CN105800788B - A kind of Constructed Wetland For Purifying device that can freely dismantle - Google Patents

A kind of Constructed Wetland For Purifying device that can freely dismantle Download PDF

Info

Publication number
CN105800788B
CN105800788B CN201610086956.7A CN201610086956A CN105800788B CN 105800788 B CN105800788 B CN 105800788B CN 201610086956 A CN201610086956 A CN 201610086956A CN 105800788 B CN105800788 B CN 105800788B
Authority
CN
China
Prior art keywords
layer
box
permeable
box body
permeable box
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610086956.7A
Other languages
Chinese (zh)
Other versions
CN105800788A (en
Inventor
徐后涛
赵风斌
陈师健
郑小燕
姜娟
陈良霞
李坤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Aquatic Technology Co ltd
Shanghai Lishui Aquatic Environment Research Institute
Original Assignee
Shanghai Lishui Aquatic Environment Institute
SHANGHAI AQUA-LIFE ENVIRONMENT ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Lishui Aquatic Environment Institute, SHANGHAI AQUA-LIFE ENVIRONMENT ENGINEERING Co Ltd filed Critical Shanghai Lishui Aquatic Environment Institute
Priority to CN201610086956.7A priority Critical patent/CN105800788B/en
Publication of CN105800788A publication Critical patent/CN105800788A/en
Application granted granted Critical
Publication of CN105800788B publication Critical patent/CN105800788B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F3/00Biological treatment of water, waste water, or sewage
    • C02F3/32Biological treatment of water, waste water, or sewage characterised by the animals or plants used, e.g. algae
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F2201/00Apparatus for treatment of water, waste water or sewage
    • C02F2201/002Construction details of the apparatus
    • C02F2201/007Modular design
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02WCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT
    • Y02W10/00Technologies for wastewater treatment
    • Y02W10/10Biological treatment of water, waste water, or sewage

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Biotechnology (AREA)
  • Botany (AREA)
  • Biodiversity & Conservation Biology (AREA)
  • Microbiology (AREA)
  • Hydrology & Water Resources (AREA)
  • Environmental & Geological Engineering (AREA)
  • Water Supply & Treatment (AREA)
  • Chemical & Material Sciences (AREA)
  • Organic Chemistry (AREA)
  • Air-Conditioning For Vehicles (AREA)
  • Packages (AREA)

Abstract

A kind of Constructed Wetland For Purifying device that can freely dismantle.It includes a Constructed Wetland For Purifying device, it is characterized in that Constructed Wetland For Purifying device is mainly made of braiding channel, water inlet pipe, front beam, middle cross beam, rear cross beam and five layers of permeable box, permeable box is respectively made of box body, connection box body four corners in the connecting rope body and connection of X-shape in the suspension strop of the connecting rope body junction of X-shape, center on box body outer bottom sets a hook, be respectively equipped with discharge outlet at the lower end of box body two side, in the box body of permeable box in be equipped with glass metalling.Box body, connecting rope body, suspension strop and the hook of the Constructed Wetland For Purifying device of the present invention use stainless steel material, therefore with number of features such as excellent corrosion resistance, mouldability, compatibility and the obdurabilities in very wide temperature range, utilization ratio is promoted, and reduces cleaning dismounting difficulty.A kind of Constructed Wetland For Purifying device that can freely dismantle of the present invention is suitable for applying in cities and towns or rural sewage disposal.

Description

A kind of Constructed Wetland For Purifying device that can freely dismantle
Technical field
The present invention relates to a kind of Constructed Wetland For Purifying device, more particularly to one kind can freely dismantle Constructed Wetland For Purifying dress It puts.
Background technology
With the quickening of Chinese Industrialization process, water environment pollution regulation is faced with increasing challenge.Artificial swamp Purifier is the combination process that a kind of natural purification is combined with artificial-strengthening, can be taken properly according to the size of sewage quantity Scale adapt to therewith, available for polluted-water directly processing and advanced treating.Constructed Wetland For Purifying device and traditional two Grade biochemical treatment is compared, and has many advantages, such as construction and operating cost is low, effluent quality is good and adaptable to load variations, than It is not very high, scale is smaller cities and towns or rural sewage disposal to be more suited to technology management level.It is however, net in artificial swamp Makeup is put in operational process, is easily caused blockages, while will also influence the clean-up effect of Constructed Wetland For Purifying device, separately Also the problem of cleaning is difficult is always existed in terms of external maintaining, thus after maintenance that cannot be conventional so that artificial swamp Purifier falls into disuse and becomes the burden of surrounding enviroment.
Invention content
The invention aims to provide a kind of Constructed Wetland For Purifying device that can freely dismantle, it not only can be net longer Change polluted-water, and operation easy to clean, convenient for reusing.
Solution of the invention is to achieve the above object:A kind of artificial swamp that can freely dismantle of the present invention Purifier includes a Constructed Wetland For Purifying device, and the Constructed Wetland For Purifying device is the braiding channel in dust pan shape, described It is distributed between upper end end in the braiding channel left and right side walls of dust pan shape and arranged in parallel is evenly equipped with osculum thereon Water inlet pipe, the water inlet and the stretching Constructed Wetland For Purifying device of the water inlet pipe are the right side in the braiding channel of dust pan shape Outside wall, between the braiding channel left and right side walls upper end end in dust pan shape also parallel show front beam, middle cross beam and Rear cross beam, is equipped with five layers of permeable box in the braiding channel in dust pan shape from top to bottom, first layer by the permeable box of one front left of layer, In before layer one in permeable box, the permeable box of one front right of layer, layer one in left permeable box, layer one in right permeable box, layer in permeable box, layer one Permeable box and the permeable box of one rear right of layer are formed in after the permeable box of one rear left, layer one, before the permeable box of one front left of layer, layer one in Permeable box and the permeable box of one front right of layer are by box body four corners before box body, articulamentum one before layer one in being connected before the layer one of X-shape Rope body and connection are formed in the one front overhang lanyard of layer of connecting rope body junction before the layer one of X-shape, and box body is before the layer one The box body of upper end opening, discharge outlet before being respectively equipped with one layer one at the lower end of box body two side before the layer one, the layer It is equipped with one front glass metalling of layer in one front cabinet body, the center on the external bottom surface of one front cabinet of layer is equipped with one layer of one front hanging Hook, before the permeable box of one front left of layer, layer one in permeable box and the permeable box of one front right of layer respectively pass through one front overhang of layer thereon Lanyard is suspended on the part to the right of front beam, in the layer one in left permeable box, layer one in it is right permeable in permeable box and layer one Box is by the layer that connecting rope body in the layer one that box body four corners in box body, articulamentum one in layer one are in X-shape and connection are in X-shape Suspension strop is formed in the layer one of connecting rope body junction in one, box body of the box body for upper end opening, the layer in the layer one It is respectively equipped with discharge outlet in one layer one in one at the lower end of box body two side, is equipped in layer one in box body in the layer one Glass metalling, the center in the layer one on box body outer bottom, which is equipped in one layer one, to be linked up with, left permeable box in the layer one, Right permeable box is respectively suspended on the to the right of middle cross beam by suspension strop in layer one thereon in permeable box and layer one in layer one On part, after the permeable box of one rear left of layer, layer one in permeable box and the permeable box of one rear right of layer by box body, articulamentum after layer one After one box body four corners in X-shape layer one after connecting rope body and connection in X-shape layer one after connecting rope body junction layer Suspension strop is formed after one, box body of the box body for upper end opening after the layer one, the lower end end of box body two side after the layer one Discharge outlet after one layer one is respectively equipped at portion, is equipped with glass metalling after layer one in the one back box body of layer, after the layer one Center on box body outer bottom is equipped with one layer of one aft hook, after the permeable box of one rear left of layer, layer one in permeable box and layer one The permeable box of rear right is respectively suspended on by suspension strop after layer one thereon on the part to the right of rear cross beam, before the second layer is by layer two In before left permeable box, layer two in permeable box, the permeable box of two front right of layer, layer two in left permeable box, layer two in it is right in permeable box, layer two Permeable box and the permeable box of two rear right of layer are formed in after permeable box, the permeable box of two rear left of layer, layer two, and two front left of layer is permeable In before box, layer two permeable box and the permeable box of two front right of layer by box body four corners before box body, articulamentum two before layer two in X-shape Connecting rope body and connection are formed in the two front overhang lanyard of layer of connecting rope body junction before the layer two of X-shape before layer two, the layer Box body is the box body of upper end opening before two, draining before being respectively equipped with one layer two at the lower end of box body two side before the layer two Mouthful, it is equipped with two front glass metalling of layer in the two front cabinet body of layer, the center on the external bottom surface of two front cabinet of layer is equipped with One layer of two front hook, before the permeable box of two front left of layer, layer two in permeable box and the permeable box of two front right of layer respectively by thereon Two front overhang lanyard of layer be suspended on the part to the left of front beam, before the permeable box of two front left of layer, layer two in permeable box and layer Permeable box and the permeable box of one front right of layer are outstanding for dislocation up and down in before the permeable box of two front rights and the permeable box of one front left of layer, layer one Hang, in the layer two in left permeable box, layer two in permeable box and layer two right permeable box by box body, articulamentum two in layer two Box body four corners are in the layer two of connecting rope body in the layer two of X-shape and connection in connecting rope body junction in the layer two of X-shape Suspension strop is formed, box body of the box body for upper end opening in the layer two, in the layer two at the lower end of box body two side It is respectively equipped with discharge outlet in one layer two, is equipped with glass metalling in layer two in the layer two in box body, box body in the layer two Center on outer bottom is equipped in one layer two and links up with, in the layer two in left permeable box, layer two in it is right in permeable box and layer two Permeable box is respectively suspended on by suspension strop in layer two thereon on the part to the left of middle cross beam, left permeable in the layer two In in box, layer two in permeable box and layer two right permeable box in permeable box left in the layer one, layer one in permeable box and layer one Right permeable box is hung for dislocation up and down, after the permeable box of two rear left of layer, layer two in permeable box and the permeable box of two rear right of layer by Box body four corners connect in connecting rope body after the layer two of X-shape and after connecting the layer two in X-shape after box body, articulamentum two after layer two Suspension strop is formed after the layer two of splicing body junction, box body of the box body for upper end opening, two back box of layer after the layer two Discharge outlet after one layer two is respectively equipped at the lower end of body two side, glass is broken after being equipped with layer two in the two back box body of layer Rock layers, the center on the external bottom surface of two back box of layer are equipped with one layer of two aft hook, after the permeable box of two rear left of layer, layer two In permeable box and the permeable box of two rear right of layer be respectively suspended on the part to the left of rear cross beam by suspension strop after layer two thereon, In after the permeable box of one rear left of layer, layer one permeable box and the permeable box of one rear right of layer with after the permeable box of two rear left of layer, layer two In permeable box and the permeable box of two rear right of layer hung for dislocation up and down, third layer by permeable box in before the permeable box of three front left of layer, layer three, In the permeable box of three front right of layer, layer three in left permeable box, layer three in right permeable box, the permeable box of three rear left of layer, layer in permeable box, layer three Permeable box and the permeable box of three rear right of layer are formed in after three, before the permeable box of three front left of layer, layer three in permeable box, three front right of layer Permeable box is by box body four corners before box body, articulamentum three before layer three in connecting rope body before the layer three of X-shape and connection in X-shape Layer three before the three front overhang lanyard of layer of connecting rope body junction formed, box body is the box body of upper end opening before the layer three, institute Discharge outlet before being respectively equipped with one layer three at the lower end of box body two side before layer three is stated, layer is equipped in the three front cabinet body of layer Three front glass metallings, the center on the external bottom surface of three front cabinet of layer are equipped with one layer of three front hook, and three front left of layer is saturating Permeable box and the permeable box of three front right of layer are respectively suspended on described one by one by three front overhang lanyard of layer thereon in before water box, layer three Set by center in before the permeable box of one front left of layer, layer one on the external bottom surface of one front cabinet of layer of permeable box and the permeable box of one front right of layer One front hook of layer on, in the layer three in left permeable box, layer three in permeable box and layer three right permeable box by box in layer three Body, three box body four corners of articulamentum join in connecting rope body in the layer three of X-shape and connection in connecting rope body in the layer three of X-shape Suspension strop is formed in the layer three at place, box body of the box body for upper end opening in the layer three, box body two side in the layer three It is respectively equipped with discharge outlet in one layer three at lower end, glass metalling in layer three is equipped in box body in the layer three, it is described Center in layer three on box body outer bottom, which is equipped in one layer three, to be linked up with, in the layer three in left permeable box, layer three in permeable box And right permeable box is respectively suspended in the layer one left permeable box, layer one one by one by suspension strop in layer three thereon in layer three In in layer one set by center in permeable box and layer one in the layer one of right permeable box on box body outer bottom on hook, it is described Permeable box and the permeable box of three rear right of layer are by box body four after box body, articulamentum three after layer three in after the permeable box of three rear left of layer, layer three In connecting rope body after the layer three of X-shape and connection in suspension strop after the layer three of connecting rope body junction after the layer three of X-shape at angle It is formed, box body of the box body for upper end opening after the layer three, is set respectively at the lower end of box body two side after the layer three Discharge outlet after having one layer three is equipped with glass metalling after layer three, the external bottom surface of three back box of layer in the three back box body of layer On center be equipped with one layer of three aft hook, after the permeable box of three rear left of layer, layer three in permeable box and the permeable box of three rear right of layer Permeable box and layer one in being respectively suspended on one by one after the permeable box of one rear left of layer, layer one by suspension strop after layer three thereon On one aft hook of layer set by center on the external bottom surface of one back box of layer of the permeable box of rear right, the 4th layer permeable by four front left of layer In before box, layer four in permeable box, the permeable box of four front right of layer, layer four in left permeable box, layer four in it is right permeable in permeable box, layer four Permeable box and the permeable box of four rear right of layer are formed in after box, the permeable box of four rear left of layer, layer four, the permeable box of four front left of layer, layer Permeable box and the permeable box of four front right of layer are by the layer four that box body four corners before box body, articulamentum four before layer four are in X-shape in before four Connecting rope body and connection are formed in the four front overhang lanyard of layer of connecting rope body junction before the layer four of X-shape, four front cabinet of layer Body is the box body of upper end opening, discharge outlet before being respectively equipped with one layer four at the lower end of box body two side before the layer four, institute It states and four front glass metalling of layer is equipped in four front cabinet body of layer, the center on the external bottom surface of four front cabinet of layer is equipped with one layer four Front hook, before the permeable box of four front left of layer, layer four in permeable box and the permeable box of four front right of layer respectively pass through layer four thereon Two front cabinet of layer of permeable box and the permeable box of two front right of layer is external during front overhang lanyard is suspended on one by one before the permeable box of two front left of layer, layer two On two front hook of layer set by center on bottom surface, in the layer four in left permeable box, layer four in it is right in permeable box and layer four Permeable box is by box body four corners in box body, articulamentum four in layer four in connecting rope body in the layer four of X-shape and connection in X-shape Layer four in connecting rope body junction layer four in suspension strop formed, in the layer four box body be upper end opening box body, institute It states and is respectively equipped with discharge outlet in one layer four in layer four at the lower end of box body two side, layer is equipped in box body in the layer four Glass metalling in four, the center in the layer four on box body outer bottom, which is equipped in one layer four, to be linked up with, in the layer four it is left thoroughly In in water box, layer four in permeable box and layer four right permeable box be respectively suspended on one by one by suspension strop in layer four thereon it is described In layer two in left permeable box, layer two in set by center in permeable box and layer two in the layer two of right permeable box on box body outer bottom Layer two on hook, after the permeable box of four rear left of layer, layer four in permeable box and the permeable box of four rear right of layer by four back box of layer Box body four corners connect in connecting rope body after the layer four of X-shape and connection in connecting rope body after the layer four of X-shape after body, articulamentum four Suspension strop is formed after the layer four at place, box body of the box body for upper end opening after the layer four, box body two side after the layer four Discharge outlet after one layer four is respectively equipped at lower end is equipped with glass metalling after layer four in the four back box body of layer, described Center on layer four back boxs external bottom surface is equipped with one layer of four aft hook, after the permeable box of four rear left of layer, layer four in permeable box And the permeable box of four rear right of layer is respectively suspended on the permeable box of two rear left of layer, layer two one by one by suspension strop after layer four thereon On two aft hook of layer set by center in afterwards on the external bottom surface of two back box of layer of permeable box and the permeable box of two rear right of layer, the 5th Layer is by permeable in permeable box left in permeable box, the permeable box of five front right of layer, layer five in before the permeable box of five front left of layer, layer five, layer five In box, layer five after right permeable box, the permeable box of five rear left of layer, layer five in permeable box and the permeable box of five rear right of layer formed, the layer Permeable box and the permeable box of five front right of layer are by box body quadrangle before box body, articulamentum five before layer five in before the permeable box of five front lefts, layer five Place in X-shape layer five before connecting rope body and connection in X-shape layer five before connecting rope body junction five front overhang lanyard institute of layer It forms, box body of the box body for upper end opening before the layer five, is respectively equipped at the lower end of box body two side before the layer five Discharge outlet before one layer five, is equipped with five front glass metalling of layer in the five front cabinet body of layer, on the external bottom surface of five front cabinet of layer Center be equipped with one layer of five front hook, before the permeable box of five front left of layer, layer five in permeable box and the permeable box of five front right of layer it is equal In being suspended on one by one before the permeable box of three front left of layer, layer three by five front overhang lanyard of layer thereon respectively before permeable box and layer three On three front hook of layer set by center on the external bottom surface of three front cabinet of layer of right permeable box, left permeable box, layer in the layer five Right permeable box is in the layer five of X-shape by box body four corners in box body, articulamentum five in layer five in permeable box and layer five in five Middle connecting rope body and connection are formed in suspension strop in the layer five of connecting rope body junction in the layer five of X-shape, in the layer five Box body is the box body of upper end opening, is respectively equipped with discharge outlet in one layer five at the lower end of box body two side in the layer five, It is equipped with glass metalling in layer five in the layer five in box body, the center in the layer five on box body outer bottom is equipped with one layer Linked up in five, in the layer five in left permeable box, layer five in permeable box and layer five right permeable box respectively by being hanged in layer five During lanyard is suspended in the layer three one by one in left permeable box, layer three in permeable box and layer three in the layer three of right permeable box outside box body In layer three set by center on bottom surface on hook, after the permeable box of five rear left of layer, layer five in five rear right of permeable box and layer Permeable box is by box body four corners after box body, articulamentum five after layer five in connecting rope body after the layer five of X-shape and connection in X-shape Layer five after connecting rope body junction layer five after suspension strop formed, after the layer five box body be upper end opening box body, institute Discharge outlet after being respectively equipped with one layer five at the lower end of box body two side after layer five is stated, layer is equipped in the five back box body of layer Glass metalling after five, the center on the external bottom surface of five back box of layer are equipped with one layer of five aft hook, and five rear left of layer is saturating After permeable box and the permeable box of five rear right of layer are respectively suspended on the layer three one by one by suspension strop after layer five in after water box, layer five The layer three set by center in after left permeable box, layer three on the external bottom surface of three back box of layer of permeable box and the permeable box of three rear right of layer On aft hook.
A kind of course of work of Constructed Wetland For Purifying device that can freely dismantle of the present invention:Polluted-water passes through water first The water-supply-pipe of pump and pump outlet enter stretch out water inlet pipe arranged in parallel outside the braiding channel right side wall in dust pan shape into The mouth of a river, and flowed out by osculum uniformly distributed on water inlet pipe arranged in parallel, in the overboard permeable box being distributed into first layer, And the permeable cassette bottom portion is reached by be laid with glass metalling, the institute of the second layer is then discharged into from the discharge outlet of two bottom sides In the permeable box of distribution, and the permeable cassette bottom portion is reached by be laid with glass metalling, then from the draining of two bottom sides Mouth is discharged into the permeable box being distributed of third layer, and reaches the permeable cassette bottom portion by be laid with glass metalling, then It is discharged into the 4th layer of the permeable box being distributed from the discharge outlet of two bottom sides, and reaches and be somebody's turn to do by be laid with glass metalling Then permeable cassette bottom portion is discharged into from the discharge outlet of two bottom sides in the permeable box being distributed of layer 5, and pass through what is be laid with Glass metalling is finally drained into braiding channel bottom to be in dust pan shape, by by multilayer institute from the discharge outlet of two bottom sides Glass metalling in the permeable box of distribution, the pollutant in adsorbed water body, to reach purifying water body purpose, and is arranged outward layer by layer Go out to be reused.
A kind of Constructed Wetland For Purifying device that can freely dismantle of the present invention has following features:
1st, a kind of water inlet pipe selection of Constructed Wetland For Purifying device that can freely dismantle of the invention, which is arranged in parallel within, catchments Between the upper end end of the left and right wall of canal, there are osculum water outlets on each pipe.It can on the upper surface of Constructed Wetland For Purifying device Geotextiles, and serike on it are laid with, green coverage can be expanded, to enhance surrounding landscape, while improves and environment is caused Harmful effect.
2nd, a kind of connecting rope body of Constructed Wetland For Purifying device that can freely dismantle of the invention and suspension strop selection steel wire Rope, steel wire rope can bear the effect of a variety of load and varying load, have higher tensile strength, fatigue resistance and shock resistance Toughness.The probable life of whole device is improved, it is cost-effective.
3rd, a kind of permeable box of Constructed Wetland For Purifying device that can freely dismantle of the invention is stainless using stainless steel material Steel have the number of features such as excellent corrosion resistance, mouldability, compatibility and the obdurability in very wide temperature range, are promoted Service life, the utilization ratio of the present apparatus reduce cleaning dismounting difficulty.
4th, a kind of Constructed Wetland For Purifying device that can freely dismantle of the invention is laid with glass rubble, glass in permeable box Rubble volume is light, and adsorption capacity is strong, improves adsorption capacity and detergent power of the Constructed Wetland For Purifying device to pollutant.
To sum up, the Constructed Wetland For Purifying apparatus structure is rationally, succinctly, purifying water body is good, can dismantle and clean, Maintaining is convenient, while takes precautions against the short stream of Medium Culture, extends Constructed Wetland For Purifying service using life, avoids secondary pollution.
A kind of Constructed Wetland For Purifying device that can freely dismantle of the present invention is suitable in cities and towns or rural sewage disposal Using.
Description of the drawings
The concrete structure of the present invention is provided by following embodiment and its attached drawing.
Fig. 1 is the structure diagram of the present invention.
Fig. 2 is the schematic diagram of the permeable box in front row in five layers of permeable box of the present invention.
Fig. 3 is the schematic diagram of the permeable box of middle row in five layers of permeable box of the present invention.
Fig. 4 is the schematic diagram of the permeable box of heel row in five layers of permeable box of the present invention.
Fig. 5 be the present invention one front left of layer, it is preceding in and the permeable box of front right left view schematic diagram.
Fig. 6 be the present invention layer one in it is left, in and the middle permeable box in the right side left view schematic diagram.
Fig. 7 be the present invention one rear left of layer, it is rear in and the permeable box of rear right left view schematic diagram.
Fig. 8 be the present invention two front left of layer, it is preceding in and the permeable box of front right left view schematic diagram.
Fig. 9 be the present invention layer two in it is left, in and the middle permeable box in the right side left view schematic diagram.
Figure 10 be the present invention two rear left of layer, it is rear in and the permeable box of rear right left view schematic diagram.
Figure 11 be the present invention three front left of layer, it is preceding in and the permeable box of front right left view schematic diagram.
Figure 12 be the present invention layer three in it is left, in and the middle permeable box in the right side left view schematic diagram.
Figure 13 be the present invention three rear left of layer, it is rear in and the permeable box of rear right left view schematic diagram.
Figure 14 be the present invention four front left of layer, it is preceding in and the permeable box of front right left view schematic diagram.
Figure 15 be the present invention layer four in it is left, in and the middle permeable box in the right side left view schematic diagram.
Figure 16 be the present invention four rear left of layer, it is rear in and the permeable box of rear right left view schematic diagram.
Figure 17 be the present invention five front left of layer, it is preceding in and the permeable box of front right left view schematic diagram.
Figure 18 be the present invention layer five in it is left, in and the middle permeable box in the right side left view schematic diagram.
Figure 19 be the present invention five rear left of layer, it is rear in and the permeable box of rear right left view schematic diagram.
Figure 20 is the reference view of the use state of the present invention.
Specific embodiment
A kind of Constructed Wetland For Purifying device that can freely dismantle of the present invention is made below with reference to attached drawing further detailed Thin description.
With reference to Fig. 1, Fig. 2, Fig. 3, Fig. 4, Fig. 5, Fig. 6, Fig. 7, Fig. 8, Fig. 9, Figure 10, Figure 11, Figure 12, Figure 13, Figure 14, figure 15th, Figure 16, Figure 17, Figure 18, Figure 19 and Figure 20, a kind of Constructed Wetland For Purifying device that can freely dismantle of the invention include a people Work wetland purification device.
The Constructed Wetland For Purifying device is the braiding channel 1 in dust pan shape, 1 left side of braiding channel in dust pan shape, The water inlet pipe 2 for being evenly equipped with osculum 21 thereon arranged in parallel, the water inlet pipe 2 are distributed between the upper end end of right side wall Water inlet and stretch out the Constructed Wetland For Purifying device for the right side wall in the braiding channel 1 of dust pan shape outside, described is in dustpan Also parallel shows front beam 31, middle cross beam 32 and rear cross beam 33 between the 1 left and right side walls upper end end of braiding channel of shape, Five layers of permeable box are equipped in the braiding channel 1 in dust pan shape from top to bottom.
First layer is by permeable box 412, the permeable box 413 of one front right of layer, layer one in before the permeable box 411 of one front left of layer, layer one In in left permeable box 414, layer one in permeable box 415, layer one after right permeable box 416, the permeable box 417 of one rear left of layer, layer one in thoroughly Water box 418 and the permeable box 419 of one rear right of layer are formed.
Before permeable box 412 and the permeable box 413 of one front right of layer are by layer one in before the permeable box 411 of one front left of layer, layer one Before box body 4101, articulamentum one 4101 four corners of box body in X-shape layer one before connecting rope body 4201 and connection in X-shape layer The one front overhang lanyard 4301 of layer of 4201 junction of connecting rope body is formed before one, and box body 4101 is upper end opening before the layer one Box body, discharge outlet 4401 before being respectively equipped with one layer one at the lower end of 4101 two side of box body before the layer one, the layer one It is equipped with one front glass metalling 4501 of layer in preceding box body 4101, the center before the layer one on 4101 outer bottom of box body is equipped with One layer of one front hook 4601.
Permeable box 412 and the permeable box 413 of one front right of layer respectively pass through in before the permeable box 411 of one front left of layer, layer one One front overhang lanyard 4301 of layer thereon is suspended on the part to the right of front beam 31.
In the layer one in left permeable box 414, layer one in permeable box 415 and layer one right permeable box 416 by layer one In box body 4102, articulamentum one 4102 four corners of box body in X-shape layer one in connecting rope body 4202 and connection in X-shape layer Suspension strop 4302 is formed in the layer one of 4202 junction of connecting rope body in one, and box body 4102 is upper end opening in the layer one Box body is respectively equipped with discharge outlet 4402 in one layer one, the layer one in the layer one at the lower end of 4102 two side of box body It is equipped with glass metalling 4502 in layer one in middle box body 4102, the center in the layer one on 4102 outer bottom of box body is equipped with 4602 are linked up in one layer one.
In the layer one in left permeable box 414, layer one in permeable box 415 and layer one right permeable box 416 respectively pass through Suspension strop 4302 is suspended on the part to the right of middle cross beam 32 in layer one thereon.
After permeable box 418 and the permeable box 419 of one rear right of layer are by layer one in after the permeable box 417 of one rear left of layer, layer one After box body 4103, articulamentum one 4103 four corners of box body in X-shape layer one after connecting rope body 4203 and connection in X-shape layer Suspension strop 4303 is formed after the layer one of 4203 junction of connecting rope body after one, and box body 4103 is upper end opening after the layer one Box body, discharge outlet 4403 after being respectively equipped with one layer one at the lower end of 4103 two side of box body after the layer one, the layer one It is equipped with glass metalling 4503 after layer one in box body 4103 afterwards, the center after the layer one on 4103 outer bottom of box body is equipped with One layer of one aft hook 4603.
Permeable box 418 and the permeable box 419 of one rear right of layer respectively pass through in after the permeable box 417 of one rear left of layer, layer one Suspension strop 4303 is suspended on the part to the right of rear cross beam 33 after layer one thereon.
The second layer is by permeable box 512, the permeable box 513 of two front right of layer, layer two in before the permeable box 511 of two front left of layer, layer two In in left permeable box 514, layer two in permeable box 515, layer two after right permeable box 516, the permeable box 517 of two rear left of layer, layer two in thoroughly Water box 518 and the permeable box 519 of two rear right of layer are formed.
Before permeable box 512 and the permeable box 513 of two front right of layer are by layer two in before the permeable box 511 of two front left of layer, layer two Before box body 5101, articulamentum two 5101 four corners of box body in X-shape layer two before connecting rope body 5201 and connection in X-shape layer The two front overhang lanyard 5301 of layer of 5201 junction of connecting rope body is formed before two, and box body 5101 is upper end opening before the layer two Box body, discharge outlet 5401 before being respectively equipped with one layer two at the lower end of 5101 two side of box body before the layer two, the layer two It is equipped with two front glass metalling 5501 of layer in preceding box body 5101, the center before the layer two on 5101 outer bottom of box body is equipped with One layer of two front hook 5601.
Permeable box 512 and the permeable box 513 of two front right of layer respectively pass through in before the permeable box 511 of two front left of layer, layer two Two front overhang lanyard 5301 of layer thereon is suspended on the part to the left of front beam 31.
Permeable box 512 and the permeable box 513 of two front right of layer and the layer one in before the permeable box 511 of two front left of layer, layer two Permeable box 412 and the permeable box 413 of one front right of layer are hung for dislocation up and down in before the permeable box 411 of front left, layer one.
In the layer two in left permeable box 514, layer two in permeable box 515 and layer two right permeable box 516 by layer two In box body 5102, articulamentum two 5102 four corners of box body in X-shape layer two in connecting rope body 5202 and connection in X-shape layer Suspension strop 5302 is formed in the layer two of 5202 junction of connecting rope body in two, and box body 5102 is upper end opening in the layer two Box body is respectively equipped with discharge outlet 5402 in one layer two, the layer two in the layer two at the lower end of 5102 two side of box body It is equipped with glass metalling 5502 in layer two in middle box body 5102, the center in the layer two on 5102 outer bottom of box body is equipped with 5602 are linked up in one layer two.
In the layer two in left permeable box 514, layer two in permeable box 515 and layer two right permeable box 516 respectively pass through Suspension strop 5302 is suspended on the part to the left of middle cross beam 32 in layer two thereon, in the layer two in left permeable box 514, layer two In in permeable box 515 and layer two right permeable box 516 in permeable box 414 left in the layer one, layer one in permeable box 415 and layer one The middle permeable box 416 in the right side is hung for dislocation up and down.
After permeable box 518 and the permeable box 519 of two rear right of layer are by layer two in after the permeable box 517 of two rear left of layer, layer two After box body 5103, articulamentum two 5103 four corners of box body in X-shape layer two after connecting rope body 5203 and connection in X-shape layer Suspension strop 5303 is formed after the layer two of 5203 junction of connecting rope body after two, and box body 5103 is upper end opening after the layer two Box body, discharge outlet 5403 after being respectively equipped with one layer two at the lower end of 5103 two side of box body after the layer two, the layer two It is equipped with glass metalling 5503 after layer two in box body 5103 afterwards, the center after the layer two on 5103 outer bottom of box body is equipped with One layer of two aft hook 5603.
Permeable box 518 and the permeable box 519 of two rear right of layer respectively pass through in after the permeable box 517 of two rear left of layer, layer two Suspension strop 5303 is suspended on the part to the left of rear cross beam 33 after layer two thereon.
Permeable box 518 and the permeable box 519 of two rear right of layer and the layer one in after the permeable box 517 of two rear left of layer, layer two Permeable box 418 and the permeable box 419 of one rear right of layer are hung for dislocation up and down in after the permeable box 417 of rear left, layer one.
Third layer is by permeable box 612, the permeable box 613 of three front right of layer, layer three in before the permeable box 611 of three front left of layer, layer three In in left permeable box 614, layer three in permeable box 615, layer three after right permeable box 616, the permeable box 617 of three rear left of layer, layer three in thoroughly Water box 618 and the permeable box 619 of three rear right of layer are formed.
Before permeable box 612 and the permeable box 613 of three front right of layer are by layer three in before the permeable box 611 of three front left of layer, layer three Before box body 6101, articulamentum three 6101 four corners of box body in X-shape layer three before connecting rope body 6201 and connection in X-shape layer The three front overhang lanyard 6301 of layer of 6201 junction of connecting rope body is formed before three, and box body 6101 is upper end opening before the layer three Box body, is respectively equipped with discharge outlet 6401 before layer three before the layer three at the lower end of 6101 two side of box body, before the layer three It is equipped with three front glass metalling 6501 of layer in box body 61, the center before the layer three on 6101 outer bottom of box body is equipped with one layer Three front hooks 6601.
Permeable box 612 and the permeable box 613 of three front right of layer respectively pass through in before the permeable box 611 of three front left of layer, layer three Permeable box 412 and layer one during three front overhang lanyard 6301 of layer thereon is suspended on one by one before the permeable box 411 of one front left of layer, layer one On one front hook 4601 of layer set by center before the layer one of the permeable box 413 of front right on 4101 outer bottom of box body.
In the layer three in left permeable box 614, layer three in permeable box 615 and layer three right permeable box 616 by layer three Box body 6102, three box body of articulamentum, 6102 four corners in X-shape layer three in connecting rope body 6202 and connection in X-shape layer three Suspension strop 6302 is formed in the layer three of middle 6202 junction of connecting rope body, and box body 6102 is the box of upper end opening in the layer three Body, is respectively equipped with discharge outlet 6402 in layer three in the layer three at the lower end of 6102 two side of box body, box in the layer three It is equipped with glass metalling 6502 in layer three in body 6102, the center in the layer three on 6102 outer bottom of box body is equipped with one layer 6602 are linked up in three.
In the layer three in left permeable box 614, layer three in permeable box 615, layer three right permeable box 616 respectively pass through it On layer three in suspension strop 6302 be suspended on one by one in the layer one in left permeable box 414, layer one in permeable box 415 and layer one In the layer one set by center in the layer one of right permeable box 416 on 4102 outer bottom of box body on hook 4602.
After permeable box 618 and the permeable box 619 of three rear right of layer are by layer three in after the permeable box 617 of three rear left of layer, layer three After box body 6103, articulamentum three 6103 four corners of box body in X-shape layer three after connecting rope body 6203 and connection in X-shape layer Suspension strop 6303 is formed after the layer three of 6203 junction of connecting rope body after three, and box body 6103 is upper end opening after the layer three Box body, is respectively equipped with discharge outlet 6403 after layer three after the layer three at the lower end of 6103 two side of box body, after the layer three It is equipped with glass metalling 6503 after layer three in box body 6103, the center after the layer three on 6103 outer bottom of box body is equipped with one Three aft hook 6603 of layer.
Permeable box 618 and the permeable box 619 of three rear right of layer respectively pass through in after the permeable box 617 of three rear left of layer, layer three Permeable box 418 and layer one during suspension strop 6303 is suspended on one by one after the permeable box 417 of one rear left of layer, layer one after layer three thereon One aft hook 4603 of layer set by center after the layer one of the permeable box 419 of rear right on 4103 outer bottom of box body.
4th layer by permeable box 712, the permeable box 713 of four front right of layer, layer four in before the permeable box 711 of four front left of layer, layer four In in left permeable box 714, layer four in permeable box 715, layer four after right permeable box 716, the permeable box 717 of four rear left of layer, layer four in thoroughly Water box 718 and the permeable box 719 of four rear right of layer are formed.
Before permeable box 712 and the permeable box 713 of four front right of layer are by layer four in before the permeable box 711 of four front left of layer, layer four 7101 four corners of box body are in the four connecting rope body 7201 of layer of X-shape before box body 7101, articulamentum four and connection is in the layer four of X-shape The four front overhang lanyard 7301 of layer of preceding 7201 junction of connecting rope body is formed, and box body 71 is the box of upper end opening before the layer four Body, discharge outlet 7401 before being respectively equipped with one layer four at the lower end of 7101 two side of box body before the layer four, before the layer four It is equipped with four front glass metalling 7501 of layer in box body 7101, the center before the layer four on 7101 outer bottom of box body is equipped with one Four front hook 7601 of layer.
Permeable box 712 and the permeable box 713 of four front right of layer respectively pass through in before the permeable box 711 of four front left of layer, layer four Two front right of permeable box 512 and layer during four front overhang lanyard 7301 of layer thereon is suspended on one by one before the permeable box 511 of two front left of layer, layer two On two front hook 5601 of layer set by center before the layer two of permeable box 513 on 5101 outer bottom of box body.
In the layer four in left permeable box 714, layer four in permeable box 715 and layer four right permeable box 716 by layer four In box body 7102, articulamentum four 7102 four corners of box body in X-shape layer four in connecting rope body 7202 and connection in X-shape layer Suspension strop 7302 is formed in the layer four of 7202 junction of connecting rope body in four, and box body 7102 is upper end opening in the layer four Box body is respectively equipped with discharge outlet 7402 in one layer four, the layer four in the layer four at the lower end of 7102 two side of box body It is equipped with glass metalling 502 in layer four in middle box body 7102, the center in the layer four on 7102 outer bottom of box body is equipped with 7602 are linked up in one layer four.
In the layer four in left permeable box 714, layer four in permeable box 715 and layer four right permeable box 716 respectively pass through Permeable box 515 and layer two during suspension strop 7302 is suspended in the layer two one by one in left permeable box 514, layer two in layer four thereon In the layer two set by center in the layer two of the middle permeable box 516 in the right side on 5102 outer bottom of box body on hook 5602.
After permeable box 718 and the permeable box 719 of four rear right of layer are by layer four in after the permeable box 717 of four rear left of layer, layer four After box body 7103, articulamentum four 7103 four corners of box body in X-shape layer four after connecting rope body 7203 and connection in X-shape layer Suspension strop 7303 is formed after the layer four of 7203 junction of connecting rope body after four, and box body 7103 is upper end opening after the layer four Box body, discharge outlet 7403 after being respectively equipped with one layer four at the lower end of 7103 two side of box body after the layer four, the layer four It is equipped with glass metalling 7503 after layer four in box body 7103 afterwards, the center after the layer four on 7103 outer bottom of box body is equipped with One layer of four aft hook 7603.
Permeable box 718 and the permeable box 719 of four rear right of layer respectively pass through in after the permeable box 717 of four rear left of layer, layer four Permeable box 518 and layer two during suspension strop 7303 is suspended on one by one after the permeable box 517 of two rear left of layer, layer two after layer four thereon On two aft hook 5603 of layer set by center after the layer two of the permeable box 519 of rear right on 5103 outer bottom of box body.
Layer 5 is by permeable box 812, the permeable box 813 of five front right of layer, layer five in before the permeable box 811 of five front left of layer, layer five In in left permeable box 814, layer five in permeable box 815, layer five after right permeable box 816, the permeable box 817 of five rear left of layer, layer five in thoroughly Water box 818 and the permeable box 819 of five rear right of layer are formed.
Before permeable box 812 and the permeable box 813 of five front right of layer are by layer five in before the permeable box 811 of five front left of layer, layer five Before box body 8101, articulamentum five 8101 four corners of box body in X-shape layer five before connecting rope body 8201 and connection in X-shape layer The five front overhang lanyard 8301 of layer of 8201 junction of connecting rope body is formed before five, and box body 8101 is upper end opening before the layer five Box body, discharge outlet 8401 before being respectively equipped with one layer five at the lower end of 8101 two side of box body before the layer five, the layer five It is equipped with five front glass metalling 8501 of layer in preceding box body 8101, the center before the layer five on 8101 outer bottom of box body is equipped with One layer of five front hook 8601.
Permeable box 812 and the permeable box 813 of five front right of layer respectively pass through in before the permeable box 811 of five front left of layer, layer five Permeable box 612 and layer three during five front overhang lanyard 8301 of layer thereon is suspended on one by one before the permeable box 611 of three front left of layer, layer three On three front hook 6601 of layer set by center before the layer three of the permeable box 613 of front right on 6101 outer bottom of box body.
In the layer five in left permeable box 814, layer five in permeable box 815 and layer five right permeable box 816 by layer five In box body 8102, articulamentum five 8102 four corners of box body in X-shape layer five in connecting rope body 8202 and connection in X-shape layer Suspension strop 8302 is formed in the layer five of 8202 junction of connecting rope body in five, and box body 8102 is upper end opening in the layer five Box body is respectively equipped with discharge outlet 8402 in one layer five, the layer five in the layer five at the lower end of 8102 two side of box body Middle 8102 Nei Shop of box body are equipped with glass metalling 8502 in layer five, and the center in the layer five on 8102 outer bottom of box body is equipped with 8602 are linked up in one layer five.
In the layer five in left permeable box 814, layer five in permeable box 815 and layer five right permeable box 816 respectively pass through During suspension strop 8302 is suspended in the layer three one by one in left permeable box 614, layer three in layer five in permeable box 615 and layer three it is right thoroughly In the layer three set by center in the layer three of water box 616 on 6102 outer bottom of box body on hook 6602.
After permeable box 818 and the permeable box 819 of five rear right of layer are by layer five in after the permeable box 817 of five rear left of layer, layer five After box body 8103, articulamentum five 8103 four corners of box body in X-shape layer five after connecting rope body 8203 and connection in X-shape layer Suspension strop 8303 is formed after the layer five of 8203 junction of connecting rope body after five, and box body 8103 is upper end opening after the layer five Box body, discharge outlet 8403 after being respectively equipped with one layer five at the lower end of 8103 two side of box body after the layer five, the layer five It is equipped with glass metalling 8503 after layer five in box body 8103 afterwards, the center after the layer five on 8103 outer bottom of box body is equipped with One layer of five aft hook 8603.
Permeable box 818 and the permeable box 819 of five rear right of layer respectively pass through in after the permeable box 817 of five rear left of layer, layer five Permeable box 618 and three rear right of layer are saturating during suspension strop 8303 is suspended on one by one after the permeable box 617 of three rear left of layer, layer three after layer five On three aft hook 6603 of layer set by center after the layer three of water box 619 on 6103 outer bottom of box body.

Claims (1)

1. a kind of Constructed Wetland For Purifying device that can freely dismantle, it includes a Constructed Wetland For Purifying device, it is characterised in that institute It is the braiding channel in dust pan shape to state Constructed Wetland For Purifying device(1), the braiding channel in dust pan shape(1)Left and right side walls Upper end end between be distributed with and arranged in parallel be evenly equipped with osculum thereon(21)Water inlet pipe(2), the water inlet pipe(2) Water inlet and to stretch out the Constructed Wetland For Purifying device be the braiding channel in dust pan shape(1)Right side wall outside, it is described in winnowing with a dustpan The braiding channel of dustpan shape(1)Also parallel shows front beam between the end of left and right side walls upper end(31), middle cross beam(32)After and Crossbeam(33), the braiding channel in dust pan shape(1)It is inside equipped with five layers of permeable box from top to bottom, first layer is saturating by one front left of layer Water box(411), before layer one in permeable box(412), the permeable box of one front right of layer(413), left permeable box in layer one(414), in layer one In permeable box(415), right permeable box in layer one(416), the permeable box of one rear left of layer(417), after layer one in permeable box(418)And layer The permeable box of one rear right(419)It is formed, the permeable box of one front left of layer(411), before layer one in permeable box(412)And one front right of layer Permeable box(413)By box body before layer one(4101), box body before articulamentum one(4101)Four corners in X-shape layer one before connect Rope body(4201)And connection is in connecting rope body before the layer one of X-shape(4201)The one front overhang lanyard of layer of junction(4301)Institute's structure Into box body before the layer one(4101)For the box body of upper end opening, box body before the layer one(4101)The lower end of two side Discharge outlet before place is respectively equipped with one layer one(4401), box body before the layer one(4101)Inside it is equipped with one front glass metalling of layer (4501), box body before the layer one(4101)Center on outer bottom is equipped with one layer of one front hook(4601), before the layer one Left permeable box(411), before layer one in permeable box(412)And the permeable box of one front right of layer(413)Respectively by layer one thereon before Suspension strop(4301)It is suspended on front beam(31)Part to the right on, left permeable box in the layer one(414), in layer one in it is permeable Box(415)And right permeable box in layer one(416)By box body in layer one(4102), box body in articulamentum one(4102)Four corners are in Connecting rope body in the layer one of X-shape(4202)And connection is in connecting rope body in the layer one of X-shape(4202)In the layer one of junction Suspension strop(4302)It is formed, box body in the layer one(4102)For the box body of upper end opening, box body in the layer one(4102) Discharge outlet in one layer one is respectively equipped at the lower end of two side(4402), box body in the layer one(4102)Inside it is equipped with layer Glass metalling in one(4502), box body in the layer one(4102)Center on outer bottom, which is equipped in one layer one, to be linked up with (4602), left permeable box in the layer one(414), in layer one in permeable box(415)And right permeable box in layer one(416)Respectively Pass through suspension strop in layer one thereon(4302)It is suspended on middle cross beam(32)Part to the right on, the permeable box of one rear left of layer (417), after layer one in permeable box(418)And the permeable box of one rear right of layer(419)By box body after layer one(4103), after articulamentum one Box body(4103)Four corners are in connecting rope body after the layer one of X-shape(4203)And connection is in connecting rope body after the layer one of X-shape (4203)Suspension strop after the layer one of junction(4303)It is formed, box body after the layer one(4103)For the box body of upper end opening, Box body after the layer one(4103)Discharge outlet after one layer one is respectively equipped at the lower end of two side(4403), after the layer one Box body(4103)Inside it is equipped with glass metalling after layer one(4503), box body after the layer one(4103)Center on outer bottom Equipped with one layer of one aft hook(4603), the permeable box of one rear left of layer(417), after layer one in permeable box(418)And one rear right of layer Permeable box(419)Respectively pass through suspension strop after layer one thereon(4303)It is suspended on rear cross beam(33)Part to the right on, Two layers by the permeable box of two front left of layer(511), before layer two in permeable box(512), the permeable box of two front right of layer(513), in layer two it is left thoroughly Water box(514), in layer two in permeable box(515), right permeable box in layer two(516), the permeable box of two rear left of layer(517), after layer two In permeable box(518)And the permeable box of two rear right of layer(519)It is formed, the permeable box of two front left of layer(511), before layer two in it is permeable Box(512)And the permeable box of two front right of layer(513)By box body before layer two(5101), box body before articulamentum two(5101)Four corners are in Connecting rope body before the layer two of X-shape(5201)And connection is in connecting rope body before the layer two of X-shape(5201)Before the layer two of junction Suspension strop(5301)It is formed, box body before the layer two(5101)For the box body of upper end opening, box body before the layer two(5101) Discharge outlet before one layer two is respectively equipped at the lower end of two side(5401), box body before the layer two(5101)Inside it is equipped with layer Two front glass metallings(5501), box body before the layer two(5101)Center on outer bottom is equipped with one layer of two front hook (5601), the permeable box of two front left of layer(511), before layer two in permeable box(512)And the permeable box of two front right of layer(513)Respectively Pass through two front overhang lanyard of layer thereon(5301)It is suspended on front beam(31)Part to the left on, the permeable box of two front left of layer (511), before layer two in permeable box(512)And the permeable box of two front right of layer(513)With the permeable box of one front left of layer(411), layer one Before in permeable box(412)And the permeable box of one front right of layer(413)For the suspension that misplaces up and down, left permeable box in the layer two(514), layer Permeable box in two(515)And right permeable box in layer two(516)By box body in layer two(5102), box body in articulamentum two (5102)Four corners are in connecting rope body in the layer two of X-shape(5202)And connection is in connecting rope body in the layer two of X-shape(5202) Suspension strop in the layer two of junction(5302)It is formed, box body in the layer two(5102)For the box body of upper end opening, the layer Box body in two(5102)Discharge outlet in one layer two is respectively equipped at the lower end of two side(5402), box body in the layer two (5102)Inside it is equipped with glass metalling in layer two(5502), box body in the layer two(5102)Center on outer bottom is equipped with It is linked up in one layer two(5602), left permeable box in the layer two(514), in layer two in permeable box(515)It is and right permeable in layer two Box(516)Respectively pass through suspension strop in layer two thereon(5302)It is suspended on middle cross beam(32)Part to the left on, the layer Left permeable box in two(514), in layer two in permeable box(515)And right permeable box in layer two(516)It is permeable with a left side in the layer one Box(414), in layer one in permeable box(415)And right permeable box in layer one(416)For the suspension that misplaces up and down, two rear left of layer is saturating Water box(517), after layer two in permeable box(518)And the permeable box of two rear right of layer(519)By box body after layer two(5103), articulamentum Box body after two(5103)Four corners are in connecting rope body after the layer two of X-shape(5203)And connection is in connecting rope after the layer two of X-shape Body(5203)Suspension strop after the layer two of junction(5303)It is formed, box body after the layer two(5103)Box for upper end opening Body, box body after the layer two(5103)Discharge outlet after one layer two is respectively equipped at the lower end of two side(5403 ), the layer Box body after two(5103)Inside it is equipped with glass metalling after layer two(5503), box body after the layer two(5103)In on outer bottom One layer of two aft hook is equipped at portion(5603), the permeable box of two rear left of layer(517), after layer two in permeable box(518)And layer two The permeable box of rear right(519)Respectively pass through suspension strop after layer two thereon(5303)It is suspended on rear cross beam(33)Part to the left On, the permeable box of one rear left of layer(417), after layer one in permeable box(418)And the permeable box of one rear right of layer(419)With the layer two The permeable box of rear left(517), after layer two in permeable box(518)And the permeable box of two rear right of layer(519)For the suspension that misplaces up and down, third layer By the permeable box of three front left of layer(611), before layer three in permeable box(612), the permeable box of three front right of layer(613), left permeable box in layer three (614), in layer three in permeable box(615), right permeable box in layer three(616), the permeable box of three rear left of layer(617), after layer three in thoroughly Water box(618)And the permeable box of three rear right of layer(619)It is formed, the permeable box of three front left of layer(611), before layer three in permeable box (612), the permeable box of three front right of layer(613)By box body before layer three(6101), box body before articulamentum three(6101)Four corners are in X-shaped Connecting rope body before the layer three of shape(6201)And connection is in connecting rope body before the layer three of X-shape(6201)Three forward mounting of layer of junction Rope(6301)It is formed, box body before the layer three(6101)For the box body of upper end opening, box body before the layer three(6101)Both sides Discharge outlet before one layer three is respectively equipped at the lower end of wall(6401), box body before the layer three(61)Inside it is equipped with glass before layer three Glass metalling(6501), box body before the layer three(6101)Center on outer bottom is equipped with one layer of three front hook(6601), institute State the permeable box of three front left of layer(611), before layer three in permeable box(612)And the permeable box of three front right of layer(613)Respectively by thereon Three front overhang lanyard of layer(6301)It is suspended on the permeable box of one front left of layer one by one(411), before layer one in permeable box(412)And layer The permeable box of one front right(413)Layer one before box body(4101)One front hook of layer set by center on outer bottom(4601)On, Left permeable box in the layer three(614), in layer three in permeable box(615)And right permeable box in layer three(616)By box in layer three Body(6102), three box body of articulamentum(6102)Four corners are in connecting rope body in the layer three of X-shape(6202)And connection is in X-shape Connecting rope body in layer three(6202)Suspension strop in the layer three of junction(6302)It is formed, box body in the layer three(6102)It is upper The box body of end opening, box body in the layer three(6102)Discharge outlet in one layer three is respectively equipped at the lower end of two side (6402), box body in the layer three(6102)Inside it is equipped with glass metalling in layer three(6502), box body in the layer three (6102)Center on outer bottom, which is equipped in one layer three, to be linked up with(6602), left permeable box in the layer three(614), in layer three in Permeable box(615)And right permeable box in layer three(616)Respectively pass through suspension strop in layer three thereon(6302)It is suspended on one by one Left permeable box in the layer one(414), in layer one in permeable box(415)And right permeable box in layer one(416)Layer one in box body (4102)It is linked up in layer one set by center on outer bottom(4602)On, the permeable box of three rear left of layer(617), after layer three In permeable box(618)And the permeable box of three rear right of layer(619)By box body after layer three(6103), box body after articulamentum three(6103)Four In connecting rope body after the layer three of X-shape at angle(6203)And connection is in connecting rope body after the layer three of X-shape(6203)Junction Suspension strop after layer three(6303)It is formed, box body after the layer three(6103)For the box body of upper end opening, box body after the layer three (6103)Discharge outlet after one layer three is respectively equipped at the lower end of two side(6403), box body after the layer three(6103)Interior paving Equipped with glass metalling after layer three(6503), box body after the layer three(6103)Center on outer bottom is hung after being equipped with one layer three Hook(6603), the permeable box of three rear left of layer(617), after layer three in permeable box(618)And the permeable box of three rear right of layer(619)Respectively Do not pass through suspension strop after layer three thereon(6303)It is suspended on the permeable box of one rear left of layer one by one(417), after layer one in it is permeable Box(418)And the permeable box of one rear right of layer(419)Layer one after box body(4103)It is hung after layer one set by center on outer bottom Hook(4603)On, the 4th layer by the permeable box of four front left of layer(711), before layer four in permeable box(712), the permeable box of four front right of layer (713), left permeable box in layer four(714), in layer four in permeable box(715), right permeable box in layer four(716), four rear left of layer it is saturating Water box(717), after layer four in permeable box(718)And the permeable box of four rear right of layer(719)It is formed, the permeable box of four front left of layer (711), before layer four in permeable box(712)And the permeable box of four front right of layer(713)By box body before layer four(7101), before articulamentum four Box body(7101)Four corners are in the four connecting rope body of layer of X-shape(7201)And connection is in connecting rope body before the layer four of X-shape (7201)The four front overhang lanyard of layer of junction(7301)It is formed, box body before the layer four(71)For the box body of upper end opening, institute State box body before layer four(7101)Discharge outlet before one layer four is respectively equipped at the lower end of two side(7401), four front cabinet of layer Body(7101)Inside it is equipped with four front glass metalling of layer(7501), box body before the layer four(7101)Center on outer bottom is set There is one layer of four front hook(7601), the permeable box of four front left of layer(711), before layer four in permeable box(712)And four front right of layer is saturating Water box(713)Respectively pass through four front overhang lanyard of layer thereon(7301)It is suspended on the permeable box of two front left of layer one by one(511), layer two Before in permeable box(512)And the permeable box of two front right of layer(513)Layer two before box body(5101)Set by center on outer bottom Two front hook of layer(5601)On, left permeable box in the layer four(714), in layer four in permeable box(715)It is and right permeable in layer four Box(716)By box body in layer four(7102), box body in articulamentum four(7102)Four corners are in connecting rope body in the layer four of X-shape (7202)And connection is in connecting rope body in the layer four of X-shape(7202)Suspension strop in the layer four of junction(7302)It is formed, institute State box body in layer four(7102)For the box body of upper end opening, box body in the layer four(7102)Distinguish at the lower end of two side Equipped with discharge outlet in one layer four(7402), box body in the layer four(7102)Inside it is equipped with glass metalling in layer four(7502), Box body in the layer four(7102)Center on outer bottom, which is equipped in one layer four, to be linked up with(7602), left permeable box in the layer four (714), in layer four in permeable box(715)And right permeable box in layer four(716)Respectively pass through suspension strop in layer four thereon (7302)Left permeable box is suspended in the layer two one by one(514), in layer two in permeable box(515)And right permeable box in layer two (516)Layer two in box body(5102)It is linked up in layer two set by center on outer bottom(5602)On, four rear left of layer Permeable box(717), after layer four in permeable box(718)And the permeable box of four rear right of layer(719)By box body after layer four(7103), connection Box body after layer four(7103)Four corners are in connecting rope body after the layer four of X-shape(7203)And it is connected after connecting the layer four in X-shape Rope body(7203)Suspension strop after the layer four of junction(7303)It is formed, box body after the layer four(7103)Box for upper end opening Body, box body after the layer four(7103)Discharge outlet after one layer four is respectively equipped at the lower end of two side(7403), the layer Box body after four(7103)Inside it is equipped with glass metalling after layer four(7503), box body after the layer four(7103)In on outer bottom One layer of four aft hook is equipped at portion(7603), the permeable box of four rear left of layer(717), after layer four in permeable box(718)And layer four The permeable box of rear right(719)Respectively pass through suspension strop after layer four thereon(7303)It is suspended on the permeable box of two rear left of layer one by one (517), after layer two in permeable box(518)And the permeable box of two rear right of layer(519)Layer two after box body(5103)In on outer bottom Two aft hook of layer that portion place is set(5603)On, layer 5 is by the permeable box of five front left of layer(811), before layer five in permeable box(812)、 The layer permeable box of five front rights(813), left permeable box in layer five(814), in layer five in permeable box(815), right permeable box in layer five (816), the permeable box of five rear left of layer(817), after layer five in permeable box(818)And the permeable box of five rear right of layer(819)It is formed, it is described The layer permeable box of five front lefts(811), before layer five in permeable box(812)And the permeable box of five front right of layer(813)By box body before layer five (8101), box body before articulamentum five(8101)Four corners are in connecting rope body before the layer five of X-shape(8201)And connection is in X-shape Connecting rope body before layer five(8201)The five front overhang lanyard of layer of junction(8301)It is formed, box body before the layer five(8101)It is upper The box body of end opening, box body before the layer five(8101)Discharge outlet before one layer five is respectively equipped at the lower end of two side (8401), box body before the layer five(8101)Inside it is equipped with five front glass metalling of layer(8501), box body before the layer five (8101)Center on outer bottom is equipped with one layer of five front hook(8601), the permeable box of five front left of layer(811), before layer five in Permeable box(812)And the permeable box of five front right of layer(813)Respectively pass through five front overhang lanyard of layer thereon(8301)It is suspended on one by one The permeable box of three front left of layer(611), before layer three in permeable box(612)And the permeable box of three front right of layer(613)Layer three before box body (6101)Three front hook of layer set by center on outer bottom(6601)On, left permeable box in the layer five(814), in layer five In permeable box(815)And right permeable box in layer five(816)By box body in layer five(8102), box body in articulamentum five(8102)Four In connecting rope body in the layer five of X-shape at angle(8202)And connection is in connecting rope body in the layer five of X-shape(8202)Junction Suspension strop in layer five(8302)It is formed, box body in the layer five(8102)For the box body of upper end opening, box body in the layer five (8102)Discharge outlet in one layer five is respectively equipped at the lower end of two side(8402), box body in the layer five(8102)Interior paving Equipped with glass metalling in layer five(8502), box body in the layer five(8102)Center on outer bottom, which is equipped in one layer five, hangs Hook(8602), left permeable box in the layer five(814), in layer five in permeable box(815)And right permeable box in layer five(816)Respectively Do not pass through suspension strop in layer five(8302)Left permeable box is suspended in the layer three one by one(614), in layer three in permeable box(615) And right permeable box in layer three(616)Layer three in box body(6102)It is linked up in layer three set by center on outer bottom(6602) On, the permeable box of five rear left of layer(817), after layer five in permeable box(818)And the permeable box of five rear right of layer(819)After layer five Box body(8103), box body after articulamentum five(8103)Four corners are in connecting rope body after the layer five of X-shape(8203)And connection is in X-shaped Connecting rope body after the layer five of shape(8203)Suspension strop after the layer five of junction(8303)It is formed, box body after the layer five(8103) For the box body of upper end opening, box body after the layer five(8103)Discharge outlet after one layer five is respectively equipped at the lower end of two side (8403), box body after the layer five(8103)Inside it is equipped with glass metalling after layer five(8503), box body after the layer five (8103)Center on outer bottom is equipped with one layer of five aft hook(8603), the permeable box of five rear left of layer(817), after layer five in Permeable box(818)And the permeable box of five rear right of layer(819)Respectively pass through suspension strop after layer five(8303)It is suspended on the layer one by one The permeable box of three rear lefts(617), after layer three in permeable box(618)And the permeable box of three rear right of layer(619)Layer three after box body(6103) Three aft hook of layer set by center on outer bottom(6603)On.
CN201610086956.7A 2016-02-16 2016-02-16 A kind of Constructed Wetland For Purifying device that can freely dismantle Active CN105800788B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610086956.7A CN105800788B (en) 2016-02-16 2016-02-16 A kind of Constructed Wetland For Purifying device that can freely dismantle

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610086956.7A CN105800788B (en) 2016-02-16 2016-02-16 A kind of Constructed Wetland For Purifying device that can freely dismantle

Publications (2)

Publication Number Publication Date
CN105800788A CN105800788A (en) 2016-07-27
CN105800788B true CN105800788B (en) 2018-06-12

Family

ID=56466390

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610086956.7A Active CN105800788B (en) 2016-02-16 2016-02-16 A kind of Constructed Wetland For Purifying device that can freely dismantle

Country Status (1)

Country Link
CN (1) CN105800788B (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1994918A (en) * 2006-12-08 2007-07-11 华中科技大学 Filler modularized artificial wetland
CN202849161U (en) * 2012-08-10 2013-04-03 中国水利水电科学研究院 Sewage treatment device for constructed wetlands
CN202880996U (en) * 2012-03-28 2013-04-17 王启明 Modularized dismountable constructed wetland
CN104944589A (en) * 2015-06-24 2015-09-30 成都理工大学 Modularized detachable artificial wetland
CN204939090U (en) * 2015-07-07 2016-01-06 北京市工业设计研究院 A kind of small-sized detachable module formula artificial wet land system
CN105236577A (en) * 2015-09-23 2016-01-13 南京吉佳新材料科技实业有限公司 Detachable module-type wetland system, and sewage treatment method
CN205398234U (en) * 2016-02-16 2016-07-27 上海水生环境工程有限公司 But freedom disassembly's constructed wetland purifier

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1994918A (en) * 2006-12-08 2007-07-11 华中科技大学 Filler modularized artificial wetland
CN202880996U (en) * 2012-03-28 2013-04-17 王启明 Modularized dismountable constructed wetland
CN202849161U (en) * 2012-08-10 2013-04-03 中国水利水电科学研究院 Sewage treatment device for constructed wetlands
CN104944589A (en) * 2015-06-24 2015-09-30 成都理工大学 Modularized detachable artificial wetland
CN204939090U (en) * 2015-07-07 2016-01-06 北京市工业设计研究院 A kind of small-sized detachable module formula artificial wet land system
CN105236577A (en) * 2015-09-23 2016-01-13 南京吉佳新材料科技实业有限公司 Detachable module-type wetland system, and sewage treatment method
CN205398234U (en) * 2016-02-16 2016-07-27 上海水生环境工程有限公司 But freedom disassembly's constructed wetland purifier

Also Published As

Publication number Publication date
CN105800788A (en) 2016-07-27

Similar Documents

Publication Publication Date Title
CN105435495B (en) A kind of efficient rain water filtering device
CN205206223U (en) Anti -skid drainage floor
CN107253772B (en) Waste water treatment device connected to drainage end of main waste water pipe of residential building
CN105800788B (en) A kind of Constructed Wetland For Purifying device that can freely dismantle
CN106732867A (en) A kind of Multifunctional test tube rack
CN207002434U (en) A kind of sanitary sewage pretreatment system
CN206328224U (en) A kind of fountain type water quality in-situ repairing device
CN206434949U (en) A kind of new pretreatment quartz filter
CN205398234U (en) But freedom disassembly's constructed wetland purifier
CN106012955B (en) A kind of retaining wall for hydraulic engineering
CN205463349U (en) One set of fruit self -loopa cleaning system
CN206089175U (en) A packing assembly for biological catalytic oxidation device
CN207520666U (en) A kind of efficient filter tank
CN207520667U (en) A kind of efficiently anti-cleaning filter tank
CN106319850A (en) Tripod and manufacturing method thereof, and washing machine with tripod
CN205933434U (en) Novel oil -water separator
CN205182312U (en) Filter and filter equipment thereof
CN209602120U (en) Ecology self-restraint ditch rubbish isolation structure
CN207619140U (en) A kind of Domestic sewage treatment device
CN209204846U (en) A kind of grid maker fishing slag system
CN202456120U (en) Filter drainage device with water pipe fixed rings
CN206232406U (en) Tomato cleans water circulation utilization system
CN212854867U (en) Sewage purification device for environmental protection engineering
CN209715998U (en) A kind of retaining ring cleaning placement tool
CN207891227U (en) A kind of oil sludge processing equipment

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 200090 room 213, living building, 300 Jungong Road, Yangpu District, Shanghai

Patentee after: Shanghai aquatic Technology Co.,Ltd.

Patentee after: Shanghai Lishui Aquatic Environment Research Institute

Address before: 200090 room 213, living building, 300 Jungong Road, Yangpu District, Shanghai

Patentee before: SHANGHAI AQUATIC ENVIRONMENT ENGINEERING CO.,LTD.

Patentee before: Shanghai Lishui Aquatic Environment Research Institute

CP01 Change in the name or title of a patent holder