CN105735330B CN201610142098.3A CN201610142098A CN105735330B CN 105735330 B CN105735330 B CN 105735330B CN 201610142098 A CN201610142098 A CN 201610142098A CN 105735330 B CN105735330 B CN 105735330B
Authority
CN
China
Prior art keywords
well
pipe
filter assemblies
point
wellhole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610142098.3A
Other languages
English (en)
Other versions
CN105735330A (zh
Inventor
陈卓杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Zhengfang Traffic Construction Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201610142098.3A priority Critical patent/CN105735330B/zh
Priority claimed from CN201510110304.8A external-priority patent/CN104674830B/zh
Publication of CN105735330A publication Critical patent/CN105735330A/zh
Application granted granted Critical
Publication of CN105735330B publication Critical patent/CN105735330B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D19/00Keeping dry foundation sites or other areas in the ground
    • E02D19/06Restraining of underground water
    • E02D19/10Restraining of underground water by lowering level of ground water

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Hydrology & Water Resources (AREA)
  • Environmental & Geological Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

本发明提供了一种井点降水的施工方法,包括以下步骤:(1)根据井点降水的设计图纸,在施工现场测量放线,确定井点的钻井位置、沟槽位置、水平高程;(2)采用钻井机械在确定的钻井位置,钻出符合设计深度的井孔;(3)开挖铺设井点管道的沟槽;(4)进行井孔内的管道铺设,将底端设置有可变形管状过滤组件的井点管放入井孔内,将井点管的底端固定至设计深度处;(5)将可变形管状过滤组件进行膨胀,将可变形管状过滤组件涨开,使其紧贴在井孔壁上,起到支撑井孔壁和过滤的作用;(6)安装抽水泵,铺设输水总管,将各井点管得出水端与输水总管连接,进行抽水施工,本发明在施工中无阻碍的将地下水排出,而将砂和淤泥阻挡在井孔内。

Description

一种井点降水的施工方法
本发明是申请号:2015101103048,申请日:2015-03-13,发明名称:一种井点降水的施工方法的分案申请。
技术领域
本发明涉及一种建筑物施工中使用的基坑降水支护的施工方法,尤其是一种井点降水的施工方法。
背景技术
随着现代社会的发展,建筑物的使用功能不断拓展,特别是大城市中,新建的建筑物对于地下空间的利用越来越广泛,大型建筑物的地下室通常都达到若干层,基坑深度甚至从十几米到几十米。因此,对基坑施工的方法也提出新的要求。
现有技术中的一种井点降水施工技术,一般先采用普通地质钻机经泥浆护壁钻进成孔后,安装过滤管形成管井,再在过滤管内采用高压水喷射冲洗,破坏护壁泥浆结构层,并使过滤管管周自形成过滤层,然后将前端设有潜水泵的出水管设置于过滤管内,最后启动潜水泵实现井点降水。但该种施工方法在实际施工中操作繁琐,而且过滤管极其容易淤积堵塞,导致井点堵死成为死井。使得降水不成功,很容易导致重大的工程事故,如国内屡见报道的基坑坍塌事故均与此有关。
现有的施工方法中,还有使用在钻孔中灌填砂石填料作为过滤层的施工方法,但是该种方法同样具有施工繁琐的缺陷,而且也同样不能避免淤积堵塞,导致井点堵死成为死井的缺陷。
发明内容
本发明涉及一种井点降水的施工方法,有效简化了施工的工序,使得实际施工操作简便,而且能避免井点堵死的情况。
本发明提供了一种井点降水的施工方法,包括以下步骤:
(1)根据井点降水的设计图纸,在施工现场测量放线,确定井点的钻井位置、沟槽位置、水平高程;
(2)采用钻井机械在确定的钻井位置,钻出符合设计深度的井孔;
(3)开挖铺设井点管道的沟槽;
(4)进行井孔内的管道铺设,将底端设置有可变形管状过滤组件的井点管放入井孔内,将井点管的底端固定至设计深度处;
(5)将可变形管状过滤组件进行膨胀,将可变形管状过滤组件涨开,使其紧贴在井孔壁上,起到支撑井孔壁和过滤的作用;可变形管状过滤组件的径向的膨胀变形方式为:在井点管内放入可以通过的膨胀椎,使得膨胀椎在机械力或者液压力的作用下,穿过基管的内部,从而使得可变形管状过滤组件得以膨胀;
(6)安装抽水泵,铺设输水总管,将各井点管的出水端与输水总管连接,进行抽水施工;
其中,可变形管状过滤组件包括:
基管,其为管状部件,基管壁上沿管的延伸方向设有若干列长条状的裂缝,并且相邻列中的长条状裂缝相互错开;
过滤层,覆盖基管形成为大致管状;
套筒,覆盖在大致管状的过滤层的外部,套筒的壁上沿管延伸的方向设置若干列菱形的孔,并且相邻列中的菱形孔相互错开。
本发明在施工中采用的可变形管状过滤组件在膨胀施工完成后,径向通过可变形管状过滤组件的水经过各层的过滤,无阻碍的将地下水排出,而将砂和淤泥阻挡在井孔内。如此,膨胀后的可变形管状过滤组件使得防砂后获得的内径最大,增加了井孔内的泄流面积,同时可变形管状过滤组件对于井孔壁具有支撑作用,有利于地下水的排出,又能避免井孔内常见的由于空隙存在而产生的环空堵塞、井孔壁冲蚀的现象。
附图说明
附图1是可变形管状过滤组件及其膨胀示意图。
附图2是可变形管状过滤组件的结构示意图。
具体实施方式
某工程深基坑井点降水的施工方法:包括
(1)根据井点降水的设计图纸,在施工现场测量放线,确定井点的钻井位置、沟槽位置、水平高程;
(2)采用钻井机械在确定的钻井位置,钻出符合设计深度的井孔;
(3)开挖铺设井点管道的沟槽;
(4)进行井孔内的管道铺设;具体为将钻井机械的钻头撤离井孔,将底端设置有可变形管状过滤组件的井点管放入井孔内,将井点管的底端固定至设计深度处;
(5)将可变形管状过滤组件进行膨胀;将可变形管状过滤组件涨开,使其紧贴在井孔壁上,起到支撑井孔壁和过滤的作用;
(6)安装抽水泵,铺设输水总管,将各井点管的出水端与输水总管连接,进行抽水施工。
如附图2所示,可变形管状过滤组件包括:基管1,其为管状部件,基管壁上沿管的延伸方向设有若干列长条状的裂缝,并且相邻列中的长条状裂缝相互错开;过滤层2,覆盖基管形成为大致管状;套筒3,覆盖在大致管状的过滤层的外部,套筒的壁上沿管延伸的方向设置若干列菱形的孔,并且相邻列中的菱形孔相互错开。
在基管1和套筒3之间的过滤层2,在基管1径向膨胀时,由于基管1和套筒3之间的膨胀不同,过滤层2需要确保二者不会相互干扰。过滤层2优选为包括三层过滤材料:外层为相对粗糙的金属材料编织层,可采用相互重叠的金属片编织而成,金属片之间相互连接,形成整体式结构,并与覆盖在外部的套管内壁连接;中间层为丝状的材料连续缠绕形成,该丝状的材料优选为不锈钢丝或合成纤维丝;内层为不锈钢丝网或合成纤维布。
如附图1所示,可变形管状过滤组件可以利用多种方法形成径向的膨胀变形。优选的方式为:在井点管内放入可以通过的膨胀椎4,使得膨胀椎4在机械力或者液压力的作用下,穿过基管的内部,从而使得可变形管状过滤组件得以膨胀;另一种优选的方式为:直接施加液压力至可变形管状过滤组件的内部,使其膨胀。
进一步优选的施工方法为:
包括:步骤(7)在井点管底端与可变形管状过滤组件连接处,设置水位传感器和流速传感器,将传感器与控制中心连接,当井点降水施工作业一段时间后,如果传感器检测到地下水位没有到达预定设计水位,而流速信号异常,则判断该井孔出现淤积,关闭该井点管与输水总管的连接阀,将该井点管拔出,清洗端部的可变形管状过滤组件重新安装井点管或更换新的可变形管状过滤组件后,重新胀开即可。

Claims (1)

1.一种井点降水的施工方法,包括以下步骤:
(1)根据井点降水的设计图纸,在施工现场测量放线,确定井点的钻井位置、沟槽位置、水平高程;
(2)采用钻井机械在确定的钻井位置,钻出符合设计深度的井孔;
(3)开挖铺设井点管道的沟槽;
(4)进行井孔内的管道铺设,将底端设置有可变形管状过滤组件的井点管放入井孔内,将井点管的底端固定至设计深度处;
(5)将可变形管状过滤组件进行膨胀,将可变形管状过滤组件涨开,使其紧贴在井孔壁上,起到支撑井孔壁和过滤的作用;可变形管状过滤组件的径向的膨胀变形方式为:在井点管内放入可以通过的膨胀椎,使得膨胀椎在机械力或者液压力的作用下,穿过基管的内部,从而使得可变形管状过滤组件得以膨胀;
(6)安装抽水泵,铺设输水总管,将各井点管的出水端与输水总管连接,进行抽水施工;
其中,可变形管状过滤组件包括:
基管,其为管状部件,基管壁上沿管的延伸方向设有若干列长条状的裂缝,并且相邻列中的长条状裂缝相互错开;
过滤层,覆盖基管形成为大致管状;
套筒,覆盖在大致管状的过滤层的外部,套筒的壁上沿管延伸的方向设置若干列菱形的孔,并且相邻列中的菱形孔相互错开。
CN201610142098.3A 2015-03-13 2015-03-13 一种井点降水的施工方法 Active CN105735330B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610142098.3A CN105735330B (zh) 2015-03-13 2015-03-13 一种井点降水的施工方法

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201610142098.3A CN105735330B (zh) 2015-03-13 2015-03-13 一种井点降水的施工方法
CN201510110304.8A CN104674830B (zh) 2015-03-13 2015-03-13 一种井点降水的施工方法

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
CN201510110304.8A Division CN104674830B (zh) 2015-03-13 2015-03-13 一种井点降水的施工方法

Publications (2)

Publication Number Publication Date
CN105735330A CN105735330A (zh) 2016-07-06
CN105735330B true CN105735330B (zh) 2017-11-14

Family

ID=56251708

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610142098.3A Active CN105735330B (zh) 2015-03-13 2015-03-13 一种井点降水的施工方法

Country Status (1)

Country Link
CN (1) CN105735330B (zh)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2563191Y (zh) * 2002-08-12 2003-07-30 李景新 井点降水机
JP2004068485A (ja) * 2002-08-08 2004-03-04 Sakamoto Shokai:Kk ディープウェル工法における表面水の強制排水方法
CN102383437A (zh) * 2011-08-08 2012-03-21 河南理工大学 一种井点定位抽水管井及井点定位抽水法
CN202194686U (zh) * 2011-08-03 2012-04-18 中铁十二局集团第四工程有限公司 一种隧道底部井点降水装置

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004068485A (ja) * 2002-08-08 2004-03-04 Sakamoto Shokai:Kk ディープウェル工法における表面水の強制排水方法
CN2563191Y (zh) * 2002-08-12 2003-07-30 李景新 井点降水机
CN202194686U (zh) * 2011-08-03 2012-04-18 中铁十二局集团第四工程有限公司 一种隧道底部井点降水装置
CN102383437A (zh) * 2011-08-08 2012-03-21 河南理工大学 一种井点定位抽水管井及井点定位抽水法

Also Published As

Publication number Publication date
CN105735330A (zh) 2016-07-06

Similar Documents

Publication Publication Date Title
CN110439029B (zh) 一种双含水层监测井装置及其建设方法
CN107044128A (zh) 深基坑开挖过程中的支护及降水施工方法
RU2485291C1 (ru) Способ разработки продуктивного пласта с низкопроницаемым участком
CN105672336B (zh) 一种井点降水用的可变形过滤组件
CN110409420B (zh) 迎坑面兼有降水功能的地下连续墙
CN110847200B (zh) 一种环基坑水平砂井降水疏干结构及降水疏干方法
CN105804104B (zh) 一种井点降水的施工方法
Hunt et al. Conceptual design of riverbank filtration systems
CN103343690B (zh) 斜井大断面过含水层井筒防渗漏结构的施工方法
CN105735330B (zh) 一种井点降水的施工方法
CN105714840B (zh) 一种井点降水的施工方法
CN104674829B (zh) 一种井点降水用的可变形过滤组件
CN105714839B (zh) 一种井点降水的施工方法
CN202914053U (zh) 防砂筛管
CN203891785U (zh) 水文水井管内投砾专用接头管总成
CN108005440A (zh) 一种竖井式车库布置形式及吊盘
CN111622249B (zh) 狭窄基坑地下水微型抽排装置及其施工方法
CN205024708U (zh) 轻型井点滤管
CN114250801A (zh) 一种管井与轻型井点组合降水施工方法
CN110409474B (zh) 置于地下连续墙底部的管井降水井
CN104060636B (zh) 高水位地区建筑基础施工时的泄压抗浮方法及装置
KR20130000001U (ko) 무공과 유공 교차 형성 합성수지 원통관을 사용한 지하수위 저하공법
CN108561082B (zh) 灰岩含水层互嵌式射流注浆改造方法
CN106894429A (zh) 一种软土地基分层降水施工结构以及施工方法
CN203834529U (zh) 高水位地区建筑基础施工时的泄压抗浮装置

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20170915

Address after: 362300, No. 1603, building 2, Yue Yi River District, Nanan, Fujian, Quanzhou

Applicant after: QUANZHOU PINCHUANG INTELLECTUAL PROPERTY SERVICES Co.,Ltd.

Address before: The 11 group Wang Xie village Beilun Daxie Development Zone 315812 area in Zhejiang city of Ningbo Province

Applicant before: Chen Zhuojie

TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20171011

Address after: 362300, No. 72 Mei Xi Road, Nanan, Fujian, Quanzhou

Applicant after: Su Jianlin

Address before: 362300, No. 1603, building 2, Yue Yi River District, Nanan, Fujian, Quanzhou

Applicant before: QUANZHOU PINCHUANG INTELLECTUAL PROPERTY SERVICES Co.,Ltd.

GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20190521

Address after: 202172 Room 1260, No. 495 Yuejin South Road, Xinhai Town, Chongming District, Shanghai (Guangming Rice Industry Economic Park)

Patentee after: Advocating Creation (Shanghai) Consulting Management Firm

Address before: 362300 No. 72 Ximeiding Ximei Road, Nanan City, Quanzhou City, Fujian Province

Patentee before: Su Jianlin

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20190805

Address after: 321025 Linjiang Industrial Zone, Wucheng New Area, Wucheng District, Jinhua City, Zhejiang Province

Patentee after: ZHEJIANG ZHENGFANG TRAFFIC CONSTRUCTION Co.,Ltd.

Address before: 202172 Room 1260, No. 495 Yuejin South Road, Xinhai Town, Chongming District, Shanghai (Guangming Rice Industry Economic Park)

Patentee before: Advocating Creation (Shanghai) Consulting Management Firm

PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: A Construction Method for Well Point Dewatering

Effective date of registration: 20230424

Granted publication date: 20171114

Pledgee: Agricultural Bank of China Limited by Share Ltd. Jinhua Wucheng branch

Pledgor: ZHEJIANG ZHENGFANG TRAFFIC CONSTRUCTION Co.,Ltd.

Registration number: Y2023980038843