CN105736831B - A kind of construction method of support of pipelines node structure - Google Patents
A kind of construction method of support of pipelines node structure Download PDFInfo
- Publication number
- CN105736831B CN105736831B CN201610231690.0A CN201610231690A CN105736831B CN 105736831 B CN105736831 B CN 105736831B CN 201610231690 A CN201610231690 A CN 201610231690A CN 105736831 B CN105736831 B CN 105736831B
- Authority
- CN
- China
- Prior art keywords
- support
- connecting plate
- pipelines
- node structure
- bolt
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000010276 construction Methods 0.000 title claims abstract description 32
- 229910000831 Steel Inorganic materials 0.000 claims description 10
- 239000010959 steel Substances 0.000 claims description 10
- 238000003466 welding Methods 0.000 claims description 8
- 239000004567 concrete Substances 0.000 claims description 2
- 239000011150 reinforced concrete Substances 0.000 claims 1
- 238000009434 installation Methods 0.000 abstract description 5
- 238000009418 renovation Methods 0.000 abstract description 4
- 238000005034 decoration Methods 0.000 abstract description 2
- 230000007812 deficiency Effects 0.000 description 3
- 238000010586 diagram Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 230000009466 transformation Effects 0.000 description 2
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 2
- 238000004873 anchoring Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16L—PIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
- F16L3/00—Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16B—DEVICES FOR FASTENING OR SECURING CONSTRUCTIONAL ELEMENTS OR MACHINE PARTS TOGETHER, e.g. NAILS, BOLTS, CIRCLIPS, CLAMPS, CLIPS OR WEDGES; JOINTS OR JOINTING
- F16B1/00—Devices for securing together, or preventing relative movement between, constructional elements or machine parts
- F16B1/02—Means for securing elements of mechanisms after operation
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16B—DEVICES FOR FASTENING OR SECURING CONSTRUCTIONAL ELEMENTS OR MACHINE PARTS TOGETHER, e.g. NAILS, BOLTS, CIRCLIPS, CLAMPS, CLIPS OR WEDGES; JOINTS OR JOINTING
- F16B13/00—Dowels or other devices fastened in walls or the like by inserting them in holes made therein for that purpose
- F16B13/04—Dowels or other devices fastened in walls or the like by inserting them in holes made therein for that purpose with parts gripping in the hole or behind the reverse side of the wall after inserting from the front
- F16B13/06—Dowels or other devices fastened in walls or the like by inserting them in holes made therein for that purpose with parts gripping in the hole or behind the reverse side of the wall after inserting from the front combined with expanding sleeve
- F16B13/063—Dowels or other devices fastened in walls or the like by inserting them in holes made therein for that purpose with parts gripping in the hole or behind the reverse side of the wall after inserting from the front combined with expanding sleeve by the use of an expander
- F16B13/065—Dowels or other devices fastened in walls or the like by inserting them in holes made therein for that purpose with parts gripping in the hole or behind the reverse side of the wall after inserting from the front combined with expanding sleeve by the use of an expander fastened by extracting the screw, nail or the like
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Supports For Pipes And Cables (AREA)
Abstract
The construction method of support of pipelines node structure disclosed by the invention, including reinforced beam, support base and support, the support base includes connecting bolt, and the support includes horizon bar, and the upper surface of the horizon bar and reinforced beam is connected by connecting bolt.It is high to solve support of pipelines node structure complexity, difficulty of construction in the prior art, it is impossible to meet the problem of Power Plant Renovation Project is actually needed.It is flexible for installation with easy construction, detachably, the advantages of being easy to decoration to restore, the advantages of saving financial resources human input.
Description
Technical field
The invention belongs to construction engineering technical field, is related to a kind of construction method of support of pipelines node structure.
Background technology
With economic slowdown, environmentally friendly system becomes tight, and country progressively tightens up to power construction examination & approval, and power construction also slows
Step, annual new power plant construction can be described as caning be counted on one's fingers, but transformation and upgrade engineering is inevitably present, or even at this stage
As some Electric Designs, corporate boss wants business scope.
Transformation and upgrade engineering is had a great influence by existing technological parameter and structure arrangement, implements cumbersome.Conventional
Pipeline support structure and node complexity, difficulty of construction are high, it is impossible to meet improvement and design and construction needs, such as existing mixed
The solidifying unilateral increase support of pipelines of native beam, it is related to post-anchoring technology, the section of original beam and carrying review, steel bar arrangement, scene
The factors such as execution conditions.Improvement project support node should be connected firmly, and improve reliability, combine scene reality, construction again
Simplicity, it is flexible for installation, save financial resources human input.
The content of the invention
The shortcomings that it is an object of the invention to overcome above-mentioned prior art, there is provided a kind of support of pipelines node structure is applied
Work method.It is high to solve support of pipelines node structure complexity, difficulty of construction in the prior art, it is impossible to meet Power Plant Renovation Project reality
The problem of border needs.
The purpose of the present invention is achieved through the following technical solutions:
A kind of support of pipelines node structure, including reinforced beam, support base and support, the support base include connection
Bolt, the support include horizon bar, and the upper surface of the horizon bar and reinforced beam is connected by connecting bolt.
Preferably, the support base also includes the first connecting plate, the side of first connecting plate and reinforced beam
Connection, the lower end of the first connecting plate are connected with the second connecting plate, and second connecting plate is embedded in reinforced beam.
Preferably, the connecting bolt sequentially passes through horizon bar, the floor of reinforced beam and the second connecting plate, by water
Flat bar and the second connecting plate connect.
It is further preferred that the upper surface of the horizon bar is provided with the 3rd connecting plate, the connecting bolt is successively by the 3rd
Connecting plate, horizon bar and the second connecting plate connect.
Preferably, the connecting bolt is two M24 bolts.
Preferably, the support is triangle steel bracket, and the triangle steel bracket is connected by brace with horizon bar to be formed, described
Brace is connected with the first connecting plate.
It is further preferred that the brace is connected with the first connecting plate by way of welding.
Preferably, first connecting plate is fixed on the side of reinforced beam by expansion bolt.
Preferably, the angle between first connecting plate and the second connecting plate is 90 °, and is connected by way of welding
Connect.
The another technical solution of the present invention there is provided a kind of construction method based on above-mentioned support of pipelines node structure,
Comprise the following steps:
(a) perforation for installing connecting bolt is dug out on the floor of reinforced beam;
(b) expansion bolt is arranged on to the side of reinforced beam;
(c) treat that expansion bolt construction finishes, the first connecting plate is fixed on expansion bolt;
(d) the second connecting plate is fixed on the lower end of the first connecting plate, by connecting bolt successively by the 3rd connecting plate, water
Flat bar and the connection of the second connecting plate;
(e) and then by the brace of triangle steel bracket it is fixed on the first connecting plate;
(f) the upper lower nut of connecting bolt is finally tightened, is formed overall.
The invention has the advantages that:
A kind of support of pipelines node structure provided by the invention and construction method, suitable for Power Plant Renovation Project, there is provided
A kind of scheme for meeting in concrete beam side and being higher by back setting beam side ducts support, compared with conventional scheme, passes through setting
Support base, the fixation to support is enhanced, so as to reduce the usage quantity of beam side expansion bolt, it is difficult to reduce construction
Degree.
Further, connecting bolt solves the problems, such as top tension deficiency, support of pipelines node structure is further simplified.
Further, it is connected firmly between each part of support of pipelines node structure, it is possible to increase the reliability of support element.
Further, with reference to live reality, there is easy construction, it is flexible for installation, detachably, it is easy to decorate the advantages of restoring,
Financial resources human input is saved, factory building is beautiful and clean.
Brief description of the drawings
Fig. 1 is the main structure diagram of support of pipelines node structure provided by the present invention;
Fig. 2 is the left view structural representation of support of pipelines node structure provided by the present invention;
Fig. 3 is the overlooking the structure diagram of support of pipelines node structure provided by the present invention.
Wherein:1 is support;2 be reinforced beam;3 be connecting bolt;4 be the first connecting plate;5 be the 3rd connecting plate;
6 be the second connecting plate;7 be expansion bolt;21 be floor.
Embodiment
The principle and feature of the present invention are described below in conjunction with accompanying drawing, example is only used for explaining the present invention, and
It is non-to be used to limit the scope of the present invention.
Referring to Fig. 1-3, a kind of support of pipelines node structure, including reinforced beam 2, support base and support 1, the branch
Support seat includes connecting bolt 3, and the support 1 includes horizon bar, and the upper surface of the horizon bar and reinforced beam 2 passes through company
Connecting bolt 3 connects.
This support of pipelines node structure for Power Plant Renovation Project provided by the invention, there is provided one kind meets mixed
Solidifying Tu Liang sides and the scheme for being higher by back setting beam side ducts support, compared with conventional scheme, by setting support base, are enhanced
To the fixation of support 1, so as to reduce the usage quantity of beam side expansion bolt 7, difficulty of construction is reduced.Also, connect
Bolt 3 solves the problems, such as top tension deficiency, support of pipelines node structure is further simplified;Meanwhile connected between each part
Firmly, it is possible to increase the reliability of the component of support 1.Furthermore with reference to live reality, there is easy construction, it is flexible for installation, it is removable
Unload, be easy to decorate the advantages of restoring, save financial resources human input, factory building is beautiful and clean.
Preferably, the support base also includes the first connecting plate 4, the side of first connecting plate 4 and reinforced beam 2
Face connects, and the lower end of the first connecting plate 4 is connected with the second connecting plate 6, and second connecting plate 6 is embedded in reinforced beam 2.
Preferably, the connecting bolt 3 sequentially passes through the connecting plate of floor 21 and second of horizon bar, reinforced beam 2
6, horizon bar and the second connecting plate 6 are connected, further solve the problems, such as top tension deficiency.
It is further preferred that the upper surface of the horizon bar is provided with the 3rd connecting plate 5, the connecting bolt 3 is successively by
Three connecting plates 5, horizon bar and the second connecting plate 6 connect.
Preferably, the connecting bolt 3 is two M24 bolts.
Preferably, the support 1 is triangle steel bracket, and the triangle steel bracket is connected by brace with horizon bar to be formed, institute
Brace is stated to be connected with the first connecting plate 4.
It is further preferred that the brace is connected with the first connecting plate 4 by way of welding.
Preferably, first connecting plate 4 is fixed on the side of reinforced beam 2 by expansion bolt 7.
Preferably, the angle between the connecting plate 6 of the first connecting plate 4 and second is 90 °, and is connected by way of welding
Connect.
The another technical solution of the present invention there is provided a kind of construction method based on above-mentioned support of pipelines node structure,
Comprise the following steps:
(a) perforation for installing connecting bolt 3 is dug out on the floor 21 of reinforced beam 2;
(b) expansion bolt 7 is arranged on to the side of reinforced beam 2;
(c) treat that the construction of expansion bolt 7 finishes, the first connecting plate 4 is fixed on expansion bolt 7;
(d) the second connecting plate 6 is fixed on the lower end of the first connecting plate 4, by connecting bolt 3 successively by the 3rd connecting plate
5th, horizon bar and the second connecting plate 6 connect;
(e) and then by the brace of triangle steel bracket it is fixed on the first connecting plate 4;
(f) the upper lower nut of connecting bolt 3 is finally tightened, is formed overall.
Preferably, in step (d), the second connecting plate 6 is fixed under the first connecting plate 4 by way of welding
End;In step (e), the brace of triangle steel bracket is fixed on the first connecting plate 4 by way of welding.
It should be noted that reinforced beam 2 includes floor 21, the side of floor 21 and reinforced beam body connects
Connect, the perforation for installing connecting bolt 3 is dug out on floor 21, than the difficulty directly punchinged on reinforced beam body
It is low, it is easy to accomplish.
The advantages of construction method has easy construction, flexible for installation, and easy to disassemble and decoration restores, saves financial resources people
Power is put into, and factory building is beautiful and clean.
Claims (6)
- A kind of 1. construction method of support of pipelines node structure, it is characterised in that including reinforced beam (2), support base and Support (1), the support base include connecting bolt (3), and the support (1) includes horizon bar, the horizon bar and reinforced concrete Tu Liang (2) upper surface is connected by connecting bolt (3), specifically includes following steps:(a) perforation for installing connecting bolt (3) is dug out on the floor (21) of reinforced beam (2);(b) expansion bolt (7) is arranged on to the side of reinforced beam (2);(c) treat that expansion bolt (7) construction finishes, the first connecting plate (4) is fixed on expansion bolt (7);(d) the second connecting plate (6) is fixed on the lower end of the first connecting plate (4), by connecting bolt (3) successively by the 3rd connection Plate (5), horizon bar and the second connecting plate (6) connection;(e) and then by the brace of triangle steel bracket it is fixed on the first connecting plate (4);(f) the upper lower nut of connecting bolt (3) is finally tightened, is formed overall.
- 2. the construction method of support of pipelines node structure according to claim 1, it is characterised in that second connecting plate (6) in embedded reinforced beam (2).
- 3. the construction method of support of pipelines node structure according to claim 1 or 2, it is characterised in that armored concrete Beam (2) includes floor (21), and floor (21) is connected with the side of reinforced beam body, is dug out on floor (21) for pacifying The perforation of load connecting bolt (3).
- 4. the construction method of support of pipelines node structure according to claim 1, it is characterised in that the connecting bolt (3) it is two M24 bolts.
- 5. the construction method of support of pipelines node structure according to claim 1, it is characterised in that in the step (e), The brace of triangle steel bracket is connected with the first connecting plate (4) by way of welding.
- 6. the construction method of support of pipelines node structure according to claim 1, it is characterised in that in the step (d), Angle between first connecting plate (4) and the second connecting plate (6) is 90 °, and is connected by way of welding.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610231690.0A CN105736831B (en) | 2016-04-14 | 2016-04-14 | A kind of construction method of support of pipelines node structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610231690.0A CN105736831B (en) | 2016-04-14 | 2016-04-14 | A kind of construction method of support of pipelines node structure |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105736831A CN105736831A (en) | 2016-07-06 |
CN105736831B true CN105736831B (en) | 2018-01-19 |
Family
ID=56255399
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610231690.0A Active CN105736831B (en) | 2016-04-14 | 2016-04-14 | A kind of construction method of support of pipelines node structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105736831B (en) |
Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB191013855A (en) * | 1910-06-08 | 1911-03-16 | William John Wood | Improvements in Scaffold Brackets. |
DE20018398U1 (en) * | 2000-10-27 | 2002-03-07 | Hauser, Jürgen, 88326 Aulendorf | Console scaffolding anchor |
CN200971603Y (en) * | 2006-10-11 | 2007-11-07 | 刘勇 | Triangle section builder's jack |
CN201232802Y (en) * | 2008-07-31 | 2009-05-06 | 贵阳铝镁设计研究院 | Device for fixing pipes with small diameter in water processing structures |
CN201407417Y (en) * | 2009-05-05 | 2010-02-17 | 中冶东方工程技术有限公司上海分公司 | Pipeline supporting frame node structure on concrete workshop post |
CN201747042U (en) * | 2010-08-19 | 2011-02-16 | 朱奎 | Working frame for outdoor decoration |
CN204284665U (en) * | 2014-12-12 | 2015-04-22 | 中铁建大桥工程局集团第五工程有限公司 | A kind of diagonal-bracing type suspension and support of rationally arranging for line classification |
CN204611087U (en) * | 2015-04-28 | 2015-09-02 | 石家庄新奥燃气有限公司 | A kind of pipeline exterior wall fixed support |
CN204781884U (en) * | 2015-07-09 | 2015-11-18 | 江西诺金建设工程有限公司 | Prop builder's jack of structure down |
CN205504205U (en) * | 2016-04-14 | 2016-08-24 | 中国能源建设集团陕西省电力设计院有限公司 | Pipeline bracket node structure |
-
2016
- 2016-04-14 CN CN201610231690.0A patent/CN105736831B/en active Active
Patent Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB191013855A (en) * | 1910-06-08 | 1911-03-16 | William John Wood | Improvements in Scaffold Brackets. |
DE20018398U1 (en) * | 2000-10-27 | 2002-03-07 | Hauser, Jürgen, 88326 Aulendorf | Console scaffolding anchor |
CN200971603Y (en) * | 2006-10-11 | 2007-11-07 | 刘勇 | Triangle section builder's jack |
CN201232802Y (en) * | 2008-07-31 | 2009-05-06 | 贵阳铝镁设计研究院 | Device for fixing pipes with small diameter in water processing structures |
CN201407417Y (en) * | 2009-05-05 | 2010-02-17 | 中冶东方工程技术有限公司上海分公司 | Pipeline supporting frame node structure on concrete workshop post |
CN201747042U (en) * | 2010-08-19 | 2011-02-16 | 朱奎 | Working frame for outdoor decoration |
CN204284665U (en) * | 2014-12-12 | 2015-04-22 | 中铁建大桥工程局集团第五工程有限公司 | A kind of diagonal-bracing type suspension and support of rationally arranging for line classification |
CN204611087U (en) * | 2015-04-28 | 2015-09-02 | 石家庄新奥燃气有限公司 | A kind of pipeline exterior wall fixed support |
CN204781884U (en) * | 2015-07-09 | 2015-11-18 | 江西诺金建设工程有限公司 | Prop builder's jack of structure down |
CN205504205U (en) * | 2016-04-14 | 2016-08-24 | 中国能源建设集团陕西省电力设计院有限公司 | Pipeline bracket node structure |
Also Published As
Publication number | Publication date |
---|---|
CN105736831A (en) | 2016-07-06 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103603431A (en) | Assembled timber structure beam column bar planting node | |
CN205153145U (en) | Adopt precast concrete coincide floor of bolt and connection structure of H shaped steel roof beam | |
CN105736831B (en) | A kind of construction method of support of pipelines node structure | |
CN105736830B (en) | A kind of construction method of support of pipelines node | |
CN205504206U (en) | Pipeline bracket node | |
CN205504205U (en) | Pipeline bracket node structure | |
CN212130012U (en) | Reinforced anchor bolt rear anchoring embedded part node | |
CN204456809U (en) | A kind of steel supporting structure | |
CN201225009Y (en) | Formwork truss with curved surface easy to adjust | |
CN206971395U (en) | A kind of rubber support and profile steel concrete column draw bail | |
CN109339480A (en) | Temporarily use movable plank house radix saposhnikoviae reinforcement means | |
CN203878779U (en) | Rectangular concrete-filled steel tube column and I-steel beam rebar penetrating type joint | |
CN204781513U (en) | Stone material curtain node structure and stone material curtain | |
CN109594655B (en) | Pre-buried connecting piece, concrete member and cross splicing method of concrete member | |
CN208039587U (en) | A kind of purlin structure in flexible cable structure | |
CN209585682U (en) | A kind of girder steel beam bottom concentrates the ruggedized construction of stress | |
CN203924412U (en) | A kind of steel interconnection system wood cement board body of wall | |
CN205975657U (en) | Six pole truss structures of triangle -shaped that fall bury piece | |
CN203430929U (en) | Bridge frame connecting piece | |
CN208733881U (en) | A kind of setting multiple tracks is kept out the wind the Super High super-span single layer cable curtain wall of steel truss | |
CN213509573U (en) | Plywood template is glued to steel frame for building | |
CN205637265U (en) | Xenogenesis profiled sheet fixing device on strength nature roof beam | |
CN211666041U (en) | Full precast floor slab and precast concrete beam connection structure | |
CN211118002U (en) | Supporting and fixing part for electromechanical pipeline on steel beam | |
CN204590617U (en) | The universal connection boots of large form support system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |