CN105762921B - A kind of cyclization of based superconductive current limiter turns method of supplying power to - Google Patents

A kind of cyclization of based superconductive current limiter turns method of supplying power to Download PDF

Info

Publication number
CN105762921B
CN105762921B CN201610057265.4A CN201610057265A CN105762921B CN 105762921 B CN105762921 B CN 105762921B CN 201610057265 A CN201610057265 A CN 201610057265A CN 105762921 B CN105762921 B CN 105762921B
Authority
CN
China
Prior art keywords
current
cyclization
genetic
current limiter
msub
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610057265.4A
Other languages
Chinese (zh)
Other versions
CN105762921A (en
Inventor
孙鸣赫
李子韵
王自桢
许洪华
顾洁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Jiaotong University
State Grid Corp of China SGCC
State Grid Jiangsu Electric Power Co Ltd
Nanjing Power Supply Co of Jiangsu Electric Power Co
Original Assignee
Shanghai Jiaotong University
State Grid Corp of China SGCC
State Grid Jiangsu Electric Power Co Ltd
Nanjing Power Supply Co of Jiangsu Electric Power Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Jiaotong University, State Grid Corp of China SGCC, State Grid Jiangsu Electric Power Co Ltd, Nanjing Power Supply Co of Jiangsu Electric Power Co filed Critical Shanghai Jiaotong University
Priority to CN201610057265.4A priority Critical patent/CN105762921B/en
Publication of CN105762921A publication Critical patent/CN105762921A/en
Application granted granted Critical
Publication of CN105762921B publication Critical patent/CN105762921B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J9/00Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting
    • H02J9/02Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting in which an auxiliary distribution system and its associated lamps are brought into service
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06NCOMPUTING ARRANGEMENTS BASED ON SPECIFIC COMPUTATIONAL MODELS
    • G06N3/00Computing arrangements based on biological models
    • G06N3/12Computing arrangements based on biological models using genetic models
    • G06N3/126Evolutionary algorithms, e.g. genetic algorithms or genetic programming

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Biophysics (AREA)
  • Health & Medical Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Theoretical Computer Science (AREA)
  • Evolutionary Biology (AREA)
  • Bioinformatics & Cheminformatics (AREA)
  • Bioinformatics & Computational Biology (AREA)
  • Biomedical Technology (AREA)
  • General Health & Medical Sciences (AREA)
  • Physiology (AREA)
  • Genetics & Genomics (AREA)
  • Artificial Intelligence (AREA)
  • Business, Economics & Management (AREA)
  • Computational Linguistics (AREA)
  • Data Mining & Analysis (AREA)
  • Evolutionary Computation (AREA)
  • Power Engineering (AREA)
  • Molecular Biology (AREA)
  • Computing Systems (AREA)
  • General Engineering & Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Mathematical Physics (AREA)
  • Software Systems (AREA)
  • Emergency Management (AREA)
  • Superconductors And Manufacturing Methods Therefor (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The invention provides a kind of cyclization of based superconductive current limiter to turn method of supplying power to, and step includes:Calculate the current limitation effect normalization evaluation index F of superconductive current limiter1, calculate the cost normalization evaluation index F of superconductive current limiter2, establish the configuration decisions model of closed loop network superconductive current limiter, establish a current limliting genetic operation device, using current limliting genetic operation device run genetic algorithm and export restrain when genetic algebra under parallel resistance resistance, actual use band length l and each installed position switching value.The cyclization turns the configuration decisions model that method of supplying power to establishes closed loop network superconductive current limiter, the principal element for influenceing cyclization design is integrated, it effectively ensure that the reliability and accuracy of cyclization design, carry out automating genetic iteration computing using current limliting genetic operation device, to export optimal programme, cyclization design is possessed universality, improve the automation of power network the whole network.

Description

A kind of cyclization of based superconductive current limiter turns method of supplying power to
Technical field
The present invention relates to a kind of cyclization to turn method of supplying power to, and especially a kind of cyclization of based superconductive current limiter turns supplier of electricity Method.
Background technology
With the fast development of modern power systems, the proposition of intelligent grid concept, the hair transmission & distribution of whole power system become All start to develop towards the direction of automation with five big links.In terms of distribution, it is contemplated that the factor such as short circuit current, at present China Domestic medium voltage distribution network is using " closed loop design, open loop operation ", when Distribution system design, between each load area There is extension wire, and under normal operating conditions, these circuits are not put into operation, and therefore, each load is only supplied by a power supply Electricity, not into inscription of loop.When 110kV main transformers need periodical power failure to overhaul, all 10k distribution web areas of substation's band The problem of large-area power-cuts will be faced with, this has severely impacted the reliability and operational flexibility of supplying power allocation, and uses and close The method that ring turns power supply is to improve power supply reliability, avoid the important measures of large-area power-cuts.So-called cyclization turns powered operation, refers to Be Liang Ge transformer stations low-pressure side distribution line between have an extension wire, the circuit does not put into power network under normal operating condition In, can and when some transformer station needs interruption maintenance, or when one section of distribution line of substation's band needs interruption maintenance First to close the interconnection switch of extension wire, then disconnect the circuit for needing to overhaul.By putting into various zones 10kV medium-voltage distributions Radial power distribution network, can be temporarily changed ring network power supply by the interconnector between net, and after Electromagnetic coupling, separate unit main transformer exits Grid power blackout maintenance will not result in institute's on-load and lose power supply, but this sub-load has been transferred under other transformer stations. Obviously, powered operation is turned by cyclization, large-area power-cuts can be avoided, greatly improve the reliability of power distribution network power supply.
But cyclization turns many risks being still had during powered operation.Although the both sides that extension wire is connected all are 10kV feeder lines, but because both sides network parameter is asymmetric, the difference on voltage magnitude and phase angle is often produced, so as to be formed Voltage difference.And the impedance of extension wire in itself is very small, when directly closing in interconnection switch access power network, it is possible to because two The voltage difference of side and produce dash current.If Loop Closing Operation is arbitrarily carried out in the case of no counter-measure, it is likely that meeting Larger dash current is produced, the stability of whole load area distribution network operation is had influence on, is possibly even led when serious Cause the consequences such as protective relaying device malfunction, circuit overload, electrical equipment damage.
For this problem, in actual moving process, most power supply department use is first out of service by load, so Afterwards in the method for transfer load.The 110kV plant stands for treating interruption maintenance are first exited into power network, at this moment substation's on-load is all In power down mode, then main transformer and distribution line are disconnected again, finally put into extension wire again, transfers a load onto it Under his main transformer.The problem of being not in thus dash current, but institute's on-load has of short duration power failure process, can not ensure The continuous-stable of power supply, it still can influence the production and living of user side.Another method is to pass through experienced dispatcher's Operation, such as changes the method for operation of power network, cutting load falls load operation, change load tap changer, switched capacitor group, makes Cyclization point both sides voltage amplitude and phase angle close to consistent, i.e., the reduction cyclization of maximum possible when extension wire both sides voltage Difference, Alloy White Iron can be thus limited in the range of an acceptable.But not a set of perfect scheme or The situation of excessive dash current when operating article to avoid cyclization, relatively more research is just for specific distribution net work structure Analyzed, and the structure of power distribution network is very complicated and changeable, therefore these are studied the conclusion drawn and are not had universality. Because Loop Closing Operation relies on dispatcher's field assay, belong to micro-judgment type, therefore the larger risk still having, and this Also the requirement of power network the whole network automation can not be catered to.
The content of the invention
The technical problem to be solved in the present invention is that existing cyclization design judges also by construction experience, existing larger Risk, and this can not also cater to power network the whole network automation requirement.
In order to solve the above-mentioned technical problem, the invention provides a kind of cyclization of based superconductive current limiter to turn method of supplying power to, Comprise the following steps:
Step 1, the current limitation effect for turning the dash current calculating superconductive current limiter of actual acquisition in power supply road according to cyclization is returned One changes evaluation index F1For:
In formula, I1For circuit constraint electric current, the maximum load current in cyclization point circuit, i are chosenMFor the impact electricity of reality Stream;
Step 2, the cost using length computation superconductive current limiter for turning superconducting tape in power supply road according to cyclization normalizes Evaluation index F2For:
In formula, lmaxFor the band maximum length set according to concrete condition, l is that cyclization turns superconducting tape in power supply road Actually use band length;
Step 3, evaluation index F is normalized according to current limitation effect1With cost normalization evaluation index F2Establish closed loop network The configuration decisions model of superconductive current limiter is:
F=ω F1+(1-ω)F2
In formula, F1Span be [0,1], F2Span be also [0,1], ω is the weight factor of model, value Scope is also [0,1];
Step 4, it is assumed that turn superconduction of the installation with digital output modul between site under each load on power supply road in cyclization Current limiter, a current limliting genetic operation device is established, the product of band length l and switching value, superconductive current limiter will be actually used The resistance of parallel resistance and the dash current i of realityMRespectively as three input quantities of current limliting genetic operation device, configuration is determined Fitness function of the plan model as current limliting genetic operation device, using the fitness function value of calculating as current limliting genetic operation device Output quantity;
Step 5, genetic algorithm is run using current limliting genetic operation device, when the fitness function value of output restrains stable, Export the resistance of the parallel resistance under current genetic algebra, actually use the switch of band length l and each installed position Amount, switching value are 1 or 0, represent whether the hypothesis opening position installs superconductive current limiter respectively.
Using current limitation effect normalization evaluation index F1With cost normalization evaluation index F2To establish closed loop network superconduction The configuration decisions model of current limiter, by influence cyclization design principal element integrated, effectively ensure that cyclization design can By property and accuracy;Genetic algorithm is run using current limliting genetic operation device, by the resistance of parallel resistance, actual use band length L and reality dash current iMInput quantity as current limliting genetic operation device carries out automating genetic iteration computing, with output Optimal programme, cyclization design is possessed universality, improve the automation of power network the whole network;Being capable of root using weight factor ω Need to be chosen according to the practice of construction of power network, further enhancing the universality of cyclization design.
As the further limits scheme of the present invention, in step 5, current limliting genetic operation device runs the specific step of genetic algorithm Suddenly it is:
Step 5.1, initialize, individual amount and maximum genetic algebra in population are set, given birth to by current limliting genetic operation device Into initial population, each individual represents a kind of programme of superconductive current limiter in population, i.e., each individual includes one group The input quantity of current limliting genetic operation device;
Step 5.2, individual evaluation, according to the configuration decisions model established in step 3 to corresponding to each individual in population Programme calculates a fitness function value, and fitness function value is bigger to represent that programme corresponding to this individual is more excellent Show, also it is better able to the existence in genetic evolution;
Step 5.3, hereditary variation, population by select, intersect and mutation operator complete hereditary variation process, complete Once judge whether to reach maximum genetic algebra after heredity, if reaching maximum genetic algebra, into step 5.4, otherwise return Step 5.2 continues hereditary variation;
Step 5.4, terminate calculate, through excessively for hereditary variation after, individual cognition in population gradually restrain stably, fitness Functional value reaches peak, referred to as optimal solution.
Preferred process can be carried out to the programme of each grey iterative generation using genetic algorithm, until fitness function value It is stable to tend to convergence, optimal programme is finally obtained, so that it is guaranteed that the superiority of the cyclization planning and designing in power network.
As the further limits scheme of the present invention, in step 1, actual dash current iMTo be stored in current matrix Maximum current value, current matrix be used for store collection actual current value.Reading can be facilitated to filter out using current matrix Maximum current value.
The beneficial effects of the present invention are:(1) using current limitation effect normalization evaluation index F1Normalize and evaluate with cost Index F2To establish the configuration decisions model of closed loop network superconductive current limiter, the principal element for influenceing cyclization design is carried out comprehensive Close, effectively ensure that the reliability and accuracy of cyclization design;(2), will simultaneously using current limliting genetic operation device operation genetic algorithm Join resistance, actual use band length l and the actual dash current i of resistanceMInput quantity as current limliting genetic operation device Carry out automating genetic iteration computing, to export optimal programme, cyclization design is possessed universality, it is complete to improve power network Automation;(3) it can be needed to be chosen according to the practice of construction of power network using weight factor ω, further enhancing cyclization The universality of design.
Brief description of the drawings
Fig. 1 is flow chart of the method for the present invention;
Fig. 2 is the current limliting genetic operation device input/output structure schematic diagram of the present invention;
Fig. 3 is the electric network composition schematic diagram of the first embodiment of the present invention;
Fig. 4 is model structure of the first embodiment of the present invention in Simulink;
Fig. 5 is the optimal solution curve of pursuit of the first embodiment of the present invention;
Fig. 6 is the superconductive current limiter configuration scheme schematic diagram of the first embodiment of the present invention;
Fig. 7 is the electric network composition schematic diagram of the second embodiment of the present invention;
Fig. 8 is model structure of the second embodiment of the present invention in Simulink;
Fig. 9 is the optimal solution curve of pursuit of A cyclizations point in the second embodiment of the present invention;
Figure 10 is the optimal solution curve of pursuit of B cyclizations point in the second embodiment of the present invention;
Figure 11 is the optimal solution curve of pursuit of C cyclizations point in the second embodiment of the present invention;
Figure 12 is three kinds of cyclization mode optimal solution tracking diagrams in the second embodiment of the present invention;
Figure 13 is the superconductive current limiter configuration scheme schematic diagram of the second embodiment of the present invention;.
Embodiment
As illustrated in fig. 1 and 2, the cyclization of based superconductive current limiter of the invention turns method of supplying power to, comprises the following steps:
Step 1, the current limitation effect for turning the dash current calculating superconductive current limiter of actual acquisition in power supply road according to cyclization is returned One changes evaluation index F1For:
In formula, I1For circuit constraint electric current, the maximum load current in cyclization point circuit, i are chosenMFor the impact electricity of reality Stream, actual dash current iMTo be stored in the maximum current value in current matrix, current matrix is used for the reality for storing collection Current value;
Step 2, the cost using length computation superconductive current limiter for turning superconducting tape in power supply road according to cyclization normalizes Evaluation index F2For:
In formula, lmaxFor the band maximum length set according to concrete condition, l is that cyclization turns superconducting tape in power supply road Actually use band length;
Step 3, evaluation index F is normalized according to current limitation effect1With cost normalization evaluation index F2Establish closed loop network The configuration decisions model of superconductive current limiter is:
F=ω F1+(1-ω)F2
In formula, F1Span be [0,1], F2Span be also [0,1], ω is the weight factor of model, value Scope is also [0,1];
Step 4, it is assumed that turn superconduction of the installation with digital output modul between site under each load on power supply road in cyclization Current limiter, a current limliting genetic operation device is established, the product of band length l and switching value, superconductive current limiter will be actually used The resistance of parallel resistance and the dash current i of realityMRespectively as three input quantities of current limliting genetic operation device, configuration is determined Fitness function of the plan model as current limliting genetic operation device, using the fitness function value of calculating as current limliting genetic operation device Output quantity;
Step 5, genetic algorithm is run using current limliting genetic operation device, when the fitness function value of output restrains stable, Export the resistance of the parallel resistance under current genetic algebra, actually use the switch of band length l and each installed position Amount, switching value are 1 or 0, represent whether the hypothesis opening position installs superconductive current limiter respectively, wherein, current limliting genetic operation device fortune Row genetic algorithm concretely comprises the following steps:
Step 5.1, initialize, individual amount and maximum genetic algebra in population are set, given birth to by current limliting genetic operation device Into initial population, each individual represents a kind of programme of superconductive current limiter in population, i.e., each individual includes one group The input quantity of current limliting genetic operation device;
Step 5.2, individual evaluation, according to the configuration decisions model established in step 3 to corresponding to each individual in population Programme calculates a fitness function value, and fitness function value is bigger to represent that programme corresponding to this individual is more excellent Show, also it is better able to the existence in genetic evolution;
Step 5.3, hereditary variation, population by select, intersect and mutation operator complete hereditary variation process, complete Once judge whether to reach maximum genetic algebra after heredity, if reaching maximum genetic algebra, into step 5.4, otherwise return Step 5.2 continues hereditary variation, wherein, the individual that selection opertor causes fitness high is easily left, and fitness is low Individual then be easily eliminated, crossover operator randomly chooses two selected individuals and intersects gene section from a point, this operation Can be with the diversity of redundant gene type, i.e. programme, mutation operator causes the genotype of individual has to be changed compared with small probability, Its effect lies also in redundant gene type so that all programmes may all occur in population in theory;
Step 5.4, terminate calculate, through excessively for hereditary variation after, individual cognition in population gradually restrain stably, fitness Functional value reaches peak, referred to as optimal solution.
Embodiment 1:
As shown in figure 3, it is directed to different 110kV plant stands low-pressure side 10kV feeder line cyclization examples.
First, set up and build electric network composition circuit as shown in Figure 3,110kV the main transformers T1's and T2 of two various zones Original and be not connected between low-pressure side 10kV feeder lines, when cyclization point closes, two sections will be into inscription of loop.Between 10kV feeder lines There is many places load off line, therefore, in whole network be provided with superconductive current limiter at A, B, C, D, E five and plan place.
The model built under Simulink is as shown in figure 4, two sections top is 220kV buses, by 220kV/ 110kV transformers, 110kV circuits, 110kV/10kV transformers enter 10kV medium voltage distribution networks, the 10kV feeder lines in two regions it Between be divided into multistage, have load off line.ABCDE is restrictor configuration place in figure, accesses the superconducting current-limiting based on Simulink Device model.Cyclization point is perfect switch, controls closed loop time by step signal, produces transient process.
The model of current limliting genetic operation device is respectively as shown in Fig. 2 the parameter of superconductive current limiter has three:Band length L, parallel resistance R and switching value k.Input signal is to flow through the current value of the current limiter, i.e. actual dash current iM.It is in parallel Resistance is inputted by In6 mouths, and sample rate current is inputted by In2 mouths, and band length and switching value input after doing product from In5 mouths.If Switching value is 1, represents that the current limiter comes into operation, and the result of product is exactly band length, if switching value is 0, represents the limit Stream device does not come into operation, and band length is equivalent to 0 after product.By such input control signal, can be easy to heredity In algorithm, the parameter of each individual inputs to model by corresponding ports, and carries out simulation calculation.
The output quantity of current limliting genetic operation device is arranged to fitness function value, is exported by conn2 mouths, the sampled value of electric current It is automatically saved in the current matrix in workspace.With reference to the decision model allocation models function of current limiter, obtaining current matrix In maximum of the maximum as dash current, and cost is then together decided on by band length and switching value, and by electric current and Cost collectively forms fitness function, carries out genetic algorithm with this, solves the optimal solution of current limiter optimization planning.
It is related to five restrictor configuration points in this planning process, therefore is related to 15 parameters, per each and every one in genetic algorithm Body is all the ordered sequence string for including this 15 numerical value, and this 15 numerical value represent five restrictor configuration points of A, B, C, D, E respectively The band length of the current limiter at place, parallel resistance resistance and switching value.Numerical value is different, can according to content corresponding to the numerical value of place To calculate the cost of programme corresponding to this individual, electric current and fitness function value.
Secondly, result of calculation, because superconductive current limiter model nonlinear degree is very big, in the presence of multiple current limiters are common Simulation velocity is very slow, therefore the number of individuals that this genetic algorithm is selected is 15, genetic algebra 40.From result, 40 In generation, restrains substantially.Shown in specific tables of data 1 and Fig. 5.
Table 1 is the result of calculation of first embodiment
Table 1 has tracked genetic algorithm and has crossed the 40 generation Xie Chengzhong asked, per a generation 15 individuals in maximum fitness function value, Least cost and minimum Alloy White Iron.Fitness function value is that cost and Alloy White Iron pass through at a linear normalization in fact Weighted value after reason.So the target distributed rationally is the maximization of fitness function value, the cost of possible optimal solution and it is not Minimum, current limitation effect is nor best, but weighted value is maximum.It can be seen that to come from optimal solution curve of pursuit, from 0.4 or so at the beginning is slowly lifted, and 0.71 is reached in or so the 22nd generation and is stablized nearby, its convergence situation is very not Wrong.The optimal solution finally drawn is as shown in table 2.
Table 2 is the individual data items in last generation
l1 l2 l3 l4 l5 R1 R2 R3 R4 R5 k1 k2 k3 k4 k5
1 122.0 35.2 19.6 17.3 36.1 1.1 4.9 5.0 4.2 2.7 1.0 0.0 1.0 1.0 0.0
2 77.6 37.2 19.6 4.7 28.2 1.1 4.5 4.8 1.7 1.1 1.0 1.0 1.0 1.0 0.0
3 122.0 25.9 18.4 7.1 34.5 1.0 4.5 3.9 2.8 1.1 1.0 0.0 0.0 1.0 1.0
4 122.0 38.4 19.5 17.3 34.5 1.1 5.0 5.0 4.2 3.6 1.0 1.0 1.0 1.0 0.0
5 122.3 38.4 15.5 4.7 28.2 1.2 4.9 5.0 4.2 2.7 1.0 1.0 1.0 0.0 0.0
6 123.0 35.9 19.6 5.5 13.3 1.2 0.5 4.8 2.8 1.1 1.0 1.0 1.0 0.0 0.0
7 123.2 35.9 18.8 17.3 34.5 1.1 5.0 5.0 4.2 3.6 1.0 1.0 1.0 0.0 0.0
8 122.3 38.4 19.3 5.5 28.2 1.2 4.5 4.8 1.7 1.1 1.0 1.0 1.0 0.0 0.0
9 122.0 35.9 19.6 17.3 165.5 1.1 4.5 5.0 4.2 3.6 1.0 1.0 1.0 1.0 1.0
10 120.6 37.6 18.2 6.3 17.3 1.0 5.0 5.0 4.2 3.6 1.0 1.0 1.0 0.0 0.0
11 121.4 37.6 21.2 6.3 17.3 1.0 4.4 3.7 2.8 1.5 1.0 1.0 1.0 0.0 0.0
12 120.1 37.6 20.6 6.3 17.3 1.2 5.0 4.9 4.2 3.6 1.0 1.0 1.0 0.0 0.0
13 122.3 35.9 19.3 17.3 36.9 1.7 4.5 4.8 1.7 1.1 1.0 1.0 1.0 0.0 0.0
14 121.4 35.4 19.1 17.3 36.9 1.3 4.5 4.8 1.7 1.0 1.0 1.0 1.0 1.0 0.0
15 122.9 38.4 18.5 4.7 171.8 1.2 4.9 5.0 0.8 2.7 1.0 1.0 1.0 0.0 0.0
The content of table 2 is 15 individual parameter situations in the 40th generation.Here it is middle B, C, D limit corresponding to 1,2,3 Device collocation point is flowed, 4,5 represent A, E restrictor configuration point, such as l respectively1What is represented is the band length that collocation point B corresponds to current limiter Degree.It can be evident that the parameter of three current limiters near cyclization point has restrained from table, l1、l2、l3Receive respectively Hold back in 122,37 and 20 or so, R1、R2、R31.2,4.9 and 4.8 are converged on respectively, and switching value is also 1.And to two later The current limiter of clutch circling point farther out, due to its current limitation effect be not it is obvious that and cost occupies leading position, therefore, open Measure k in pass4、k50 is converged to, corresponding band length and parallel resistance, because having no effect on target in the case where not putting into operation Functional value, so there is not convergent situation.
Finally, conclusion is obtained, can be concluded that by the result of genetic algorithm:Needed at B, C, D of cyclization point Install superconductive current limiter additional, its parameter is l respectively1=122m, R1=1.2 Ω, l2=37m, R2=4.9 Ω, l3=20m, R3= 4.8 Ω, clutch circling point farther out two at A, E do not install superconductive current limiter additional.Under the program, totle drilling cost is 811170 yuan, after current limliting Maximum current be 570A, the configuration diagram of superconductive current limiter is as shown in Figure 6.
Embodiment 2:
More cyclization point complexity 10kV closed loop network examples:
First, circuit is built, first embodiment provides the result of distributing rationally of simple 10kV feeder lines cyclization, but real The electric network composition on border may not be the structure that simple unit feeder is segmented more.Therefore example two will combine actual medium voltage distribution network Structure optimizes configuration.Because the topological structure and parameter of network provide in the form of data, therefore first by its turn Wei not graphical equivalent network.
Rough schematic view and artificial circuit based on Simulink are respectively as shown in Figure 7 and Figure 8.All loads are omitted, Reservation 10kV buses, feeder line, bus, the structure after cyclization point switchs are as shown in Figure 7.In the medium voltage distribution network, altogether There are three 10kV buses 140,141 and 15096, and draw 4 feeder lines, two of which feeder line comes from same 10kV buses 140.Four Bar feeder line respectively power alone by burst, and is connected between any two by switching extension wire, totally three cyclization points, and often A superconductive current limiter collocation point is respectively provided with one cyclization branch road, is also three allocation positions altogether.
The distribution network model is erected under Simulink, while accesses load, as a result as shown in Figure 8.Three cyclizations Point is A, B, C respectively, identical with example one, passes through step signal control and closes a floodgate, simulates transient process.It is corresponding with cyclization point , superconductive current limiter is set respectively at D, E, F.The input quantity of its control signal seldom repeats herein with embodiment 1.
Secondly, result of calculation, due to there is three cyclization points, therefore current embodiment require that solved three times, i.e., it is corresponding often The cyclization of individual cyclization point, will carry out a simulation calculation, and according to optimal solution respectively, choose optimal cyclization mode and The allocation plan of superconductive current limiter.It is very big plus superconductive current limiter nonlinear degree because the model emulation of cyclization is slower, because This, the number of individuals that this genetic algorithm uses is 30, genetic algebra 20.In the loop closing examination of each cyclization point, add super Before leading current limiter, direct cyclization is first carried out, cyclization dash current is reached 1000A by adjusting parameter.When addition current limiter Afterwards, the maximum impact electric current after current limliting is compareed with 1000A.
The processing of data is identical with embodiment, only provides optimal solution aircraft pursuit course under each cyclization mode, most herein Excellent solution and optimal objective function value.During cyclization point A cyclizations, optimal solution aircraft pursuit course is as shown in Figure 9.Fitness function is maximum It is worth for 0.7192, now maximum Alloy White Iron is 673A, and cost is the cost summation of two current limiters, totally 560650 yuan.It is corresponding Optimal solution is as shown in table 3.
Table 3 is A point cyclization restrictor configuration optimal solutions
D current limiters E current limiters F current limiters
Switching value 1 1 0
Parallel resistance (Ω) 2.2 1.7
Band length (m) 140.2 35.3
During cyclization point B cyclizations, optimal solution aircraft pursuit course is as shown in Figure 10.Fitness function maximum is 0.6928, now Maximum Alloy White Iron is 742A, and cost is the cost summation of two current limiters, and totally 564500 yuan of corresponding optimal solutions are as shown in table 4.
The B point cyclization restrictor configuration optimal solutions of table 4
D current limiters E current limiters F current limiters
Switching value 1 1 0
Parallel resistance (Ω) 1.4 2.5
Band length (m) 52.8 135.7
During cyclization point C cyclizations, optimal solution aircraft pursuit course is as shown in figure 11.Fitness function maximum is 0.5183, now Alloy White Iron is 752A, and cost is three current limiter cost summations, and totally 835560 yuan of corresponding optimal solutions are as shown in table 5.
The A point cyclization restrictor configuration optimal solutions of table 5
D current limiters E current limiters F current limiters
Switching value 1 1 1
Parallel resistance (Ω) 1.0 1.2 3.3
Band length (m) 28.7 42.3 174.2
The optimal solution curve of pursuit of cyclization position at three is contrasted, as shown in figure 12.
Finally, obtain conclusion, due to this algorithm use object function be more big more excellent type, it is clear that A point cyclizations it is optimal Target function value corresponding to solution is more than B and C two schemes, therefore, in the cyclization location problem and superconducting current-limiting of the power distribution network In the addressing constant volume problem of device, it should choose A points as optimal cyclization place, current limliting ratio is 32.7%, while superconductive current limiter The configuration of parameter installs current limiter D, E positioned at cyclization point A, B branch road additional, does not install the current limliting positioned at C branch roads additional as shown in upper table 3 Device F, current limiter D parameter configuration are 140.2 meters of band lengths, and parallel resistance 2.2 Ω, current limiter E parameter configuration are bands 35.3 meters of length, the Ω of parallel resistance 1.7.It is as shown in figure 13 that it distributes figure rationally.

Claims (3)

1. a kind of cyclization of based superconductive current limiter turns method of supplying power to, it is characterised in that comprises the following steps:
Step 1, the current limitation effect for turning the dash current calculating superconductive current limiter of actual acquisition in power supply road according to cyclization normalizes Evaluation index F1For:
<mrow> <msub> <mi>F</mi> <mn>1</mn> </msub> <mo>=</mo> <mfrac> <mrow> <msub> <mi>I</mi> <mn>1</mn> </msub> <mo>-</mo> <msub> <mi>i</mi> <mi>M</mi> </msub> </mrow> <msub> <mi>I</mi> <mn>1</mn> </msub> </mfrac> </mrow>
In formula, I1For circuit constraint electric current, the maximum load current in cyclization point circuit, i are chosenMFor the dash current of reality;
Step 2, the cost using length computation superconductive current limiter for turning superconducting tape in power supply road according to cyclization normalizes evaluation Index F2For:
<mrow> <msub> <mi>F</mi> <mn>2</mn> </msub> <mo>=</mo> <mfrac> <mrow> <msub> <mi>l</mi> <mrow> <mi>m</mi> <mi>a</mi> <mi>x</mi> </mrow> </msub> <mo>-</mo> <mi>l</mi> </mrow> <msub> <mi>l</mi> <mrow> <mi>m</mi> <mi>a</mi> <mi>x</mi> </mrow> </msub> </mfrac> </mrow>
In formula, lmaxFor the band maximum length set according to concrete condition, l is the reality that cyclization turns superconducting tape in power supply road Use band length;
Step 3, evaluation index F is normalized according to current limitation effect1With cost normalization evaluation index F2Establish closed loop network superconduction The configuration decisions model of current limiter is:
F=ω F1+(1-ω)F2
In formula, F1Span be [0,1], F2Span be also [0,1], ω is the weight factor of model, span Also it is [0,1];
Step 4, it is assumed that turn to install the superconducting current-limiting with digital output modul under each load on power supply road between site in cyclization Device, establish a current limliting genetic operation device, by actually use the product of band length l and switching value, superconductive current limiter it is in parallel The resistance of resistance and the dash current i of realityMRespectively as three input quantities of current limliting genetic operation device, by configuration decisions mould Fitness function of the type as current limliting genetic operation device, the output using the fitness function value of calculating as current limliting genetic operation device Amount;
Step 5, genetic algorithm is run using current limliting genetic operation device, when the fitness function value of output restrains stable, export The resistance of parallel resistance under current genetic algebra, the switching value for actually using band length l and each installed position, are opened Pass amount is 1 or 0, represents whether the hypothesis opening position installs superconductive current limiter respectively.
2. the cyclization of based superconductive current limiter according to claim 1 turns method of supplying power to, it is characterised in that in step 5, limit Stream genetic operation device operation genetic algorithm concretely comprises the following steps:
Step 5.1, initialize, individual amount and maximum genetic algebra in population are set, generated just by current limliting genetic operation device Beginning population, each individual represents a kind of programme of superconductive current limiter in population, i.e., each individual includes one group of current limliting The input quantity of genetic operation device;
Step 5.2, individual evaluation, according to the configuration decisions model established in step 3 to planning corresponding to each individual in population Scheme calculates a fitness function value, and fitness function value is bigger to represent that programme corresponding to this individual is more outstanding, Also it is better able to the existence in genetic evolution;
Step 5.3, hereditary variation, population by select, intersect and mutation operator complete hereditary variation process, complete once Judge whether to reach maximum genetic algebra after heredity, if reaching maximum genetic algebra, into step 5.4, otherwise return to step 5.2 continue hereditary variation;
Step 5.4, terminate calculate, through excessively for hereditary variation after, individual cognition in population gradually restrain stably, fitness function Value reaches peak, referred to as optimal solution.
3. the cyclization of based superconductive current limiter according to claim 1 turns method of supplying power to, it is characterised in that real in step 1 The dash current i on borderMTo be stored in the maximum current value in current matrix, current matrix is used for the actual current for storing collection Value.
CN201610057265.4A 2016-01-27 2016-01-27 A kind of cyclization of based superconductive current limiter turns method of supplying power to Active CN105762921B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610057265.4A CN105762921B (en) 2016-01-27 2016-01-27 A kind of cyclization of based superconductive current limiter turns method of supplying power to

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610057265.4A CN105762921B (en) 2016-01-27 2016-01-27 A kind of cyclization of based superconductive current limiter turns method of supplying power to

Publications (2)

Publication Number Publication Date
CN105762921A CN105762921A (en) 2016-07-13
CN105762921B true CN105762921B (en) 2018-03-13

Family

ID=56342699

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610057265.4A Active CN105762921B (en) 2016-01-27 2016-01-27 A kind of cyclization of based superconductive current limiter turns method of supplying power to

Country Status (1)

Country Link
CN (1) CN105762921B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109406327A (en) * 2018-09-28 2019-03-01 中国计量大学 A kind of evaluation of uncertainty in measurement method of impact force traceability system

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109888755B (en) * 2019-03-22 2021-01-22 广东电网有限责任公司 Optimal configuration method, device and equipment for superconducting current limiter of power grid
CN112993948A (en) * 2021-02-23 2021-06-18 广西电网有限责任公司电力科学研究院 Circuit and method for preventing relay protection misoperation in loop closing operation
CN115207926B (en) * 2022-09-15 2023-01-24 广东电网有限责任公司湛江供电局 Method and related device for measuring and calculating transferable power supply capacity of medium-voltage line of power distribution network

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102521673B (en) * 2011-12-01 2016-08-24 嘉兴电力局 A kind of method for optimizing power-failure plan based on genetic algorithm
CN102611107A (en) * 2012-04-09 2012-07-25 凯里供电局 Urban medium-voltage power distribution network closed-loop power supply system based on annular net rack
CN103580264B (en) * 2013-10-24 2016-08-17 深圳供电局有限公司 Direct current micro-grid system with power supplied in looped network form
CN103560512B (en) * 2013-11-19 2015-09-02 国家电网公司 A kind of medium voltage distribution network high reliability closed loop mode of connection
CN104037765B (en) * 2014-07-08 2016-03-30 上海电力学院 The method of active power distribution network service restoration scheme is chosen based on improved adaptive GA-IAGA

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109406327A (en) * 2018-09-28 2019-03-01 中国计量大学 A kind of evaluation of uncertainty in measurement method of impact force traceability system

Also Published As

Publication number Publication date
CN105762921A (en) 2016-07-13

Similar Documents

Publication Publication Date Title
Ding et al. Feeder reconfiguration for unbalanced distribution systems with distributed generation: A hierarchical decentralized approach
Lin et al. A new approach for distribution feeder reconfiguration for loss reduction and service restoration
Shao et al. Corrective switching algorithm for relieving overloads and voltage violations
Millar et al. Impact of MV connected microgrids on MV distribution planning
CN105762921B (en) A kind of cyclization of based superconductive current limiter turns method of supplying power to
CN106655207A (en) Power distribution network reactive power optimization system and method based on multi-data analysis
Degefa et al. Optimal voltage control strategies for day-ahead active distribution network operation
Sedighizadeh et al. Reconfiguration of distribution systems to improve re-liability and reduce power losses using imperialist com-petitive algorithm
CN109449945A (en) Power distribution network based on the DG 10kV Alloy White Iron constraint adjusted turns for optimization method
CN103279656B (en) Based on the power distribution network net capability computing method of trend
CN105846422B (en) A kind of large capacity grid short circuit current control stimulation optimization configuration method
CN104156531A (en) Fault current limiter distribution point optimization and capacity selection method taking operation loss into consideration
CN109494719A (en) A kind of mesolow mixing power distribution network stratification impedance analysis method
CN108631278B (en) The Optimal Configuration Method of breaker and fault current limiter in a kind of looped network formula direct-current micro-grid
Rudnick et al. Reconfiguration of electric distribution systems
CN109377020B (en) Power transmission network planning method considering load transfer capacity of power distribution network
CN104485662A (en) Method of calculating maximum power supply capability of power distribution network during parallel operation of substation
CN106505576B (en) It is a kind of based on Link-path urban high voltage distribution network load turn for method
Roytelman et al. Practical aspects of distribution automation in normal and emergency conditions
Rugthaicharoencheep et al. Feeder reconfiguration for loss reduction in three phase distribution system under unbalanced loading conditions
Feng et al. Implementation of control center based voltage and var optimization in distribution management system
CN106558874A (en) A kind of transformer station&#39;s reliability comprehensive estimation method towards management and running
Vyas et al. Feeder Reconfiguration of distribution network using Minimum Power Flow methodology
CN106159937B (en) A method of improving multichannel section ability to transmit electricity
CN113158382B (en) Computer-aided decision support system for power grid planning

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant