CN105716054A - Novel anti-explosion and explosion-proof upright-flue heat pipe waste heat boiler - Google Patents

Novel anti-explosion and explosion-proof upright-flue heat pipe waste heat boiler Download PDF

Info

Publication number
CN105716054A
CN105716054A CN201610110902.XA CN201610110902A CN105716054A CN 105716054 A CN105716054 A CN 105716054A CN 201610110902 A CN201610110902 A CN 201610110902A CN 105716054 A CN105716054 A CN 105716054A
Authority
CN
China
Prior art keywords
heat
explosion
water
heat pipe
pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610110902.XA
Other languages
Chinese (zh)
Inventor
赵尚武
刘海永
马剑博
朱华东
时月清
高志军
Original Assignee
Beijing Redun Energy Saving Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Redun Energy Saving Technology Co Ltd filed Critical Beijing Redun Energy Saving Technology Co Ltd
Priority to CN201610110902.XA priority Critical patent/CN105716054A/en
Publication of CN105716054A publication Critical patent/CN105716054A/en
Pending legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F22STEAM GENERATION
    • F22BMETHODS OF STEAM GENERATION; STEAM BOILERS
    • F22B1/00Methods of steam generation characterised by form of heating method
    • F22B1/02Methods of steam generation characterised by form of heating method by exploitation of the heat content of hot heat carriers
    • F22B1/18Methods of steam generation characterised by form of heating method by exploitation of the heat content of hot heat carriers the heat carrier being a hot gas, e.g. waste gas such as exhaust gas of internal-combustion engines
    • F22B1/183Methods of steam generation characterised by form of heating method by exploitation of the heat content of hot heat carriers the heat carrier being a hot gas, e.g. waste gas such as exhaust gas of internal-combustion engines in combination with metallurgical converter installations
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21CPROCESSING OF PIG-IRON, e.g. REFINING, MANUFACTURE OF WROUGHT-IRON OR STEEL; TREATMENT IN MOLTEN STATE OF FERROUS ALLOYS
    • C21C5/00Manufacture of carbon-steel, e.g. plain mild steel, medium carbon steel or cast steel or stainless steel
    • C21C5/28Manufacture of steel in the converter
    • C21C5/42Constructional features of converters
    • C21C5/46Details or accessories
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F22STEAM GENERATION
    • F22BMETHODS OF STEAM GENERATION; STEAM BOILERS
    • F22B31/00Modifications of boiler construction, or of tube systems, dependent on installation of combustion apparatus; Arrangements of dispositions of combustion apparatus
    • F22B31/08Installation of heat-exchange apparatus or of means in boilers for heating air supplied for combustion
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21CPROCESSING OF PIG-IRON, e.g. REFINING, MANUFACTURE OF WROUGHT-IRON OR STEEL; TREATMENT IN MOLTEN STATE OF FERROUS ALLOYS
    • C21C2100/00Exhaust gas
    • C21C2100/06Energy from waste gas used in other processes

Abstract

The invention discloses a novel anti-explosion and explosion-proof upright-flue heat pipe waste heat boiler. The novel anti-explosion and explosion-proof upright-flue heat pipe waste heat boiler is novel process equipment capable of avoiding water leakage during a recovery process of converting the heat energy of the high-temperature flue gas of a converter to steam in a non-water-spray-cooling process, which is used for a non-water-spray-cooling synchronous heat energy recovery process for the high-temperature flue gas of a steel-making converter, so as to cope the high temperature, high dust and high CO of the flue gas of the converter, and maintain the characteristic of continuous casting, that is, continuous production. According to the novel anti-explosion and explosion-proof upright-flue heat pipe waste heat boiler disclosed by the invention, heat pipe heat transfer components are installed on a converter wall; heat exchange components are arranged in an opposite-insertion manner; the inner side of a converter body is a heat pipe heat absorption end; the outer side of the converter body is a heat pipe heat release end; the heat pipe heat release end is arranged in a water pipe in a sleeving manner; the water pipe is provided with a water inlet port and a steam port; and through heat pipe heat exchange, direct in-converter water spray and water leakage during the steam recovery process are avoided.

Description

A kind of novel antiknock explosion-proof type vertical flue-pipe formula heat pipe waste heat boiler
Technical field
The present invention relates to dry dust removal equipment field, particularly relate to a kind of novel antiknock explosion-proof type vertical flue-pipe formula heat pipe Waste heat boiler.
Background technology
1, steelmaking converter flue gas belongs at metallurgy industry and most having specific characteristics flue gas, and flue gas itself has three large resources:
One is that cigarette temperature is high---reach 800~1000 DEG C;
Two is high containing CO---reach more than 70%;
Three is containing ferrum oxide, calcium oxide dust height---reach 80~150g/m3.
When this three large resource is integrated in one, gas cleaning becomes a difficult problem, uses to high-temperature flue gas spray cooling both at home and abroad for this Dust collecting process, this technique includes OG method, LT method.
The dust collecting process of converter gas water spray, flue gas is to be purified, but the usefulness of three large resources, then become to minimize: High temperature heat cannot recycle, coal gas becomes and then loses original calcium oxide ferrum oxide characteristic containing water and steam coal gas, stove dirt.
OG method, LT method consume great lot of water resources during water spray cleaning:
OG method often refines one ton of steel need to spray recirculated water 3--5 ton;LT method is often refined one ton of steel and need to be sprayed water 0.2 ton, spraying steam 0.025 ton, removes The process of dirt is i.e. the process consuming water resource in a large number.
While OG method, LT method consume great lot of water resources during water spray cleaning, part water becomes steam, then increase Exhaust gas volumn, blower fan power consumption increases therewith.
For not water spray cleaning converter gas can be realized, research and develop through team, make more than a kind of antiknock explosion-proof type vertical flue-pipe formula Heat boiler [has obtained national inventing patent (Authorization Notice No. CN 102094104 B)].Described waste heat boiler is from cooling converter cigarette Gas, recovery converter gas waste heat aspect of performance, reached technological requirement, and had cost advantage.Become first generation converter gas Cooling, waste heat reclaiming process equipment.
2, the particularity that steelmaking converter produces.
Current steelmaking converter is smelted, and is to match with continuous casting, need to supply molten steel at regular time and quantity.To this end, converter smelting can not Occur affecting continuous casting situation.This proposes requirements at the higher level, i.e. waste heat boiler in the configuration of converter gas cooling residual heat boiler can not Break down and affect the smelting of converter.The heat exchanger tube of waterpipe type waste heat boiler, all in boiler furnace, its length reaches myriametre, weldering Mouth is thousands of, and leaking such as occurs in any point, and repairs a few days at least, then converter cannot be smelted, and certainly will affect continuous casting.
To this end, research and development adapt to converter smelting feature high-temperature flue gas not water-spraying control synchronize energy recovery new technology and with Supporting new technology equipment.
Summary of the invention
The technical problem to be solved in the present invention is to provide a kind of for steelmaking converter high-temperature flue gas not water-spraying control synchronization heat Energy recovery process,--high temperature, high dust, high CO and guarantor's continuous casting--the not water-spraying control of seriality characteristic to tackle converter gas A kind of converter high-temperature flue gas heat energy of technique is converted into Steam Recovery process watertight new technology equipment-novel antiknock explosion-proof type Vertical flue-pipe formula heat pipe waste heat boiler.
For reaching above-mentioned purpose, a kind of novel antiknock explosion-proof type vertical flue-pipe formula heat pipe waste heat boiler of the present invention, it includes directly Vertical tubular body of heater and the external support structure of body of heater, body of heater cross section is rectangle or circle, and described body of heater corner is respectively provided with one Square air-cooled column, arranges some horizontal ring beams between four furnace stays, constitute general frame structure;Furnace wall it is provided with inside ring beam, Furnace wall is made up of furnace wall and heat insulation layer, and furnace wall is welded for thick shell plate, is welded with T-shaped support, inside T-shaped support inside furnace wall Being welded with hexsteel, T-shaped support and the heat insulation layer that hexsteel is skeleton are divided into inside and outside two-layer, outer layer is that heat-insulation layer, internal layer are for high Strong wearing layer;Outside furnace wall containing laterally and stand to reinforcement;Furnace wall is equipped with adopting heat pipes for heat transfer element, and heat exchange element is mutual-inserting type Arranging, furnace body inside is that described heat pipe release end of heat is sheathed in water pipe, water for heat pipe release end of heat outside heat pipe heat absorbing end, body of heater Pipe is provided with water inlet and steam port;Body of heater from bottom to up, is followed successively by boiler cooling section, economizer section, evaporation I section, evaporation section Ⅱ, As superheated steam need to be produced, then between evaporation I, II section, add superheat section;Heat pipe release end of heat makes steam header, respectively with vapour Bag connects, and constitutes steam natural cycle system;It is respectively equipped with ball storehouse and storehouse valve at body of heater, constitutes the ball soot cleaning system that falls, automatically Peace and quiet heat exchange element dust stratification, it is ensured that exhaust gases passes is unobstructed and heat exchange efficiency.
The invention difference from existing technology is that the present invention achieves following technique effect:
High-temperature flue gas of the present invention not water-spraying control synchronizes energy recovery technique, and compared with water spray craft existing with converter, flue gas becomes Pure dry flue gas;Smoke heat energy is converted into steam, recycles.
Antiknock explosion-proof type vertical flue-pipe formula heat pipe waste heat boiler of the present invention is imitated with conventional upright chimney flue type water pipe residual heat boiler for exchanging heat The most identical, but there is great advantage on the whole:
Vertical flue-pipe formula heat pipe waste heat boiler the most of the present invention, not water flowing in body of heater, the probability that boiler does not leak, more adapt to Steelmaking converter smelt demand, do not have waste heat boiler leak affect steel-making accident generation;
Heat pipe waste heat boiler the most of the present invention, service life is longer, even if there being a small amount of heat pipe to damage, nor affects on boiler operatiopn;
3. after reaching life cycle, it is convenient to change, and can take whole group of replacing, is not required to change boiler overall structure;
4. site installation test is convenient, because, before dispatching from the factory, packet section suppresses test, is conducive to improving boiler quality;
5. carrying out outside body of heater because of steam/water circulating, pipeline shortens relatively, and resistance is damaged relatively low, is therefore not required to install forced circulation Pump, thus reduce power consumption;
6. more preferably, furnace wall thickeies for safety, unfailing performance, and intensity improves, and air-tightness improves, and more adapts to steelmaking converter flue gas and contains CO, the characteristic of high dust.
Present invention process is equipped steelmaking converter cooled flue gas waste heat recovery waterpipe type vertical flue-pipe formula waste heat boiler Upgrading, concentrates its advantage, in addition heat pipe advantage, forms steelmaking converter cooled flue gas waste heat recovery brand-new vertical flue-pipe formula waste heat pot Stove.
The invention will be further described below in conjunction with the accompanying drawings.
Accompanying drawing explanation
Fig. 1 is the structural representation of antiknock explosion-proof type vertical flue-pipe formula heat pipe waste heat boiler of the present invention;
Fig. 2 is the structural representation at another visual angle of antiknock explosion-proof type vertical flue-pipe formula heat pipe waste heat boiler of the present invention;
Fig. 3 is the structural representation of heat pipe sleeve pipe group of the present invention.
Description of reference numerals: 1 connects converter vaporization flue III section outlet;2 heat pipes;3 header tanks;4 steam inlet pipes;5 evaporations II Section;6 evaporation section Ⅱs;7 evaporations I section;8 evaporations I section;9 economizer sections;10. economizer section;11 cooling sections;12. economizers send vapour Bag hot-water line;13 seal valve;14 storage ash ball storehouses;15 vibrosieves;16 lifting trucks;17. shot storehouses;18. gas-tight silos;19 heat pipes; 20-water pipe;21-steam port;22-water inlet.
Detailed description of the invention
Below in conjunction with embodiment, to the present invention, above-mentioned and other technical characteristic and advantage are described in more detail.
First, technique:
From evaporated flueSection outlet, sends into the exhaust gases passes of the anhydrous heat exchange of a kind of vertical type, and exhaust gases passes is built with heat conduction unit Part, the process that flue gas passes through, is i.e. the process that is sent out of heat, it is achieved heat exchange--reduces flue-gas temperature, synchronizes energy recovery.
Its exhaust gases passes is rising structure, and cross section is circular or square (rectangle).Flue gas enters from top, bottom is drawn Go out.
Convection current that heat exchange mode is: convection current--conduction--;
Housing is made to be had anti-knock properties, sealing and installs pressure relief mechanism, forms antiknock explosion-proof type structure.
Present invention process flow process is as follows:
Converter gas → overskirt → evaporated flue Section → be covered with the upright anhydrous exhaust gases passes → cleaner unit of heat conducting element → air-introduced machine → switching station → gas cooler → gas chamber → user
Diffusing tower → diffuse
Contrast OG method technological process frame:
Converter gas → overskirt → evaporated flue Section →Level venturi scrubber →Level venturi scrubber → draw Blower fan → switching station → gas chamber → user
Diffusing tower → diffuse
Contrast LT method technological process frame:
Converter gas → overskirt → evaporated flue Section → spray cooling tower → horizontal-type electrostatic dust collector → air-introduced machine → Switching station → gas cooler → gas chamber → user
Diffusing tower → diffuse
Contrast waterpipe type vertical flue-pipe formula waste heat boiler technological process:
Converter gas → overskirt → evaporated flue Section → the be covered with upright exhaust gases passes → cleaner unit of heat exchange water cooling tube → Air-introduced machine → switching station → gas cooler → gas chamber → user
Diffusing tower → diffuse
By above-mentioned comparison, new technological flow of the present invention, more adapt to converter gas characteristic and the particularity of converter smelting.
Second, technological equipment
Novel antiknock explosion-proof type vertical flue-pipe formula heat pipe waste heat boiler
* ultimate principle
The present invention is to utilize heat pipe this high efficient heat exchanging element, effectively substitutes water flowing heat exchanger tube in boiler furnace.
Heat pipe is that in utilizing the pipe closed, medium phase transformation is conducted heat, and heat exchange has that heat transfer is fast, efficiency high, structure is tightly played Feature, special adaptation does not allows the waste heat boiler leaked.
By the heat exchanger tube of conventional upright chimney flue type water pipe waste heat boiler, change heat pipe heat exchanging into, will more adapt to converter gas special Property.
* basic structure:
1. waste heat boiler body of heater is still vertical flue-pipe formula, and its internal heat exchange tubes all changes integrated thermal into: heat pipe heat absorbing end (cigarette Gas side) it is placed in boiler furnace;Heat pipe release end of heat (steam side) is outside furnace wall;Release end of heat makes bushing type, the most each heat pipe Release end of heat sets a tubulose steam water heater;
2. boiler furnace is from bottom to top, installs heat pipe economizer section (2 groups), heat pipe evaporation I section of (2 groups), heat pipe mistake successively Hot arc (1 group), heat pipe evaporation section Ⅱ (2 groups).
If heat boiler outlet flue gas is less than 150 DEG C, then install 1 group of heat pipe cooling section additional at body of heater bottommost.
3. arranging for convenience of release end of heat, often group heat pipe all takes body of heater both sides to slotting arrangement, i.e. body of heater outer both sides shape Becoming symmetrical vapour pipe case, bobbin carriage is pressure 2.5Mpa;
4., for taking into account adopting heat pipes for heat transfer and automatic ash removing effect, heat pipe inclination angle is chosen as 5~10 °;
5. converter gas dustiness is 80~150g/m3, heat pipe heat absorbing end all selects light pipe.And it is furnished with automatic ash removing system.Press Heat pipe waste heat boiler exit gas temperature, pressure set points, automatically+manual deashing pattern;
6. furnace wall inwall uses metal hexsteel+high-strength high temperature-resistant spray paint to make heat insulation layer;
7. heat pipe boiler is provided with pot drum, is placed in the top higher than body of heater, and the tubulose soda pop that often group heat pipe oven is external adds Hot device forms steam header, and bottom sets water inlet manifold respectively, top sets out steam house steward, and water-steam system connected mode is respectively as follows:
Cooling section: supplied water by special water pump, oxygen-eliminating device is sent in water outlet;
Economizer section: being supplied water by the pressurization of special small pump, drum is sent in water outlet;
Evaporate I section (2 groups): drum supplies water;Produce soda pop and send into drum;
Evaporation section Ⅱ (2 groups): drum supplies water;Produce soda pop and send into drum;
Superheat section: by drum steam steam supply, overheated after send user.
Steam water-level interlocked control small pump supplies water.
Whole water-steam system is that Natural Circulation, i.e. converter gas are absorbed heat by boiler furnace, heat pipe, and heat pipe is conducted to immediately Release end of heat, soda pop bobbin carriage produces hot soda pop immediately and is automatically fed into drum, steam-water separation, Automatic Cycle.
8. converter gas contains CO, there is the probability fired, for ensuring safety:
The most whole body of heater makes explosion resistant structure:
* thickening furnace wall plate, use 20# shell plate, thickness is intended selecting > 20mm;
* furnace stay overstriking, laterally installs crossbeam additional by heat pipe heat, forms independent blocks posture pressure-resistance structure;
*, body of heater can be made cylinder body structure.
The most whole body of heater blast resistance construction:
The most whole body of heater makes sealed cylinder;
* deashing device import, outlet, be both designed as having lock airway dysfunction structure, be double beat valve+intermediate isolating storehouse, and pass through Automatic controlling system each valve opening and closing.
3. venting of dust explosion structure:
At non-installation heat pipe oven metope, install and there is auto-reset function explosion venting valve.Just in case occurring unexpected, explosion venting valve is beaten automatically Open.To ensure the person, equipment safety.
By above-mentioned measure, heat pipe waste heat boiler is made antiknock explosion-proof type safety boiler.
Invention effect:
With 60t converter embodiment:
Converter gas major parameter: exhaust gas volumn 40000Nm3/h
Flue-gas temperature--800~1000 DEG C
Dust content--80~150g/Nm3
When flue gas CO is the highest 70%
1. flue gas is through waste heat boiler, and temperature is down to less than 170 DEG C;
2. antiknock explosion-proof type vertical flue-pipe formula heat pipe waste heat boiler structure is:
Cross section: rectangle 2200 × 3000mm equipment clear height: 24m
Heat pipe heat section: save coal gas section (2 groups), evaporation I section of (2 groups), evaporation section Ⅱ (2 groups)
3. boiler steams parameter: steam pressure 1.0Mpa, steam production: 75~80kg/t steel.
4. converter gas enters boiler furnace from Fig. 1, and flue gas is through evaporation section Ⅱ (2 groups), evaporation section Ⅱ (1
Group), evaporation I section (2 groups), evaporation I section of (1 group), economizer section (2 groups), economizer section (1 group), cooling section, go out from boiler Mouth smoke pipe is discharged;Through each heat pipe heat section hookup 2 heat absorbing end, the instantaneous heat absorption of Fig. 2, heat is quickly reached its release end of heat collection Heat pipe case, through hot vapour, the water of heat pipes heat, because proportion changes, rapid increase, enters drum, in drum, automatically carries out steam Separating, steam send user, water auto-returned header tank through steam outlet pipe, by heat pipes heat, continues above-mentioned circulation.Required water is by drum Water-level gauge sends instruction---and special small pump supplies water.
Compared with present invention water spray existing with converter gas dust collecting process, high-temperature flue gas is real by the exhaust gases passes of anhydrous heat exchange Flue gas of the most not spraying water cools down, and synchronizes to realize smoke heat energy and is converted into Steam Recovery.
Present invention process is equipped, and the antiknock that real realization adapts to converter needs is explosion-proof--and safety is the most quick-fried;Dimension water-tight, convenient Protect reliable;The novel converter flue gas cooling residual heat of Natural Circulation energy saving reclaims special process equipment.
Embodiment described above is only to be described the preferred embodiment of the present invention, the not model to the present invention Enclose and be defined, on the premise of designing spirit without departing from the present invention, the those of ordinary skill in the art technical side to the present invention Various deformation that case is made and improvement, all should fall in the protection domain that claims of the present invention determines.

Claims (1)

1. a novel antiknock explosion-proof type vertical flue-pipe formula heat pipe waste heat boiler, it is characterised in that: it includes upright tubular stove Body and the external support structure of body of heater, body of heater cross section is rectangle or circle, and it is square air-cooled that described body of heater corner is respectively provided with one Column, arranges some horizontal ring beams between four furnace stays, constitute general frame structure;Being provided with furnace wall inside ring beam, furnace wall is by furnace wall Forming with heat insulation layer, furnace wall is welded for thick shell plate, is welded with T-shaped support, is welded with Carapax Et Plastrum Testudinis inside T-shaped support inside furnace wall Net, is divided into inside and outside two-layer by T-shaped support and the heat insulation layer that hexsteel is skeleton, outer layer be heat-insulation layer, internal layer be high-strength wearable layer; Outside furnace wall containing laterally and stand to reinforcement;Furnace wall is equipped with adopting heat pipes for heat transfer element, and heat exchange element is that mutual-inserting type is arranged, body of heater Inner side be outside heat pipe heat absorbing end, body of heater be heat pipe release end of heat, described heat pipe release end of heat is sheathed in water pipe, and water pipe is provided with into water Mouth and steam port;Body of heater from bottom to up, is followed successively by boiler cooling section, economizer section, evaporation I section, evaporation section Ⅱ, as produced Vapours, then add superheat section between evaporation I, II section;Heat pipe release end of heat makes steam header, is connected with drum respectively, structure Become steam natural cycle system;It is respectively equipped with ball storehouse and storehouse valve at body of heater, constitutes the ball soot cleaning system that falls, automatic peace and quiet heat exchange unit Part dust stratification, it is ensured that exhaust gases passes is unobstructed and heat exchange efficiency.
CN201610110902.XA 2016-02-29 2016-02-29 Novel anti-explosion and explosion-proof upright-flue heat pipe waste heat boiler Pending CN105716054A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610110902.XA CN105716054A (en) 2016-02-29 2016-02-29 Novel anti-explosion and explosion-proof upright-flue heat pipe waste heat boiler

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610110902.XA CN105716054A (en) 2016-02-29 2016-02-29 Novel anti-explosion and explosion-proof upright-flue heat pipe waste heat boiler

Publications (1)

Publication Number Publication Date
CN105716054A true CN105716054A (en) 2016-06-29

Family

ID=56156241

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610110902.XA Pending CN105716054A (en) 2016-02-29 2016-02-29 Novel anti-explosion and explosion-proof upright-flue heat pipe waste heat boiler

Country Status (1)

Country Link
CN (1) CN105716054A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111961799A (en) * 2020-08-27 2020-11-20 江苏热盾节能环保科技有限公司 Converter flue gas high-temperature cyclone dust removal waste heat boiler integrated device and method
CN114606358A (en) * 2022-03-17 2022-06-10 浙江伯益环境科技有限公司 Steelmaking converter flue gas waste heat recovery and dry dedusting system

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101144111A (en) * 2007-07-02 2008-03-19 昆明阳光基业股份有限公司 Technique and combined system for removing dust from steelmaking convertor smoke by dry method and reusing waste heat
CN201289065Y (en) * 2008-09-28 2009-08-12 南京圣诺热管有限公司 Hot pipe type exhaust heat boiler
CN201289067Y (en) * 2008-09-28 2009-08-12 南京圣诺热管有限公司 Hot pipe combined exhaust heat boiler
CN201289066Y (en) * 2008-09-28 2009-08-12 南京圣诺热管有限公司 Hot pipe combined medium-pressure exhaust heat boiler
CN102094104A (en) * 2010-12-16 2011-06-15 包头市磁力节能环保设备有限公司 Process for removing dust from steelmaking converter flue gas by pure dry method and recovering heat energy synchronously, and waste heat boiler

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101144111A (en) * 2007-07-02 2008-03-19 昆明阳光基业股份有限公司 Technique and combined system for removing dust from steelmaking convertor smoke by dry method and reusing waste heat
CN201289065Y (en) * 2008-09-28 2009-08-12 南京圣诺热管有限公司 Hot pipe type exhaust heat boiler
CN201289067Y (en) * 2008-09-28 2009-08-12 南京圣诺热管有限公司 Hot pipe combined exhaust heat boiler
CN201289066Y (en) * 2008-09-28 2009-08-12 南京圣诺热管有限公司 Hot pipe combined medium-pressure exhaust heat boiler
CN102094104A (en) * 2010-12-16 2011-06-15 包头市磁力节能环保设备有限公司 Process for removing dust from steelmaking converter flue gas by pure dry method and recovering heat energy synchronously, and waste heat boiler

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111961799A (en) * 2020-08-27 2020-11-20 江苏热盾节能环保科技有限公司 Converter flue gas high-temperature cyclone dust removal waste heat boiler integrated device and method
CN111961799B (en) * 2020-08-27 2021-11-19 江苏热盾节能环保科技有限公司 Converter flue gas high-temperature cyclone dust removal waste heat boiler integrated device and method
CN114606358A (en) * 2022-03-17 2022-06-10 浙江伯益环境科技有限公司 Steelmaking converter flue gas waste heat recovery and dry dedusting system

Similar Documents

Publication Publication Date Title
CN102094104B (en) Process for removing dust from steelmaking converter flue gas by pure dry method and recovering heat energy synchronously, and waste heat boiler
CN102635844B (en) Boiler system using waste heat of flue gas of rotary hearth furnace
CN103591575B (en) 350MW supercritical circulating fluidized bed boiler and steam/water circulating method
CN202581248U (en) Improved rotary hearth furnace flue gas waste heat boiler device
CN106755718B (en) The fume waste heat utilization and dust removal integrated system and technique that pneumatic steelmaking generates
CN201737972U (en) Fully developed flue gas waste heat recovery device for AOD converter
CN101476015B (en) AOD converter flue gas waste heat recovery apparatus
CN206093991U (en) High -efficient recovery system of steelmaking electric furnace flue gas waste heat
CN105716054A (en) Novel anti-explosion and explosion-proof upright-flue heat pipe waste heat boiler
CN205560784U (en) Four unification sulfur recovery waste heat utilization processing apparatus
CN201662040U (en) Hydrogen gas burning boiler
CN209147056U (en) The low-nitrogen discharged top blast boiler of full premix combustion
CN203203010U (en) Boiler for yellow phosphorus tail gas combustion
CN203836922U (en) Waste heat recycling equipment applied to coal gasification device
CN203454081U (en) Vertical type carbon waste heat boiler
CN211199269U (en) Converter flue gas waste heat recovery system
CN214038332U (en) Power generation system is collected in melting reduction waste heat circulation
CN201636832U (en) Exhaust heat boiler of electric steelmaking furnace
CN205261499U (en) Vertical fire tube boiler of high temperature
CN204829831U (en) Novel bayonet tubular water pipe waste heat boiler
CN101173760A (en) Tower type arrangement system for steam generation device SG of gas-steam association circulating power station
CN209672288U (en) A kind of three backhaul fire tube pan shell type steam boilers
CN209605129U (en) A kind of double steam boilers
CN208108060U (en) A kind of coke oven flue residual neat recovering system steam exhaust drainage recycling device
CN206173379U (en) Converter degree of depth waste heat recovery boiler

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20170418

Address after: 014000 East District, Inner Mongolia, Baotou East Street, No. 88, building No. two, No. 7

Applicant after: Ma Jianbo

Address before: 102627 Beijing Xinghua Street (No. two), building 3, building 21, floor 1, 2511

Applicant before: BEIJING REDUN ENERGY SAVING TECHNOLOGY CO., LTD.

RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20160629