CN105784544B - A kind of experimental method for being used to determine filling cut of asphaltum road surface viscosity of material requirement - Google Patents

A kind of experimental method for being used to determine filling cut of asphaltum road surface viscosity of material requirement Download PDF

Info

Publication number
CN105784544B
CN105784544B CN201511016546.7A CN201511016546A CN105784544B CN 105784544 B CN105784544 B CN 105784544B CN 201511016546 A CN201511016546 A CN 201511016546A CN 105784544 B CN105784544 B CN 105784544B
Authority
CN
China
Prior art keywords
viscosity
road surface
filling cut
asphaltum road
fissures
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201511016546.7A
Other languages
Chinese (zh)
Other versions
CN105784544A (en
Inventor
陈磊磊
钱振东
张勐
姚波
刘雨萱
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Southeast University
Original Assignee
Southeast University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Southeast University filed Critical Southeast University
Priority to CN201511016546.7A priority Critical patent/CN105784544B/en
Publication of CN105784544A publication Critical patent/CN105784544A/en
Application granted granted Critical
Publication of CN105784544B publication Critical patent/CN105784544B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N11/00Investigating flow properties of materials, e.g. viscosity, plasticity; Analysing materials by determining flow properties

Landscapes

  • Physics & Mathematics (AREA)
  • Health & Medical Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Chemical & Material Sciences (AREA)
  • Analytical Chemistry (AREA)
  • Biochemistry (AREA)
  • General Health & Medical Sciences (AREA)
  • General Physics & Mathematics (AREA)
  • Immunology (AREA)
  • Pathology (AREA)
  • Road Paving Structures (AREA)
  • Road Repair (AREA)

Abstract

The invention discloses a kind of experimental method for being used to determine filling cut of asphaltum road surface viscosity of material requirement, claimed using cementation of fissures interface coverage rate to the viscosity of filling cut of asphaltum road surface material.The present invention is suitable for determining for various filling cut of asphaltum road surface viscosity of material requirement, and after the method for the invention, the repairing effect of asphalt pavement crack significantly improves, and avoids the generation of crack extension.

Description

A kind of experimental method for being used to determine filling cut of asphaltum road surface viscosity of material requirement
Technical field
The present invention relates to a kind of experimental method for being used to determine filling cut of asphaltum road surface viscosity of material requirement, belong to road engineering Technology.
Background technology
Crack disease is most common Damage Types during bituminous paving use, general to be dripped using the method for the cementation of fissures Blue or green pavement crack reparation.But during the cementation of fissures of actual bitumen concrete road surface cracks, many materials are excessive due to viscosity It can not penetrate into inside crack, cause gap-grouting material to rest on fracture faces or only penetrate into very little part, seriously affected reparation effect Fruit.Therefore, to ensure the cementation of fissures repairing effect of asphalt pavement crack, the requirement to filling cut of asphaltum road surface viscosity of material need to be proposed. However, China is mostly empirically to be determined to the viscosity requirement of filling cut of asphaltum road surface material at present, lack determining for science Method.For this reason, the present invention proposes a kind of test method for being used to determine filling cut of asphaltum road surface viscosity of material requirement.
The content of the invention
Goal of the invention:In order to overcome the deficiencies in the prior art, the present invention provides a kind of for determining bituminous paving The experimental method of gap-grouting material viscosity requirement, for determining the viscosity requirement of filling cut of asphaltum road surface material;Cementation of fissures interface is covered Rate corresponding viscosity at 85~95% is the viscosity requirement to filling cut of asphaltum road surface material.
Technical solution:To achieve the above object, the technical solution adopted by the present invention is:
A kind of experimental method for being used to determine filling cut of asphaltum road surface viscosity of material requirement, using cementation of fissures interface coverage rate to drip The viscosity of blue or green pavement seam filling material claims, and cementation of fissures interface coverage rate is filling cut of asphaltum road surface material on crack side circle Area coverage and the ratio of the side interface gross area on face.
According to mechanics of materials correlation theory, when the timing of stress intensity one, pulling force or shearing are directly proportional to tension shear(ing) area. The crack of bituminous paving is corresponded to, after filling cut of asphaltum road surface material is circulated into crack, filling cut of asphaltum road surface material sheet The tensile strength of body and the product of contact area are the pulling force limiting value that can bear, and shearing is also identical.Therefore, for fixation Filling cut of asphaltum road surface material for, cementation of fissures interface coverage rate is bigger, and the success rate of reparation is higher.Multiple laboratory test results table Bright, when cementation of fissures interface coverage rate is not less than 90%, repairing effect is preferable.Therefore, we determined that being covered with 90% cementation of fissures interface Rate is to determine the threshold value of viscosity requirement, it is desirable to which the viscosity of repair materials is less than identified viscosity.
Specifically, this method comprises the following steps:
(1) the miniature bituminous concrete of equal proportion is prepared according to the structure of crack bituminous paving first and tests beam, then will Experiment beam is broken or sawed-off, the crack for simulation bituminous paving that fracture is stitched together, according to the fracture width tune of bituminous paving Save fracture spacing;
(2) with the both sides and lower part of masking foil parcel fracture, fracture top is reserved, by the bituminous paving of a certain viscosity undetermined Gap-grouting material is poured into fracture by fracture top;
(3) after filling cut of asphaltum road surface material no longer flows, the masking foil around experiment beam is removed, separately tests beam, point Cementation of fissures interface of the filling cut of asphaltum road surface material of a certain viscosity undetermined on two sides of fracture is not calculated with gridding method Coverage rate is simultaneously averaged;
(4) the filling cut of asphaltum road surface material of another viscosity undetermined is replaced, it is another to obtain this to step (3) for repeat step (1) Cementation of fissures interface coverage rate of the filling cut of asphaltum road surface material of viscosity undetermined on two sides of fracture is simultaneously averaged;
(5) according to obtained two average values and corresponding viscosity, 90% cementation of fissures circle is determined by the way of linear interpolation Viscosity corresponding to the coverage rate of face, the viscosity are viscosity requirement of the crack bituminous paving to filling cut of asphaltum road surface material;When true When arriving crack bituminous paving surely to the viscosity requirement of filling cut of asphaltum road surface material, with the filling cut of asphaltum road surface less than the viscosity requirement Material carries out the cementation of fissures to the crack of bituminous paving.
Beneficial effect:Experimental method provided by the present invention for determining the requirement of filling cut of asphaltum road surface viscosity of material, implements Process is simple, and after the method for the present invention, the repairing effect of asphalt pavement crack significantly improves, and avoids the hair of crack extension It is raw.
Brief description of the drawings
Fig. 1 is the schematic diagram for the fracture cementation of fissures reparation that beam is tested in the method for the present invention;
Fig. 2 is the schematic diagram that gridding method calculates cementation of fissures interface coverage rate;
In figure:1 is filling cut of asphaltum road surface material, and 2 be experiment beam.
Embodiment
The present invention is further described below in conjunction with the accompanying drawings.
A kind of experimental method for being used to determine filling cut of asphaltum road surface viscosity of material requirement, includes the following steps:
Step 1:The miniature bituminous concrete of equal proportion is prepared according to the structure of crack bituminous paving first and tests beam, so Experiment beam is broken or sawed-off afterwards, the crack for simulation bituminous paving that fracture is stitched together is wide according to the crack of bituminous paving Degree adjusts fracture spacing;
Step 2:With the both sides and lower part of masking foil parcel fracture, fracture top is reserved, by the pitch of a certain viscosity undetermined Pavement seam filling material is poured into fracture by fracture top;
Step 3:After filling cut of asphaltum road surface material no longer flows, the masking foil around experiment beam is removed, separately experiment Beam, is calculated the cementation of fissures of the filling cut of asphaltum road surface material of a certain viscosity undetermined on two sides of fracture with gridding method respectively Interface coverage rate is simultaneously averaged;
Step 4:The filling cut of asphaltum road surface material of another viscosity undetermined is replaced, repeat step (1) is somebody's turn to do to step (3) Cementation of fissures interface coverage rate of the filling cut of asphaltum road surface material of another viscosity undetermined on two sides of fracture is simultaneously averaged;
Step 5:According to two obtained average values and corresponding viscosity, 90% filling is determined by the way of linear interpolation The viscosity corresponding to the coverage rate of interface is stitched, which is viscosity requirement of the crack bituminous paving to filling cut of asphaltum road surface material; When determine to crack bituminous paving to the viscosity requirement of filling cut of asphaltum road surface material when, with the bituminous paving less than the viscosity requirement Gap-grouting material carries out the cementation of fissures to the crack of bituminous paving.
The present invention is made further instructions with reference to embodiment.
There are a large amount of cracks in certain section of SMA-13 road surface, and live crack investigation shows that most cracks are more than 1mm cracks; Implementation steps are as follows:
Step 1:One group of SMA girder test specimen is made, the size of girder test specimen is 380cm × 50cm × 50cm.Girder is sawed It is disconnected, then fracture is stitched together and simulates the crack of bituminous paving, at a distance of 1mm between fracture.
Step 2:SMA girder fracture lower parts and both sides are wrapped up using masking foil, only stay top.Then using viscosity as The repair materials A of 3000mPas is poured into the crack between fracture.
Step 3:After gap-grouting material A stablizes and no longer flows, the masking foil around girder is removed, girder is separated, with grid Method calculates coverage rate of the repair materials on two side section of girder, is respectively 76% and 78%, and it is 77% to take average result.
Step 4:Repeat the above steps, the repair materials cementation of fissures using viscosity as 1000mPas, calculates interface coverage rate For 93%.Determine that the viscosity requirement corresponding to 90% interface coverage rate is about 1375mPas with linear interpolation method.
Because the section overwhelming majority fracture width is in more than 1mm, therefore, the present embodiment using 1mm as control width requirement, Determine the viscosity requirement of repair materials.Repair materials viscosity selected by this section should be not more than 1375mPas.
The above is only the preferred embodiment of the present invention, it should be pointed out that:For the ordinary skill people of the art For member, various improvements and modifications may be made without departing from the principle of the present invention, these improvements and modifications also should It is considered as protection scope of the present invention.

Claims (3)

  1. A kind of 1. experimental method for being used to determine filling cut of asphaltum road surface viscosity of material requirement, it is characterised in that:Using cementation of fissures interface Coverage rate claims the viscosity of filling cut of asphaltum road surface material, and cementation of fissures interface coverage rate exists for filling cut of asphaltum road surface material Area coverage and the ratio of the side interface gross area on the interface of crack side;By cementation of fissures interface coverage rate at 85~95% Corresponding viscosity is as the viscosity requirement to filling cut of asphaltum road surface material;This method comprises the following steps:
    (1) the miniature bituminous concrete of equal proportion is prepared according to the structure of crack bituminous paving first and tests beam, then will experiment Beam is broken or sawed-off, the crack for simulation bituminous paving that fracture is stitched together, disconnected according to the adjusting of the fracture width of bituminous paving Mouth spacing;
    (2) with the both sides and lower part of masking foil parcel fracture, fracture top is reserved, by the filling cut of asphaltum road surface of a certain particular viscosity Material is poured into fracture by fracture top;
    (3) after filling cut of asphaltum road surface material no longer flows, remove experiment beam around masking foil, separately test beam, respectively with Cementation of fissures interface covering of the filling cut of asphaltum road surface material of a certain particular viscosity on two sides of fracture is calculated in gridding method Rate is simultaneously averaged;
    (4) the filling cut of asphaltum road surface material of another particular viscosity is replaced, it is another specific to obtain this to step (3) for repeat step (1) Cementation of fissures interface coverage rate of the filling cut of asphaltum road surface material of viscosity on two sides of fracture is simultaneously averaged;
    (5) according to obtained two average values and corresponding viscosity, 85~95% cementation of fissures circle are determined by the way of linear interpolation Viscosity corresponding to the coverage rate of face, the viscosity are viscosity requirement of the crack bituminous paving to filling cut of asphaltum road surface material.
  2. 2. the experimental method according to claim 1 for being used to determine filling cut of asphaltum road surface viscosity of material requirement, its feature exist In:By cementation of fissures interface coverage rate, corresponding viscosity is the viscosity requirement to filling cut of asphaltum road surface material at 90%.
  3. 3. the experimental method according to claim 1 for being used to determine filling cut of asphaltum road surface viscosity of material requirement, its feature exist In:When determine to crack bituminous paving to the viscosity requirement of filling cut of asphaltum road surface material when, with the pitch less than the viscosity requirement Pavement seam filling material carries out the cementation of fissures to the crack of bituminous paving.
CN201511016546.7A 2015-12-29 2015-12-29 A kind of experimental method for being used to determine filling cut of asphaltum road surface viscosity of material requirement Active CN105784544B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201511016546.7A CN105784544B (en) 2015-12-29 2015-12-29 A kind of experimental method for being used to determine filling cut of asphaltum road surface viscosity of material requirement

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201511016546.7A CN105784544B (en) 2015-12-29 2015-12-29 A kind of experimental method for being used to determine filling cut of asphaltum road surface viscosity of material requirement

Publications (2)

Publication Number Publication Date
CN105784544A CN105784544A (en) 2016-07-20
CN105784544B true CN105784544B (en) 2018-04-24

Family

ID=56390047

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201511016546.7A Active CN105784544B (en) 2015-12-29 2015-12-29 A kind of experimental method for being used to determine filling cut of asphaltum road surface viscosity of material requirement

Country Status (1)

Country Link
CN (1) CN105784544B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107560962B (en) * 2017-09-22 2020-10-30 广东省长大公路工程有限公司 Thermal load test device and method for epoxy resin waterproof layer for pouring type asphalt pavement

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE20014891U1 (en) * 2000-08-29 2001-03-01 Beiersdorf Ag Measuring device for determining the viscoelastic properties of PSAs, especially in thin layers
CN101441159A (en) * 2007-11-20 2009-05-27 宝理塑料株式会社 Simple melt viscosity test method of thermoplastic resin
CN202018414U (en) * 2010-12-23 2011-10-26 中国铁道科学研究院铁道建筑研究所 Working performance comprehensive test device for self-filling concrete for high speed railway slab ballastless tracks
CN202512038U (en) * 2012-04-06 2012-10-31 苏州生益科技有限公司 Resin proportion slump test press for prepregs
CN103543087A (en) * 2013-10-28 2014-01-29 中建材中岩科技有限公司 Testing apparatus and method for characterizing diffusion radius of injecting paste material in solid medium
CN204154600U (en) * 2014-10-21 2015-02-11 江西鑫盛实业有限公司 Flowing degree of net paste of cement detection glass plate
CN204594834U (en) * 2015-05-26 2015-08-26 浙江海洋学院 Integral type slump tester

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004053564A (en) * 2002-07-24 2004-02-19 Hitachi Chem Co Ltd Resin flowability evaluation method of adhesive sheet with copper foil
JP5843223B2 (en) * 2013-03-26 2016-01-13 東京電力株式会社 Degradation evaluation method for ultra-trace grease-like substances

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE20014891U1 (en) * 2000-08-29 2001-03-01 Beiersdorf Ag Measuring device for determining the viscoelastic properties of PSAs, especially in thin layers
CN101441159A (en) * 2007-11-20 2009-05-27 宝理塑料株式会社 Simple melt viscosity test method of thermoplastic resin
CN202018414U (en) * 2010-12-23 2011-10-26 中国铁道科学研究院铁道建筑研究所 Working performance comprehensive test device for self-filling concrete for high speed railway slab ballastless tracks
CN202512038U (en) * 2012-04-06 2012-10-31 苏州生益科技有限公司 Resin proportion slump test press for prepregs
CN103543087A (en) * 2013-10-28 2014-01-29 中建材中岩科技有限公司 Testing apparatus and method for characterizing diffusion radius of injecting paste material in solid medium
CN204154600U (en) * 2014-10-21 2015-02-11 江西鑫盛实业有限公司 Flowing degree of net paste of cement detection glass plate
CN204594834U (en) * 2015-05-26 2015-08-26 浙江海洋学院 Integral type slump tester

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
《钢桥面沥青铺装裂缝处治技术效果评价》;陈磊磊 等;《北京工业大学学报》;20110630;第37卷(第6期);第888-892页 *

Also Published As

Publication number Publication date
CN105784544A (en) 2016-07-20

Similar Documents

Publication Publication Date Title
CN107014706A (en) The base joint grouting glue low temperature and fatigue behaviour evaluation method of a kind of bituminous paving
He et al. Effects of moisture on strength and permanent deformation of foamed asphalt mix incorporating RAP materials
CN105331330B (en) The asphalt pavement crack sealing of resistance to ultraviolet glue and preparation method thereof
CN102879272B (en) Method for evaluating damage self-healing capacity of asphalt mortar
CN104652261B (en) Expansion joint based on elastic concrete fast repairing method and system
CN106977968A (en) High adhered modification pitch, road quick patch and preparation method thereof and application method
CN107722927A (en) A kind of bituminous paving high adhered modification cementation of fissures glue material and preparation method
CN105784544B (en) A kind of experimental method for being used to determine filling cut of asphaltum road surface viscosity of material requirement
Zumrawi Prediction of CBR value from index properties of cohesive soils
CN103758009A (en) Asphalt pavement crack quick repairing method
CN105300770A (en) Preparation method of fractured carbonate rock core
CN107236458B (en) Pitch restorative for asphalt pavement conserving and preparation method thereof and application method
CN102720114A (en) Method for rapid control on degree of compaction of asphalt mixture
CN110359349A (en) A kind of construction method of asphalt pavement crack processing
CN102746679B (en) Nondestructive pavement crack mending material, preparation method and mending process
CN205295969U (en) Fixing device is restoreed in road and bridge crack
CN110230240A (en) Steel slag semi-flexible composite road surface structure
CN106644786B (en) A method of evaluation asphaltmastic fatigue behaviour
CN206902523U (en) Hand-held patch seam car
Jaskuła et al. Verification of the criteria for evaluation of water and frost resistance of asphalt concrete
CN109580396A (en) A kind of test method of bituminous pavement superficial layer load fatigue damage degree
CN208104991U (en) A kind of fixed device of road and bridge crack reparation
CN107064203A (en) A kind of asphalt pavement crack hot type base joint grouting glue selecting method
CN207851072U (en) Characteristic of crack and its simulator that overlay is influenced between a kind of broken block
Li et al. Field investigation and laboratory evaluation of asphalt pavement crack seal band

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant