Fluid-flywheel clutch workpiece and production method
Technical field
It is specifically a kind of to be centrifuged using all-metal mould mould the present invention relates to a kind of production of fluid-flywheel clutch workpiece
Pouring procedure produces fluid-flywheel clutch workpiece and production method, more particularly to a kind of UTILIZATION OF VESIDUAL HEAT IN using biomass aluminium melting furnace
The fluid-flywheel clutch workpiece and production method of device preheated mold and bearing holder (housing, cover).
Background technology
The production method of the fluid-flywheel clutch workpiece such as aluminum component housing such as turbine, pump impeller, shell generally comprises sand core casting, again
Power is poured into a mould and three kinds of die casting, and wherein the main of sand core casting is disadvantageous in that first, internal model is cast using core, to sand
Modeling requirement is high, high to the technical requirements of moulder;Second, core is fragile, by core positioning and Quick pouring, casts out and
Product easily there is center asymmetry, blade is uneven, and the defects of blade surface and rough inner chamber, fluid-flywheel clutch is existed
Circulation of oil flow resistance during use is big, loss power;Third, the product surface finish of core casting is not high, yield rate is low, makes
The site area taken needed for type is big, and sand is mostly discarded after having cast, not only not environmentally but also uneconomical.Gravity-assist pouring it is main not
The workpiece density that foot part is to produce does not reach requirement, and its qualification rate is merely able to reach 40 ﹪ or so.Also there is part enterprise
Industry uses low-pressure casting process, and low pressure casting is to lean on advanced equipment investment, and press is high with mould input cost, and fluid coupling
The description of device is various, and every kind of product all makes mould according to the requirement of low pressure casting, and manufacturing enterprise is difficult to bear.
Therefore, the patent application of Application No. 201510523735.7, which discloses one kind, uses all-metal mould centrifugal casting work
The method that skill prepares fluid coupling workpiece, the maximum outside diameter of made fluid coupling workpiece can reach 110 ㎝, most
Big weight can reach 100 ㎏, and the density of workpiece is high;Meanwhile centrifugal transmission improves cooling effectiveness.
But in the centrifugal casting of all-metal mould, metal die must be preheated to 350 DEG C~600 DEG C, and in workpiece
Bearing holder (housing, cover) must also preheat, and for the cast temperature of aluminium water at 800 DEG C~900 DEG C or so, yield rate is just high.At present, fluid coupling
The main material of the workpiece of device is aluminium alloy, and the melting mode of existing aluminium alloy is mainly using electric furnace, gas furnace and common Jiao
Charcoal stove, ordinary coke stove do not allow to use from the policy requirements of environmental protection;Although electric furnace, gas furnace are fast and environmentally friendly, can only also do
Smelting furnace is used, and is grown in the centrifugal casting process time of all-metal mould, and aluminium water needs to be incubated, and such cost is high, especially for
For the product of small lot, cost is higher.Meanwhile metal die must make oven in addition and carry out mould heating heating.
Biomass aluminium melting furnace is the professional energy saving and environment friendly smelting furnace using bioenergy, is put english streaming using half gasification, and combustion
Air distribution designs, and using Crucible melting and heat-insulating integral, has coloured gold mainly for low melting points such as fusing or smelting aluminum, zinc, lead, tin, cadmiums
Category and alloy, it is typically supporting with die casting machine, it can also be used to aluminium liquid insulation, degasification, refining.With energy-efficient, low-carbon environment-friendly, life
The characteristics of cost is low, Operation and Maintenance is simple, flexibly safe is produced, is the best product of replacing fuel oil, combustion gas, coke-fired furnace, electric furnace, can
So that enterprise reduces the ﹪ of 30 ﹪~60 energy consumption cost.
The content of the invention
It is an object of the invention to provide one kind using biomass aluminium melting furnace and to utilize its waste heat apparatus preheated mold and bearing
The fluid-flywheel clutch workpiece and production method of set.
The present invention, which adopts the following technical scheme that, realizes its goal of the invention, a kind of fluid-flywheel clutch work piece production method,
It comprises the following steps:
(1) aluminum melting:Biomass aluminium melting furnace is opened, aluminium ingot is put into biomass aluminium melting furnace crucible and is melt into aluminium water;
The present invention step (1) in, the temperature of the aluminium water is 800 DEG C~900 DEG C.
(2) grilled mold:The residual heat using device that mould and bearing holder (housing, cover) are put into biomass aluminium melting furnace preheats;
The present invention step (2) in, the mould is preheated to 350 DEG C~600 DEG C, the bearing holder (housing, cover) be preheated to 350 DEG C~
600℃。
The present invention step (2) in, be preferably that the mould is preheated to 450 DEG C~500 DEG C, the bearing holder (housing, cover) is preheated to
450 DEG C~500 DEG C.
The present invention step (2) in, the residual heat using device includes biomass aluminum melting furnace body, and body of heater is provided with adding
The flue of hot chamber connection, the flue is interior to be provided with bearing holder (housing, cover) heating chamber, and bearing holder (housing, cover) heating chamber sidepiece is provided with mould heating arrangements, institute
Stating mould heating arrangements includes casing, and casing top is provided with case lid, and case lid is provided with exhaust outlet, and the space in casing adds for mould
Hot chamber, mould heating chamber connect with flue.
For homogeneous heating, mould heating chamber of the present invention is interior to be provided with turntable, treats that preheated mold is placed on a spinstand,
Side rotates, side preheating.
The rotary speed of turntable of the present invention is the rev/min of 2 rev/min~8.
To improve the temperature of biomass aluminium melting furnace crucible, air preheat pipeline is provided with flue of the present invention, blower fan will
Cold wind is sent into air preheat pipeline, and combustion chamber is sent into after the air in air preheat pipeline is preheated.
(3) upper mould:Mould after grilled mold is put into apparatus for pouring, bearing holder (housing, cover) is put into mould, makes mould by transmission device
Rotation;
The present invention step (3) in, the rotary speed of mould is the rev/min of 500 rev/min~800.
(4) pour into a mould:Aluminium water is cast in mold cavity by cast gate, in casting process, side cast, mold side rotation;
(5) mould is moved back:Carry out moving back mould after casting complete, after cooling, take out workpiece, then toward another bearing holder (housing, cover) is put into mould, enter
The cast of the next workpiece of row.
A kind of fluid-flywheel clutch workpiece of the production of fluid-flywheel clutch work piece production method as described above, it includes fluid coupling
Turbine, pump impeller and the shell of device.
Because using above-mentioned technical proposal, the present invention preferably realizes goal of the invention, using all-metal mould centrifugal casting
Technique, using biomass aluminium melting furnace aluminum melting and its waste heat grilled mold, with energy-efficient, low-carbon environment-friendly, production cost is low, operates dimension
Protect the characteristics of simple.
Brief description of the drawings
Fig. 1 is the structural representation of biomass aluminium melting furnace before transformation;
Fig. 2 is the overlooking the structure diagram of biomass aluminium melting furnace of the present invention;
Fig. 3 is the facade structures schematic diagram of biomass aluminium melting furnace of the present invention.
Embodiment
Below in conjunction with the accompanying drawings and embodiment the invention will be further described.
From Fig. 1, Fig. 2, Fig. 3, a kind of fluid-flywheel clutch work piece production method, it comprises the following steps:
(1) aluminum melting:Biomass aluminium melting furnace is opened, aluminium ingot is put into biomass aluminium melting furnace crucible 3 and is melt into aluminium water;
The present invention step (1) in, the temperature of the aluminium water is 800 DEG C~900 DEG C.
(2) grilled mold:The residual heat using device that mould and bearing holder (housing, cover) are put into biomass aluminium melting furnace preheats;
The present invention step (2) in, the mould is preheated to 350 DEG C~600 DEG C, the bearing holder (housing, cover) be preheated to 350 DEG C~
600℃。
The present invention step (2) in, be preferably that the mould is preheated to 450 DEG C~500 DEG C, the bearing holder (housing, cover) is preheated to
450 DEG C~500 DEG C.
The present invention step (2) in, the residual heat using device includes biomass aluminum melting furnace body 1, body of heater 1 provided with
The flue 5 that heating chamber 2 connects, the flue 5 is interior to be provided with bearing holder (housing, cover) heating chamber 13, and the sidepiece of bearing holder (housing, cover) heating chamber 13 adds provided with mould
Heat engine structure, the mould heating arrangements include casing 11, and the top of casing 11 is provided with case lid 14, and case lid 14 is provided with exhaust outlet 15,
Space in casing 11 is mould heating chamber 10, and mould heating chamber 10 connects with flue 5.
For homogeneous heating, mould heating chamber 10 of the present invention is interior to be provided with turntable 12, treats that preheated mold is placed on rotation
On platform 12, side rotation, side preheating.
The rotary speed of turntable 12 of the present invention is the rev/min of 2 rev/min~8.
To improve the temperature of biomass aluminium melting furnace crucible 3, air preheat pipeline 9, blower fan are provided with flue 5 of the present invention
Cold wind is sent into air preheat pipeline 9 by 7, and combustion chamber 4 is sent into after the air in air preheat pipeline 9 is preheated.
(3) upper mould:Mould after grilled mold is put into apparatus for pouring, bearing holder (housing, cover) is put into mould, makes mould by transmission device
Rotation;
The present invention step (3) in, the rotary speed of mould is the rev/min of 500 rev/min~800.
(4) pour into a mould:Aluminium water is cast in mold cavity by cast gate, in casting process, side cast, mold side rotation;
(5) mould is moved back:Carry out moving back mould after casting complete, after cooling, take out workpiece, then toward another bearing holder (housing, cover) is put into mould, enter
The cast of the next workpiece of row.
In all-metal mould spun casting technique, it is necessary to mould is carried out to be preheated to 350 DEG C~600 DEG C, secondly, to improve
Product service life and intensity, the bearing holder (housing, cover) that intensity is high, wear-resisting must be bumped into aluminium casting, therefore, to ensure quality of casting, to axle
Bearing sleeve must also carry out being preheated to 350 DEG C~600 DEG C.As separately preheated using heating furnace, then cost is too high, and occupied ground
Greatly.For the product of small lot, cost is higher.
Therefore, the present invention is improved in existing biomass aluminium melting furnace, residual heat using device is additionally arranged.I.e. closing is existing
There is the exhaust outlet of flue 5, bearing holder (housing, cover) heating chamber 13 is set in flue 5, air preheat is set around bearing holder (housing, cover) heating chamber 13
Pipeline 9, the one end of air preheat pipeline 9 are connected with blower fan 7, and the other end is passed through the combustion chamber 4 of biomass aluminium melting furnace;Bearing holder (housing, cover) heats
The sidepiece of chamber 13 is provided with mould heating arrangements, and the mould heating arrangements include casing 11, and the top of casing 11 is provided with case lid 14, case lid
14 are provided with exhaust outlet 15, and the space in casing 11 is mould heating chamber 10, and mould heating chamber 10 connects with flue 5.Cold wind by
Blower fan 7 is sent into air preheat pipeline 9, after preheated to 300 DEG C or so of air, combustion chamber 4 is re-fed into, so, in combustion chamber 4
Temperature is greatly improved, and the temperature of the outer wall of crucible 3 can reach more than 1200 DEG C in heating chamber 2, can be higher than using fusing point
More than 800 DEG C of alloy material, the temperature of aluminium water can reach 800 DEG C~900 DEG C after fusing.Biomass granule fuel is through hopper 6
It is sent into combustion chamber 4 to burn, the heating crucible 3 of chamber 2 heated first of high-temperature flue gas caused by burning, then through flue 5 first to bearing
The air in bearing holder (housing, cover) and air preheat pipeline 9 in set heating chamber 13 is preheated(The present embodiment bearing holder (housing, cover) is preheated to 450
℃), mould is preheated subsequently into mould heating chamber 10(The present embodiment mould is preheated to 450 DEG C), finally by case lid 14
On exhaust outlet 15 discharge, waste heat is obtained abundant secondary use, the temperature of exhaust outlet 15 compared to reduced before improving 100 DEG C~
200℃.Ashes are discharged by ash disposal mouth 8.
Because the sectional area for connecting the flue of mould heating chamber 10 is small, the heating to mould is only confined to some position of mould
On, make mould uneven heating even.Therefore, the present embodiment is provided with turntable 12 in mould heating chamber 10, treat that preheated mold is placed
On turntable 12, rotary speed is 4 rev/min, and side rotation, side is heated.
Mould after preheating is put into after biomass aluminium melting furnace completes the warm grilled mold of aluminium aqueous fusion and pours filling by the present embodiment
Put, bearing holder (housing, cover) is also placed in mould, and rotates mould by transmission device;The rotary speed of mould is 700 rev/min;
During cast, aluminium water is cast in mold cavity by cast gate, in casting process, side cast, mold side rotation, passes through centrifugal force
Effect removes the impurity in aluminium water, and improves the density of workpiece;Carry out moving back mould after casting complete, after cooling, take out workpiece, then
Another bearing holder (housing, cover) is put into mould, carries out the cast of next workpiece.
A kind of fluid-flywheel clutch workpiece of the production of fluid-flywheel clutch work piece production method as described above, it includes fluid coupling
Turbine, pump impeller and the shell of device.