CN105786691A - Automatic integration testing device, method and system of mobile terminal - Google Patents

Automatic integration testing device, method and system of mobile terminal Download PDF

Info

Publication number
CN105786691A
CN105786691A CN201410820686.9A CN201410820686A CN105786691A CN 105786691 A CN105786691 A CN 105786691A CN 201410820686 A CN201410820686 A CN 201410820686A CN 105786691 A CN105786691 A CN 105786691A
Authority
CN
China
Prior art keywords
server
source code
service device
continuous integrating
test
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410820686.9A
Other languages
Chinese (zh)
Other versions
CN105786691B (en
Inventor
陈磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Keen Chongqing Microelectronics Technology Co ltd
Original Assignee
Chongqing Cyit Communication Technologies Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Cyit Communication Technologies Co Ltd filed Critical Chongqing Cyit Communication Technologies Co Ltd
Priority to CN201410820686.9A priority Critical patent/CN105786691B/en
Publication of CN105786691A publication Critical patent/CN105786691A/en
Application granted granted Critical
Publication of CN105786691B publication Critical patent/CN105786691B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]

Abstract

The embodiment of the invention provides an automatic integration testing device, method and system of a mobile terminal. The device of the embodiment of the invention comprises a source code management server, a continuous integration server, a source code compiling server and a version updating and testing server, wherein the source code management server is used for managing the source code of each subsystem of a mobile terminal; the continuous integration server is used for taking charge of controlling the scheduling mechanism of each task flow; the source code compiling server is used for taking charge of executing a source code compiling task; and the version updating and testing server is used for taking charge of executing a mirror image document updating task and an automatic test task of a version. The embodiment of the invention realizes the automatic process of integration testing, improves development efficiency and lowers development and research cost.

