begins to be continuously increased, and a people's lives quality and environmental quality important process as government all will improve in current nearly all local government;River water is stopped by acting as of regulating dam in good time, opens it when needs;Current regulating dam only has functional and does not have view and practicality, and the view regulating dam in recent years built is and is perpendicular to the regulating dam that river course is arranged along a straight line, and view does not have by force the technique effect of high intensity and corrosion resistance and timely operability yet;The water level current monitoring of regulating dam is fairly heavy to be wanted, once water level current transfinite, it will cause the loss of people's lives and properties.
Summary of the invention
Goal of the invention: the present invention provides a kind of city regulating dam being suitable in hydraulic engineering, little to solve regulating dam view and practicality in prior art, and regulating dam do not have the problem that water level current are monitored.
Technical scheme: for achieving the above object, the technical solution used in the present invention is:
A kind of city regulating dam being suitable in hydraulic engineering, including the left bank body of wall 1 and the right bank body of wall 12 that are positioned at both sides, river course, it is additionally provided with middle wall body 15 between described left bank body of wall 1 and right bank body of wall 12, the top of described left bank body of wall 1 and right bank body of wall 12 is connected by main body of cross-beam 2, main body of cross-beam 2 top is fixed with arch pontic 3
The first main shutter 17 of vertical reciprocating movement it is provided with between described left bank body of wall 1 and middle wall body 15, described first main shutter 17 is provided with the first secondary gate 18 of vertical reciprocating movement, described first main shutter 17 is connected with the keying main side of the first headstock gear 6, and the described first secondary gate 18 is connected with the keying pair end of the first headstock gear 6;
The second main shutter 13 of vertical reciprocating movement it is provided with between described right bank body of wall 12 and middle wall body 15, described second main shutter 13 is provided with the second secondary gate 14 of vertical reciprocating movement, described second main shutter 13 is connected with the keying main side of the second headstock gear 8, and the described second secondary gate 14 is connected with the keying pair end of the second headstock gear 8;
Being equipped with several through holes 19 in described first main shutter 17 and the second main shutter 13, the described first secondary gate 18 and the second secondary gate 14 have been respectively provided with sky frame 20, have been provided with baffle plate 21 between empty frame 20, described empty frame 20 and baffle plate 21 can alternately block through hole 19.
Further, described first both sides, main shutter 17 upper end are sequentially connected with the keying main side of the first guider 4 and the first headstock gear 6 respectively through the first main stay cord 5, and the described first secondary gate 18 upper end is connected with the keying pair end of the first headstock gear 6 by the first secondary stay cord 7;
Described second both sides, main shutter 13 upper end are sequentially connected with the keying main side of the second guider 10 and the second headstock gear 8 respectively through the second main stay cord 11, and the described second secondary gate 14 upper end is connected with the keying pair end of the second headstock gear 8 by the second secondary stay cord 9.
Further, described first headstock gear 6 and the second headstock gear 8 are fixedly connected with on main body of cross-beam 2.
Further, described left bank body of wall 1, right bank body of wall 12 and middle wall body 15 are parallel to each other, and all parallel with the water (flow) direction in river course.
Further, the end face of described middle wall body 15 is fixing with bottom main body of cross-beam 2 is connected.
Further, described middle wall body 15 is fixed with water level current induction apparatus 16.
Further, the described first main secondary stay cord of stay cord 5, first 7, second secondary stay cord 9 and the second main stay cord 11 are steel wire rope.
Beneficial effect: the present invention compared with prior art, has the advantages that
(1) present configuration rationally simple, production cost is low, easy for installation, multiple functional, it is possible to effective solve existing regulating dam view and practicality is little, and regulating dam do not have the problem that water level current are monitored.
(2) present invention is provided with water level current induction apparatus, it is possible to the situation of effective level monitoring current, thus being effectively guaranteed the safety of people's lives and properties.
(3) present invention is provided with main shutter and secondary gate, and in main shutter, is provided with several through holes, neither affect result of use, be easy to again form fountain shape and view and admire to people.
Accompanying drawing explanation
Fig. 1 is the structural representation of the present invention;
Wherein: 1-left bank body of wall;2-main body of cross-beam;3-arch pontic;4-the first guider;The main stay cord of 5-first;6-the first headstock gear;The secondary stay cord of 7-first;8-the second headstock gear;The secondary stay cord of 9-second;10-the second guider;The main stay cord of 11-second;12-right bank body of wall;13-the second main shutter;The secondary gate of 14-second;15-middle wall body;16-water level current induction apparatus;17-the first main shutter;The secondary gate of 18-first;19-through hole;20-sky frame;21-baffle plate.
Detailed description of the invention
Below in conjunction with accompanying drawing, the present invention is further described.
As shown in Figure 1, a kind of city regulating dam being suitable in hydraulic engineering, including the left bank body of wall 1 and the right bank body of wall 12 that are positioned at both sides, river course, it is additionally provided with middle wall body 15 between described left bank body of wall 1 and right bank body of wall 12, the top of described left bank body of wall 1 and right bank body of wall 12 is connected by main body of cross-beam 2, main body of cross-beam 2 top is fixed with arch pontic 3
The first main shutter 17 of vertical reciprocating movement it is provided with between described left bank body of wall 1 and middle wall body 15, described first main shutter 17 is provided with the first secondary gate 18 of vertical reciprocating movement, described first main shutter 17 is connected with the keying main side of the first headstock gear 6, and the described first secondary gate 18 is connected with the keying pair end of the first headstock gear 6;
The second main shutter 13 of vertical reciprocating movement it is provided with between described right bank body of wall 12 and middle wall body 15, described second main shutter 13 is provided with the second secondary gate 14 of vertical reciprocating movement, described second main shutter 13 is connected with the keying main side of the second headstock gear 8, and the described second secondary gate 14 is connected with the keying pair end of the second headstock gear 8;
Being equipped with several through holes 19 in described first main shutter 17 and the second main shutter 13, the described first secondary gate 18 and the second secondary gate 14 have been respectively provided with sky frame 20, have been provided with baffle plate 21 between empty frame 20, described empty frame 20 and baffle plate 21 can alternately block through hole 19.
Described first both sides, main shutter 17 upper end are sequentially connected with the keying main side of the first guider 4 and the first headstock gear 6 respectively through the first main stay cord 5, described first secondary gate 18 upper end is connected with the keying pair end of the first headstock gear 6 by the first secondary stay cord 7, and therefore the secondary end that opens and closes of the first headstock gear 6 controls the lifting of the first secondary gate 18;
Described second both sides, main shutter 13 upper end are sequentially connected with the keying main side of the second guider 10 and the second headstock gear 8 respectively through the second main stay cord 11, described second secondary gate 14 upper end is connected with the keying pair end of the second headstock gear 8 by the second secondary stay cord 9, and therefore the secondary end that opens and closes of the second headstock gear 8 controls the lifting of the second secondary gate 14.
Described first headstock gear 6 and the second headstock gear 8 are fixedly connected with on main body of cross-beam 2;The keying main side of described first headstock gear 6 connects the first both sides, main shutter 17 upper end respectively through two first main stay cords 5, therefore the lifting of the first main shutter 17 is controlled, wherein also being separately installed with the first guider 4 between keying main side and first both sides, main shutter 17 upper end of the first headstock gear 6, the first guider 4 controls the direction of the first main shutter 17 lifting;The keying main side of described second headstock gear 8 connects the second both sides, main shutter 13 upper end respectively through two second main stay cords 11, therefore the lifting of the second main shutter 13 is controlled, wherein also being separately installed with the second guider 10 between keying main side and the second secondary both sides, gate 14 upper end of the second headstock gear 8, the second guider 10 controls the direction of the second main shutter 13 lifting.
Described left bank body of wall 1, right bank body of wall 12 and middle wall body 15 are parallel to each other, and all parallel with the water (flow) direction in river course.
The end face of described middle wall body 15 is fixing with bottom main body of cross-beam 2 to be connected.
Described middle wall body 15 is vertically fixed water level current induction apparatus 16, knows whether that needs are opened a sluice gate and drawn out some water or close lock water-retention according to water level current induction apparatus 16.
The described first main secondary stay cord of stay cord 5, first 7, second secondary stay cord 9 and the second main stay cord 11 are steel wire rope.
Described main body of cross-beam 2 two bottom sides is respectively fixedly connected with on left bank body of wall 1 and right bank body of wall 12;Described arch pontic 3 is fixedly connected on above main body of cross-beam 2;Described middle wall body 15 is between left bank body of wall 1 and right bank body of wall 12, and described middle wall body 15 end face is fixing with bottom main body of cross-beam 2 to be connected;The first main shutter 17 vertically it is connected with between described left bank body of wall 1 and middle wall body 15, described first main shutter 17 is provided with the first secondary gate 18, described first both sides, main shutter 17 upper end open and close main side with the first main stay cord 5 with the first headstock gear 6 respectively through the first guider 4 and are connected, and the described first secondary gate 18 upper end opens and closes secondary end by the first secondary stay cord 7 and is connected with the first headstock gear 6;The second main shutter 13 vertically it is connected with between described right bank body of wall 12 and middle wall body 15, described second main shutter 13 is provided with the second secondary gate 14, described second both sides, main shutter 13 upper end open and close main side with the second main stay cord 11 with the second headstock gear 8 respectively through the second guider 10 and are connected, and the described second secondary gate 14 upper end opens and closes secondary end by the second secondary stay cord 9 and is connected with the second headstock gear 8;Described first headstock gear 6 and the second headstock gear 8 are fixedly connected with on main body of cross-beam 2;Described water level current induction apparatus 16 is vertically fixedly connected on above middle wall body 15.
The use state of the present invention is: during closed shutter, first the first main shutter 17 and the second main shutter 13 are put down, first secondary gate 18 and the second secondary gate 14 will be moved simultaneously, the baffle plate 21 on the first secondary gate 18 and the second secondary gate 14 is made to cover the through hole 19 in the first main shutter 17 and the second main shutter 13, thus realizing completely closing gate;During to view and admire, it is only necessary to the first secondary gate 18 and the second secondary gate 14 are put down so that baffle plate 21 and through hole 19 stagger, and water is flowed out by the through hole in the first main shutter 17 and the second main shutter 13, consequently facilitating people view and admire.
The above is only the preferred embodiment of the present invention; it is noted that, for those skilled in the art; under the premise without departing from the principles of the invention, it is also possible to make some improvements and modifications, these improvements and modifications also should be regarded as protection scope of the present invention.
Claims (7)
1. the city regulating dam that a kind is suitable in hydraulic engineering, including the left bank body of wall (1) and the right bank body of wall (12) that are positioned at both sides, river course, middle wall body (15) it is additionally provided with between described left bank body of wall (1) and right bank body of wall (12), the top of described left bank body of wall (1) and right bank body of wall (12) is connected by main body of cross-beam (2), main body of cross-beam (2) top is fixed with arch pontic (3), it is characterised in that:
First main shutter (17) of vertical reciprocating movement it is provided with between described left bank body of wall (1) and middle wall body (15), described first main shutter (17) is provided with the first secondary gate (18) of vertical reciprocating movement, described first main shutter (17) is connected with the keying main side of the first headstock gear (6), and the described first secondary gate (18) is connected with the keying pair end of the first headstock gear (6);
Second main shutter (13) of vertical reciprocating movement it is provided with between described right bank body of wall (12) and middle wall body (15), described second main shutter (13) is provided with the second secondary gate (14) of vertical reciprocating movement, described second main shutter (13) is connected with the keying main side of the second headstock gear (8), and the described second secondary gate (14) is connected with the keying pair end of the second headstock gear (8);
Described first main shutter (17) and the second main shutter (13) are equipped with several through holes (19), described first secondary gate (18) and the second secondary gate (14) have been respectively provided with sky frame (20), being provided with baffle plate (21) between empty frame (20), described empty frame (20) and baffle plate (21) can alternately block through hole (19).
2. the city regulating dam being suitable in hydraulic engineering according to claim 1, it is characterized in that: described first main shutter (17) both sides, upper end are sequentially connected with the first guider (4) and the keying main side of the first headstock gear (6) respectively through the first main stay cord (5), the described first secondary gate (18) upper end is connected with the keying pair end of the first headstock gear (6) by the first secondary stay cord (7);
Described second main shutter (13) both sides, upper end are sequentially connected with the second guider (10) and the keying main side of the second headstock gear (8) respectively through the second main stay cord (11), and the described second secondary gate (14) upper end is connected with the keying pair end of the second headstock gear (8) by the second secondary stay cord (9).
3. the city regulating dam being suitable in hydraulic engineering according to claim 2, it is characterised in that: described first headstock gear (6) and the second headstock gear (8) are fixedly connected with on main body of cross-beam (2).
4. the city regulating dam being suitable in hydraulic engineering according to claim 1, it is characterised in that: described left bank body of wall (1), right bank body of wall (12) and middle wall body (15) are parallel to each other, and all parallel with the water (flow) direction in river course.
5. the city regulating dam being suitable in hydraulic engineering according to claim 1, it is characterised in that: the end face of described middle wall body (15) is fixing with main body of cross-beam (2) bottom to be connected.
6. the city regulating dam being suitable in hydraulic engineering according to claim 1, it is characterised in that: described middle wall body (15) is fixed with water level current induction apparatus (16).
7. the city regulating dam being suitable in hydraulic engineering according to claim 1, it is characterised in that: described first main stay cord (5), the first secondary stay cord (7), the second secondary stay cord (9) and the second main stay cord (11) are steel wire rope.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610204877.1A CN105804016B (en) | 2016-04-05 | 2016-04-05 | A kind of city regulating dam being suitable in hydraulic engineering |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610204877.1A CN105804016B (en) | 2016-04-05 | 2016-04-05 | A kind of city regulating dam being suitable in hydraulic engineering |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105804016A true CN105804016A (en) | 2016-07-27 |
CN105804016B CN105804016B (en) | 2017-11-07 |
Family
ID=56459528
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610204877.1A Expired - Fee Related CN105804016B (en) | 2016-04-05 | 2016-04-05 | A kind of city regulating dam being suitable in hydraulic engineering |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105804016B (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107489130A (en) * | 2017-09-29 | 2017-12-19 | 万绿生态园林股份有限公司 | The two-part river course blocking apparatus improved for city appearance water body |
CN107604883A (en) * | 2017-11-10 | 2018-01-19 | 洛阳水利勘测设计有限责任公司 | A kind of energy dissipating buffer type hydraulic dam |
CN114892606A (en) * | 2022-03-06 | 2022-08-12 | 陈丽霞 | Water stop device for hydraulic engineering construction |
CN114934487A (en) * | 2022-04-07 | 2022-08-23 | 安徽建筑大学 | Telescopic river course flow control device |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2011020143A1 (en) * | 2009-08-18 | 2011-02-24 | Rubicon Research Pty Ltd | Flow meter assembly, gate assemblies and methods of flow measurement |
CN204435328U (en) * | 2015-02-05 | 2015-07-01 | 四川省建筑科学研究院 | A kind of constant flow rate automatic ecological is released gate and releasing device |
CN204491529U (en) * | 2014-12-25 | 2015-07-22 | 重庆大方生态环境治理股份有限公司 | A kind of novel river sluice structure |
CN204715194U (en) * | 2015-06-12 | 2015-10-21 | 确山县公路管理局 | With the bridge of small-sized view gate |
CN103498413B (en) * | 2013-09-04 | 2016-01-06 | 河南省水利勘测设计研究有限公司 | With People's Bank of China's steel bridge of small-sized view gate |
-
2016
- 2016-04-05 CN CN201610204877.1A patent/CN105804016B/en not_active Expired - Fee Related
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2011020143A1 (en) * | 2009-08-18 | 2011-02-24 | Rubicon Research Pty Ltd | Flow meter assembly, gate assemblies and methods of flow measurement |
CN103498413B (en) * | 2013-09-04 | 2016-01-06 | 河南省水利勘测设计研究有限公司 | With People's Bank of China's steel bridge of small-sized view gate |
CN204491529U (en) * | 2014-12-25 | 2015-07-22 | 重庆大方生态环境治理股份有限公司 | A kind of novel river sluice structure |
CN204435328U (en) * | 2015-02-05 | 2015-07-01 | 四川省建筑科学研究院 | A kind of constant flow rate automatic ecological is released gate and releasing device |
CN204715194U (en) * | 2015-06-12 | 2015-10-21 | 确山县公路管理局 | With the bridge of small-sized view gate |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107489130A (en) * | 2017-09-29 | 2017-12-19 | 万绿生态园林股份有限公司 | The two-part river course blocking apparatus improved for city appearance water body |
CN107604883A (en) * | 2017-11-10 | 2018-01-19 | 洛阳水利勘测设计有限责任公司 | A kind of energy dissipating buffer type hydraulic dam |
CN114892606A (en) * | 2022-03-06 | 2022-08-12 | 陈丽霞 | Water stop device for hydraulic engineering construction |
CN114892606B (en) * | 2022-03-06 | 2024-03-08 | 陈丽霞 | Water stop device for hydraulic engineering construction |
CN114934487A (en) * | 2022-04-07 | 2022-08-23 | 安徽建筑大学 | Telescopic river course flow control device |
CN114934487B (en) * | 2022-04-07 | 2023-06-27 | 安徽建筑大学 | Telescopic river flow regulating device |
Also Published As
Publication number | Publication date |
---|---|
CN105804016B (en) | 2017-11-07 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105804016A (en) | Urban river sluice suitable for water conservancy project | |
CN104018473A (en) | Double-axis adjustable vertical seam type fish way and operation method thereof | |
CN106702979A (en) | Multi-stage superimposed arc type fish passage and fish passing method | |
CN209873738U (en) | A manger plate dam for hydraulic and hydroelectric engineering | |
CN204940217U (en) | A kind of ultra-large type plane splits arc triangle gate | |
CN201162208Y (en) | Floater horizontal opening door | |
CN203144978U (en) | Hydraulic open-close large-span upturning type arch steel gate | |
CN206233193U (en) | A kind of gate of hydraulic engineering | |
CN208792265U (en) | A kind of hydraulic engineering cylinder iron gate | |
CN202644491U (en) | Urban landscape steel gate | |
CN204959679U (en) | Fishway experimental apparatus | |
CN212200334U (en) | A manger plate dam for hydraulic and hydroelectric engineering | |
CN206554039U (en) | A kind of vertical seam type fish channel structure | |
CN207498953U (en) | Build sluice and water conservancy dykes and dams | |
CN209384204U (en) | A kind of small-sized sluice gate convenient for adjusting flow | |
CN210917560U (en) | Water intake with layered water taking function | |
CN206581229U (en) | A kind of hydraulic engineering gate | |
CN206706700U (en) | Suitable for the external apparatus for examination and repair of medium and small reservoirs water intaking structure | |
CN107044779A (en) | A kind of closed type industrial furnace fire door | |
CN206143736U (en) | Novel rise horizontal sluice | |
CN206784309U (en) | Lift flood-control wall | |
CN205873675U (en) | Chlorination frame device | |
CN216972697U (en) | Automatic opening and closing door of electrolytic tank | |
CN205662906U (en) | Full -automatic hidden stoplog bulkhead gate | |
CN205917667U (en) | Novel hand -operated screw gate |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20171107 Termination date: 20200405 |
|