CN105773051A - Framework assembling clamp for preparation of high-pressure steam injection machine - Google Patents

Framework assembling clamp for preparation of high-pressure steam injection machine Download PDF

Info

Publication number
CN105773051A
CN105773051A CN201510187371.XA CN201510187371A CN105773051A CN 105773051 A CN105773051 A CN 105773051A CN 201510187371 A CN201510187371 A CN 201510187371A CN 105773051 A CN105773051 A CN 105773051A
Authority
CN
China
Prior art keywords
fixture
framework
frame
frame set
pressure steam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510187371.XA
Other languages
Chinese (zh)
Inventor
王玉庆
段明涛
苏海亭
孙丹
王海峰
闫继超
李文军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Junma Petroleum Equipment Manufacturing Co Ltd
Original Assignee
Junma Petroleum Equipment Manufacturing Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Junma Petroleum Equipment Manufacturing Co Ltd filed Critical Junma Petroleum Equipment Manufacturing Co Ltd
Priority to CN201510187371.XA priority Critical patent/CN105773051A/en
Publication of CN105773051A publication Critical patent/CN105773051A/en
Pending legal-status Critical Current

Links

Abstract

The invention provides a framework assembling clamp for preparation of a high-pressure steam injection machine. The framework assembling clamp comprises a left framework and a right framework which are arranged oppositely. The left framework and the right framework are both of profile framework structures. Each profile framework structure is internally provided with a telescopic mechanism. The telescopic mechanisms can make the four sides of the frameworks lifted, and accordingly the framework assembling clamp is discharged out of a tank to be machined. The left framework and the right framework are each provided with a positioning clamp and both connected with a welding positioner. The profile framework structures are adopted; the four sides of the frameworks can be lifted, and accordingly the clamp can be discharged out of the tank; an air cylinder is utilized for positioning and clamping a flange, and magnets are utilized for attracting a steel plate; the positioning face is lifted by a hydraulic system; and the clamp can be adjusted rapidly if the model of a produced product changes.

Description

A kind of frame set prepared for high pressure steam injection unit is to fixture
Technical field
The present invention relates to a kind of high-pressure gas injection boiler for producing technical field, be specifically related to a kind of frame set prepared for high pressure steam injection unit to fixture.
Background technology
The material of convection section FRAME COMPONENTS is Q235, adopts MAG welding manner, and weld seam allows segmentation welding, and the framework outside weld blocked by flange part allows not weld.Weld seam has monolayer and bilayer, wherein sleeve pipe weld seam is monolayer, framework four limit steel plate outside weld is monolayer, all the other weld seams are double-deck, sleeve pipe is outside inconel weld only, and tube sheet outer face is exposed on the basis of sleeve pipe entire length and caliber be not more than 5mm not changing, the intersection welding seam of section bar is unreachable due to robot, it is necessary in other work station repair welding.The last process part relevant with this work station and logistics mode need to meet the demand of this work station.
Framework welding station supplied materials requires: the stud on side plate does not weld at convection section;Tube sheet assembly is made up of tube sheet, sleeve pipe, angle steel flange and channel-section steel flange, it is desirable in plate (type) material group, work station point is solid complete;Side panel assembly is made up of side plate, angle steel, channel-section steel and locating sleeve molectron, and its latus inframedium is spliced by two block plates, all requires in plate (type) material group work station point is solid complete;Channel-section steel is+0.2~-0.2mm with the hole on angle steel relative to the position of related features on limit;The overall dimensions of angle steel, channel-section steel and steel plate, flatness must meet workpiece group to requiring.The rustless oil-free impulse-free robustness in all part requirements surfaces (framework welding station artwork is as shown in Figure 1).
But at present, being generally adopted assembling manually, manual welding production mode, production technology quality is unstable, cost is high, efficiency is low, needs a large amount of manpowers, has now become the bottleneck operation of modern production.
Summary of the invention
In order to overcome above-mentioned deficiency, the present invention provides a kind of frame set prepared for high pressure steam injection unit to fixture, it is mainly used in the framework welding station of the prefabricated work station of convection section framework of high pressure steam injection unit, realize the group of convection section framework to weld, manual labour, steady quality can be exempted, production efficiency is high and cost is low.
The technical scheme is that and be achieved in that:
A kind of frame set prepared for high pressure steam injection unit is to fixture, including the left frame being oppositely arranged and correct frame, left frame and correct frame are respectively adopted section material framework structure, it is provided with telescoping mechanism in section material framework structure, the four sides that can make framework lifts, so that fixture is exited casing to be processed by frame set, left frame and be respectively arranged with positioning fixture, left frame and correct frame on correct frame and be connected with positioner respectively.
Wherein it is preferred to, also include frame set to fixture slide unit, can make frame set that fixture slide unit is moved along frame set by fixture.
Wherein, preferably, described telescoping mechanism includes the longitudinal hydraulic stem and the transverse hydraulic bar that are arranged in frame structure, and the two ends of longitudinal hydraulic stem are fixing with the upper and lower surface of described section material framework structure respectively to be connected, and transverse hydraulic bar is fixing with the two sides, left and right of described section material framework structure to be connected.
Wherein it is preferred to, the two sides, left and right of described section material framework structure is respectively arranged with Magnet, for adsorbing the steel plate of casing to be processed.
Wherein it is preferred to, described Magnet is fixed on the two sides, left and right of described section material framework structure by installing plate and Magnet fastener, and installing plate is fixed on the two sides, left and right of described section material framework structure, and Magnet fastener is fixing with described installing plate to be connected.
Wherein it is preferred to, it being provided with T-slot in described Magnet fastener, described Magnet is arranged in T-slot.
Beneficial effects of the present invention:
1. production efficiency is high: use the present invention can realize the assembling of product, group to and Automation of Welding operation, be greatly improved production efficiency, production efficiency 10 times can be improved compared with original manual work through measuring and calculating, labour force 20 people can be saved.
2. steady quality: use the present invention can realize the assembling of product, automated job and intelligent robot are welded by group, reduce percent defective, constant product quality is significantly increased, and reduce waste, reduce cost.
3. the mode of production change: use the present invention, can by intellectuality, flexibility, automatization advanced production technology be introduced into conventionally manufactured industry, bring the transformation of the mode of production efficient, friendly, green, it is achieved the transition and upgrade of conventional industries.
Accompanying drawing explanation
In order to be illustrated more clearly that the embodiment of the present invention or technical scheme of the prior art, the accompanying drawing used required in embodiment or description of the prior art will be briefly described below, apparently, accompanying drawing in the following describes is only some embodiments of the present invention, for those of ordinary skill in the art, put after not paying creative work, it is also possible to obtain other accompanying drawing according to these accompanying drawings.
Fig. 1 is framework welding station artwork;
Fig. 2 is the frame set of the present invention structural representation to fixture;
Fig. 3 is the frame set of the present invention generalized section to jig frame structure;
Fig. 4 is the structural representation of installing plate and Magnet fastener in the present invention.
In figure, 1. section material framework structure, 2. positioning fixture, 3. positioner, 4. frame set is to fixture slide unit, 5. longitudinal hydraulic stem, 6. transverse hydraulic bar, 7. Magnet, 8. installing plate, 9. Magnet fastener, 10.T type groove
Detailed description of the invention
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is clearly and completely described, it is clear that described embodiment is only a part of embodiment of the present invention, rather than whole embodiments.Based on the embodiment in the present invention, those of ordinary skill in the art put the every other embodiment obtained after not making creative work, broadly fall into the scope of protection of the invention.
As shown in Figure 2 to 4, the present embodiment provides a kind of frame set prepared for high pressure steam injection unit to fixture, including the left frame being oppositely arranged and correct frame, left frame and correct frame are respectively adopted section material framework structure 1, it is provided with telescoping mechanism in section material framework structure 1, the four sides of framework can be made to lift, so that fixture is exited casing to be processed by frame set, left frame and correct frame are respectively arranged with positioning fixture 2, left frame and correct frame be connected with positioner 3 respectively.According to description to shape of product, change in size in design input, and analysis to fixture in industrial analysis, fixture position width and position length can be adjusted in time.Sending change as produced product type, fixture can quickly adjust.Positioning fixture can be fixture conventional at present, such as hydraulic connecting rod mechanism, hydraulic mandril etc..
Positioner 3 shelf structure form end to end.It is made up of welding structural element, servomotor, accurate retarding machine, revolving support etc..Servomotor adopts the outside spindle motor of robot, it is possible to link with robot.Positioner can be controlled by robotic programming to rotate, meet robot automation when welding, the requirement to access for welding.Positioner drives workpiece to rotate, it is ensured that weld seam is in the welding position of the best all the time, it is thus achieved that good weldquality.
Wherein, also include frame set to fixture slide unit 4, can make frame set that fixture slide unit 4 is moved along frame set by fixture.
Wherein, telescoping mechanism includes the longitudinal hydraulic stem 5 and the transverse hydraulic bar 6 that are arranged in frame structure, and the two ends of longitudinal hydraulic stem 5 are fixing with the upper and lower surface of section material framework structure 1 respectively to be connected, and transverse hydraulic bar 6 is fixing with the two sides, left and right of section material framework structure 1 to be connected.Telescoping mechanism adopts hydraulic mechanism, it is possible to adjust accurately according to product size.
As the present invention preferably technical scheme, the two sides, left and right of section material framework structure 1 is respectively arranged with Magnet 7, for adsorbing the steel plate of casing to be processed.
Wherein, Magnet 7 is fixed on the two sides, left and right of section material framework structure 1 by installing plate 8 and Magnet fastener 9, and installing plate 8 is fixed on the two sides, left and right of section material framework structure 1, and Magnet fastener 9 is fixing with installing plate 8 to be connected.
Wherein, being provided with T-slot 10 in Magnet fastener 9, Magnet is arranged in T-slot 10.Magnet fastener 9 may also set up other shapes of groove, such as dovetail groove etc..Adopting the steel plate of magnet adsorption casing to be processed, principle is reliable, highly versatile, simple in construction, manufactures and production cost is low
Workflow:
Framework welding station:
1.1 supplied materials: two casing board assemblies wherein one on lifting platform, another part is in tube sheet group on fixture, and station is made by side panel assembly by plate (type) material group.
1.2 groups pairs: workman's button press makes lifting platform give rise to specified altitude assignment, it is placed to frame set to then fixture Automatic-clamping tube sheet assembly on fixture by the high KMC tube sheet assembly captured on lifting platform, following fixture positioner rotation turnback, is placed to frame set to then fixture Automatic-clamping tube sheet assembly on fixture by the high KMC another set of tube sheet assembly captured on lifting platform.Positioner 90-degree rotation is captured the side panel assembly on lifting platform by KMC robot afterwards, and it is installed to frame set on fixture, after fixture Automatic-clamping, KMC exits piece installing position, by robot, side panel assembly point is solid, and last positioner rotation turnback is captured the another set of side panel assembly on lifting platform by KMC robot, and it is installed to frame set on fixture, after fixture Automatic-clamping, KMC exits part position, by robot, side panel assembly point is solid.
1.3 welding: the splicing welding joint of framework needs segmentation to weld, thus reducing the deformation of framework.Whole parts install and put after determining, double; two suspension robots carry out outside weld and the welding of part tubular girth joint.
1.4 blankings: after welding, manual operation AGV logistic car advances to below workpiece and gives rise to position, the left and right supporting surface of fixture is shunk by frame set subsequently, rear jig upper bottom support surface shrink make framework fall on AGV logistic car, then fixture slides out inside workpiece, and manual operation AGV logistic car drops to safe altitude and taken away by framework and be transported to framework inside weld station.
The foregoing is only presently preferred embodiments of the present invention, not in order to limit the present invention, all within the spirit and principles in the present invention, any amendment of making, equivalent replacement, improvement etc., should be included within protection scope of the present invention.

Claims (6)

1. the frame set prepared for high pressure steam injection unit is to fixture, it is characterized in that: include the left frame and the correct frame that are oppositely arranged, left frame and correct frame are respectively adopted section material framework structure, it is provided with telescoping mechanism in section material framework structure, the four sides that can make framework lifts, so that fixture is exited casing to be processed by frame set, left frame and be respectively arranged with positioning fixture, left frame and correct frame on correct frame and be connected with positioner respectively.
2. a kind of frame set prepared for high pressure steam injection unit according to claim 1 is to fixture, it is characterised in that: also include frame set to fixture slide unit, can make frame set that fixture slide unit is moved along frame set by fixture.
3. a kind of frame set prepared for high pressure steam injection unit according to claim 1 is to fixture, it is characterized in that: described telescoping mechanism includes the longitudinal hydraulic stem and the transverse hydraulic bar that are arranged in frame structure, the two ends of longitudinal hydraulic stem are fixing with the upper and lower surface of described section material framework structure respectively to be connected, and transverse hydraulic bar is fixing with the two sides, left and right of described section material framework structure to be connected.
4. a kind of frame set prepared for high pressure steam injection unit according to claim 1 is to fixture, it is characterised in that: the two sides, left and right of described section material framework structure is respectively arranged with Magnet, for adsorbing the steel plate of casing to be processed.
5. a kind of frame set prepared for high pressure steam injection unit according to claim 4 is to fixture, it is characterized in that: described Magnet is fixed on the two sides, left and right of described section material framework structure by installing plate and Magnet fastener, installing plate is fixed on the two sides, left and right of described section material framework structure, and Magnet fastener is fixing with described installing plate to be connected.
6. a kind of frame set prepared for high pressure steam injection unit according to claim 5 is to fixture, it is characterised in that: being provided with T-slot in described Magnet fastener, described Magnet is arranged in T-slot.
CN201510187371.XA 2015-04-20 2015-04-20 Framework assembling clamp for preparation of high-pressure steam injection machine Pending CN105773051A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510187371.XA CN105773051A (en) 2015-04-20 2015-04-20 Framework assembling clamp for preparation of high-pressure steam injection machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510187371.XA CN105773051A (en) 2015-04-20 2015-04-20 Framework assembling clamp for preparation of high-pressure steam injection machine

Publications (1)

Publication Number Publication Date
CN105773051A true CN105773051A (en) 2016-07-20

Family

ID=56389862

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510187371.XA Pending CN105773051A (en) 2015-04-20 2015-04-20 Framework assembling clamp for preparation of high-pressure steam injection machine

Country Status (1)

Country Link
CN (1) CN105773051A (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001219297A (en) * 2000-02-04 2001-08-14 Hitachi Plant Eng & Constr Co Ltd Butting apparatus for welding
CN201324922Y (en) * 2008-12-23 2009-10-14 天津重钢机械装备股份有限公司 Adjustable box-girder welding and assembling device
CN201931225U (en) * 2010-12-13 2011-08-17 林松 Adjustable box beam welding assembly device
CN102513766A (en) * 2011-12-23 2012-06-27 浙江金象科技有限公司 Tank container end frame assembling tooling
CN103331558A (en) * 2013-06-19 2013-10-02 青岛云和机械制造有限公司 Lifting type welding positioner
CN204735897U (en) * 2015-04-20 2015-11-04 骏马石油装备制造有限公司 A frame set is to anchor clamps that is used for high pressure notes steam turbine group to prepare

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001219297A (en) * 2000-02-04 2001-08-14 Hitachi Plant Eng & Constr Co Ltd Butting apparatus for welding
CN201324922Y (en) * 2008-12-23 2009-10-14 天津重钢机械装备股份有限公司 Adjustable box-girder welding and assembling device
CN201931225U (en) * 2010-12-13 2011-08-17 林松 Adjustable box beam welding assembly device
CN102513766A (en) * 2011-12-23 2012-06-27 浙江金象科技有限公司 Tank container end frame assembling tooling
CN103331558A (en) * 2013-06-19 2013-10-02 青岛云和机械制造有限公司 Lifting type welding positioner
CN204735897U (en) * 2015-04-20 2015-11-04 骏马石油装备制造有限公司 A frame set is to anchor clamps that is used for high pressure notes steam turbine group to prepare

Similar Documents

Publication Publication Date Title
CN201309054Y (en) Electric locomotive top cover positive assembling tool
CN109465585B (en) Integrated fixing system for combined welding of automobile sheet metal parts
CN110102888A (en) A kind of system of processing and method of automobile knocker tailor welded blank
CN104325231B (en) Steel pipe bundle combining structure component automatic assembling welder
CN105772996A (en) Prefabricating working station for convection section frameworks of high-pressure gas injection units
CN204771197U (en) Prefabricated workstation of convection zone frame of steam turbine group is annotated to high pressure
CN105171342A (en) Making and forming method for model of siphon type water outlet passage of large pump station
CN107775200A (en) Aluminium alloy sheet T connector laser welding robot's auxiliary welding tool fixture
CN204735897U (en) A frame set is to anchor clamps that is used for high pressure notes steam turbine group to prepare
CN104028875B (en) Aluminum electrolytic cell manufacturing method
CN105773051A (en) Framework assembling clamp for preparation of high-pressure steam injection machine
CN104942616A (en) Irregular frame geometrical form machining positioning centering special jig
JP4987671B2 (en) Column core assembly equipment
CN110722317B (en) Block assembly tool and method for block type steel pipe ring
CN210818193U (en) Block assembly tool for block-type steel pipe ring
CN204321594U (en) The automated production equipment of steel pipe bundle combining structure component
CN204209494U (en) U-shaped steel pipe orientation turns materials device
CN102179653A (en) Assembly jig mold of side plates for gas chamber
CN104785898A (en) Steam-injection boiler unit convection section box body automatic welding work station and machining technology thereof
CN218311734U (en) Automatic fixed-position welding tool for butt-joint type garbage truck box body
CN114406620B (en) Production and manufacturing process of main steel structural part of hydraulic material grabbing machine
CN217618735U (en) Pneumatic tool for welding iron bed climbing frame
CN204295138U (en) Yi word pattern steel pipe bundle automatic assembling welder
CN204771065U (en) Steam injection boiler unit convection zone box automatic weld workstation
CN108857045B (en) Deformation control process for side wall friction stir welding

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
AD01 Patent right deemed abandoned

Effective date of abandoning: 20191022

AD01 Patent right deemed abandoned