CN105718610A - Method for realizing material requirements of CAD (Computer-Aided Design) drawing on the basis of BOM (Bill of Material) - Google Patents
Method for realizing material requirements of CAD (Computer-Aided Design) drawing on the basis of BOM (Bill of Material) Download PDFInfo
- Publication number
- CN105718610A CN105718610A CN201410721669.XA CN201410721669A CN105718610A CN 105718610 A CN105718610 A CN 105718610A CN 201410721669 A CN201410721669 A CN 201410721669A CN 105718610 A CN105718610 A CN 105718610A
- Authority
- CN
- China
- Prior art keywords
- bom
- product
- autocad
- chart
- module
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention relates to a method for realizing the material requirements of a CAD (Computer-Aided Design) drawing on the basis of a BOM (Bill of Material), in particular to a method in which the amount of raw materials which are required by a designed product in an AutoCAD drawing process can be easily known. The method belongs to the field of the CAD. Through the method for realizing the material requirements of the CAD drawing on the basis of the BOM, a manager can accurately know the material cost of a product; and the fact that a designer can directly know the amount of the products will directly affect design types so that more materials can be saved, cost can be reduced and the design is quite perfect.
Description
Technical field
The present invention relates to and a kind of realize CAD based on BOM and chart to obtain the method for materials demand, belong to field of computer aided design.
Background technology
AutoCAD is Autodesk(Ou Teke) company is first in the automatic computing engine Autocad of nineteen eighty-two exploitation, for two-dimensional graphics, in detail drafting, design documentation and basic three dimensional design.Now have become as drawing instrument widely popular in the world.AutoCAD has good user interface, just can carry out various operation by interactive menu or command line mode.Its many file designs environment, Non-computer Majors personnel also can be learned soon to use.The process of constantly practice is grasped its various application and exploitation skill better, thus improving constantly work efficiency.
Other industries relatively, from last century, " made in China " becomes the important force that promotion China's economic increases, the industry class that the development of manufacturing of China is very fast, international competitiveness is stronger, is also the industry that after entry into the World Trade Organization, benefited probability is bigger.Associated Electrical Design Software AutoCAD, is more likely to draw, for replacing the instrument of manual plotting at present strictly speaking.
The electrical design of made in China enterprise of today just from " abstract design " to " entity design " makes the transition, the manufacturing industry of China enters the Development Transformation phase of " made in China " to " Created in China ", therefore Electrical Design Software be there has also been new requirement, the bill of materials (BOM) for equipment, owing to AutoCAD lacks the management of data base, most enterprises statistically all rely at BOM and manually allow engineer oneself shine drawing statistics number of devices.The designing BOM of one complex product is likely to contain raw material thousands of or up to ten thousand, and engineer there will be majority, the leakage multiple mistake such as number, error logging often in statistics, causes the increase of production cost and production cycle.
Summary of the invention
It is an object of the invention to: in AutoCAD drawing course, just can find out designed product needed uses how many raw materials.
In order to reach object above, the present invention a kind of based on BOM realize CAD chart the method for materials demand should comprise such as lower module:
ERP system interface module---the product structure (BOM) in ERP or the data in EBOM are imported in AutoCAD software;
Production module---what select when drawing is which assembly in BOM or semi-finished product;
Data computation module---add up the raw material required when the change in size of product;
Automatically update module---after product design figure completes confirmation, the material of product needed and quantity are passed back to BOM table automatically, updates original parameter;
The present invention relates to and a kind of realize CAD based on BOM and chart to obtain the method for materials demand, need to containing following steps:
Step one: typing BOM table accurately in ERP software;
Step 2: open software and select the product figure made to be which level at BOM table;
Step 3: according to the product of selected level when newly-built or amendment, raw-material title required for programming count and quantity are shown in the lower section of drawing from the BOM table of ERP;
Step 4: after completing drawing, in Operation Log, improvement where has been done in record this time operation compared with before;
Step 5: last before preservation, confirms whether raw material there is a need to variation, if after having change quantity, after preservation, software is by automatically by the BOM table automatically updating module and passing back to ERP;
Step 6: after BOM table receives the AutoCAD data being transmitted through in ERP system, by automatic updating data storehouse information;
Step 7: ERP system is automatically reminded to BOM table manager and revises raw-material quantity involved in BOM table, and the version number of BOM table will add one automatically, and further relating to this product will be as the criterion with this version number later.
As can be seen here, the present invention by a kind of based on BOM realize CAD chart materials demand method after, the material cost of a product can be learnt accurately for manager, for designer directly and after the consumption of product docks, to directly affect how to design and be better able to save material, save cost, design more perfect.
Claims (6)
1. one kind realizes AUTOCAD based on BOM and charts to obtain the method for materials demand, it is characterised in that comprise such as lower module:
ERP system interface module---the product structure (BOM) in ERP or the data in EBOM are imported in AutoCAD software;
Production module---what select when drawing is which assembly in BOM or semi-finished product;
Data computation module---add up the raw material required when the change in size of product;
Automatically update module---after product design figure completes confirmation, the material of product needed and quantity are passed back to BOM table automatically, updates original parameter.
2. a kind of according to claim 1 realize AUTOCAD based on BOM and chart to obtain the method for materials demand, it is characterised in that open software and select the product figure made to be which level at BOM table.
3. a kind of according to claim 1 realize AUTOCAD based on BOM and chart to obtain the method for materials demand, it is characterized in that the product according to selected level is when newly-built or amendment, from the BOM table of ERP, raw-material title required for programming count and quantity are shown in the lower section of drawing.
4. a kind of according to claim 1 realize AUTOCAD based on BOM and chart to obtain the method for materials demand, it is characterised in that after completing drawing, improvement where has been done in record this time operation compared with before in Operation Log.
5. a kind of according to claim 1 realize AUTOCAD based on BOM and chart to obtain the method for materials demand, it is characterized in that last before preservation, confirming whether raw material there is a need to variation, if after having change quantity, after preservation, software is by automatically by the BOM table automatically updating module and passing back to ERP.
6. a kind of according to claim 1 realize AUTOCAD based on BOM and chart to obtain the method for materials demand, it is characterised in that after BOM table receives the AutoCAD data being transmitted through in ERP system, by automatic updating data storehouse information.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410721669.XA CN105718610A (en) | 2014-12-03 | 2014-12-03 | Method for realizing material requirements of CAD (Computer-Aided Design) drawing on the basis of BOM (Bill of Material) |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410721669.XA CN105718610A (en) | 2014-12-03 | 2014-12-03 | Method for realizing material requirements of CAD (Computer-Aided Design) drawing on the basis of BOM (Bill of Material) |
Publications (1)
Publication Number | Publication Date |
---|---|
CN105718610A true CN105718610A (en) | 2016-06-29 |
Family
ID=56146253
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410721669.XA Pending CN105718610A (en) | 2014-12-03 | 2014-12-03 | Method for realizing material requirements of CAD (Computer-Aided Design) drawing on the basis of BOM (Bill of Material) |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105718610A (en) |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20020124010A1 (en) * | 2000-12-28 | 2002-09-05 | Joong-Ki Park | Design system based on design options with shared data base |
US20090066698A1 (en) * | 2007-09-10 | 2009-03-12 | Andrew Wood | Systems And Methods For Performing Quantity Takeoff Computations From Computer Aided Design Drawings |
CN101515308A (en) * | 2009-03-31 | 2009-08-26 | 上海同济同捷科技股份有限公司 | Data management system for vehicle products and collaborative design method thereof |
CN102044016A (en) * | 2010-12-13 | 2011-05-04 | 沈阳东大中新科技有限公司 | Method and device for realizing automatic product configuration by utilizing spreadsheet definition rule |
-
2014
- 2014-12-03 CN CN201410721669.XA patent/CN105718610A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20020124010A1 (en) * | 2000-12-28 | 2002-09-05 | Joong-Ki Park | Design system based on design options with shared data base |
US20090066698A1 (en) * | 2007-09-10 | 2009-03-12 | Andrew Wood | Systems And Methods For Performing Quantity Takeoff Computations From Computer Aided Design Drawings |
CN101515308A (en) * | 2009-03-31 | 2009-08-26 | 上海同济同捷科技股份有限公司 | Data management system for vehicle products and collaborative design method thereof |
CN102044016A (en) * | 2010-12-13 | 2011-05-04 | 沈阳东大中新科技有限公司 | Method and device for realizing automatic product configuration by utilizing spreadsheet definition rule |
Non-Patent Citations (1)
Title |
---|
严亮: "基于AutoCAD Mechanical BOM表的CAD/ERP信息集成及BOM管理研究", 《万方数据知识服务平台》 * |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Mas et al. | A review of PLM impact on US and EU aerospace industry | |
CN100474318C (en) | Automatic generation system for designing BOM | |
CN102044016A (en) | Method and device for realizing automatic product configuration by utilizing spreadsheet definition rule | |
CN103530733A (en) | Manufacturing execution system | |
CN102707669B (en) | Method for constructing CAM (computer-aided manufacturing) system for punching for automobile girders | |
CN104778540A (en) | BOM (bill of material) management method and management system for building material equipment manufacturing | |
CN103955577A (en) | Computer automatic design method for mechanical equipment | |
US10242132B2 (en) | Production system simulation device, production system simulation method, and production system simulation program | |
CN101718977A (en) | CAM system for automobile longeron punching processing and control method and construction method thereof | |
US10295979B2 (en) | Scheduling in manufacturing environments | |
CN103678648A (en) | Classifying and gathering system and method of BOM tables | |
CN116171453A (en) | Method and apparatus for generating and utilizing knowledge patterns for manufacturing simulation models | |
CN112487648B (en) | Multi-dimensional structured data creation method based on aerospace product features | |
CN102385722A (en) | Method for automatically leading drilling data in Genesis 2000 system into ERP system | |
CN114140047B (en) | System bill of materials generation method, system, storage medium and equipment | |
CN103324681B (en) | Process chart data creation method based on CAD | |
CN103838916A (en) | Mechanical part quadratic parametric rapid modeling method | |
EP2881903A1 (en) | Managing design updates in a manufacturing execution system | |
CN112101904A (en) | Ship manufacturing site problem management method, system and device of three-dimensional model | |
CN103902757A (en) | System and method for rapid creation and interaction of three-dimensional model | |
CN104021002B (en) | A kind of PDM system standards part storage method | |
WO2014127338A1 (en) | Method and system for optimized projection in a multidisciplinary engineering system | |
CN112292644A (en) | Constrained programming using block-based workflows | |
Lundgren et al. | Model-driven process planning and quality assurance | |
CN105278501A (en) | Manufacture execution system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20160629 |
|
WD01 | Invention patent application deemed withdrawn after publication |