CN105790156A - 一种输电线路施工新封网工法 - Google Patents
一种输电线路施工新封网工法 Download PDFInfo
- Publication number
- CN105790156A CN105790156A CN201610225820.XA CN201610225820A CN105790156A CN 105790156 A CN105790156 A CN 105790156A CN 201610225820 A CN201610225820 A CN 201610225820A CN 105790156 A CN105790156 A CN 105790156A
- Authority
- CN
- China
- Prior art keywords
- rope
- catch net
- catch
- stringing
- net
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02G—INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
- H02G1/00—Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
- H02G1/02—Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for overhead lines or cables
Landscapes
- Emergency Lowering Means (AREA)
Abstract
本发明涉及一种输电线路施工新封网工法,步骤为:⑴在待架线的两个架线塔之间连接多根保护网承托绳,保护网承托绳之间接绳安装有保护网;牵引绳或导线的安装位置在保护网的上方,防止导线掉落到跨越物上;⑵在待架线的两个架线塔上端分别安装上横担;⑶在上横担的上端之间连接安装上承托绳,在上承托绳与保护网承托绳之间安装侧面编网绳,形成侧面保护网。本发明“U”型封网与原有保护网承托绳之间安装侧面编网绳,形成侧面保护网,这样导线或牵引绳始终处在保护网中,降低了安全风险,有效解决了出现在大风天气或在跨越物本档断线的情况,导线或牵引绳会偏离到保护网之外,从而掉落在被跨越物上的问题。
Description
技术领域
本发明属于电力施工技术领域,尤其是一种输电线路施工新封网工法。
背景技术
我国特高压线路的建设已进入快速发展的阶段,在特高压输电线路施工过程中常遇到跨越重要设施的情况,且呈现出跨越高度越来越高、次数越来越多、工况越来越复杂等特点。
为保障新建线路跨越施工安全性,特发明出一套安全可靠地跨越防护装置,“U”型封网方法,在新建线路下方和侧面形成保护网,以防止新建线路在施工过程中出现导线或牵引绳断线情况时,导线或牵引绳直接落到下方的重要设施上,造成危害。
目前,在新建线路在跨越重要设施时,多采用无跨越架封网施工方法,即通过在新建线路跨越档两端铁塔上安装辅助横担(即抱杆)作为承托绳的定位装置,对应每侧导线在辅助横担上安装承托绳,在承托绳间安装封网装置,形成对被跨电力线的防护。然而,在大风天气下或者发生导引绳断裂、导线断裂时往往导引绳与导线偏离保护网,造成极为严重的后果。为此通过技术组讨论开发一种新型的封网工法。
发明内容
本发明的目的在于克服现有技术的不足之处,提供一种结构合理、使用方便、安全可靠、提高效率的输电线路施工新封网工法。
本发明解决其技术问题是采取以下技术方案实现的:
一种输电线路施工新封网工法,其特征在于:步骤为:
⑴在待架线的两个架线塔之间连接多根保护网承托绳,保护网承托绳之间接绳安装有保护网;展放牵引绳,牵引绳用于牵引带动导线,牵引绳或导线的安装位置在保护网的上方,防止导线掉落到跨越物上;
⑵在待架线的两个架线塔上端分别安装上横担;
⑶在上横担的上端之间连接安装上承托绳,在上承托绳与保护网承托绳之间安装侧面编网绳,形成侧面保护网;侧面保护网与保护网形成U型封网结构,展放过程中的导线或牵引绳始终处在保护网中。
而且,在保护网承托绳与地面之间分别连接承托绳水平控制拉线。
而且,展放牵引绳采用无人机牵引架线方式,将牵引绳连接在两个架线塔上的预装点。
而且,所述上横担是由多个由下向上依次连接的轻型抱杆组成,轻型抱杆包括矩形外框以及斜梁,由2至3个矩形外框依次连接组成,矩形外框是角钢焊接组成正立方柱体,在矩形外框的四面分别焊接有对角斜梁。
本发明的优点和积极效果是:
本发明“U”型封网与原有保护网承托绳之间安装侧面编网绳,形成侧面保护网,这样导线或牵引绳始终处在保护网中,降低了安全风险,有效解决了出现在大风天气或在跨越物本档断线的情况,导线或牵引绳会偏离到保护网之外,从而掉落在被跨越物上的问题。
附图说明
图1为封网结构示意图;
图2为封网结构俯视平面图;
图3为“U”型封网局部结构示意图;
图4为2m轻型抱杆结构示意图;
图5为3m轻型抱杆结构示意图。
具体实施方式
下面结合附图并通过具体实施例对本发明作进一步详述,以下实施例只是描述性的,不是限定性的,不能以此限定本发明的保护范围。
一种输电线路施工新封网工法,步骤为:
⑴在待架线的两个架线塔之间连接多根保护网承托绳,保护网承托绳之间接绳安装有保护网;展放牵引绳,牵引绳用于牵引带动导线,牵引绳或导线的安装位置在保护网的上方,防止导线掉落到跨越物上;
为了保持保护网的位置稳定,在保护网承托绳与地面之间连接有承托绳水平控制拉线4。
展放牵引绳可以采用传统架线方式,也可以采用无人机牵引架线方式,将牵引绳连接在两个架线塔上的预装点;
⑵在待架线的两个架线塔上端分别安装上横担7;
上横担是由多个由下向上依次连接的轻型抱杆组成,轻型抱杆的结构参见附图4、5,包括矩形外框9以及斜梁10,由2至3个矩形外框依次连接组成,附图4所示为2个矩形外框组成的抱杆,附图5所示为3个矩形外框组成的抱杆,矩形外框是角钢焊接组成正立方柱体,在矩形外框的四面分别焊接有对角斜梁,保证抱杆强度;
对于用于封网段的抱杆,采用3个矩形外框组成的抱杆,在中间的矩形外框内固装有一工具箱11,工具箱立方形五面封闭且分别与矩形外框或对角斜梁连接保证工具箱安装稳固,工具箱一面为开启用于拿放工具。
本实施例轻型抱杆均为400mm×400mm框架式方形柱体,材质选用Q345的∟40×5的角钢进行焊接。考虑现场实际长度需要,为方便运输做为2m或3m等长的抱杆,每节抱杆都相对比较轻便,即方便施工也适合现场的搬运。
⑶在上横担7的上端之间连接安装上承托绳2,在上承托绳与保护网承托绳之间安装侧面编网绳5,形成侧面保护网;
侧面保护网与保护网形成如附图3所示的“U”型封网结构,展放过程中的导线或牵引绳1始终处在保护网中,有效降低了安全风险。这一改进从结构上看虽然简单,但是意义重大,在实际施工中可避免的损失是难以估量的。
本实施例所示,在高度为61.5m的两个架线塔8之间间隔存在两个宽度均为21.6m的吴霸输送塔,吴霸输送塔为本实施例的跨越物6,本次施工时,展发过程中的导线1从通过两个架线塔由上方跨越两个吴霸输送塔;保护网下端与跨越物上端之间分别留有7m和8m的间隔。
尽管为说明目的公开了本发明的实施例和附图,但是本领域的技术人员可以理解:在不脱离本发明的精神和范围内,各种替换、变化和修改都是可能的,因此,本发明的范围不局限于实施例和附图所公开的内容。
Claims (4)
1.一种输电线路施工新封网工法,其特征在于:步骤为:
⑴在待架线的两个架线塔之间连接多根保护网承托绳,保护网承托绳之间接绳安装有保护网;展放牵引绳,牵引绳用于牵引带动导线,牵引绳或导线的安装位置在保护网的上方,防止导线掉落到跨越物上;
⑵在待架线的两个架线塔上端分别安装上横担;
⑶在上横担的上端之间连接安装上承托绳,在上承托绳与保护网承托绳之间安装侧面编网绳,形成侧面保护网;侧面保护网与保护网形成U型封网结构,展放过程中的导线或牵引绳始终处在保护网中。
2.根据权利要求1所述的输电线路施工新封网工法,其特征在于:在保护网承托绳与地面之间分别连接承托绳水平控制拉线。
3.根据权利要求1所述的输电线路施工新封网工法,其特征在于:展放牵引绳采用无人机牵引架线方式,将牵引绳连接在两个架线塔上的预装点。
4.根据权利要求1所述的输电线路施工新封网工法,其特征在于:所述上横担是由多个由下向上依次连接的轻型抱杆组成,轻型抱杆包括矩形外框以及斜梁,由2至3个矩形外框依次连接组成,矩形外框是角钢焊接组成正立方柱体,在矩形外框的四面分别焊接有对角斜梁。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610225820.XA CN105790156A (zh) | 2016-04-11 | 2016-04-11 | 一种输电线路施工新封网工法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610225820.XA CN105790156A (zh) | 2016-04-11 | 2016-04-11 | 一种输电线路施工新封网工法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN105790156A true CN105790156A (zh) | 2016-07-20 |
Family
ID=56397218
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610225820.XA Pending CN105790156A (zh) | 2016-04-11 | 2016-04-11 | 一种输电线路施工新封网工法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105790156A (zh) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106229890A (zh) * | 2016-07-28 | 2016-12-14 | 郑州东辰科技有限公司 | 跨越障碍物架线施工保护结构 |
CN107394678A (zh) * | 2017-06-27 | 2017-11-24 | 国家电网公司 | 一种伸缩臂封网跨越架 |
CN111181066A (zh) * | 2020-01-20 | 2020-05-19 | 广东电网能源发展有限公司 | 一种三相二分裂导线的封网保护装置的搭建方法 |
CN111244815A (zh) * | 2020-01-20 | 2020-06-05 | 广东电网能源发展有限公司 | 一种三相导线的封网保护装置的搭建方法 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101442194A (zh) * | 2008-09-11 | 2009-05-27 | 山西省电力公司送变电工程公司 | 超、特高压线路施工无跨越架跨越方法 |
CN201315444Y (zh) * | 2008-11-20 | 2009-09-23 | 四川电力送变电建设公司 | 悬索式吊篮封网带电跨越架 |
DE202014104013U1 (de) * | 2014-08-27 | 2014-12-01 | Ga Hochspannung Leitungsbau Gmbh | Schutzsystem zum Schutz eines Transportweges mit schwenkbarem Haltearm |
CN104536459A (zh) * | 2014-12-24 | 2015-04-22 | 国家电网公司 | 一种小型多轴无人机展放牵引绳的施工方法 |
CN104577875A (zh) * | 2014-12-29 | 2015-04-29 | 国家电网公司 | 一种电力线路的封网跨越架线施工方法 |
-
2016
- 2016-04-11 CN CN201610225820.XA patent/CN105790156A/zh active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101442194A (zh) * | 2008-09-11 | 2009-05-27 | 山西省电力公司送变电工程公司 | 超、特高压线路施工无跨越架跨越方法 |
CN201315444Y (zh) * | 2008-11-20 | 2009-09-23 | 四川电力送变电建设公司 | 悬索式吊篮封网带电跨越架 |
DE202014104013U1 (de) * | 2014-08-27 | 2014-12-01 | Ga Hochspannung Leitungsbau Gmbh | Schutzsystem zum Schutz eines Transportweges mit schwenkbarem Haltearm |
CN104536459A (zh) * | 2014-12-24 | 2015-04-22 | 国家电网公司 | 一种小型多轴无人机展放牵引绳的施工方法 |
CN104577875A (zh) * | 2014-12-29 | 2015-04-29 | 国家电网公司 | 一种电力线路的封网跨越架线施工方法 |
Non-Patent Citations (1)
Title |
---|
李文绮: "《设备现场安装技术》", 30 September 1995, 中国石化出版社 * |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106229890A (zh) * | 2016-07-28 | 2016-12-14 | 郑州东辰科技有限公司 | 跨越障碍物架线施工保护结构 |
CN106229890B (zh) * | 2016-07-28 | 2024-04-12 | 郑州东辰科技有限公司 | 跨越障碍物架线施工保护结构 |
CN107394678A (zh) * | 2017-06-27 | 2017-11-24 | 国家电网公司 | 一种伸缩臂封网跨越架 |
CN107394678B (zh) * | 2017-06-27 | 2019-09-20 | 国家电网公司 | 一种伸缩臂封网跨越架 |
CN111181066A (zh) * | 2020-01-20 | 2020-05-19 | 广东电网能源发展有限公司 | 一种三相二分裂导线的封网保护装置的搭建方法 |
CN111244815A (zh) * | 2020-01-20 | 2020-06-05 | 广东电网能源发展有限公司 | 一种三相导线的封网保护装置的搭建方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105790156A (zh) | 一种输电线路施工新封网工法 | |
CN101174761B (zh) | 高压输电线路耐张绝缘子串上旋带电更换方法 | |
US10544014B2 (en) | Method for hoisting and transporting assemblies in underground nuclear power plant | |
CN105610093B (zh) | 一种锚固装置及锚固方法 | |
CN111355188A (zh) | 高压线路带电跨越施工方法 | |
US3162719A (en) | X-frame transmission line structure | |
CN105552776B (zh) | 新型不停运跨高铁施工方法 | |
CN105607206A (zh) | 输电线路直线杆塔opgw光缆连接结构 | |
CN205355669U (zh) | 一种输电线施工用辅助横担 | |
CN205724641U (zh) | 一种输电线路施工新封网结构 | |
CN203439984U (zh) | 杆用手动起重器 | |
CN102611057A (zh) | 跨越网 | |
CN204188856U (zh) | 输电线路直线杆塔opgw光缆连接结构 | |
CN109132880B (zh) | 门座式起重机的拆卸方法 | |
CN106939724B (zh) | 一种架空输电线路铁塔分片整体组立装置与方法 | |
CN206640282U (zh) | 一种拖缆固定装置以及拖缆系统 | |
CN105591318B (zh) | 一种u型网的封网方法 | |
CN204190271U (zh) | 一种架空地线落线装置 | |
CN204782182U (zh) | 一种在钢管杆上检修电缆线的操作平台 | |
Jianjun et al. | Study on safety management of guy wires in the construction of UHV (EHV) transmission lines | |
CN211319742U (zh) | 一种用于核电站电气贯穿件吊装的工具 | |
CN201126951Y (zh) | 一种与钢绞线直接配合的拉线盘 | |
KR102275469B1 (ko) | 전차선 선로용 가설벤트 및 그 시공방법 | |
CN203271226U (zh) | 220kV单回电缆终端钢杆塔 | |
CN208835590U (zh) | 一种带有操作平台的电缆终端杆 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20160720 |