CN105736831A - Piping support node structure and construction method - Google Patents

Piping support node structure and construction method Download PDF

Info

Publication number
CN105736831A
CN105736831A CN201610231690.0A CN201610231690A CN105736831A CN 105736831 A CN105736831 A CN 105736831A CN 201610231690 A CN201610231690 A CN 201610231690A CN 105736831 A CN105736831 A CN 105736831A
Authority
CN
China
Prior art keywords
connecting plate
support
node structure
pipelines
bolt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610231690.0A
Other languages
Chinese (zh)
Other versions
CN105736831B (en
Inventor
孙宏斌
雷艳红
王胜利
张学奇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Energy Engineering Group Shaanxi Electric Ppower Design Institute Co Ltd
Original Assignee
China Energy Engineering Group Shaanxi Electric Ppower Design Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Energy Engineering Group Shaanxi Electric Ppower Design Institute Co Ltd filed Critical China Energy Engineering Group Shaanxi Electric Ppower Design Institute Co Ltd
Priority to CN201610231690.0A priority Critical patent/CN105736831B/en
Publication of CN105736831A publication Critical patent/CN105736831A/en
Application granted granted Critical
Publication of CN105736831B publication Critical patent/CN105736831B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L3/00Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16BDEVICES FOR FASTENING OR SECURING CONSTRUCTIONAL ELEMENTS OR MACHINE PARTS TOGETHER, e.g. NAILS, BOLTS, CIRCLIPS, CLAMPS, CLIPS OR WEDGES; JOINTS OR JOINTING
    • F16B1/00Devices for securing together, or preventing relative movement between, constructional elements or machine parts
    • F16B1/02Means for securing elements of mechanisms after operation
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16BDEVICES FOR FASTENING OR SECURING CONSTRUCTIONAL ELEMENTS OR MACHINE PARTS TOGETHER, e.g. NAILS, BOLTS, CIRCLIPS, CLAMPS, CLIPS OR WEDGES; JOINTS OR JOINTING
    • F16B13/00Dowels or other devices fastened in walls or the like by inserting them in holes made therein for that purpose
    • F16B13/04Dowels or other devices fastened in walls or the like by inserting them in holes made therein for that purpose with parts gripping in the hole or behind the reverse side of the wall after inserting from the front
    • F16B13/06Dowels or other devices fastened in walls or the like by inserting them in holes made therein for that purpose with parts gripping in the hole or behind the reverse side of the wall after inserting from the front combined with expanding sleeve
    • F16B13/063Dowels or other devices fastened in walls or the like by inserting them in holes made therein for that purpose with parts gripping in the hole or behind the reverse side of the wall after inserting from the front combined with expanding sleeve by the use of an expander
    • F16B13/065Dowels or other devices fastened in walls or the like by inserting them in holes made therein for that purpose with parts gripping in the hole or behind the reverse side of the wall after inserting from the front combined with expanding sleeve by the use of an expander fastened by extracting the screw, nail or the like

Abstract

The invention discloses a piping support node structure and a construction method. The piping support node structure comprises a reinforced concrete beam, a supporting seat and a support, wherein the supporting seat comprises a connecting bolt; the support comprises a horizontal rod; and the horizontal rod is connected with the upper end surface of the reinforced concrete beam by the connecting bolt. The invention solves the problems in the prior art that a piping support node structure is complicated, is high in construction difficulty and cannot meet the actual requirements of a power plant renewal project. The piping support node structure and the construction method have the advantages that the construction is simple and convenient, the installation is flexible, detachment can be realized, decorative restoration is convenient and both financial investment and manpower input are reduced.

Description

A kind of support of pipelines node structure and construction method
Technical field
The invention belongs to construction engineering technical field, relate to a kind of support of pipelines node structure, further relate to a kind of construction method based on this support of pipelines node structure.
Background technology
Along with economic slowdown, environmental protection system becomes tight, and power construction examination & approval are progressively tightened up by country, power construction also slows step, annual new power plant construction can be described as very few, but transformation and upgrade engineering inevitably exists, and becomes some Electric Design corporate boss even at present stage and wants business scope.
Transformation and upgrade engineering is arranged by existing technological parameter and structure to be affected relatively greatly, implements cumbersome.Conventional pipeline support structure and node complexity, difficulty of construction height, it is impossible to meet improvement and design and construction needs, such as increase support of pipelines in existing beams of concrete one side, relate to post-anchoring technology, the factors such as cross section and the carrying of original beam are checked, steel bar arrangement, construction condition.Improvement project support node should be connected firmly, and improves reliability, combines on-the-spot actual again, and easy construction is flexible for installation, saves financial resources human input.
Summary of the invention
It is an object of the invention to the shortcoming overcoming above-mentioned prior art, it is provided that a kind of support of pipelines node structure.Additionally provide a kind of construction method based on this support of pipelines node structure.Solve support of pipelines node structure complexity in prior art, difficulty of construction height, it is impossible to meet the problem that Power Plant Renovation Project is actually needed.
It is an object of the invention to be achieved through the following technical solutions:
A kind of support of pipelines node structure, including reinforced beam, supporting seat and support, described supporting seat includes connecting bolt, and described support includes horizon bar, and described horizon bar is connected by connecting bolt with the upper surface of reinforced beam.
Preferably, described supporting seat also includes the first connecting plate, and described first connecting plate is connected with the side of reinforced beam, and the lower end of the first connecting plate is connected to the second connecting plate, and described second connecting plate embeds in reinforced beam.
Preferably, described connecting bolt sequentially passes through horizon bar, the floor of reinforced beam and the second connecting plate, horizon bar and the second connecting plate is coupled together.
It is further preferred that the upper surface of described horizon bar is provided with the 3rd connecting plate, the 3rd connecting plate, horizon bar and the second connecting plate are coupled together by described connecting bolt successively.
Preferably, described connecting bolt is two M24 bolts.
Preferably, described support is triangular steel support, and described triangular steel support is connected to form by brace and horizon bar, and described brace and the first connecting plate connect.
It is further preferred that described brace and the first connecting plate are connected by the mode welded.
Preferably, described first connecting plate is fixed on the side of reinforced beam by expansion bolt.
Preferably, the angle between described first connecting plate and the second connecting plate is 90 °, and is connected by the mode welded.
The another kind of technical scheme of the present invention there is provided a kind of construction method based on above-mentioned support of pipelines node structure, comprises the following steps:
A () digs out the perforation for installing connecting bolt on the floor of reinforced beam;
B expansion bolt is arranged on the side of reinforced beam by ();
C () treats that expansion bolt construction is complete, fixed by the first connecting plate on expansion bolt;
D () is fixed on the lower end of the first connecting plate the second connecting plate, the 3rd connecting plate, horizon bar and the second connecting plate are connected successively by connecting bolt;
E then the brace of triangular steel support is fixed on the first connecting plate by ();
F () finally tightens the upper lower nut of connecting bolt, form entirety.
The method have the advantages that
A kind of support of pipelines node structure provided by the invention and construction method, suitable in Power Plant Renovation Project, provide and a kind of meet at concrete beam side and exceed back the scheme of beam side ducts support is set, compared with conventional scheme, by arranging supporting seat, enhancing the fixation to support, thus decreasing the usage quantity of beam side expansion bolt, reducing difficulty of construction.
Further, connecting bolt solves the problem that top tension is not enough, makes support of pipelines node structure simplify further.
Further, it is connected firmly between each parts of support of pipelines node structure, it is possible to increase the reliability of support element.
Further, in conjunction with on-the-spot actual, there is easy construction, flexible for installation, detachably, it is simple to the advantage that decoration restores, save financial resources human input, Factory Building is beautiful and clean.
Accompanying drawing explanation
Fig. 1 is the main TV structure schematic diagram of support of pipelines node structure provided by the present invention;
Fig. 2 is the left view structural representation of support of pipelines node structure provided by the present invention;
Fig. 3 is the plan structure schematic diagram of support of pipelines node structure provided by the present invention.
Wherein: 1 is support;2 is reinforced beam;3 is connecting bolt;4 is the first connecting plate;5 is the 3rd connecting plate;6 is the second connecting plate;7 is expansion bolt;21 is floor.
Detailed description of the invention
Below in conjunction with accompanying drawing, principles of the invention and feature being described, example is only used for explaining the present invention, is not intended to limit the scope of the present invention.
Referring to Fig. 1-3, a kind of support of pipelines node structure, including reinforced beam 2, supporting seat and support 1, described supporting seat includes connecting bolt 3, and described support 1 includes horizon bar, and described horizon bar is connected by connecting bolt 3 with the upper surface of reinforced beam 2.
This support of pipelines node structure for Power Plant Renovation Project provided by the invention, provide and a kind of meet at concrete beam side and exceed back the scheme of beam side ducts support is set, compared with conventional scheme, by arranging supporting seat, enhance the fixation to support 1, thus decreasing the usage quantity of beam side expansion bolt 7, reduce difficulty of construction.Further, connecting bolt 3 solves the problem that top tension is not enough, makes support of pipelines node structure simplify further;Meanwhile, it is connected firmly between each parts, it is possible to increase the reliability of support 1 component.Furthermore, in conjunction with on-the-spot actual, there is easy construction, flexible for installation, detachably, it is simple to the advantage that decoration restores, save financial resources human input, Factory Building is beautiful and clean.
Preferably, described supporting seat also includes the first connecting plate 4, and described first connecting plate 4 is connected with the side of reinforced beam 2, and the lower end of the first connecting plate 4 is connected to the second connecting plate 6, and described second connecting plate 6 embeds in reinforced beam 2.
Preferably, described connecting bolt 3 sequentially passes through horizon bar, the floor 21 of reinforced beam 2 and the second connecting plate 6, horizon bar and the second connecting plate 6 is coupled together, and solves the problem that top tension is not enough further.
It is further preferred that the upper surface of described horizon bar is provided with the 3rd connecting plate 5, the 3rd connecting plate 5, horizon bar and the second connecting plate 6 are coupled together by described connecting bolt 3 successively.
Preferably, described connecting bolt 3 is two M24 bolts.
Preferably, described support 1 is triangular steel support, and described triangular steel support is connected to form by brace and horizon bar, and described brace and the first connecting plate 4 connect.
It is further preferred that described brace and the first connecting plate 4 are connected by the mode welded.
Preferably, described first connecting plate 4 is fixed on the side of reinforced beam 2 by expansion bolt 7.
Preferably, the angle between described first connecting plate 4 and the second connecting plate 6 is 90 °, and is connected by the mode welded.
The another kind of technical scheme of the present invention there is provided a kind of construction method based on above-mentioned support of pipelines node structure, comprises the following steps:
A () digs out the perforation for installing connecting bolt 3 on the floor 21 of reinforced beam 2;
B expansion bolt 7 is arranged on the side of reinforced beam 2 by ();
C () treats that expansion bolt 7 is constructed complete, fixed by the first connecting plate 4 on expansion bolt 7;
D () is fixed on the lower end of the first connecting plate 4 the second connecting plate 6, the 3rd connecting plate 5, horizon bar and the second connecting plate 6 are connected successively by connecting bolt 3;
E then the brace of triangular steel support is fixed on the first connecting plate 4 by ();
F () finally tightens the upper lower nut of connecting bolt 3, form entirety.
Preferably, in step (d), by the mode of welding, the second connecting plate 6 is fixed on the lower end of the first connecting plate 4;In step (e), by the mode welded, the brace of triangular steel support is fixed on the first connecting plate 4.
It should be noted that reinforced beam 2 includes floor 21, floor 21 is connected with the side of reinforced beam body, digs out the perforation for installing connecting bolt 3 on floor 21, lower than the difficulty directly punchinged on reinforced beam body, it is easy to accomplish.
This construction method has easy construction, flexible for installation, it is simple to the advantage that dismounting and decoration restore, and saves financial resources human input, and Factory Building is beautiful and clean.

Claims (10)

1. a support of pipelines node structure, it is characterized in that, including reinforced beam (2), supporting seat and support (1), described supporting seat includes connecting bolt (3), described support (1) includes horizon bar, and described horizon bar is connected by connecting bolt (3) with the upper surface of reinforced beam (2).
2. support of pipelines node structure according to claim 1, it is characterized in that, described supporting seat also includes the first connecting plate (4), described first connecting plate (4) is connected with the side of reinforced beam (2), the lower end of the first connecting plate (4) is connected to the second connecting plate (6), and described second connecting plate (6) embeds in reinforced beam (2).
3. support of pipelines node structure according to claim 1 and 2, it is characterized in that, described connecting bolt (3) sequentially passes through horizon bar, the floor (21) of reinforced beam (2) and the second connecting plate (6), horizon bar and the second connecting plate (6) is coupled together.
4. support of pipelines node structure according to claim 3, it is characterized in that, the upper surface of described horizon bar is provided with the 3rd connecting plate (5), and the 3rd connecting plate (5), horizon bar and the second connecting plate (6) are coupled together by described connecting bolt (3) successively.
5. support of pipelines node structure according to claim 3, it is characterised in that described connecting bolt (3) is two M24 bolts.
6. support of pipelines node structure according to claim 1 and 2, it is characterised in that described support (1) is triangular steel support, and described triangular steel support is connected to form by brace and horizon bar, described brace and the first connecting plate (4) connect.
7. support of pipelines node structure according to claim 6, it is characterised in that described brace and the first connecting plate (4) are connected by the mode welded.
8. support of pipelines node structure according to claim 2, it is characterised in that described first connecting plate (4) is fixed on the side of reinforced beam (2) by expansion bolt (7).
9. support of pipelines node structure according to claim 2, it is characterised in that the angle between described first connecting plate (4) and the second connecting plate (6) is 90 °, and connected by the mode welded.
10. the construction method based on the support of pipelines node structure described in claim 1, it is characterised in that comprise the following steps:
A () digs out the perforation for installing connecting bolt (3) on the floor (21) of reinforced beam (2);
B expansion bolt (7) is arranged on the side of reinforced beam (2) by ();
C () treats that expansion bolt (7) is constructed complete, the first connecting plate (4) is upper fixing at expansion bolt (7);
D () is fixed on the lower end of the first connecting plate (4) the second connecting plate (6), the 3rd connecting plate (5), horizon bar and the second connecting plate (6) are connected successively by connecting bolt (3);
E then the brace of triangular steel support is fixed on the first connecting plate (4) by ();
F () finally tightens the upper lower nut of connecting bolt (3), form entirety.
CN201610231690.0A 2016-04-14 2016-04-14 A kind of construction method of support of pipelines node structure Active CN105736831B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610231690.0A CN105736831B (en) 2016-04-14 2016-04-14 A kind of construction method of support of pipelines node structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610231690.0A CN105736831B (en) 2016-04-14 2016-04-14 A kind of construction method of support of pipelines node structure

Publications (2)

Publication Number Publication Date
CN105736831A true CN105736831A (en) 2016-07-06
CN105736831B CN105736831B (en) 2018-01-19

Family

ID=56255399

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610231690.0A Active CN105736831B (en) 2016-04-14 2016-04-14 A kind of construction method of support of pipelines node structure

Country Status (1)

Country Link
CN (1) CN105736831B (en)

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB191013855A (en) * 1910-06-08 1911-03-16 William John Wood Improvements in Scaffold Brackets.
DE20018398U1 (en) * 2000-10-27 2002-03-07 Hauser Juergen Console scaffolding anchor
CN200971603Y (en) * 2006-10-11 2007-11-07 刘勇 Triangle section builder's jack
CN201232802Y (en) * 2008-07-31 2009-05-06 贵阳铝镁设计研究院 Device for fixing pipes with small diameter in water processing structures
CN201407417Y (en) * 2009-05-05 2010-02-17 中冶东方工程技术有限公司上海分公司 Pipeline supporting frame node structure on concrete workshop post
CN201747042U (en) * 2010-08-19 2011-02-16 朱奎 Working frame for outdoor decoration
CN204284665U (en) * 2014-12-12 2015-04-22 中铁建大桥工程局集团第五工程有限公司 A kind of diagonal-bracing type suspension and support of rationally arranging for line classification
CN204611087U (en) * 2015-04-28 2015-09-02 石家庄新奥燃气有限公司 A kind of pipeline exterior wall fixed support
CN204781884U (en) * 2015-07-09 2015-11-18 江西诺金建设工程有限公司 Prop builder's jack of structure down
CN205504205U (en) * 2016-04-14 2016-08-24 中国能源建设集团陕西省电力设计院有限公司 Pipeline bracket node structure

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB191013855A (en) * 1910-06-08 1911-03-16 William John Wood Improvements in Scaffold Brackets.
DE20018398U1 (en) * 2000-10-27 2002-03-07 Hauser Juergen Console scaffolding anchor
CN200971603Y (en) * 2006-10-11 2007-11-07 刘勇 Triangle section builder's jack
CN201232802Y (en) * 2008-07-31 2009-05-06 贵阳铝镁设计研究院 Device for fixing pipes with small diameter in water processing structures
CN201407417Y (en) * 2009-05-05 2010-02-17 中冶东方工程技术有限公司上海分公司 Pipeline supporting frame node structure on concrete workshop post
CN201747042U (en) * 2010-08-19 2011-02-16 朱奎 Working frame for outdoor decoration
CN204284665U (en) * 2014-12-12 2015-04-22 中铁建大桥工程局集团第五工程有限公司 A kind of diagonal-bracing type suspension and support of rationally arranging for line classification
CN204611087U (en) * 2015-04-28 2015-09-02 石家庄新奥燃气有限公司 A kind of pipeline exterior wall fixed support
CN204781884U (en) * 2015-07-09 2015-11-18 江西诺金建设工程有限公司 Prop builder's jack of structure down
CN205504205U (en) * 2016-04-14 2016-08-24 中国能源建设集团陕西省电力设计院有限公司 Pipeline bracket node structure

Also Published As

Publication number Publication date
CN105736831B (en) 2018-01-19

Similar Documents

Publication Publication Date Title
CN102979319B (en) A kind of method of stiffening frame node
CN103075020A (en) Steel tray supporting force transferring system
CN205026213U (en) A pipeline fixing device for managing on truss
CN105442704A (en) Reinforced space truss structure and construction method for space truss structure reinforcement
CN205504205U (en) Pipeline bracket node structure
CN102900166B (en) Buckling restrained brace, as well as joint connecting plate and mounting method thereof
CN205504206U (en) Pipeline bracket node
CN105736830A (en) Piping support joint and construction method
CN105736831A (en) Piping support node structure and construction method
CN205348415U (en) Steel frame structure H type beam column node
CN103967508A (en) Stretchable quick stress compensation type steel frame connection structure
CN104372928A (en) Cantilever type scaffold assembly
CN102011432B (en) Novel polygonal combined steel pipe
CN102392491A (en) Connecting joint for beam, column and inclined strut of box section of boiler steel frame and construction method thereof
CN109339480A (en) Temporarily use movable plank house radix saposhnikoviae reinforcement means
CN206971395U (en) A kind of rubber support and profile steel concrete column draw bail
CN202347682U (en) Buckling-restrained brace
CN203571219U (en) Novel cable tray for bridge
CN210947305U (en) Point type curtain wall structure of diamond tangent plane daylighting top
CN103938556A (en) Transverse reinforcing device of space double K-shaped supports of concrete beam bridge with T-shaped section
CN114704029A (en) Steel-wood combined roof truss structure
CN204456811U (en) A kind of Portable scaffold
CN203878779U (en) Rectangular concrete-filled steel tube column and I-steel beam rebar penetrating type joint
CN208122294U (en) Strenthening member device
CN208235601U (en) A kind of concrete foundation and the reinforced base isolation reinforcement structure in foundation beam junction

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant