CN105782566B - A kind of insulated piping anchor block and its construction method of installation - Google Patents

A kind of insulated piping anchor block and its construction method of installation Download PDF

Info

Publication number
CN105782566B
CN105782566B CN201610214616.8A CN201610214616A CN105782566B CN 105782566 B CN105782566 B CN 105782566B CN 201610214616 A CN201610214616 A CN 201610214616A CN 105782566 B CN105782566 B CN 105782566B
Authority
CN
China
Prior art keywords
anchor block
heat insulation
insulation layer
layer
insulated piping
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610214616.8A
Other languages
Chinese (zh)
Other versions
CN105782566A (en
Inventor
陆江
耿晓梅
滕爱君
马永祥
程梦鹏
吴文
李可夫
王鸿
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Design Branch Of China Petroleum Pipeline Engineering Corp
China National Petroleum Corp
China Petroleum Pipeline Engineering Corp
Original Assignee
China National Petroleum Corp
China Petroleum Pipeline Engineering Corp
China Petroleum Pipeline Engineering Corp Design Branch
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China National Petroleum Corp, China Petroleum Pipeline Engineering Corp, China Petroleum Pipeline Engineering Corp Design Branch filed Critical China National Petroleum Corp
Priority to CN201610214616.8A priority Critical patent/CN105782566B/en
Publication of CN105782566A publication Critical patent/CN105782566A/en
Application granted granted Critical
Publication of CN105782566B publication Critical patent/CN105782566B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L1/00Laying or reclaiming pipes; Repairing or joining pipes on or under water
    • F16L1/024Laying or reclaiming pipes on land, e.g. above the ground
    • F16L1/06Accessories therefor, e.g. anchors
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L1/00Laying or reclaiming pipes; Repairing or joining pipes on or under water
    • F16L1/024Laying or reclaiming pipes on land, e.g. above the ground
    • F16L1/026Laying or reclaiming pipes on land, e.g. above the ground in or on a frozen surface
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L59/00Thermal insulation in general
    • F16L59/12Arrangements for supporting insulation from the wall or body insulated, e.g. by means of spacers between pipe and heat-insulating material; Arrangements specially adapted for supporting insulated bodies
    • F16L59/135Hangers or supports specially adapted for insulated pipes

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Road Paving Structures (AREA)

Abstract

The present invention relates to a kind of insulated piping anchor block and its construction methods of installation, belong to pipeline engineering technical field.A kind of insulated piping anchor block, the anchor block outer surface set heat insulation layer, and the heat insulation layer outer surface is equipped with finishing mucilage;Wherein, the heat insulation layer is fixed on by bonding agent or expandable nail on the anchor block outer surface, and the material of the heat insulation layer is rigid polyurethane foam or extrusion molding polystyrene polyfoam.The invention further relates to a kind of construction methods of installation of insulated piping anchor block.Insulated piping anchor block of the present invention blocks pipeline system thermal scattering and disappearing into frozen soil stratum, so as to fulfill pipe-line system energy consumption, protection of permafrost layer thermal balance is reduced by setting heat insulation layer in anchor block outer surface.

Description

A kind of insulated piping anchor block and its construction method of installation
Technical field
The present invention relates to a kind of insulated piping anchor block and its construction methods of installation, belong to pipeline engineering technical field.
Background technology
Buried heated transportation pipeline generally sets insulating layer in pipeline external surface, prevents pipeline heat by Frozen Ground Area Loss destroys the thermal balance of surrounding frozen soil layer.It is restrained line because of the position for generation of expanding with heat and contract with cold in part hot-bending bends position It moves, it is necessary to set anchor block (also referred to as anchoring pier).Pipeline and anchoring flange in anchor block directly connect without insulating layer with concrete It touches, and anchor block surface is also not provided with insulating layer, and pipe-line system heat is caused largely to scatter and disappear at anchor block.Frozen soil is to temperature pole For sensitivity, pipe-line system heat largely scatters and disappears at anchor block, will destroy the thermal balance on surrounding frozen soil stratum, thaw collapse etc. is caused to ask Topic influences pipe safety, therefore anchor block becomes the weak link of pipeline heat-insulating system.
The content of the invention
To solve the above problems, it is an object of the invention to provide a kind of insulated piping anchor block and its installation sides Method, suitable for the pipeline anchor of Frozen Ground Area, by setting heat insulation layer in anchor block outer surface, block pipeline system thermal to Scattering and disappearing in frozen soil stratum, so as to fulfill pipe-line system energy consumption, protection of permafrost layer thermal balance is reduced.
The purpose of the present invention is what is be achieved through the following technical solutions:
A kind of insulated piping anchor block, the anchor block outer surface set heat insulation layer, and the heat insulation layer outer surface is equipped with and smears Face rubber cement;Wherein, the heat insulation layer is fixed on by bonding agent or expandable nail on the anchor block outer surface, the heat insulation layer Material is rigid polyurethane foam or extrusion molding polystyrene polyfoam.
Further, the thickness of the heat insulation layer is not less than 50mm.
Further, the rigid polyurethane foam or the apparent density of extrusion molding polystyrene polyfoam are not less than 30kg/m3
Further, the rigid polyurethane foam or the compression strength of extrusion molding polystyrene polyfoam are not less than 100kPa。
Further, the heat insulation layer outer surface is equipped with two layers of finishing mucilage, is pasted among two layers of finishing mucilage Grid cloth.
Further, the grid cloth is fiberglass gridding cloth.
The construction method of installation of the insulated piping anchor block, comprises the following steps:
Step 1, in bottom of foundation ditch casting concrete bed course, tile one layer of heat insulation layer on the concrete cushion;
Step 2, formwork and casting concrete anchor block on the heat insulation layer, the anchor block conserve 2- in step 1 After 14 days, the template of the anchor block is removed;
Step 3, one layer of thermal insulation is fixed by bonding agent or expandable nail respectively in the top surface of the anchor block and four sides Layer;
Step 4, heat insulation layer outer surface in step 3 applies one layer of finishing mucilage, then paving fiberglass gridding cloth, After the finishing mucilage solidifies and dries, then one layer of finishing mucilage of even application, and conserve 2-14 days;
Step 5, foundation pit earth back-filling in layers and tamp, complete the installation of insulated piping anchor block.
Further, the rigid polyurethane foam is in-situ spraying or is prefabricated rear mounted on the anchor block Outer surface.
Further, the extrusion molding polystyrene polyfoam is the prefabricated rear outer surface for being mounted on the anchor block.
Beneficial effects of the present invention are:
Insulated piping anchor block of the present invention, suitable for the pipeline anchor of Frozen Ground Area, by anchor block appearance Face sets heat insulation layer, blocks pipeline system thermal scattering and disappearing into frozen soil stratum, so as to fulfill pipe-line system energy consumption, protection is reduced Frozen soil layer thermal balance.
Description of the drawings
Fig. 1 is the structure diagram of insulated piping anchor block of the present invention;
Wherein, 1- anchor blocks, 2- bonding agents, 3- heat insulation layers, 4- expandable nails, 5- grid cloths, 6- finishing mucilages.
Specific embodiment
In order to make the purpose , technical scheme and advantage of the present invention be clearer, with reference to the accompanying drawings and embodiments, it is right The present invention is further elaborated.It should be appreciated that specific embodiment described herein is only to explain the present invention, not For limiting the present invention.
A kind of insulated piping anchor block, the anchor block outer surface set heat insulation layer in one week, and the thickness of the heat insulation layer is not Less than 50mm, the heat insulation layer outer surface is equipped with two layers of finishing mucilage, and grid cloth is pasted among two layers of finishing mucilage, In, the heat insulation layer is fixed on by bonding agent or expandable nail on the anchor block outer surface, and the material of the heat insulation layer is hard Matter polyurethane foam plastics or extrusion molding polystyrene polyfoam, the rigid polyurethane foam or extruded polystyrene bubble The apparent density of foam plastics is not less than 30kg/m3, the rigid polyurethane foam or extrusion molding polystyrene polyfoam Compression strength is not less than 100kPa.
Preferably, the grid cloth is fiberglass gridding cloth.
The construction method of installation of the insulated piping anchor block, comprises the following steps:
Step 1, in bottom of foundation ditch casting concrete bed course, tile one layer of heat insulation layer on the concrete cushion;
Step 2, formwork and casting concrete anchor block on the heat insulation layer, the anchor block conserve 7 days in step 1 Afterwards, the template of the anchor block is removed;
Step 3, one layer is fixed by bonding agent or expandable nail absolutely respectively in the side of the anchor block and the outside of top surface Thermosphere;
Step 4, heat insulation layer outer surface in step 3 applies one layer of finishing mucilage, then paving fiberglass gridding cloth, After the finishing mucilage solidifies and dries, then one layer of finishing mucilage of even application, and conserve 7 days;
Step 5, foundation pit earth back-filling in layers and tamp, complete the installation of insulated piping anchor block.
Wherein, the rigid polyurethane foam is in-situ spraying or is the prefabricated rear appearance for being mounted on the anchor block Face.
The extrusion molding polystyrene polyfoam is the prefabricated rear outer surface for being mounted on the anchor block.
The foregoing is only a preferred embodiment of the present invention, is not intended to limit the invention, for the skill of this field For art personnel, the invention may be variously modified and varied.Within the spirit and principles of the invention, that is made any repaiies Change, equivalent substitution, improvement etc., should all be included in the protection scope of the present invention.

Claims (1)

1. a kind of construction method of installation of insulated piping anchor block, which is characterized in that
Anchor block (1) outer surface sets heat insulation layer (3), and heat insulation layer (3) outer surface is equipped with finishing mucilage (6);Wherein, The heat insulation layer (3) is fixed on by bonding agent (2) or expandable nail (4) on the anchor block (1) outer surface, the heat insulation layer (3) material is rigid polyurethane foam;
The thickness of the heat insulation layer (3) is not less than 50mm;The apparent density of the rigid polyurethane foam is not less than 30kg/ m3;The compression strength of the rigid polyurethane foam is not less than 100kPa;
Heat insulation layer (3) outer surface is equipped with two layers of finishing mucilage (6), and grid is pasted among two layers of finishing mucilage (6) Cloth (5);Wherein, the grid cloth (5) is fiberglass gridding cloth;
The construction method of installation comprises the following steps:
Step 1, in bottom of foundation ditch casting concrete bed course, tile one layer of heat insulation layer on the concrete cushion;
Step 2, formwork and casting concrete anchor block on the heat insulation layer, the anchor block conserve 2-14 days in step 1 Afterwards, the template of the anchor block is removed;
Step 3, one layer of heat insulation layer is fixed by bonding agent or expandable nail respectively in the top surface of the anchor block and four sides;
Step 4, heat insulation layer outer surface in step 3 applies one layer of finishing mucilage, and then paving fiberglass gridding cloth, treats institute After stating finishing mucilage solidification and drying, then one layer of finishing mucilage of even application, and conserve 2-14 days;
Step 5, foundation pit earth back-filling in layers and tamp, complete the installation of insulated piping anchor block;
Wherein, the rigid polyurethane foam is in-situ spraying or is the prefabricated rear outer surface for being mounted on the anchor block.
CN201610214616.8A 2016-04-07 2016-04-07 A kind of insulated piping anchor block and its construction method of installation Active CN105782566B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610214616.8A CN105782566B (en) 2016-04-07 2016-04-07 A kind of insulated piping anchor block and its construction method of installation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610214616.8A CN105782566B (en) 2016-04-07 2016-04-07 A kind of insulated piping anchor block and its construction method of installation

Publications (2)

Publication Number Publication Date
CN105782566A CN105782566A (en) 2016-07-20
CN105782566B true CN105782566B (en) 2018-06-01

Family

ID=56395997

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610214616.8A Active CN105782566B (en) 2016-04-07 2016-04-07 A kind of insulated piping anchor block and its construction method of installation

Country Status (1)

Country Link
CN (1) CN105782566B (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4629364A (en) * 1985-07-25 1986-12-16 The United States Of America As Represented By The Secretary Of The Army Method and system for relieving pipeline stress due to frost action
CN1936401A (en) * 2006-10-20 2007-03-28 吕迎智 Direct-buried steam pipeline heat-insulation fixing rack
CN102561685A (en) * 2010-12-13 2012-07-11 五冶集团上海有限公司 Construction method of extruded polystyrene foamed plastic insulation boards in house energy-saving materials
CN203034631U (en) * 2012-12-17 2013-07-03 天津英康科技发展有限公司 Vitrified micro-bead fireproof isolation band plate
CN204609012U (en) * 2015-02-01 2015-09-02 江苏卧牛山保温防水技术有限公司 A kind of assembled architecture outer wall heat-insulation system
CN205534578U (en) * 2016-04-07 2016-08-31 中国石油天然气集团公司 Adiabatic pipeline anchor

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4629364A (en) * 1985-07-25 1986-12-16 The United States Of America As Represented By The Secretary Of The Army Method and system for relieving pipeline stress due to frost action
CN1936401A (en) * 2006-10-20 2007-03-28 吕迎智 Direct-buried steam pipeline heat-insulation fixing rack
CN102561685A (en) * 2010-12-13 2012-07-11 五冶集团上海有限公司 Construction method of extruded polystyrene foamed plastic insulation boards in house energy-saving materials
CN203034631U (en) * 2012-12-17 2013-07-03 天津英康科技发展有限公司 Vitrified micro-bead fireproof isolation band plate
CN204609012U (en) * 2015-02-01 2015-09-02 江苏卧牛山保温防水技术有限公司 A kind of assembled architecture outer wall heat-insulation system
CN205534578U (en) * 2016-04-07 2016-08-31 中国石油天然气集团公司 Adiabatic pipeline anchor

Also Published As

Publication number Publication date
CN105782566A (en) 2016-07-20

Similar Documents

Publication Publication Date Title
CN104314088B (en) Seasonal frozen soil region self-temperature-regulating return power consumption slope body supporting and protection structure and construction method
CN102116078B (en) Heat insulation and water prevention integration building roof and construction method thereof
CN103774663B (en) The water proof structure of basement anti-floating dowel and construction method
CN104895089B (en) Basement floor and the construction method of the cooperative permanent support system of support pile
CN103938583B (en) Earth and rockfill dam revetment and construction method thereof
CN205475195U (en) Bloated joint vacuum preloading ground processing apparatus of bandlet side
CN205013018U (en) Severe cold district tunnel portal section waterproof heat -insulating layer construction structures
CN110295614B (en) Slope supporting device and system in frozen soil area
CN205534578U (en) Adiabatic pipeline anchor
CN105421178A (en) Heating-layer pavement for cold region and construction technology thereof
CN106948502A (en) A kind of water-proof top cover and its construction method
WO2009129727A1 (en) Dam construction method utilizing refrigeration technique
CN105782566B (en) A kind of insulated piping anchor block and its construction method of installation
CN111472817B (en) Water-stopping and anti-freezing structure for tunnel in high-cold freezing and thawing water-rich environment and construction method
US20120057941A1 (en) Method and device for supporting lightly loaded structures and pavements on highly expansive soils
Xiao et al. Mechanical model and validation of frost heave damage of precast concrete slab lining trapezoidal canal in open system
CN207228173U (en) A kind of underground project waterproof structure
CN108166455A (en) A kind of construction method and structure of High-cold regions excavation channel anti-freeze expansion
CN114086572A (en) Waterproof energy dissipation supporting construction is used on inflation soil slope
CN207211611U (en) Floor heating ground wall body structure
RU2440464C1 (en) Anti-heaving foundation of building with basement
CN203569726U (en) Bearing-type cast-in-place insulating layer outer wall
JP2781828B2 (en) Lightweight embankment method
RU2552741C2 (en) Foundation under column grid
CN218814964U (en) Ground structure that gypsum base self-leveling mortar laid

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TA01 Transfer of patent application right

Effective date of registration: 20180515

Address after: 100120 Xicheng District six paw Kang in Beijing City

Applicant after: China National Petroleum Corp.

Applicant after: China Petroleum Pipeline Engineering Co.,Ltd.

Applicant after: DESIGN BRANCH OF CHINA PETROLEUM PIPELINE ENGINEERING Corp.

Address before: 100007 Dongzhimen North Street, Dongcheng District, Dongcheng District, Beijing

Applicant before: China National Petroleum Corp.

Applicant before: CHINA PETROLEUM PIPELINE BUREAU

Applicant before: CHINA PETROLEUM PIPELINE ENGINEERING Corp.

TA01 Transfer of patent application right
CP03 Change of name, title or address

Address after: 100007 Dongzhimen North Street, Dongcheng District, Dongcheng District, Beijing

Co-patentee after: China Petroleum Pipeline Engineering Co.,Ltd.

Patentee after: CHINA NATIONAL PETROLEUM Corp.

Co-patentee after: DESIGN BRANCH OF CHINA PETROLEUM PIPELINE ENGINEERING Corp.

Address before: 100120 Xicheng District six paw Kang in Beijing City

Co-patentee before: China Petroleum Pipeline Engineering Co.,Ltd.

Patentee before: China National Petroleum Corp.

Co-patentee before: DESIGN BRANCH OF CHINA PETROLEUM PIPELINE ENGINEERING Corp.

CP03 Change of name, title or address
TR01 Transfer of patent right

Effective date of registration: 20190702

Address after: 100007 Dongzhimen North Street, Dongcheng District, Dongcheng District, Beijing

Co-patentee after: China Petroleum Pipeline Engineering Co.,Ltd.

Patentee after: CHINA NATIONAL PETROLEUM Corp.

Co-patentee after: CHINA PETROLEUM PIPELINE ENGINEERING Corp.

Address before: 100007 Dongzhimen North Street, Dongcheng District, Dongcheng District, Beijing

Co-patentee before: China Petroleum Pipeline Engineering Co.,Ltd.

Patentee before: CHINA NATIONAL PETROLEUM Corp.

Co-patentee before: DESIGN BRANCH OF CHINA PETROLEUM PIPELINE ENGINEERING Corp.

TR01 Transfer of patent right