Description

A kind of mobile terminal automation integrated test set, method and system
Technical field
The present invention relates to the communications field, particularly to mobile terminal automation integrated test set, method and system.
Background technology
nullMobile terminal integration testing generally comprises code compilation、Integrated、Image file updates、Redaction validation test several stage,Generally this process is primarily based on source code management instrument by integrated personnel and obtains engineering source code,Then source code compiling is carried out according to compiling config option,Use the image file programming terminal to be measured that compiling is generated by specific instrument,Last execution again tests checking flow process,Basic test example can enter the system test stage by released version after being verified,In the integrating process stage,Integrated personnel need to participate in the compiling of substantial amounts of source code、Mirror image updates、The repetitive operation such as version checking,Current technology is for source code management、Although version compiling has some instruments personnel can be become to complete by supplementary set,But the renewal of image file is typically required integrated personnel's manual operation makes terminal to be measured entrance generation patterns just can complete,Whole integration testing process is bigger to integrated Personnel Dependence,Inefficiency.
Summary of the invention
A kind of mobile terminal automation integrated test set, method and system is provided, to realize integration testing automatic flow for realizing purpose of the present invention.
Embodiment of the present invention first aspect provides a kind of mobile terminal automation integrated test set, including:
Source code management server, for managing the source code of mobile terminal subsystems;
Continuous integrating server, for being responsible for controlling the scheduling mechanism of each task flow;
Source code compiler server, for being responsible for performing the compiler task of source code;
Version updating testing service device, for being responsible for performing image file more new task and the automatic test assignment of version.
Embodiment of the present invention second aspect provides a kind of mobile terminal automation integration test method, including:
Source code compiler server starts compiler task;
Continuous integrating server processes going to mirror image more redaction testing service device in compiling image file;
Above-mentioned version updating testing service device starts image file more new task and version test assignment completes integration testing automation process and performs.
The embodiment of the present invention third aspect provides a kind of mobile terminal automation integrated test system, said system includes above-mentioned mobile terminal automation integrated test set, also include trunking and terminal to be measured, above-mentioned trunking is connected with above-mentioned terminal to be measured and version updating testing service device, forward the control signal between terminal to be measured and version updating testing service device, control terminal to be measured and enter mirror image generation patterns, perform image file automatically updating function in conjunction with Automated condtrol script.
As can be seen from the above technical solutions, the embodiment of the present invention has the advantage that
By device provided by the invention, method and system, realize integration testing automatic flow, it is no longer necessary to special integrated personnel and manually participates in this flow process, further, by installing automatic test management software, the operation in each stage in integrating process is performed by Automated condtrol script, and utilize trunking to connect terminal to be measured and main frame, by source code management software, automatic test management software is connected by task flow mode, realize integration testing process version updating, the automated execution workflow in the stages such as test, the process of all stage can perform automatically according to integrated collocation strategy, improve efficiency of research and development, reduce R&D costs.
Accompanying drawing explanation
Fig. 1 is embodiment of the present invention apparatus structure schematic diagram;
Fig. 2 is embodiment of the present invention system structure schematic diagram;
Fig. 3 is embodiment of the present invention method flow schematic diagram;
Fig. 4 is embodiment of the present invention method for updating edition schematic flow sheet;
The continuous integrating task flow that Fig. 5 is a kind of automatization of embodiment of the present invention integrated test system performs schematic flow sheet.
Detailed description of the invention
In order to make the object, technical solutions and advantages of the present invention clearly, below in conjunction with accompanying drawing, the present invention is described in further detail, it is clear that described embodiment is only some embodiments of the present invention, rather than whole embodiments.Based on the embodiment in the present invention, all other embodiments that those of ordinary skill in the art obtain under not making creative work premise, broadly fall into the scope of protection of the invention.
The invention provides a kind of mobile terminal automation integrated test set, as it is shown in figure 1, include: source code management server, for managing the source code of mobile terminal subsystems;
In embodiments of the present invention, source code management server is for managing the source code of mobile terminal subsystems, in conjunction with source code management software such as git/svn, set up the source code warehouse of subsystems, realize the renewal of subsystems source code, synchronization, stock management, rely on the plug-in unit support of continuous integrating server, it is achieved oss server and continuous integrating server system source code synchronize.
Continuous integrating server, for being responsible for controlling the scheduling mechanism of each task flow;
In embodiments of the present invention, continuous integrating server, above-mentioned continuous integrating server is installed continuous integrating utility services end software, above-mentioned continuous integrating server configures becomes a continuous integrating tool host run, it is achieved the operational management of continuous integrating each task of process.
Source code compiler server, for being responsible for performing the compiler task of source code;
Version updating testing service device, for being responsible for performing image file more new task and the automatic test assignment of version.
In embodiments of the present invention, above-mentioned source code compiler server and version updating testing service device are installed continuous integrating instrument client terminal software, and above-mentioned source code compiler server and version updating testing service device are configured to continuous integrating instrument from equipment, above-mentioned continuous integrating instrument, from the equipment agency as above-mentioned continuous integrating server, is responsible for performing the task of described continuous integrating server-assignment.Above-mentioned continuous integrating instrument has multiple, and such as jenkins, strider, hudson etc., adopting jenkins in the embodiment of the present invention is example.
Above-mentioned source code compiler server and version updating testing service device can have multiple, one continuous integrating tool host can manage multiple continuous integrating tool agent, it is used for servicing for different tasks or identical task team difference configuration, the integration testing automation process realizing multiple mobile terminal to be measured performs simultaneously, improve work efficiency, illustrate with a terminal to be measured in embodiments of the present invention.
In embodiments of the present invention, being additionally included on version updating testing service device and install automatic test management software, above-mentioned automatic test management software is used for controlling source code compiling in integrated test process, mirror image updates, the Automated condtrol script of version test performs.
Above-mentioned automatic test management software, major control test case performs, test LOG record, test log are reported, by the automatic test case bag of version updating testing service device is installed to terminal to be measured, terminal operating test case bag to be measured, result is fed back to automatic supervision test software, automatic supervision test software generates test report, is uploaded to continuous integrating server, and user checks test result by web interface.
Present invention also offers a kind of mobile terminal automation integrated test system, as shown in Figure 2, also include: trunking, trunking connects terminal to be measured and above-mentioned version updating testing service device, above-mentioned version updating testing service device sends control signal and to above-mentioned trunking and controls above-mentioned terminal to be measured entrance file renewal programming pattern, completes image file more new task.
In the present embodiment, above-mentioned trunking mainly provides modelling customer behavior to make terminal to be measured enter mirror image generation patterns and image file programming pattern, performs image file automatically updating function in conjunction with Automated condtrol script.
Present invention also offers a kind of mobile terminal automation integration test method, as it is shown on figure 3, include:
Source code compiler server starts compiler task;
In the present embodiment, above-mentioned source code compiler server also includes above-mentioned source code compiler server before starting compiler task and detects that source code management server has renewal, and above-mentioned source code compiler server obtains source code to be compiled from above-mentioned source code management server.
Continuous integrating server processes going to mirror image more redaction testing service device in compiling image file;
In embodiments of the present invention, it is additionally included on above-mentioned continuous integrating server and continuous integrating utility services end software is installed, and configure git/svn source code management plug-in unit, support source code compilation script, above-mentioned continuous integrating server configures becomes a continuous integrating instrument main equipment run.
In embodiments of the present invention, it is additionally included on above-mentioned source code compiler server and version updating testing service device and continuous integrating instrument client terminal software is installed, and above-mentioned source code compiler server and version updating testing service device being configured to continuous integrating instrument from equipment, above-mentioned continuous integrating instrument is from the equipment agency as above-mentioned continuous integrating server.
Above-mentioned version updating testing service device starts image file more new task and version test assignment completes integration testing automation process and performs.
In embodiments of the present invention, being additionally included on above-mentioned version updating testing service device and install automatic test management software, above-mentioned automatic test management software performs for controlling the Automated condtrol script of version test in integrated test process and generates test report.
In embodiments of the present invention, above-mentioned version updating testing service device startup version test assignment completes integration testing automation process and performs to include the above-mentioned version test assignment of above-mentioned continuous integrating server scheduling, the test program package that above-mentioned version updating testing service device will perform is installed to above-mentioned terminal to be measured, above-mentioned terminal implementation of test cases to be measured feedback test result give above-mentioned version updating testing service device, above-mentioned version updating testing service device generates test report, is uploaded to above-mentioned continuous integrating server and completes above-mentioned version test assignment.
In embodiments of the present invention, also include being connected terminal to be measured and above-mentioned version updating testing service device by trunking, above-mentioned version updating testing service device startup image file more new task includes above-mentioned version updating testing service device transmission control signal and to above-mentioned trunking and controls above-mentioned terminal to be measured entrance file renewal programming pattern, completes above-mentioned image file more new task.
The embodiment of the present invention provides a kind of method for updating edition, as shown in Figure 4, and including:
Version updating testing service device monitors image file renewal, automatically performs image file more new script, and this script sends control signal to trunking to the UART mouth specified, and namely sends set data;
By specific GPIO by terminal volume key set to be measured after trunking process UART set data, namely analog subscriber length presses the effect of volume key;
Image file more new script is sent by USB restarts end command to be measured, and terminal to be measured restarts detection volume key set, enters file and updates programming pattern.
Automatically update script and perform file renewal instruction, after image file completes renewal by USB, send terminal to be measured to the UART mouth specified and enter the control signal of normal mode to trunking, i.e. the effect of analog subscriber release volume key.
Terminal volume key to be measured is resetted after processing by trunking by specific GPIO, automatically updates script and restarts the pending automatic test case scripts such as end command to be measured, terminal to be measured normally startup again through USB transmission.Image file updates job and has performed.
The embodiment of the present invention provides the continuous integrating task flow of a kind of automatization integrated test system to perform flow process, illustrates as it is shown in figure 5, be updated to example with AP subsystem source code, including:
Source code compiler server compiler task detects that AP system source code management server has renewal, automatically detection is current updates, start to perform compiler task, namely compilation script is performed, compilation script first configures translation and compiling environment variable, it is reconfigured at product objective platform, calls makefile file and perform compiling, by the AP image file of generation by continuous integrating server replicates to version updating testing service device after having compiled.Image file more new task monitors AP image file renewal, automatically image file more new script is performed, this script sends control signal to trunking to the UART mouth specified, by specific GPIO by terminal volume key set to be measured after trunking process, automatically update script and restart end command to be measured by USB transmission, terminal to be measured restarts detection volume key set, enter file and update programming pattern, automatically update script and perform file renewal instruction, after image file completes renewal by USB, control signal is sent to trunking to the UART mouth specified, terminal volume key to be measured is resetted after processing by trunking by specific GPIO, automatically update script and restart end command to be measured again through USB transmission, the pending automatic test case scripts such as terminal to be measured normally startup.Image file updates tasks carrying to be completed, the automatic test assignment of continuous integrating server scheduling version performs, test set is called automatic supervision test software and starts interface by automatic test assignment, incoming test set title, the test program package that automatic supervision test software will perform is installed to terminal to be measured by USB, call test case execution script to perform successively, terminal implementation of test cases to be measured feedback test result, automatic supervision test software generates test log, integrated personnel can check test result by the interface of continuous integrating server, after the automatic test assignment of version has been run, whole integration testing process terminates, after each subsystem version compiler task detects that each subsystem source code warehouse has new renewal to submit to, this automatization integrated test system again circulates and performs compiling, update, test each task flow.
Above example only in order to technical scheme to be described, is not intended to limit;Although the present invention being described in detail with reference to previous embodiment, it will be understood by those within the art that: the technical scheme described in foregoing embodiments still can be modified by it, or wherein portion of techniques feature is carried out equivalent replacement;And these amendments or replacement, do not make the essence of appropriate technical solution depart from the spirit and scope of various embodiments of the present invention technical scheme.

Claims (13)

1. a mobile terminal automation integrated test set, it is characterised in that including:
Source code management server, for managing the source code of mobile terminal subsystems;
Continuous integrating server, for being responsible for controlling the scheduling mechanism of each task flow;
Source code compiler server, for being responsible for performing the compiler task of source code;
Version updating testing service device, for being responsible for performing image file more new task and the automatic test assignment of version.
2. a kind of mobile terminal automation integrated test set as claimed in claim 1, it is characterized in that, being additionally included on version updating testing service device and install automatic test management software, described automatic test management software performs for controlling the Automated condtrol script of version test in integrated test process and generates test report.
3. a kind of mobile terminal automation integrated test set as claimed in claim 2, it is characterized in that, it is additionally included on described continuous integrating server and continuous integrating utility services end software is installed, described continuous integrating server configures become a continuous integrating tool host run, it is achieved the operational management of continuous integrating each task of process.
4. a kind of mobile terminal automation integrated test set as claimed in claim 2, it is characterized in that, it is additionally included on described source code compiler server and version updating testing service device and continuous integrating instrument client terminal software is installed, and described source code compiler server and version updating testing service device are configured to continuous integrating instrument from equipment, described continuous integrating instrument, from the equipment agency as described continuous integrating server, is responsible for performing the task of described continuous integrating server-assignment.
5. a kind of mobile terminal automation integrated test set as claimed in claim 1, it is characterized in that, also include trunking, trunking connects terminal to be measured and described version updating testing service device, described version updating testing service device sends control signal and to described trunking and controls described terminal to be measured entrance file renewal programming pattern, completes image file more new task.
6. a mobile terminal automation integration test method, it is characterised in that including:
Source code compiler server starts compiler task;
Continuous integrating server processes going to mirror image more redaction testing service device in compiling image file;
Described version updating testing service device starts image file more new task and version test assignment completes integration testing automation process and performs.
7. a kind of mobile terminal automation integration test method as claimed in claim 6, it is characterized in that, described source code compiler server also includes described source code compiler server before starting compiler task and detects that source code management server has renewal, and described source code compiler server obtains source code to be compiled from described source code management server.
8. a kind of mobile terminal automation integration test method as claimed in claim 6, it is characterized in that, also include: installing automatic test management software on described version updating testing service device, described automatic test management software performs for the Automated condtrol script controlling integrated test process, version is tested and generates test report.
9. a kind of mobile terminal automation integration test method as claimed in claim 6, it is characterized in that, it is additionally included on described continuous integrating server and continuous integrating utility services end software is installed, and configure source code management plug-in unit, support source code compilation script, described continuous integrating server configures becomes a continuous integrating instrument main equipment run.
10. a kind of mobile terminal automation integration test method as claimed in claim 6, it is characterized in that, it is additionally included on described source code compiler server and version updating testing service device and continuous integrating instrument client terminal software is installed, and described source code compiler server and version updating testing service device are configured to continuous integrating instrument from equipment, described continuous integrating instrument, from the equipment agency as described continuous integrating server, is responsible for performing the task of described continuous integrating server-assignment.
11. a kind of mobile terminal automation integration test method as claimed in claim 6, it is characterized in that, described version updating testing service device starts image file more new task and version test assignment completes integration testing automation process and performs to include image file more new task described in described continuous integrating server scheduling and described version test assignment, image file is updated to terminal to be measured by described image file more new task, the test program package that described version updating testing service device will perform is installed to described terminal to be measured, described terminal implementation of test cases to be measured feedback test result give described version updating testing service device, described version updating testing service device generates test report, it is uploaded to described continuous integrating server, complete described version test assignment.
12. a kind of mobile terminal automation integration test method as described in claim 6-11, it is characterized in that, also include being connected terminal to be measured and described version updating testing service device by trunking, described version updating testing service device startup image file more new task includes described version updating testing service device transmission control signal and to described trunking and controls described terminal to be measured entrance file renewal programming pattern, completes described image file more new task.
13. a mobile terminal automation integrated test system, it is characterized in that, described system includes mobile terminal automation integrated test set as claimed in claim 1, also include trunking and terminal to be measured, described trunking is connected with described terminal to be measured and version updating testing service device, forward the control signal between terminal to be measured and version updating testing service device, control terminal to be measured and enter mirror image generation patterns, perform image file automatically updating function in conjunction with Automated condtrol script.
CN201410820686.9A 2014-12-25 2014-12-25 Automatic integrated testing device, method and system for mobile terminal Active CN105786691B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410820686.9A CN105786691B (en) 2014-12-25 2014-12-25 Automatic integrated testing device, method and system for mobile terminal

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410820686.9A CN105786691B (en) 2014-12-25 2014-12-25 Automatic integrated testing device, method and system for mobile terminal

Publications (2)

Publication Number Publication Date
CN105786691A true CN105786691A (en) 2016-07-20
CN105786691B CN105786691B (en) 2023-05-12

Family

ID=56377121

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410820686.9A Active CN105786691B (en) 2014-12-25 2014-12-25 Automatic integrated testing device, method and system for mobile terminal

Country Status (1)

Country Link
CN (1) CN105786691B (en)

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106775823A (en) * 2016-11-21 2017-05-31 努比亚技术有限公司 Mobile terminal and its quick start method
CN107026754A (en) * 2017-03-04 2017-08-08 郑州云海信息技术有限公司 A kind of automation O&M method and device of single node PaaS platform
CN107193619A (en) * 2017-07-28 2017-09-22 郑州云海信息技术有限公司 The method and apparatus that a kind of compiled version is automatically updated
CN107608710A (en) * 2017-08-31 2018-01-19 华为技术有限公司 Software project structure task collocation method and device based on Jenkins instruments
CN107656873A (en) * 2017-10-23 2018-02-02 扬州航盛科技有限公司 Automatization test system and method for testing based on the vehicle-mounted softwares of Linux
CN108011974A (en) * 2017-12-25 2018-05-08 苏州赛源微电子有限公司 A kind of software building continuous integration system
CN109240716A (en) * 2018-09-10 2019-01-18 福建星瑞格软件有限公司 A kind of big data platform version management and iteratively faster dispositions method and system
CN109976996A (en) * 2017-12-28 2019-07-05 神讯电脑(昆山)有限公司 Keyboard controller test method
CN110262931A (en) * 2019-05-31 2019-09-20 深圳市杰科数码有限公司 A kind of keyboard test method and keyboard test computer
CN110674024A (en) * 2018-07-02 2020-01-10 北京忆恒创源科技有限公司 Electronic equipment integration test system and method thereof
CN111049912A (en) * 2019-12-17 2020-04-21 用友网络科技股份有限公司 Debugging method, test development device, and computer-readable storage medium
CN111159972A (en) * 2019-12-31 2020-05-15 深圳市汇顶科技股份有限公司 Test method, test device and test system applied to integrated circuit
CN112506793A (en) * 2020-12-18 2021-03-16 航天信息股份有限公司 Embedded software unit testing method, system, readable medium and electronic equipment
CN112527312A (en) * 2020-12-15 2021-03-19 西安中朗智控科技有限公司 Test method and test device for embedded system
CN113608996A (en) * 2021-06-30 2021-11-05 苏州浪潮智能科技有限公司 Mirror image compiling test method, system, device and readable storage medium
CN113836039A (en) * 2021-10-25 2021-12-24 四川虹美智能科技有限公司 Automatic smoking test method and system
CN117724725B (en) * 2024-02-05 2024-05-03 英诺达(成都)电子科技有限公司 Continuously integrated automatic scheduling method, device, system and storage medium

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102693183A (en) * 2012-05-30 2012-09-26 瑞斯康达科技发展股份有限公司 Method and system for realizing automatic software testing
CN102880546A (en) * 2012-09-03 2013-01-16 上海方正数字出版技术有限公司 Software integration testing method and system based on extensible markup language (XML) database
US20130174117A1 (en) * 2011-12-29 2013-07-04 Christina Watters Single development test environment
CN103336688A (en) * 2013-06-20 2013-10-02 中标软件有限公司 Software integrating method and system oriented to cloud computing software research and development process
CN104077140A (en) * 2014-07-04 2014-10-01 用友软件股份有限公司 Automatic compiling method and compiling device for continuous integration

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20130174117A1 (en) * 2011-12-29 2013-07-04 Christina Watters Single development test environment
CN102693183A (en) * 2012-05-30 2012-09-26 瑞斯康达科技发展股份有限公司 Method and system for realizing automatic software testing
CN102880546A (en) * 2012-09-03 2013-01-16 上海方正数字出版技术有限公司 Software integration testing method and system based on extensible markup language (XML) database
CN103336688A (en) * 2013-06-20 2013-10-02 中标软件有限公司 Software integrating method and system oriented to cloud computing software research and development process
CN104077140A (en) * 2014-07-04 2014-10-01 用友软件股份有限公司 Automatic compiling method and compiling device for continuous integration

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
N.C.W.M. BRASPENNING 等: "Estimating and quantifying the impact of using models for integration and testing" *
贺旭 等: "基于CC和STAF的分布式持续集成和自动测试方案" *

Cited By (25)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106775823A (en) * 2016-11-21 2017-05-31 努比亚技术有限公司 Mobile terminal and its quick start method
CN106775823B (en) * 2016-11-21 2020-03-27 努比亚技术有限公司 Mobile terminal and quick starting method thereof
CN107026754A (en) * 2017-03-04 2017-08-08 郑州云海信息技术有限公司 A kind of automation O&M method and device of single node PaaS platform
CN107026754B (en) * 2017-03-04 2021-01-05 浪潮云信息技术股份公司 Automatic operation and maintenance method and device for single-node PaaS platform
CN107193619A (en) * 2017-07-28 2017-09-22 郑州云海信息技术有限公司 The method and apparatus that a kind of compiled version is automatically updated
CN107193619B (en) * 2017-07-28 2021-02-02 苏州浪潮智能科技有限公司 Method and device for automatically updating compiled version
CN107608710A (en) * 2017-08-31 2018-01-19 华为技术有限公司 Software project structure task collocation method and device based on Jenkins instruments
WO2019042311A1 (en) * 2017-08-31 2019-03-07 华为技术有限公司 Software project setup task configuration method and device using jenkins
CN107608710B (en) * 2017-08-31 2021-08-31 华为技术有限公司 Software project construction task configuration method and device based on Jenkins tool
CN107656873A (en) * 2017-10-23 2018-02-02 扬州航盛科技有限公司 Automatization test system and method for testing based on the vehicle-mounted softwares of Linux
CN108011974A (en) * 2017-12-25 2018-05-08 苏州赛源微电子有限公司 A kind of software building continuous integration system
CN109976996A (en) * 2017-12-28 2019-07-05 神讯电脑(昆山)有限公司 Keyboard controller test method
CN110674024A (en) * 2018-07-02 2020-01-10 北京忆恒创源科技有限公司 Electronic equipment integration test system and method thereof
CN109240716A (en) * 2018-09-10 2019-01-18 福建星瑞格软件有限公司 A kind of big data platform version management and iteratively faster dispositions method and system
CN109240716B (en) * 2018-09-10 2022-10-25 福建星瑞格软件有限公司 Big data platform version management and rapid iterative deployment method and system
CN110262931A (en) * 2019-05-31 2019-09-20 深圳市杰科数码有限公司 A kind of keyboard test method and keyboard test computer
CN110262931B (en) * 2019-05-31 2023-02-28 深圳市杰科数码有限公司 Keyboard testing method and keyboard testing computer
CN111049912A (en) * 2019-12-17 2020-04-21 用友网络科技股份有限公司 Debugging method, test development device, and computer-readable storage medium
CN111159972A (en) * 2019-12-31 2020-05-15 深圳市汇顶科技股份有限公司 Test method, test device and test system applied to integrated circuit
CN112527312A (en) * 2020-12-15 2021-03-19 西安中朗智控科技有限公司 Test method and test device for embedded system
CN112506793A (en) * 2020-12-18 2021-03-16 航天信息股份有限公司 Embedded software unit testing method, system, readable medium and electronic equipment
CN113608996A (en) * 2021-06-30 2021-11-05 苏州浪潮智能科技有限公司 Mirror image compiling test method, system, device and readable storage medium
CN113608996B (en) * 2021-06-30 2023-07-18 苏州浪潮智能科技有限公司 Mirror image compiling test method, system, device and readable storage medium
CN113836039A (en) * 2021-10-25 2021-12-24 四川虹美智能科技有限公司 Automatic smoking test method and system
CN117724725B (en) * 2024-02-05 2024-05-03 英诺达(成都)电子科技有限公司 Continuously integrated automatic scheduling method, device, system and storage medium

Also Published As

Publication number Publication date
CN105786691B (en) 2023-05-12

Similar Documents

Publication Publication Date Title
CN105786691A (en) Automatic integration testing device, method and system of mobile terminal
CN101411123B (en) Method, system and computer program for the centralized system management on endpoints of a distributed data processing system
US20180270349A1 (en) Using automatically collected device problem information to route and guide users' requests
US11249769B2 (en) Enhanced MobileQ platform application for IOS and android mobile devices
CN108196843A (en) Visualization Docker containers compile the O&M method of deployment automatically
US9086899B2 (en) Loading and debugging method and debugging system thereof
CN101876940A (en) Automatic test method and device
CN105867941A (en) Software upgrading system and realization method thereof
CN104102527A (en) Method for updating software of virtual machine
CN106326100A (en) Software automatic testing method and device
CN104246702A (en) Workflow compilation
CN104731706A (en) Method and device for test management using distributed computing
CN100451986C (en) Automatic verification method of network chip
CN105511936A (en) Test system, method and device
CN106325901A (en) Software version management method and system
CN109558147A (en) A kind of continuous integrating platform construction method based on Jenkins and Gitlab
CN113434158A (en) User-defined management method, device, equipment and medium for big data component
CN106452937A (en) Router automatic test method and test apparatus
CN112732561A (en) Project deployment method and device, computer equipment and storage medium
CN113778486A (en) Containerization processing method, device, medium and equipment for code pipeline
JP2007082078A (en) Data relay device
CN110096304A (en) Task construction method, device, equipment and storage medium based on Jenkins
CN112527312B (en) Test method and test device for embedded system
CN110209565B (en) Metadata model debugging method and device
CN111290934A (en) Jenkins-based vehicle-mounted network product cloud testing method and system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
TA01 Transfer of patent application right

Effective date of registration: 20170420

Address after: Nanping Street 400060 Chongqing Nan'an District Nancheng Road No. 199 left attached to the floor 403

Applicant after: Keen (Chongqing) Microelectronics Technology Co.,Ltd.

Address before: 400065 Chongqing Nan'an District huangjuezhen pass Fort Park No. 1

Applicant before: CHONGQING CYIT COMMUNICATION TECHNOLOGIES Co.,Ltd.

TA01 Transfer of patent application right
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant