CN105743785B - The route switching method and device of equipment - Google Patents
The route switching method and device of equipment Download PDFInfo
- Publication number
- CN105743785B CN105743785B CN201410767944.1A CN201410767944A CN105743785B CN 105743785 B CN105743785 B CN 105743785B CN 201410767944 A CN201410767944 A CN 201410767944A CN 105743785 B CN105743785 B CN 105743785B
- Authority
- CN
- China
- Prior art keywords
- equipment
- routing
- network
- physical location
- location information
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Data Exchanges In Wide-Area Networks (AREA)
- Mobile Radio Communication Systems (AREA)
- Telephonic Communication Services (AREA)
Abstract
The present invention provides a kind of route switching method of equipment and devices, wherein this method comprises: obtaining the physical location information of all devices in specified network;Network structure is established according to physical location information, wherein the network structure is used for the positional relationship reflected between all devices;Designated equipment is being detected there are when routing failure, foundation network structure is according to preset rules selection target switching equipment;Route handoff of the execution designated equipment to target device.Through the invention, the equipment in network system in the related technology is solved when there is routing failure, it is difficult to which the problem of effectively restoring communication network in the short period ensure that the communication of equipment is normal to realize the switching of routing in a short time.
Description
Technical field
The present invention relates to the communications fields, in particular to the route switching method and device of a kind of equipment.
Background technique
In recent years, with the sustainable development of the wireless terminal devices such as mobile phone, the dependence of wireless network is got over by society
Come bigger.Especially in military and power domain, the routing stability of wireless telecom equipment is most important, therefore various Routing Protocols
It comes into being.
In earthquake, after the disasters such as mud-rock flow occur, often there is the problems such as broken ring of power equipment, communication system interruption, this
Sample seriously affects rescue work generation, will cause the quadratic loss of personnel and property.Therefore, can quickly restoration route lead to
News become the task of top priority.In military field, if can not communicate, tactics can not be conveyed, and can not be exchanged between personnel, and stable is logical
News equipment is the guarantee that war is won victory.However, the case where military field, is often fast changing, and in new military area, military people
Member generally requires quickly to establish perfect communication network, provides reliable communication environment.Meanwhile communication apparatus is several by what is destroyed
Rate is very big, guarantees that communication is unimpeded particularly important.In communication network of today, the effect of emergency system is most important, is encountering
When failure, need it that can establish effective and stable new routing in time.
Current wireless communication networks become increasingly complex, and the entry number of the routing table of equipment is also increasingly huge.By related skill
Mode in art, after routing disconnecting, software needs to update routing table, according to a certain routing algorithm, establishes new
Connection.Traditional Routing Protocol is divided into static routing protocol and dynamic routing protocol, and dynamic routing protocol can be divided into distance vector
Routing Protocol (Distance Vector Routing Protocol is referred to as DVRP) and link-state routing protocol (Link
State Routing Protocol is referred to as LSRP).By taking distance vector Routing Protocol as an example, it is according to distance vector, example
Such as: hop count hop, come the method for a determining Optimization route being routed, this distance refers to virtual hop count distance, and
It is not actual physics absolute distance.Routing Protocol in the related technology is the software switched over by the routing iinformation of equipment
Agreement, there are two big drawbacks.First is that communication apparatus needs to safeguard the routing table information of whole network, this needs to consume a large amount of moneys
Source;Second is that algorithm based on routing table is complicated, this requirement to software protocol is high.Above-mentioned deficiency can all influence the stabilization of network
Property.
For the equipment in network system in the related technology when there is routing failure, it is difficult in the short period effectively
The problem of restoring communication network, currently no effective solution has been proposed.
Summary of the invention
The main purpose of the present invention is to provide a kind of switching method of routing and device, solve related in the related technology
Equipment in technology in network system is when there is routing failure, it is difficult to effectively restore asking for communication network in the short period
Topic.
According to aspects of the present invention, a kind of route switching method of equipment is provided, comprising: obtain and own in specified network
The physical location information of equipment;The network structure is established according to the physical location information, wherein the network structure is used
In the positional relationship reflected between all devices;Designated equipment is being detected there are when routing failure, according to the network
Structure chart is according to preset rules selection target switching equipment;Execute the designated equipment to the target device route handoff.
It further, include: according to described according to preset rules selection target switching equipment according to the position assumption diagram
Position assumption diagram will be with the shortest equipment of designated equipment physical distance as the target switching equipment.
Further, the physical location information includes: coordinate information, obtains the physical bit of all devices in specified network
Confidence breath includes: to obtain the coordinate information from local pre-stored historical record.
It further, is including: periodicity before obtaining the coordinate information in local pre-stored historical record
Obtain the coordinate information of all devices in the specified network;Update the coordinate information stored in local historical record.
Further, the equipment for periodically acquiring the coordinate information of all devices in the specified network include it is following it
One: global position system GPS equipment, Beidou Navigation System BDNS equipment.
Further, establishing the network structure according to the physical location information includes: according to the coordinate information
Construct the routing connection relationship of the equipment, wherein the routing connection relationship be used to indicate the physics between the equipment away from
From;The network structure of the equipment is established according to the routing connection relationship.
According to another aspect of the present invention, a kind of route handoff device of equipment is provided, comprising: first obtains module,
For obtaining the physical location information of all devices in specified network;Module is established, for building according to the physical location information
The network structure is found, wherein the network structure is used for the positional relationship reflected between all devices;Selecting module,
For detecting designated equipment there are when routing failure, switch according to the position assumption diagram according to preset rules selection target
Equipment;Switching module, the route handoff for executing the designated equipment to the target device.
Further, the switching module is also used to, according to the position assumption diagram will with the designated equipment physics away from
From shortest equipment as the target switching equipment.
Further, the physical location information includes: coordinate information, and the first acquisition module is also used to, from local
The coordinate information is obtained in pre-stored historical record.
Further, described device further include: second obtains module, owns for periodically acquiring in the specified network
The coordinate information of equipment;Update module, for updating the coordinate information stored in local historical record.
Through the invention, it using the physical location information for obtaining all devices in specified network, is built according to the location information
The network structure of vertical all devices is executed according to preset rules according to the network structure and is specified when there is routing failure
Equipment to target device route handoff mode, the route handoff of equipment is carried out by the physical location information of equipment, no
Need to safeguard complicated huge routing table, and the algorithm of which is simple, solves setting in network system in the related technology
For when there is routing failure, it is difficult to the problem of effectively restoring communication network in the short period, thus real in a short time
The switching for having showed routing, ensure that the communication of equipment is normal.
Detailed description of the invention
The drawings described herein are used to provide a further understanding of the present invention, constitutes part of this application, this hair
Bright illustrative embodiments and their description are used to explain the present invention, and are not constituted improper limitations of the present invention.In the accompanying drawings:
Fig. 1 is the route switching method flow chart of equipment according to an embodiment of the present invention;
Fig. 2 is the route handoff apparatus structure block diagram of equipment according to an embodiment of the present invention;
Fig. 3 is the alternative construction block diagram of the route handoff device of equipment according to an embodiment of the present invention;
Fig. 4 is the route handoff apparatus structure block diagram of the communication apparatus of alternative embodiment according to the present invention;
Fig. 5 is the initialization route switching method flow chart of the communication apparatus of alternative embodiment according to the present invention;
Fig. 6 is the route switching method flow chart one of the communication apparatus of alternative embodiment according to the present invention;
Fig. 7 is the route switching method flowchart 2 of the communication apparatus of alternative embodiment according to the present invention;
Fig. 8 is the structural schematic diagram of the route network of alternative embodiment according to the present invention.
Specific embodiment
Hereinafter, the present invention will be described in detail with reference to the accompanying drawings and in combination with Examples.It should be noted that not conflicting
In the case of, the features in the embodiments and the embodiments of the present application can be combined with each other.
A kind of switching method of routing is provided in the present embodiment, and Fig. 1 is the road of equipment according to an embodiment of the present invention
By switching method flow chart, as shown in Figure 1, the process includes the following steps:
Step S102: the physical location information of all devices in specified network is obtained;
Step S104: network structure is established according to physical location information;
Wherein the network structure is used for the positional relationship reflected between all devices;
Step S106: designated equipment is being detected there are when routing failure, foundation network structure is selected according to preset rules
Select target switching equipment;
Step S108: the route handoff of execution designated equipment to target device.
Through this embodiment, using the physical location information for obtaining all devices in specified network, according to the location information
The network structure for establishing all devices refers to according to the network structure according to preset rules execution when there is routing failure
Locking equipment to target device route handoff mode, the route handoff of equipment is carried out by the physical location information of equipment,
The complicated huge routing table of maintenance is not needed, and the algorithm of which is simple, solves in network system in the related technology
Equipment is when there is routing failure, it is difficult to the problem of effectively restoring communication network in the short period, thus in a short time
The switching for realizing routing ensure that the communication of equipment is normal.
In the present embodiment, there are many according to position assumption diagram in the way of preset rules selection target switching equipment,
Can be achieved in that in an optional embodiment of the present embodiment will set according to position assumption diagram with specified
The standby shortest equipment of physical distance is as target switching equipment.
It should be noted that the above-mentioned mode selected according to physical location information apart from shortest equipment as target device
An only optional embodiment of the invention, in a practical situation, if necessary to switch the routing relation between two equipment,
But it is not to be close to, and measure there are many routing relations between equipment between the two equipment, it can be according to physical bit confidence
Breath selects the switching that is routed of the shortest routing relation of distance between this equipment, that is to say, that can according to actual needs,
Aforesaid way is only used only to be illustrated, and does not constitute restriction of the invention.
The physical location information being related to for the present embodiment may include: coordinate information, when the physical location information is
When coordinate information, obtain the physical location information of all devices in specified network mode can be accomplished in that from
Coordinate information is obtained in local pre-stored historical record.
And in another optional embodiment of the present embodiment, it is obtained from local pre-stored historical record above-mentioned
Before taking coordinate information, the method for the present embodiment can also include:
Step S11: the coordinate information of all devices in specified network is periodically acquired;
Step S12: the coordinate information stored in local historical record is updated.
And in the present embodiment, optionally, the equipment for periodically acquiring the coordinate information of all devices in specified network can
To be following one: global position system GPS equipment, Beidou Navigation System BDNS equipment.Certain GPS device and BDNS equipment
Also it is merely illustrative, can choose one of them in actual application scenarios, also can choose other and be able to carry out position
The equipment of positioning.
In addition, also relating to the method for establishing network structure according to physical location information, this method in the present embodiment
It can be accomplished in that
Step S21: the routing connection relationship of equipment is constructed according to coordinate information, wherein routing connection relationship is used to indicate
Physical distance between equipment;
Step S22: the network structure of equipment is established according to routing connection relationship.
The switching method and device of a kind of routing are additionally provided in the present embodiment, and the device is for realizing above-described embodiment
And preferred embodiment, the descriptions that have already been made will not be repeated.As used below, term " module " may be implemented to make a reservation for
The combination of the software and/or hardware of function.It is hard although device described in following embodiment is preferably realized with software
The realization of the combination of part or software and hardware is also that may and be contemplated.
Fig. 2 is the route handoff apparatus structure block diagram of equipment according to an embodiment of the present invention, as shown in Fig. 2, the device packet
Include: first obtains module 22, for obtaining the physical location information of all devices in specified network;Module 24 is established to obtain with first
Modulus block 22 is of coupled connections, and for establishing network structure according to physical location information, wherein the network structure is for reflecting
Positional relationship between all devices;Selecting module 26 is of coupled connections with module 24 is established, for detecting that designated equipment deposits
In routing failure, according to position assumption diagram according to preset rules selection target switching equipment;Switching module 28 and selecting module
26 are of coupled connections, the route handoff for executing designated equipment to target device.
Optionally, switching module 28 can be also used for according to position assumption diagram will with designated equipment physical distance is shortest sets
It is standby to be used as target switching equipment.
Optionally, physical location information includes: coordinate information, and the first acquisition module 22 is also used to from local pre-stored
Coordinate information is obtained in historical record.
Fig. 3 is the alternative construction block diagram of the route handoff device of equipment according to an embodiment of the present invention, as shown in figure 3, should
Device further include: second obtains module 32, for periodically acquiring the coordinate information of all devices in specified network;Update module
34 are of coupled connections with the second acquisition module 32 and the first acquisition module 22, for updating the coordinate stored in local historical record letter
Breath.
In order to which preferably the present invention will be described, it is illustrated below with reference to optional implementation of the invention.
This alternative embodiment provides a kind of route handoff device of communication apparatus, and Fig. 4 is optional implementation according to the present invention
The route handoff apparatus structure block diagram of the communication apparatus of example, as shown in figure 4, the device includes: position locating module 42, state inspection
Survey module 44, information acquisition module 46, route handoff module 48.
Global positioning system (Global Positioning is provided in the locating module of position in this alternative embodiment
System is referred to as GPS) positioning function of Lai Shixian equipment, i.e., it is sat by the position that position locating module obtains communication apparatus
Mark;State detection module is used to detect the connection status of communication apparatus, and the detection needs real-time perfoming in the present embodiment, ability
The routing connecting fault of communication apparatus is effectively found in time;Information acquisition module is for collecting locating module and state-detection mould
Information of both block, that is, the physical coordinates of current device and its peripheral equipment, and the position of route network is consequently formed
Whether the port connection state of structure chart and communication apparatus judges the routing of equipment by broken ring;Once routing is interrupted, routing
Switching module will cut off existing routing connection, switch to new routing connection up;Route handoff module is used for according to information
The routing connection status that the communication apparatus location information and state detection module that acquisition module provides provide switches over.Routing is cut
Changing not is to run the software algorithm based on routing table and select new connection, but according to the physical location of adjacent communication apparatus
Information selects nearest communication apparatus as new connecting object.
Increasingly complicated now with network structure, the entry number of routing table increases in geometric progression, this is to route handoff
Algorithm requires also higher and higher.Route handoff algorithm in the related technology is the software algorithm based on routing table.Software algorithm
The raising of complexity, on the one hand will lead to algorithm, there are certain delays, on the other hand increase the uncertain of route handoff
Property.Especially in the emergency systems such as military affairs, when routing link is by broken ring, primary demand is exactly fast and effeciently to establish
New routing connection.Software exchange algorithm based on routing table is difficult to meet the needs of in emergency system.
By above description as it can be seen that the route protection device of this alternative embodiment and route handoff algorithm phase in the related technology
Than having the effect that 1. this alternative embodiment do not need additional equipment;2. this alternative embodiment only needs to safeguard simply
Route location information, do not need the complicated huge routing table of maintenance;3. this alternative embodiment algorithm is simple, it is based on physical location
Nearest routing algorithm does not need to search complicated routing table;4. this alternative embodiment response quickly, once communication apparatus by
Broken ring, device do not need to carry out cumbersome algorithm, so that it may quickly establish effective routing connection, thus meet it is military it is equal for
Routing stability and the more demanding field of timeliness.
Completely, clearly retouch according to technical solution of the specific embodiment to this alternative embodiment below in conjunction with attached drawing
It states.Technical solution involved in this alternative embodiment is based on router, according to the physical location information of each communication apparatus,
In the case that routing link is by broken ring, route handoff is quickly carried out.
Embodiment one
Fig. 5 is the initialization route switching method flow chart of the communication apparatus of alternative embodiment according to the present invention, such as Fig. 5 institute
Show, this method comprises:
Step S502: position locating module according to GPS device, sit by the position for obtaining all communication apparatus in this routing network
Mark;
Step S504: information acquisition module forms network structure by the position coordinates of acquisition communication apparatus;
Step S506: the communication apparatus position coordinates that route handoff module is provided according to information acquisition module, physics away from
From initialization routing connection between two nearest communication apparatus.
Fig. 6 is the route switching method flow chart one of the communication apparatus of alternative embodiment according to the present invention, as shown in fig. 6,
This method comprises:
Step S602: the position coordinates of routing device are obtained;
Wherein, position locating module obtains the position coordinates of communication apparatus in this routing network according to GPS device;
Step S604: real-time detection connection status and location status;
The wherein location updating situation of state detection module real-time detection communication apparatus, state detection module detect logical simultaneously
The connection status of equipment is interrogated, this is the foundation that route handoff is carried out in this alternative embodiment;
Step S606: judge whether state changes;
On the one hand information acquisition module passes through the position coordinates for obtaining communication apparatus, form network structure, one side root
According to the connection status of communication apparatus, judge whether to need to switch over;Once a certain link interrupts, then follow the steps
S608;
Step S608: new connection is established for condition so that physical distance is most short;
Wherein, once routing link interrupts, route handoff module is started to work;The module is according to information acquisition module
The communication apparatus position coordinates of offer, by the route handoff of interruption to the shortest communication apparatus of this communication apparatus physical distance.
Fig. 7 is the route switching method flowchart 2 of the communication apparatus of alternative embodiment according to the present invention, as shown in fig. 7,
The device, this method comprises:
Step S702: the position coordinates of routing device are obtained;
Wherein, position locating module obtains the position coordinates of communication apparatus in this routing network according to GPS device;
Step S704: new backup connection is established for condition so that physical distance is most short;
Wherein, the communication apparatus position coordinates that information acquisition module is provided according to position locating module are established and this communication
The link of equipment physical shortest path;
Step S706: judge whether original link state changes;
Wherein, the connection status of state detection module real-time detection link judges whether to need to switch over.Once a certain
Link interrupts, and thens follow the steps S708;
Step S708: backup connection is enabled;
Wherein, route handoff is carried out according to the shortest route established in step 2.
Embodiment two
Fig. 8 is the structural schematic diagram of the route network of alternative embodiment according to the present invention, as shown in figure 8, whole network contains
There is the routing of six communication apparatus, all equipment requires to route by root and the external world communicates.In addition, other than routing 5,
Remaining 5 equipment is all equipment existing for original, and routing 5 is the equipment being added in the later period.Root routing is whole network correspondence with foreign country
Unique channel.
Application scenarios one: the foundation of route network.In emergency system, when equipment is destroyed, need promptly to introduce
New communication apparatus routes and establishes communication connection, and routing 1 to routing 4 has 4 equipment altogether and establishes road according to network physical position
By connecting, here it is the initialization of network connection.Routing 1, routing 2 with root routing at a distance from be all 2 units, they directly with
Root routing connection, completes initialization with the root routing nearest equipment of physical distance in this way.Routing 3 can choose routing 1 or routing 2
Any one establishes connection, and the physical distance of routing 3 and root routing in this way is most short, it is assumed that company is established in final route 3 and routing 1
It connects.The connection with routing 3 is established in routing 4, although routing 4 is minimum by the hop count of 2 connection root routing of routing, according to physics
Apart from nearest principle, the connection with routing 3 is established in routing 4.It can thus be seen that the process that new route network initializes
The process exactly constantly expanded outwardly from root routing does not need complicated software algorithm, it is only necessary to the physics of communication apparatus
Position.
Application scenarios two: the introducing of new communication apparatus routing.Existing network needs new be added to route 5, according to most short
Distance algorithm, routing 5 directly establish initial connection with routing 4.If former according to the routing minimum hop count in usual software algorithm
Then, routing 5 needs to know the connection of remaining routing in network, establishes the connection with routing 1, routes 5 in this way to root routing
Hop count it is minimum.The software algorithm of this complexity, needs to know the connection state of whole network.And it is related to this alternative embodiment
And method, routing 5 is by directly establishing connection with routing 4, so that it may existing network rapidly be added.
Application scenarios three: routing connection is destroyed in network.Disconnecting between routing 3 and routing 1.Route 3, road
It still can not mutually be communicated between them with root route communication by 4, routing 5.Current routing 2 is recently from them
Routing establishes connection between routing 3 and routing 2, and routing 4 and routing 5 do not need to do any work, can restore entire net
Network.It is this using most short physical distance as the routing algorithm of foundation, fast and effeciently guarantee network it is unobstructed.
Field higher for route handoff time requirement is waited in military affairs, using the route handoff side in this alternative embodiment
Method can establish new routing connection fast and reliablely.Compared with the equipment based on routing table in the related technology, this equipment disappears
The resource of consumption greatly reduces, while algorithm is simple, has certain superiority.When constructing route network, using this optional reality
The device in example is applied, traditional route protection device is replaced, route protection cost can be reduced, improves the effect of Route establishment switching
Rate.
The above is only alternative embodiments of the invention, are not intended to restrict the invention, for those skilled in the art
For member, the invention may be variously modified and varied.All within the spirits and principles of the present invention, it is made it is any modification,
Equivalent replacement, improvement etc., should all be included in the protection scope of the present invention.
Claims (8)
1. a kind of route switching method of equipment characterized by comprising
Obtain the physical location information of all devices in specified network;
The network structure is established according to the physical location information, wherein the network structure is for reflecting described all set
Positional relationship between standby;
Designated equipment is being detected there are when routing failure, is being switched according to the network structure according to preset rules selection target
Equipment;
Execute the designated equipment to the target device route handoff;
It wherein, include: according to the positional structure according to preset rules selection target switching equipment according to the position assumption diagram
Figure will be with the shortest equipment of designated equipment physical distance as the target switching equipment.
2. acquisition refers to the method according to claim 1, wherein the physical location information includes: coordinate information
The physical location information for determining all devices in network includes:
The coordinate information is obtained from local pre-stored historical record.
3. according to the method described in claim 2, it is characterized in that, described in obtained from local pre-stored historical record
Include: before coordinate information
Periodically acquire the coordinate information of all devices in the specified network;
Update the coordinate information stored in local historical record.
4. according to the method described in claim 3, it is characterized in that, periodically acquiring the seat of all devices in the specified network
The equipment for marking information includes following one:
Global position system GPS equipment, Beidou Navigation System BDNS equipment.
5. according to the method described in claim 2, it is characterized in that, establishing the network structure according to the physical location information
Figure includes:
The routing connection relationship of the equipment is constructed according to the coordinate information, wherein the routing connection relationship is used to indicate
Physical distance between the equipment;
The network structure of the equipment is established according to the routing connection relationship.
6. a kind of route handoff device of equipment characterized by comprising
First obtains module, for obtaining the physical location information of all devices in specified network;
Module is established, for establishing the network structure according to the physical location information, wherein the network structure is used for
Reflect the positional relationship between all devices;
Selecting module, for detecting designated equipment there are when routing failure, according to the position assumption diagram according to default rule
Then selection target switching equipment;
Switching module, the route handoff for executing the designated equipment to the target device;
Wherein, the switching module is also used to, will be shortest with the designated equipment physical distance according to the position assumption diagram
Equipment is as the target switching equipment.
7. device according to claim 6, which is characterized in that the physical location information includes: coordinate information, and described
One acquisition module is also used to, and obtains the coordinate information from local pre-stored historical record.
8. device according to claim 7, which is characterized in that described device further include:
Second obtains module, for periodically acquiring the coordinate information of all devices in the specified network;
Update module, for updating the coordinate information stored in local historical record.
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410767944.1A CN105743785B (en) | 2014-12-12 | 2014-12-12 | The route switching method and device of equipment |
PCT/CN2015/097032 WO2016091190A1 (en) | 2014-12-12 | 2015-12-10 | Route switching method and apparatus of device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410767944.1A CN105743785B (en) | 2014-12-12 | 2014-12-12 | The route switching method and device of equipment |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105743785A CN105743785A (en) | 2016-07-06 |
CN105743785B true CN105743785B (en) | 2019-09-10 |
Family
ID=56106733
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410767944.1A Active CN105743785B (en) | 2014-12-12 | 2014-12-12 | The route switching method and device of equipment |
Country Status (2)
Country | Link |
---|---|
CN (1) | CN105743785B (en) |
WO (1) | WO2016091190A1 (en) |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1631009A (en) * | 2001-09-27 | 2005-06-22 | 西门子公司 | Method and device for adapting label-switched paths in packet networks |
US6937569B1 (en) * | 2001-05-21 | 2005-08-30 | Cisco Technology, Inc. | Method and system for determining a relative position of a device on a network |
CN1738286A (en) * | 2004-08-18 | 2006-02-22 | 华为技术有限公司 | Method for realizing heavy route in IP network |
CN1805412A (en) * | 2005-01-14 | 2006-07-19 | 三星电子株式会社 | Fast rerouting apparatus and method for mpls multicast |
KR20070031174A (en) * | 2005-09-14 | 2007-03-19 | 삼성전자주식회사 | MPLS Network and Method for Applying Mobile IP to MPLS Network |
CN103179032A (en) * | 2011-12-20 | 2013-06-26 | 华为技术有限公司 | Method and device for route backup |
CN104184608A (en) * | 2013-05-22 | 2014-12-03 | 富士通株式会社 | Data transmitting device, data transmitting method and non-transitory computer-readable storage medium |
Family Cites Families (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP4437984B2 (en) * | 2005-08-24 | 2010-03-24 | アラクサラネットワークス株式会社 | Network relay device and control method thereof |
CN101197591B (en) * | 2008-01-02 | 2011-05-25 | 中兴通讯股份有限公司 | Protection recovery method and apparatus for ASON |
US9176832B2 (en) * | 2013-03-15 | 2015-11-03 | Cisco Technology, Inc. | Providing a backup network topology without service disruption |
CN104093166A (en) * | 2014-07-08 | 2014-10-08 | 南京信息工程大学 | Wireless sensor network connection recovery method based on minimum movement of nodes |
-
2014
- 2014-12-12 CN CN201410767944.1A patent/CN105743785B/en active Active
-
2015
- 2015-12-10 WO PCT/CN2015/097032 patent/WO2016091190A1/en active Application Filing
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6937569B1 (en) * | 2001-05-21 | 2005-08-30 | Cisco Technology, Inc. | Method and system for determining a relative position of a device on a network |
CN1631009A (en) * | 2001-09-27 | 2005-06-22 | 西门子公司 | Method and device for adapting label-switched paths in packet networks |
CN1738286A (en) * | 2004-08-18 | 2006-02-22 | 华为技术有限公司 | Method for realizing heavy route in IP network |
CN1805412A (en) * | 2005-01-14 | 2006-07-19 | 三星电子株式会社 | Fast rerouting apparatus and method for mpls multicast |
KR20070031174A (en) * | 2005-09-14 | 2007-03-19 | 삼성전자주식회사 | MPLS Network and Method for Applying Mobile IP to MPLS Network |
CN103179032A (en) * | 2011-12-20 | 2013-06-26 | 华为技术有限公司 | Method and device for route backup |
CN104184608A (en) * | 2013-05-22 | 2014-12-03 | 富士通株式会社 | Data transmitting device, data transmitting method and non-transitory computer-readable storage medium |
Also Published As
Publication number | Publication date |
---|---|
CN105743785A (en) | 2016-07-06 |
WO2016091190A1 (en) | 2016-06-16 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Secinti et al. | SDNs in the sky: Robust end-to-end connectivity for aerial vehicular networks | |
US11637755B2 (en) | SDN network system, controller, and controlling method | |
TWI547127B (en) | Notifying network operator when virtual addresses do not match on network elements configured for interchassis redundancy | |
EP2974166B1 (en) | Method and apparatus for ip/mpls fast reroute | |
CN108512703A (en) | BRAS turns backup method, device, equipment and the machine readable storage medium of control separation | |
KR20150056159A (en) | A method operating of a controller and a switch to resolve network error, and the controller and the switch therefor | |
CN110100479A (en) | A kind of device and method without path DAO signaling optimization route break using modification | |
US8593941B2 (en) | Method for implementing permanent ring network protection in an MESH network | |
US9282025B2 (en) | Medium access control address protection method and switch | |
CN107124365A (en) | A kind of acquisition system of the routing policy based on machine learning | |
CN106899501A (en) | Method for centralized route control in distributed communication network | |
CN104486214B (en) | The method and apparatus for realizing the quick heavy-routes of RIP | |
CN106603401B (en) | Fast rerouting method and device | |
CN105743785B (en) | The route switching method and device of equipment | |
US20120201170A1 (en) | Backhaul Optimization For Traffic Aggregation | |
CN106230717B (en) | Route obtaining method and device in cluster system | |
US7869351B2 (en) | Communication techniques and generic layer 3 automatic switching protection | |
CN109787894A (en) | A kind of route control method and device | |
CN105763374B (en) | Route convergent method and device | |
CN105991426A (en) | Method and device for managing link in load sharing | |
CN104486223B (en) | A kind of G/R method and system based on ospf protocol | |
CN112291143A (en) | Method and system for optimizing main and standby routes of label switched path | |
Bhagat | Virtual Router Redundancy Protocol-A Best Open Standard Protocol in Maintaining Redundancy | |
CN106130898B (en) | A kind of virtual flow-line link support method and device | |
CN110138636A (en) | Dynamic linear guard method and device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20190717 Address after: 210012 Nanjing, Yuhuatai District, South Street, Bauhinia Road, No. 68 Applicant after: Nanjing Zhongxing Software Co., Ltd. Address before: 518057 Nanshan District science and technology, Guangdong Province, South Road, No. 55, No. Applicant before: ZTE Corporation |
|
TA01 | Transfer of patent application right | ||
GR01 | Patent grant | ||
GR01 | Patent grant |