CN105775959A - Electric power tower maintenance equipment for installing indicator lights and use method thereof - Google Patents

Electric power tower maintenance equipment for installing indicator lights and use method thereof Download PDF

Info

Publication number
CN105775959A
CN105775959A CN201610170069.8A CN201610170069A CN105775959A CN 105775959 A CN105775959 A CN 105775959A CN 201610170069 A CN201610170069 A CN 201610170069A CN 105775959 A CN105775959 A CN 105775959A
Authority
CN
China
Prior art keywords
lead
electric power
moving leader
power tower
block
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610170069.8A
Other languages
Chinese (zh)
Other versions
CN105775959B (en
Inventor
卞毓平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xiangxi Tongfu Power Construction Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201610170069.8A priority Critical patent/CN105775959B/en
Priority to CN201711302293.9A priority patent/CN107826937B/en
Publication of CN105775959A publication Critical patent/CN105775959A/en
Application granted granted Critical
Publication of CN105775959B publication Critical patent/CN105775959B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B9/00Kinds or types of lifts in, or associated with, buildings or other structures
    • B66B9/04Kinds or types of lifts in, or associated with, buildings or other structures actuated pneumatically or hydraulically
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B11/00Main component parts of lifts in, or associated with, buildings or other structures
    • B66B11/04Driving gear ; Details thereof, e.g. seals
    • B66B11/0423Driving gear ; Details thereof, e.g. seals actuated pneumatically or hydraulically
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B3/00Applications of devices for indicating or signalling operating conditions of elevators
    • B66B3/002Indicators
    • B66B3/004Mechanical devices that can be illuminated

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Structural Engineering (AREA)
  • Automation & Control Theory (AREA)
  • Civil Engineering (AREA)
  • Fastening Of Light Sources Or Lamp Holders (AREA)

Abstract

The invention discloses electric power tower maintenance equipment for installing indicator lights. An equipment body comprises a shell and a movable guide rod, wherein a clamping block which is used for clamping a guide post is arranged on the shell, gripping blocks which are used for gripping the guide post are respectively arranged on the top and at the bottom of the movable guide rod, a lifting cylinder is arranged between the clamping block and the bottom gripping block of the movable guide rod, a locking bolt is arranged on the clamping block, a driving motor is arranged in a locking cavity, an eccentric wheel is arranged on a main shaft of the driving motor, a cavity is formed in the movable guide rod, the indicator lights are respectively arranged on the top and at the bottom of the movable guide rod, a power supply battery pack is arranged in the cavity, and a control button which is used for controlling the indicator lights is arranged on the inner wall of the locking cavity. The electric power tower maintenance equipment has the advantages of simple structure, convenience in operation, strong applicability and good practicability, and the indication function of operation is increased. The invention further discloses a use method of the electric power tower maintenance equipment for installing the indicator lights. The operation method disclosed by the invention has the advantages of simplicity and convenience, and the use stability is greatly increased.

Description

The electric power tower maintenance equipment of a kind of installation suggestion lamp and using method thereof
Technical field
The invention belongs to electric power tower technical field, be specifically related to electric power tower maintenance equipment and the using method thereof of a kind of installation suggestion lamp.
Background technology
Maturation along with China's electric power network technology, various electric power towers quickly grow, in order to ensure the safety in utilization of electric power tower, general all can installation on electric power tower indicates device, artificial climbing is needed to install when installing instruction device yet with prior art, although its installation that can realize instruction device is fixed, but climbing is manually more difficult lifting when indicating device heavier, the labour force artificial owing to considerably increasing climbing, so also considerably increasing the risk dropped, so the suitability and practicality are restricted.
Summary of the invention
In order to solve above-mentioned technical problem, the present invention is to provide electric power tower maintenance equipment and the using method thereof of a kind of installation suggestion lamp.
nullThe technical scheme realizing the object of the invention is the electric power tower maintenance equipment of a kind of installation suggestion lamp,Including the movable apparatus body of lead on electric power tower,Described apparatus body includes housing and moving leader,Described housing is movably arranged on described moving leader,Described housing is provided with the fixture block for being clamped in lead,The grip block for being clamped in lead it is equipped with at the top of described moving leader and bottom,It is provided with lift cylinder between the end grip block of described fixture block and described moving leader,Described fixture block is provided with clamping screw,Described fixture block is fixed on lead by clamping screw is adjustable,The bottom clamping block of described moving leader is provided with lock-bit chamber,It is provided with drive motor at described lock-bit intracavity,The main shaft of described drive motor is provided with eccentric,Described eccentric take turns limit activity and be pressed on lead thus realizing the spacing fixing of moving leader,It is provided with bearing cavity in described housing,It is provided with cavity in described moving leader,It is equipped with warning light at the top of described moving leader and bottom,The supplying cell group being connected with described warning light it is provided with in described cavity,The inwall in described lock-bit chamber is provided with the control knob for controlling warning light,Described control knob is arranged far from the sidewall of lead,When described drive motor drives,The limit activity of described eccentric protruding wheel is pressed on lead or control knob.
Being provided with acoustical cotton layer on the inwall in described lock-bit chamber and be provided with buffering press block on described grip block inwall, being provided with buffering stage clip between described buffering press block and the inwall of described grip block, described buffering press block and described lock-bit chamber are symmetrical arranged.
Described eccentric wheel, limit is provided with anti-skidding burr.
Described warning light is flash lamp.
A kind of using method of the electric power tower maintenance equipment of installation suggestion lamp, including following operating procedure:
Step A, controls drive motor, makes eccentric chimb be pressed on control knob, and now warning light lights, and is fixed on lead now by clamping screw by fixture block, makes shell position fix;
Step B, then operates moving leader, makes bottom clamping block move up, and stops when the bottom surface of housing is pressed on the lift cylinder telescopic shaft of contraction;
Step C, starts drive motor, makes the grip block bottom moving leader be fixed on lead, and now eccentric chimb is pressed on lead and is separated with control knob, so now warning light does not work;
Step D, unclamps clamping screw, then starts lift cylinder, makes housing realize lifting operations under the effect of lift cylinder, and when reaching the top of lift cylinder, housing fixed by clamping screw, then shrinks lift cylinder and repeats step B.
The present invention has positive effect: the simple in construction of the present invention, simple operation, can effectively and quickly realize the elevating control of housing, and substantially increase stability in use and safety in utilization, compare artificial climbing to carry, heavier article can be carried, and the burden of climbing personnel will not be increased, stability in use is good, and it is provided with warning light, can be pointed out by warning light when moving leader lifting operations, when moving leader is fixing, warning light does not work, because now moving leader is fixing will not produce danger, substantially increase the deictic function of operation, the suitability is strong and practicality good.Operational approach disclosed by the invention is easy, and substantially increases stability in use, and the suitability is strong and applied widely.
Accompanying drawing explanation
In order to make present disclosure be more likely to be clearly understood, below according to specific embodiment and in conjunction with accompanying drawing, the present invention is further detailed explanation, wherein:
Fig. 1 is the structural representation of the present invention.
Detailed description of the invention
(embodiment 1)
Fig. 1 shows a kind of detailed description of the invention of the present invention, and wherein Fig. 1 is the structural representation of the present invention.
nullSee Fig. 1,A kind of electric power tower maintenance equipment of installation suggestion lamp,Including the movable apparatus body of lead 1 on electric power tower,Described apparatus body includes housing 2 and moving leader 3,Described housing 2 is movably arranged on described moving leader 3,Described housing 2 is provided with the fixture block 4 for being clamped in lead 1,The grip block 5 for being clamped in lead 1 it is equipped with at the top of described moving leader 3 and bottom,It is provided with lift cylinder 6 between described fixture block 4 and the end grip block of described moving leader 3,Described fixture block 4 is provided with clamping screw 7,Described fixture block 4 is fixed on lead 1 by clamping screw 7 is adjustable,The bottom clamping block of described moving leader 3 is provided with lock-bit chamber 8,It is provided with drive motor 9 in described lock-bit chamber 8,The main shaft of described drive motor 9 is provided with eccentric 10,The wheel limit activity of described eccentric 10 is pressed on lead 1 thus realizing the spacing fixing of moving leader 3,It is provided with bearing cavity 11 in described housing 2,It is provided with cavity 12 in described moving leader 3,It is equipped with warning light 13 at the top of described moving leader 3 and bottom,The supplying cell group 14 being connected with described warning light 13 it is provided with in described cavity 12,The inwall in described lock-bit chamber 8 is provided with the control knob 15 for controlling warning light,Described control knob 15 is arranged far from the sidewall of lead 1,When described drive motor 9 drives,The projection wheel limit activity of described eccentric 10 is pressed on lead 1 or control knob 15.
The inwall in described lock-bit chamber 8 is provided with acoustical cotton layer 16 and on described grip block 5 inwall, is provided with buffering press block 17, being provided with buffering stage clip 18 between described buffering press block 17 and the inwall of described grip block 5, described buffering press block and described lock-bit chamber are symmetrical arranged.
Described eccentric wheel, limit is provided with anti-skidding burr 19.
Described warning light is flash lamp.
The simple in construction of the present invention, simple operation, can effectively and quickly realize the elevating control of housing, and substantially increase stability in use and safety in utilization, compare artificial climbing to carry, heavier article can be carried, and the burden of climbing personnel will not be increased, stability in use is good, and it is provided with warning light, can be pointed out by warning light when moving leader lifting operations, when moving leader is fixing, warning light does not work, because now moving leader is fixing will not produce danger, substantially increase the deictic function of operation, the suitability is strong and practicality good.
A kind of using method of the electric power tower maintenance equipment of installation suggestion lamp, including following operating procedure:
Step A, controls drive motor, makes eccentric chimb be pressed on control knob, and now warning light lights, and is fixed on lead now by clamping screw by fixture block, makes shell position fix;
Step B, then operates moving leader, makes bottom clamping block move up, and stops when the bottom surface of housing is pressed on the lift cylinder telescopic shaft of contraction;
Step C, starts drive motor, makes the grip block bottom moving leader be fixed on lead, and now eccentric chimb is pressed on lead and is separated with control knob, so now warning light does not work;
Step D, unclamps clamping screw, then starts lift cylinder, makes housing realize lifting operations under the effect of lift cylinder, and when reaching the top of lift cylinder, housing fixed by clamping screw, then shrinks lift cylinder and repeats step B.
Operational approach disclosed by the invention is easy, and substantially increases stability in use, and the suitability is strong and applied widely.
Obviously, the above embodiment of the present invention is only for clearly demonstrating example of the present invention, and is not the restriction to embodiments of the present invention.For those of ordinary skill in the field, can also make other changes in different forms on the basis of the above description.Here without also cannot all of embodiment be given exhaustive.And the apparent change that these connotations belonging to the present invention are extended out or variation still fall within protection scope of the present invention.

Claims (4)

  1. null1. the electric power tower maintenance equipment of an installation suggestion lamp,Including the movable apparatus body of lead on electric power tower,It is characterized in that: described apparatus body includes housing and moving leader,Described housing is movably arranged on described moving leader,Described housing is provided with the fixture block for being clamped in lead,The grip block for being clamped in lead it is equipped with at the top of described moving leader and bottom,It is provided with lift cylinder between the end grip block of described fixture block and described moving leader,Described fixture block is provided with clamping screw,Described fixture block is fixed on lead by clamping screw is adjustable,The bottom clamping block of described moving leader is provided with lock-bit chamber,It is provided with drive motor at described lock-bit intracavity,The main shaft of described drive motor is provided with eccentric,Described eccentric take turns limit activity and be pressed on lead thus realizing the spacing fixing of moving leader,It is provided with bearing cavity in described housing,It is provided with cavity in described moving leader,It is equipped with warning light at the top of described moving leader and bottom,The supplying cell group being connected with described warning light it is provided with in described cavity,The inwall in described lock-bit chamber is provided with the control knob for controlling warning light,Described control knob is arranged far from the sidewall of lead,When described drive motor drives,The limit activity of described eccentric protruding wheel is pressed on lead or control knob,Described warning light is flash lamp.
  2. 2. the electric power tower maintenance equipment of installation suggestion lamp according to claim 1, it is characterized in that: on the inwall in described lock-bit chamber, be provided with acoustical cotton layer and be provided with buffering press block on described grip block inwall, being provided with buffering stage clip between described buffering press block and the inwall of described grip block, described buffering press block and described lock-bit chamber are symmetrical arranged.
  3. 3. the electric power tower maintenance equipment of installation suggestion lamp according to claim 2, it is characterised in that: described eccentric wheel, limit is provided with anti-skidding burr.
  4. 4. the using method of the electric power tower maintenance equipment of installation suggestion lamp according to claim 1, it is characterised in that: include following operating procedure:
    Step A, controls drive motor, makes eccentric chimb be pressed on control knob, and now warning light lights, and is fixed on lead now by clamping screw by fixture block, makes shell position fix;
    Step B, then operates moving leader, makes bottom clamping block move up, and stops when the bottom surface of housing is pressed on the lift cylinder telescopic shaft of contraction;
    Step C, starts drive motor, makes the grip block bottom moving leader be fixed on lead, and now eccentric chimb is pressed on lead and is separated with control knob, so now warning light does not work;
    Step D, unclamps clamping screw, then starts lift cylinder, makes housing realize lifting operations under the effect of lift cylinder, and when reaching the top of lift cylinder, housing fixed by clamping screw, then shrinks lift cylinder and repeats step B.
CN201610170069.8A 2016-03-23 2016-03-23 The electric power tower maintenance equipment and its application method of a kind of installation suggestion lamp Active CN105775959B (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201610170069.8A CN105775959B (en) 2016-03-23 2016-03-23 The electric power tower maintenance equipment and its application method of a kind of installation suggestion lamp
CN201711302293.9A CN107826937B (en) 2016-03-23 2016-03-23 Electric power tower maintenance equipment and its application method of installation suggestion lamp

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610170069.8A CN105775959B (en) 2016-03-23 2016-03-23 The electric power tower maintenance equipment and its application method of a kind of installation suggestion lamp

Related Child Applications (1)

Application Number Title Priority Date Filing Date
CN201711302293.9A Division CN107826937B (en) 2016-03-23 2016-03-23 Electric power tower maintenance equipment and its application method of installation suggestion lamp

Publications (2)

Publication Number Publication Date
CN105775959A true CN105775959A (en) 2016-07-20
CN105775959B CN105775959B (en) 2018-02-27

Family

ID=56390702

Family Applications (2)

Application Number Title Priority Date Filing Date
CN201610170069.8A Active CN105775959B (en) 2016-03-23 2016-03-23 The electric power tower maintenance equipment and its application method of a kind of installation suggestion lamp
CN201711302293.9A Expired - Fee Related CN107826937B (en) 2016-03-23 2016-03-23 Electric power tower maintenance equipment and its application method of installation suggestion lamp

Family Applications After (1)

Application Number Title Priority Date Filing Date
CN201711302293.9A Expired - Fee Related CN107826937B (en) 2016-03-23 2016-03-23 Electric power tower maintenance equipment and its application method of installation suggestion lamp

Country Status (1)

Country Link
CN (2) CN105775959B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105775959B (en) * 2016-03-23 2018-02-27 南通知航机电科技有限公司 The electric power tower maintenance equipment and its application method of a kind of installation suggestion lamp

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20100001123U (en) * 2008-07-24 2010-02-03 이병영 Self-standing auto climbing apparatus and system using the same
CN102068768A (en) * 2011-01-27 2011-05-25 鞍山拜尔自控有限公司 Follow-up clamp type climbing fire fighting rescue capsule
CN102407004A (en) * 2011-10-21 2012-04-11 沈阳建筑大学 Multifunctional automatic climbing device
CN104129447A (en) * 2014-07-08 2014-11-05 南京工程学院 Power transmission tower climbing robot and power transmission tower routing inspection mode thereof
CN105128970A (en) * 2015-08-12 2015-12-09 山东建筑大学 Pole-climbing robot with grippers controlled by cams

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001347203A (en) * 2000-06-08 2001-12-18 Yondenko Corp Method and device for preventing scattering of paint when steel tower is coated
CN201033707Y (en) * 2007-03-13 2008-03-12 国网北京电力建设研究院 Climbing machine rail frame and power transmission line steel tower climbing machine having same
CN102059704B (en) * 2010-10-08 2012-07-25 四川大学 Novel iron tower climbing robot manipulator device
CN203582233U (en) * 2013-07-09 2014-05-07 杨翼宾 Side-face lifting system for tower-top device
CN104767152A (en) * 2015-04-29 2015-07-08 李常明 Electric iron tower maintenance equipment with alarm lamps and using method thereof
CN105775959B (en) * 2016-03-23 2018-02-27 南通知航机电科技有限公司 The electric power tower maintenance equipment and its application method of a kind of installation suggestion lamp

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20100001123U (en) * 2008-07-24 2010-02-03 이병영 Self-standing auto climbing apparatus and system using the same
CN102068768A (en) * 2011-01-27 2011-05-25 鞍山拜尔自控有限公司 Follow-up clamp type climbing fire fighting rescue capsule
CN102407004A (en) * 2011-10-21 2012-04-11 沈阳建筑大学 Multifunctional automatic climbing device
CN104129447A (en) * 2014-07-08 2014-11-05 南京工程学院 Power transmission tower climbing robot and power transmission tower routing inspection mode thereof
CN105128970A (en) * 2015-08-12 2015-12-09 山东建筑大学 Pole-climbing robot with grippers controlled by cams

Also Published As

Publication number Publication date
CN105775959B (en) 2018-02-27
CN107826937B (en) 2019-09-24
CN107826937A (en) 2018-03-23

Similar Documents

Publication Publication Date Title
CN204060114U (en) A kind of electric pole rectifier
CN105775959A (en) Electric power tower maintenance equipment for installing indicator lights and use method thereof
CN105752895A (en) Equipment for electric iron tower maintenance and use method thereof
CN209762607U (en) Electrical equipment mounting and fixing device
CN205472327U (en) GIS dismouting intelligence auxiliary platform hoist
CN205178050U (en) Telescopic earth bar with alarming function
CN112502607A (en) Movable ladder stand for high-altitude operation construction
CN204835371U (en) Installation of cable fixing tool
CN106082041B (en) The electric power tower maintenance equipment and its application method of a kind of installation suggestion device
CN203039290U (en) Wire outgoing device for tension tower double ceramic composite insulator strings
CN105776084A (en) Electric power tower maintenance equipment with good heat dissipation performance and use method thereof
CN105552784A (en) Device suitable for installing bird repeller on cross arm of low-altitude power transmission line
CN207155670U (en) A kind of frock suitable for big-and-middle-sized transformer radiator maintenance of fan
CN105776085A (en) Electric iron tower maintenance equipment with heat dissipation performance and use method thereof
CN213562549U (en) Electrical maintenance tool with illumination function
CN105552783A (en) Method for installing bird repeller on low-altitude line by utilizing bird repeller installation device
CN205193490U (en) Ware controlling means exempts from to climb
CN217915568U (en) Rib supply device with anti-skidding structure for ear ribs
CN205282987U (en) A hoisting device for wire
CN216530292U (en) Electric power engineering fixed knot constructs
CN211776319U (en) Outdoor solar energy environmental monitoring equipment
CN217281881U (en) Electric mounting and dismounting insulation device for grounding ring
CN221463295U (en) Monitoring device for digital rural management
CN215681559U (en) Cable erection supporting device for electromechanical installation
CN103296613A (en) Hot-line working limit orbital cabin

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Yuan Demei

Inventor before: Bian Yuping

TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20180123

Address after: The 9 group town Haian County East Bridge Village 226600 Jiangsu city of Nantong Province

Applicant after: NANTONG ZHI HANG MECHANICAL AND ELECTRICAL TECHNOLOGY Co.,Ltd.

Address before: 211200, No. 2, Shandong Road, Lishui Economic Development Zone, Nanjing, Jiangsu

Applicant before: Bian Yuping

GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20221226

Address after: 256599 East 600m south of the intersection of Yangao Road X030 and Bohua Road, Jingbo Industrial Park, Boxing County Economic Development Zone, Binzhou City, Shandong Province

Patentee after: Boxing County Xingye Logistics Co.,Ltd.

Address before: 226600 group 9, Minqiao village, Chengdong Town, Hai'an County, Nantong City, Jiangsu Province

Patentee before: NANTONG ZHI HANG MECHANICAL AND ELECTRICAL TECHNOLOGY Co.,Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20240612

Address after: No. 26, Shizi Village, Qianzhou, Jishou City, Xiangxi Tujia and Miao Autonomous Prefecture, Hunan Province, 416000 (opposite Hengzheng Jiayuan)

Patentee after: Xiangxi Tongfu Power Construction Co.,Ltd.

Country or region after: China

Address before: 256599 East 600m south of the intersection of Yangao Road X030 and Bohua Road, Jingbo Industrial Park, Boxing County Economic Development Zone, Binzhou City, Shandong Province

Patentee before: Boxing County Xingye Logistics Co.,Ltd.

Country or region before: China