CN105780714B - 一种水库群联合供水水权分配调度方法 - Google Patents
一种水库群联合供水水权分配调度方法 Download PDFInfo
- Publication number
- CN105780714B CN105780714B CN201610181406.3A CN201610181406A CN105780714B CN 105780714 B CN105780714 B CN 105780714B CN 201610181406 A CN201610181406 A CN 201610181406A CN 105780714 B CN105780714 B CN 105780714B
- Authority
- CN
- China
- Prior art keywords
- water
- reservoir
- mrow
- msub
- transfer
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B1/00—Equipment or apparatus for, or methods of, general hydraulic engineering, e.g. protection of constructions against ice-strains
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
针对两个及两个以上调水水库调水量与调水时机不确定的问题,本发明建立基于供水系统全局缺水风险最小化的水库群联合模拟优化调度模型,采用并行多种群混合进化的粒子群算法PMSE‑PSO优化确定满足各水库供水要求的库群调水规则和供水规则,并优化确定多调水水库的最大调水规模,最后基于优化规则及调水规模进行水库调度计算,进而求出各计算时段调水过程以及各水库区用水户供水量。本发明针对多并联调水水库向一个受水水库调水且调水量未知的情形,求解各调水水库调水量和调水时机,实现了水库群联合调度的技术突破,为水库调度决策部门提供了一个新的调度思路。
Description
技术领域
本发明涉及水库调度领域,具体地说是一种水库群联合供水水权分配调度方法。
背景技术
我国水资源日趋短缺,且时空分布极度不均衡。在新时期区域社会经济发展的高用水要求下,水库群间的水力联系日益复杂化使水库群联合调度研究表现出高度的复杂性。但是目前在水库群联合优化调度方面的研究大多集中在一个调水水库向多个(或单个)受水水库调水且目标调水量已知的情形,而针对两个及两个以上调水水库调水量与调水时机不确定的并联调水的水库群联合调度规则研究很少见到,并且很少将水库供水规则和调水规则相结合来研究水库群优化调度。在调水时机与调水量未知的情况下,如何基于缺水风险确定调水水库的最大调水规模、水库群调水规则和供水规则成为当前亟待解决的问题。也就是说,需要解决水源区水库群何时向受水区水库调水、调多少水并考虑在调水启动的情况下,水库群如何对各用水户进行适时适量供水的问题。
发明内容
本发明的目的是克服现有技术存在的不足,提供一种水库群联合供水水权分配调度方法,能在调水时机和调水量未知的情形下,由基于供水系统全局风险最小化的水库群联合模拟优化调度模型确定出的调水水库最大调水规模,各水库调水控制线和用水户供水限制线,构成了简单实用的水库群调水规则和供水规则。
本发明的工作原理为:建立基于供水系统全局风险最小化的水库群联合模拟优化调度模型,同时确定水库群的调水规则、供水规则以及调水规模,以此来指导水库群的实际调度。
本发明一种水库群联合供水水权分配调度方法,包括如下步骤:
建立基于供水系统全局风险最小化的水库群联合模拟优化调度模型;
确定水库群的调水规则、供水规则以及调水规模。
所述建立水库群联合模拟优化调度模型,首先建立目标函数,目标函数包括缺水风险最低、弃水量最小、缺水损失程度最低、调水时段数最小,目标函数如下式:
式中,RHij为i水库j用水户的缺水危险性,REij为i水库j用水户的缺水暴露性,RVij为i水库j用水户的缺水脆弱性,RCij为i水库j用水户的防旱抗旱能力,T为总时段数,Ti为调水时段,SUi为i水库的弃水量,Wij为i水库j用水户的缺水量,Qij为i水库j用水户的供水量,N为水库的个数,M为用水户的个数,wR,wE,wSU和wT分别为各子目标的权重。
决策变量x,y,z分别为各水库调水控制线、供水限制线、和调水水库的最大调水规模;
约束条件为:
水量平衡约束:Vt+1=Vt+It-Qt+Lt+SUt+Dt
水库蓄水能力上下限约束:V min≤Vt≤V max
决策变量上下限约束:V min≤xi,yi,zi≤V max
水库库容-面积-水位特征曲线:Zi,t=f(Vi,t),Vi,t=f(Si,t)
限制供水能力不超过允许破坏深度:α1=0.9,α2=0.75。
为避免陷入局部最优解,出现早熟收敛的现象,采用并行多种群混合进化的粒子群算法(Parallel-swarms Shuffling Evolution Algorithm,简称PMSE-PSO)。
所述并行多种群混合进化的粒子群算法的具体步骤如下:
(1)在可行域范围内随机产生M×N个粒子,其中M为子群体个数,N为每个子群体中粒子的个数,并计算每个粒子的目标函数值;
(2)将粒子按目标函数值从小到大的顺序进行排序;
(3)按照分配规则将总群体分成M个子群体,每个子群体中粒子的个数为N;
(4)利用PSO算法进化每个子群体;
(5)经过一定迭代次数后,将子群体进行混合,使所有粒子进行信息交流,并将每个粒子按目标函数值重新进行排序;
(6)如果满足终止准则则退出;否则回到步骤(3)。
调水规则如下:(1)当受水水库a蓄水量高于其调水控制线时,表示不需要调水,故不发生调水。无论水源水库b、c蓄水情况怎样,均不发生调水;
(2)对于受水水库a蓄水量低于其调水控制线时,需要调水,存在以下情形:
①当调水水库b、c蓄水量均高于各自调水控制线时,表示有多余水量可以外调,调水启动,即水源水库在其最大调水规模的约束下向受水水库a调水;
②当调水水库中的某个水库(b或c)的蓄水量高于调水控制线,另外一个水库的蓄水量低于调水控制线时,则可以进行外调的水源水库在其最大调水规模的约束下向受水水库调水;
③如果调水水库b、c蓄水量均低于各自调水控制线,说明无论受水水库蓄水状态如何,都不发生调水。
供水规则如下:农业供水限制线、工业与生活供水限制线确定水库是否限制供水;在一定时段内:当水库水位位于农业限制供水线之上、水库最高蓄水位之下时,水库生活、工业、农业供水均按需供水;当水库水位位于农业限制供水线之下、工业与生活限制供水线之上时,生活和工业正常供水,农业供水按限制系数限制供水;当水库水位位于工业与生活供水限制线之下、死水位之上时,工业、农业供水均按各自的限制系数限制供水。
与现有技术相比,本发明的有益效果在于:
其一,自动确定多个并联调水水库调水时机,调水量大小仅与调水水库及受水水库时段初的库容相关,与受水水库是否缺水无直接关系。
其二,调水量大小仅受调水规模及其可调水量约束,与受水水库缺水量大小无直接关系。
其三,从缺水风险最小化的角度建立调度模型,同时优化确定调水规则、供水规则及最大调水规模。
其四,多个并联调水水库向一个受水水库调水,在调水量未知的情况下,优化调度模型,把调水水库最大调水规模为决策变量之一,然后把优化得到的最大调水规模作为本流域最后一个虚拟的用水户进行供水(即可向受水水库调水),进而确定各时段实际调水量和用水户供水量。
其五,把调水规则和供水规则结合起来,基于供水系统全局风险最小化研究水库群调度规则。
附图说明
图1为本发明方法流程图。
图2为本发明实施例的a-b-c水库群水力联系图。
图3为本发明实施例的a-b-c水库群调水规则和供水规则图。
具体实施方式
下面通过实施例,并结合附图对本发明作进一步说明。
如图1所示,一种水库群联合供水水权分配调度方法,以湖北省本来没有水力联系的三库库群为例:a(代表短港水库)为受水水库,b(代表高关水库)和c(代表郑家河水库)是调水水库,利用水库群联合模拟优化调度模型来优化确定调水规则、供水规则以及调水规模。
目标函数:包括缺水风险最低、弃水量最小、缺水损失程度最低、调水时段数最小,目标函数如下式:
式中,RHij为i水库j用水户的缺水危险性,REij为i水库j用水户的缺水暴露性,RVij为i水库j用水户的缺水脆弱性,RCij为i水库j用水户的防旱抗旱能力,T为总时段数,Ti为调水时段,SUi为i水库的弃水量,Wij为i水库j用水户的缺水量,Qij为i水库j用水户的供水量,N为水库的个数,M为用水户的个数,wR,wE,wSU和wT分别为各子目标的权重。
决策变量x,y,z分别为各水库调水控制线、供水限制线、和调水水库的最大调水规模。
约束条件为:
水量平衡约束:Vt+1=Vt+It-Qt+Lt+SUt+Dt
水库蓄水能力上下限约束:V min≤Vt≤V max
决策变量上下限约束:V min≤xi,yi,zi≤V max
水库库容-面积-水位特征曲线:Zi,t=f(Vi,t),Vi,t=f(Si,t)
限制供水能力不超过允许破坏深度:α1=0.9,α2=0.75。
模型求解:为避免陷入局部最优解,出现早熟收敛的现象,采用并行多种群混合进化的粒子群算法(PMSE-PSO)。PMSE-PSO算法的具体步骤如下:(1)算法在可行域范围内随机产生M×N个粒子,其中M为子群体个数,N为每个子群体中粒子的个数,并计算每个粒子的目标函数值;(2)将粒子按目标函数值从小到大的顺序进行排序;(3)按照分配规则将总群体分成M个子群体,每个子群体中粒子的个数为N;(4)利用PSO算法进化每个子群体;(5)经过一定迭代次数后,将子群体进行混合,使所有粒子进行信息交流,并将每个粒子按目标函数值重新进行排序;(6)如果满足终止准则则退出;否则回到步骤(3)。
2.具体结果见图3,下面是具体结果分析:
(1)两调水水库向一个受水水库调水,以月为计算时段,在调水量未知的情况下,优化调度模型把两调水水库最大调水规模为决策变量之一,然后把优化得到的最大调水规模(高关水库的最大调水规模为15m3/s,郑家河水库的最大调水规模为2m3/s)作为本流域最后一个虚拟的用水户进行供水,进而进行水库调度计算,求出调水控制线和供水限制线(如图3)。
(2)调水规则由一组基于各水库蓄水量的调水控制线表示(如图3)。a、b、c水库在调水过程中,根据各库蓄水量与对应调水控制线的相对位置关系,决定是否调水,调水量如何分配等。供水规则由各库供水限制线表示(如图3),对应于不同用水户的限制供水线将水库的兴利库容分为若干调度区。调度过程中,根据水库蓄水状态所在调度区的供水规则对各用水户进行供水。
(3)调水控制线位置的高低决定了调水行为的启动条件。对于水源水库b和c,调水控制线位置越低意味着向外调水的几率越大,这样年均外调水量会变大。对于受水水库a,调水控制线位置越高,意味着接受调水的几率越大,年均调入水量会越多。
(4)结合图3,调水规则如下:(1)当受水水库a蓄水量高于其调水控制线时,表示不需要调水,故不发生调水。无论水源水库b、c蓄水情况怎样,均不发生调水。(2)对于受水水库a蓄水量低于其调水控制线时,需要调水,存在以下情形:①当调水水库b、c蓄水量均高于各自调水控制线时,表示有多余水量可以外调,调水启动,即水源水库在其最大调水规模的约束下向受水水库a调水。②当调水水库中的某个水库(b或c)的蓄水量高于调水控制线,另外一个水库的蓄水量低于调水控制线时,则可以进行外调的水源水库在其最大调水规模的约束下向受水水库调水。③如果调水水库b、c蓄水量均低于各自调水控制线,说明无论受水水库蓄水状态如何,都不发生调水。
(5)结合图3,供水规则如下:农业供水限制线、工业与生活供水限制线确定水库是否限制供水。在一定时段内:当水库水位位于农业限制供水线之上、水库最高蓄水位之下时,水库生活、工业、农业供水均按需供水;当水库水位位于农业限制供水线之下、工业与生活限制供水线之上时,生活和工业正常供水,农业供水按限制系数限制供水;当水库水位位于工业与生活供水限制线之下、死水位之上时,工业、农业供水均按各自的限制系数限制供水。
Claims (4)
1.一种水库群联合供水水权分配调度方法,其特征在于包括如下步骤:
建立基于供水系统全局风险最小化的水库群联合模拟优化调度模型;
确定水库群的调水规则、供水规则以及调水规模;
所述建立水库群联合模拟优化调度模型,建立目标函数如下式:
<mfenced open = "" close = "">
<mtable>
<mtr>
<mtd>
<mrow>
<mi>o</mi>
<mi>b</mi>
<mi>j</mi>
<mo>:</mo>
<mi>m</mi>
<mi>i</mi>
<mi>n</mi>
<mi> </mi>
<mi>F</mi>
<mrow>
<mo>(</mo>
<mi>x</mi>
<mo>,</mo>
<mi>y</mi>
<mo>,</mo>
<mi>z</mi>
<mo>)</mo>
</mrow>
<mo>=</mo>
<msub>
<mi>w</mi>
<mi>R</mi>
</msub>
<mo>.</mo>
<mrow>
<mo>(</mo>
<munderover>
<mo>&Sigma;</mo>
<mrow>
<mi>i</mi>
<mo>=</mo>
<mn>1</mn>
</mrow>
<mi>N</mi>
</munderover>
<munderover>
<mo>&Sigma;</mo>
<mrow>
<mi>j</mi>
<mo>=</mo>
<mn>1</mn>
</mrow>
<mi>M</mi>
</munderover>
<mo>(</mo>
<mrow>
<msub>
<mi>RH</mi>
<mrow>
<mi>i</mi>
<mi>j</mi>
</mrow>
</msub>
<mo>.</mo>
<msub>
<mi>RE</mi>
<mrow>
<mi>i</mi>
<mi>j</mi>
</mrow>
</msub>
<mo>.</mo>
<msub>
<mi>RV</mi>
<mrow>
<mi>i</mi>
<mi>j</mi>
</mrow>
</msub>
<mo>.</mo>
<msub>
<mi>RC</mi>
<mrow>
<mi>i</mi>
<mi>j</mi>
</mrow>
</msub>
</mrow>
<mo>)</mo>
<mo>)</mo>
</mrow>
</mrow>
</mtd>
</mtr>
<mtr>
<mtd>
<mrow>
<mo>+</mo>
<msub>
<mi>w</mi>
<mrow>
<mi>S</mi>
<mi>U</mi>
</mrow>
</msub>
<mo>.</mo>
<munderover>
<mo>&Sigma;</mo>
<mrow>
<mi>i</mi>
<mo>=</mo>
<mn>1</mn>
</mrow>
<mi>N</mi>
</munderover>
<msub>
<mi>SU</mi>
<mi>i</mi>
</msub>
<mo>+</mo>
<msub>
<mi>w</mi>
<mi>T</mi>
</msub>
<mo>.</mo>
<munderover>
<mo>&Sigma;</mo>
<mrow>
<mi>i</mi>
<mo>=</mo>
<mn>1</mn>
</mrow>
<mi>N</mi>
</munderover>
<msub>
<mi>T</mi>
<mi>i</mi>
</msub>
<mo>+</mo>
<msub>
<mi>w</mi>
<mi>E</mi>
</msub>
<mo>.</mo>
<mrow>
<mo>{</mo>
<mrow>
<mfrac>
<mn>1</mn>
<mi>T</mi>
</mfrac>
<munderover>
<mo>&Sigma;</mo>
<mrow>
<mi>t</mi>
<mo>=</mo>
<mn>1</mn>
</mrow>
<mi>T</mi>
</munderover>
<mrow>
<mo>&lsqb;</mo>
<mrow>
<mi>max</mi>
<mrow>
<mo>(</mo>
<mrow>
<mn>0</mn>
<mo>,</mo>
<munderover>
<mo>&Sigma;</mo>
<mrow>
<mi>i</mi>
<mo>=</mo>
<mn>1</mn>
</mrow>
<mi>N</mi>
</munderover>
<munderover>
<mo>&Sigma;</mo>
<mrow>
<mi>j</mi>
<mo>=</mo>
<mn>1</mn>
</mrow>
<mi>M</mi>
</munderover>
<mfrac>
<mrow>
<msub>
<mi>W</mi>
<mrow>
<mi>i</mi>
<mi>j</mi>
</mrow>
</msub>
<mo>-</mo>
<msub>
<mi>Q</mi>
<mrow>
<mi>i</mi>
<mi>j</mi>
</mrow>
</msub>
</mrow>
<msub>
<mi>W</mi>
<mrow>
<mi>i</mi>
<mi>j</mi>
</mrow>
</msub>
</mfrac>
</mrow>
<mo>)</mo>
</mrow>
</mrow>
<mo>&rsqb;</mo>
</mrow>
</mrow>
<mo>}</mo>
</mrow>
</mrow>
</mtd>
</mtr>
</mtable>
</mfenced>
式中,RHij为i水库j用水户的缺水危险性,REij为i水库j用水户的缺水暴露性,RVij为i水库j用水户的缺水脆弱性,RCij为i水库j用水户的防旱抗旱能力,T为总时段数,Ti为调水时段,SUi为i水库的弃水量,Wij为i水库j用水户的缺水量,Qij为i水库j用水户的供水量,N为水库的个数,M为用水户的个数,wR,wE,wSU和wT分别为各子目标的权重;
决策变量x,y,z分别为各水库调水控制线、供水限制线、和调水水库的最大调水规模;
约束条件为:
水量平衡约束:Vt+1=Vt+It-Qt+Lt+SUt+Dt
水库蓄水能力上下限约束:V min≤Vt≤V max
决策变量上下限约束:V min≤xi,yi,zi≤V max
水库库容-面积-水位特征曲线:Zi,t=f(Vi,t),Vi,t=f(Si,t)
限制供水能力不超过允许破坏深度:α1=0.9,α2=0.75。
2.如权利要求1所述的方法,其特征在于:为避免陷入局部最优解及出现早熟收敛的现象,采用并行多种群混合进化的粒子群算法,具体步骤如下:
(1)在可行域范围内随机产生M×N个粒子,其中M为子群体个数,N为每个子群体中粒子的个数,并计算每个粒子的目标函数值;
(2)将粒子按目标函数值从小到大的顺序进行排序;
(3)按照分配规则将总群体分成M个子群体,每个子群体中粒子的个数为N;
(4)利用PSO算法进化每个子群体;
(5)经过一定迭代次数后,将子群体进行混合,使所有粒子进行信息交流,并将每个粒子按目标函数值重新进行排序;
(6)如果满足终止准则则退出;否则回到步骤(3)。
3.如权利要求1所述的方法,其特征在于调水规则如下:
(1)当受水水库a蓄水量高于其调水控制线时,表示不需要调水,故不发生调水;
(2)对于受水水库a蓄水量低于其调水控制线时,需要调水,存在以下情形:
①当调水水库b、c蓄水量均高于各自调水控制线时,表示有多余水量可以外调,调水启动,即水源水库在其最大调水规模的约束下向受水水库a调水;
②当调水水库中的某个水库的蓄水量高于调水控制线,另外一个水库的蓄水量低于调水控制线时,则可以进行外调的水源水库在其最大调水规模的约束下向受水水库调水;
③如果调水水库b、c蓄水量均低于各自调水控制线,说明无论受水水库蓄水状态如何,都不发生调水。
4.如权利要求1所述的方法,其特征在于供水规则如下:农业供水限制线、工业与生活供水限制线确定水库是否限制供水;在一定时段内:当水库水位位于农业限制供水线之上、水库最高蓄水位之下时,水库生活、工业、农业供水均按需供水;当水库水位位于农业限制供水线之下、工业与生活限制供水线之上时,生活和工业正常供水,农业供水按限制系数限制供水;当水库水位位于工业与生活供水限制线之下、死水位之上时,工业、农业供水均按各自的限制系数限制供水。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610181406.3A CN105780714B (zh) | 2016-03-28 | 2016-03-28 | 一种水库群联合供水水权分配调度方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610181406.3A CN105780714B (zh) | 2016-03-28 | 2016-03-28 | 一种水库群联合供水水权分配调度方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105780714A CN105780714A (zh) | 2016-07-20 |
CN105780714B true CN105780714B (zh) | 2017-11-28 |
Family
ID=56391087
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610181406.3A Expired - Fee Related CN105780714B (zh) | 2016-03-28 | 2016-03-28 | 一种水库群联合供水水权分配调度方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105780714B (zh) |
Families Citing this family (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108797511B (zh) * | 2018-06-19 | 2019-05-21 | 中国水利水电科学研究院 | 一种面向河道生态需水的水资源配置的方法 |
CN109409721A (zh) * | 2018-10-17 | 2019-03-01 | 中水东北勘测设计研究有限责任公司 | 一种双向跨流域供水水库群联合调度方法 |
CN109377064B (zh) * | 2018-10-31 | 2021-09-07 | 中国水利水电科学研究院 | 基于综合评价信息的城市多水库水源水量分配方法 |
CN109709797A (zh) * | 2018-12-27 | 2019-05-03 | 上海电力学院 | 一种变频调速恒压供水控制方法及控制系统 |
CN110485362A (zh) * | 2019-09-20 | 2019-11-22 | 中国电建集团成都勘测设计研究院有限公司 | 多库自动联调式水库 |
CN111967666B (zh) * | 2020-08-17 | 2021-05-28 | 水利部交通运输部国家能源局南京水利科学研究院 | 一种江河湖水系综合协同调度系统及其调度方法 |
CN115271437B (zh) * | 2022-07-27 | 2023-04-07 | 中国水利水电科学研究院 | 一种基于多决策主体的水资源配置方法及系统 |
CN116485156B (zh) * | 2023-06-01 | 2024-03-22 | 水利部水利水电规划设计总院 | 区域水网骨干调蓄结点联合调度规则挖掘方法 |
Family Cites Families (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH1011150A (ja) * | 1996-06-26 | 1998-01-16 | Hitachi Ltd | 河川管理施設運用ガイダンスシステム |
CN101714193B (zh) * | 2009-12-29 | 2011-04-20 | 北京师范大学 | 面向河流生态系统保护的发电型水库调度函数优化方法 |
CN101833609B (zh) * | 2010-03-18 | 2011-05-18 | 北京师范大学 | 一种面向河流生态流量维持的水库优化调度方法 |
CN102708248A (zh) * | 2012-05-10 | 2012-10-03 | 湖北省电力公司 | 一种基于多目标遗传算法的调度函数优化方法 |
CN103679285B (zh) * | 2013-11-29 | 2015-04-15 | 河海大学 | 改善江湖关系的水库群联合运行调度系统及方法 |
CN104047258B (zh) * | 2014-06-23 | 2015-08-19 | 清华大学 | 一种面向环境保护的联合调度水库群的生态库容确定方法 |
-
2016
- 2016-03-28 CN CN201610181406.3A patent/CN105780714B/zh not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
CN105780714A (zh) | 2016-07-20 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105780714B (zh) | 一种水库群联合供水水权分配调度方法 | |
CN107368648B (zh) | 一种面向市政给水管网压力监测点优化布置方法 | |
CN101833609B (zh) | 一种面向河流生态流量维持的水库优化调度方法 | |
CN107044710A (zh) | 基于联合智能算法的中央空调节能控制方法及系统 | |
Tan et al. | Derivation of optimal joint operating rules for multi-purpose multi-reservoir water-supply system | |
CN108695902A (zh) | 一种梯级水库群生态-发电动态互馈调控方法 | |
CN105825437B (zh) | 一种复杂水库群共同供水任务分配方法 | |
CN102110371A (zh) | 一种基于分级多智能体架构的交通信号控制系统 | |
CN107563538A (zh) | 大电网平台下的面向关键水位控制的多目标水库群调度优化方法 | |
CN105389743A (zh) | 一种流域水量-水质联合调控优化方法 | |
CN105243611A (zh) | 一种基于负荷能效评估的集群建筑协调容量分配方法 | |
Moeini et al. | Extension of the hybrid ant colony optimization algorithm for layout and size optimization of sewer networks | |
Dong et al. | A spatial multi-objective optimization model for sustainable urban wastewater system layout planning | |
CN107992967A (zh) | 基于改进多目标遗传算法的船闸调度方法 | |
CN111680429A (zh) | 水箱主动调蓄方法及系统、电子设备、存储介质 | |
CN109496520A (zh) | 一种多目标水肥一体化系统轮灌组划分方法 | |
CN108269002A (zh) | 一种基于熵权法和可变模糊法的水上交通安全监管能力评估方法 | |
CN105849654A (zh) | 用于操作为实施至少一种化学反应而设的设备的方法 | |
CN104594282B (zh) | 一种水库运行调度图绘制方法 | |
CN110458415A (zh) | 一种基于优化配置的水资源承载状态评价方法及系统 | |
CN113309173B (zh) | 一种给水系统优化方法及小区给水系统用调整方法 | |
CN115423290A (zh) | 一种调蓄带-库塘联动系统模拟方法、装置、设备及存储介质 | |
CN109056962A (zh) | 管控水网的方法及装置 | |
CN104218598A (zh) | 一种针对多个分布式储能系统的分散自律控制方法 | |
CN104047257A (zh) | 一种面向环境保护的单一供水水库的生态库容确定方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20171128 Termination date: 20200328 |
|