CN105712216A - Press-rail hoisting device surrounding factory building - Google Patents
Press-rail hoisting device surrounding factory building Download PDFInfo
- Publication number
- CN105712216A CN105712216A CN201610201707.8A CN201610201707A CN105712216A CN 105712216 A CN105712216 A CN 105712216A CN 201610201707 A CN201610201707 A CN 201610201707A CN 105712216 A CN105712216 A CN 105712216A
- Authority
- CN
- China
- Prior art keywords
- arm
- factory building
- underframe
- hoisting apparatus
- pressure rail
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C23/00—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
- B66C23/18—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes
- B66C23/20—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes with supporting couples provided by walls of buildings or like structures
- B66C23/202—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes with supporting couples provided by walls of buildings or like structures with supporting couples provided from below, e.g. by floors of buildings
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C23/00—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
- B66C23/18—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes
- B66C23/20—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes with supporting couples provided by walls of buildings or like structures
- B66C23/205—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes with supporting couples provided by walls of buildings or like structures for use on top of roofs
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C23/00—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
- B66C23/62—Constructional features or details
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C23/00—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
- B66C23/62—Constructional features or details
- B66C23/72—Counterweights or supports for balancing lifting couples
- B66C23/78—Supports, e.g. outriggers, for mobile cranes
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Structural Engineering (AREA)
- Civil Engineering (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The invention discloses a press-rail hoisting device surrounding a factory building, and relates to the technical field of hoisting equipment. The press-rail hoisting device is characterized in that each rail hanging arm is inverted-L-shaped, and an upper rail is connected with the lower side of the tail end of a suspension arm of each rail hanging arm; an outer-side lower rail and an inner-side lower rail are both located at the top end of a foundation building; an underframe is connected with each slide wheel; lower movable arm shafts are installed on each underframe; the upper end and the lower end of each movable arm are connected with the corresponding upper movable arm shaft and lower movable arm shaft respectively; a support column is installed on each underframe, and vertical to the underframe; each hanging arm is connected with the corresponding upper movable arm shaft; two groups of symmetrical hanging arms are provided, and are connected by a plurality of upper connection rods; lower connection rods are connected with the underframes at the left side and the right side; a connection frame is connected with the underframes at the left side and the right side; a winch motor is installed on each connection frame; each two pulleys at the front and rear respectively bear the same steel cable are grouped; each two pulleys are connected with the corresponding steel cable, each steel cable is connected with a winch box, and each winch box is connected with a winch motor through a winch shaft; each hanging arm is connected with the corresponding pulley; each steel cable is connected with a hanging disc; and each hanging disc is parallel to the horizontal plane.
Description
Technical field
Around the pressure rail hoisting apparatus of Factory Building, relate to technical field of crane equipment.
Background technology
Improving constantly and industrial developing rapidly along with people's life, no matter it is the renewal of indoor article in life, or the maximization demand of industrial equipment all no longer can meet the demand in the modern life, production in the mode being transported to by main equipment in house increasing traditional formula of doing it by hand and carry it on one's shoulder.Such as housing-group is built complete, and people move successively, and the large-scale domestic device equipment such as substantial amounts of finishing material, large-scale household electrical appliances and other objects such as piano and substantial amounts of household goods also and then to move into indoor.But new building one builds up scaffold and large lifting equipment is torn open tears open, that removes removes, skyscraper can also pass through elevator conveying, tier building just can only lean on everybody's hands half the circumference of the sleeve where it joins the shoulder to shoulder, the narrow many people of corridor lift also inconvenience, therefore the replacing of the main equipment of the resettlement in new building and factory has brought very big inconvenience, person who is ambitious or tenacious of purpose after being not difficult to see the completion of new building-owner's body no matter exterior wall whitewash or inside fitting is hung down several rows of crane by roof, really afford a magnificent spectacle.
Summary of the invention
For the deficiency overcoming prior art to exist,
One of purpose of the application is to design a kind of hoisting apparatus being prone to main equipment is delivered to indoor;
The two of the purpose of the application to design a kind of hoisting apparatus continuing as conveying articles afterwards;
The three of the purpose of the application be to design a kind of be possible not only to vertical direction and also horizontal direction can also move be suitable to each room around the hoisting apparatus in house.
The application adopts the following technical scheme that for achieving the above object
1, around the pressure rail hoisting apparatus of Factory Building, including: pulley 1, wirerope 2, lever arm 3, capstan box 4, lower connecting rod 5, handle stem 6, hanging scaffold 7, capstan winch motor 8, capsizing moment spindle 9, arm 10, support column 11, upper connecting rod 12, upper movable arm axle 13.1, lower movable arm axle 13.2, get on the right track 14, track arm 15, movable pulley 16, outside lower railway 17.1, inner side lower railway 17.2, link 18, underframe 19, foundation construction thing top 101, foundation construction thing sidewall 102;
It is characterized in that:
The cross section of outside lower railway 17.1 and inner side lower railway 17.2 is I-shaped;
Get on the right track 14 cross section for fall I-shaped;
Track arm 15 is inverted "L" shaped, is positioned on foundation construction thing top 101;
Get on the right track on the downside of the end of 14 connection track arm 15 cantilevers;
Outside lower railway 17.1 and inner side lower railway 17.2 are respectively positioned on foundation construction thing top 101;
Outside lower railway 17.1 is parallel with inner side lower railway 17.2;
Get on the right track and 14 overlap with inner side lower railway 17.2 projection in the horizontal plane;
Underframe 19 connects movable pulley 16;
Equipped with lower movable arm axle 13.2 on underframe 19;
Lever arm about 3 two ends connect movable arm axle 13.1 and lower movable arm axle 13.2 respectively;
Equipped with support column 11 on underframe 19, support column 11 is perpendicular to underframe 19;
Arm 10 connects upper movable arm axle 13.1;
Arm 10 is symmetrical two groups, is connected by many upper connecting rods 12 between arm 10;
Lower connecting rod 5 connects the underframe 19 of the left and right sides;
Link 18 connects the underframe 19 of the left and right sides;
Capstan winch motor 8 is contained on link 18;
Two pulleys 1 of front and back carrying same wirerope 2 are one group;
Pulley 1 connects wirerope 2, and wirerope 2 connects capstan box 4, and capstan box 4 connects capstan winch motor 8 by capsizing moment spindle 9;
Arm 10 connects pulley 1;
Wirerope 2 connects hanging scaffold 7;
Hanging scaffold 7 is parallel to horizontal plane.
2, the described pressure rail hoisting apparatus around Factory Building, it is characterised in that: described track arm 15 have multiple (depending on the goods weight of carrying and get on the right track 14 length, every meter-gage road is individual equipped with 3-4).
3, the described pressure rail hoisting apparatus around Factory Building, it is characterised in that: described upper connecting rod 12 has 2-5 root.
4, the described pressure rail hoisting apparatus around Factory Building, it is characterised in that: described movable pulley 16 and get on the right track and have gap between 14, its gap is 5-10mm.
5, the described pressure rail hoisting apparatus around Factory Building, it is characterised in that: equipped with handle stem 6 on described hanging scaffold 7.
6, the described pressure rail hoisting apparatus around Factory Building, it is characterised in that: described pulley 1 is 4-8 group;Difference group pulley 1 layout straggly in the height direction of homonymy.
7, the described pressure rail hoisting apparatus around Factory Building, it is characterised in that: described wirerope 2 is 4-8 root.
8, the described pressure rail hoisting apparatus around Factory Building, it is characterised in that: there is gap between described hanging scaffold 7 and foundation construction thing sidewall 102;Its gap is 100-200mm.
9, the described pressure rail hoisting apparatus around Factory Building, it is characterised in that: described lever arm 3 is alloy material, has outward antirust coat.
10, the described pressure rail hoisting apparatus around Factory Building, it is characterised in that: described underframe 19 is A3 Steel material.
Beneficial effect
1, around the pressure rail hoisting apparatus of Factory Building due to " on the downside of the end of 14 connection track arms 15 that gets on the right track;Outside lower railway 17.1 and inner side lower railway 17.2 are respectively positioned on foundation construction thing top 101;" therefore hoisting apparatus can around roof operation on building top, the arbitrary place of building can member's dress.
2, around the pressure rail hoisting apparatus of Factory Building, " lever arm about 3 two ends connect upper movable arm axle 13.1 and lower movable arm axle 13.2 respectively;" therefore arm 10 can be folded up.
3, can as the hanging device of routine use building after building is complete around the pressure rail hoisting apparatus of Factory Building.
Accompanying drawing explanation
Fig. 1: around the pressure rail hoisting apparatus front view of Factory Building
Fig. 2: around the pressure rail hoisting apparatus side view of Factory Building
Fig. 3: around the pressure rail hoisting apparatus top view of Factory Building
Fig. 4: I partial enlarged drawing
Fig. 5: II partial enlarged drawing
Fig. 6: III partial enlarged drawing
In figure: 1 pulley, 2 wireropes, 3 lever arms, 4 capstan boxs, 5 lower connecting rods, 6 handle stems, 7 hanging scaffolds, 8 capstan winch motors, 9 capsizing moment spindles, 10 arms, 11 support columns, 12 connecting rods, movable arm axle on 13.1,13.2 times movable arm axles, 14 get on the right track, 15 track arms, 16 movable pulleies, lower railway outside 17.1, lower railway, 18 links, 19 underframe, 101 foundation construction thing tops, 102 foundation construction thing sidewalls inside 17.2.
Detailed description of the invention
Below in conjunction with drawings and Examples, the application is described further.
Embodiment 1
1, around the pressure rail hoisting apparatus of Factory Building, including: pulley 1, wirerope 2, lever arm 3, capstan box 4, lower connecting rod 5, handle stem 6, hanging scaffold 7, capstan winch motor 8, capsizing moment spindle 9, arm 10, support column 11, upper connecting rod 12, upper movable arm axle 13.1, lower movable arm axle 13.2, get on the right track 14, track arm 15, movable pulley 16, outside lower railway 17.1, inner side lower railway 17.2, link 18, underframe 19, foundation construction thing top 101, foundation construction thing sidewall 102;
It is characterized in that:
The cross section of outside lower railway 17.1 and inner side lower railway 17.2 is I-shaped;
Get on the right track 14 cross section for fall I-shaped;
Track arm 15 is inverted "L" shaped, is positioned on foundation construction thing top 101;
Get on the right track on the downside of the end of 14 connection track arm 15 cantilevers;
Outside lower railway 17.1 and inner side lower railway 17.2 are respectively positioned on foundation construction thing top 101;
Outside lower railway 17.1 is parallel with inner side lower railway 17.2;
Get on the right track and 14 overlap with inner side lower railway 17.2 projection in the horizontal plane;
Underframe 19 connects movable pulley 16;
Equipped with lower movable arm axle 13.2 on underframe 19;
Lever arm about 3 two ends connect movable arm axle 13.1 and lower movable arm axle 13.2 respectively;
Equipped with support column 11 on underframe 19, support column 11 is perpendicular to underframe 19;
Arm 10 connects upper movable arm axle 13.1;
Arm 10 is symmetrical two groups, is connected by many upper connecting rods 12 between arm 10;
Lower connecting rod 5 connects the underframe 19 of the left and right sides;
Link 18 connects the underframe 19 of the left and right sides;
Capstan winch motor 8 is contained on link 18;
Two pulleys 1 of front and back carrying same wirerope 2 are one group;
Pulley 1 connects wirerope 2, and wirerope 2 connects capstan box 4, and capstan box 4 connects capstan winch motor 8 by capsizing moment spindle 9;
Arm 10 connects pulley 1;
Wirerope 2 connects hanging scaffold 7;
Hanging scaffold 7 is parallel to horizontal plane.
2, the described pressure rail hoisting apparatus around Factory Building, it is characterised in that: described track arm 15 have multiple (depending on the goods weight of carrying and get on the right track 14 length, every meter-gage road is equipped with 3).
3, the described pressure rail hoisting apparatus around Factory Building, it is characterised in that: described upper connecting rod 12 has 2.
4, the described pressure rail hoisting apparatus around Factory Building, it is characterised in that: described movable pulley 16 and get on the right track and have gap between 14, its gap is 5mm.
5, the described pressure rail hoisting apparatus around Factory Building, it is characterised in that: equipped with handle stem 6 on described hanging scaffold 7.
6, the described pressure rail hoisting apparatus around Factory Building, it is characterised in that: described pulley 1 is 4 groups;Difference group pulley 1 layout straggly in the height direction of homonymy.
7, the described pressure rail hoisting apparatus around Factory Building, it is characterised in that: described wirerope 2 is 4.
8, the described pressure rail hoisting apparatus around Factory Building, it is characterised in that: there is gap between described hanging scaffold 7 and foundation construction thing sidewall 102;Its gap is 100mm.
9, the described pressure rail hoisting apparatus around Factory Building, it is characterised in that: described lever arm 3 is alloy material, has outward antirust coat.
10, the described pressure rail hoisting apparatus around Factory Building, it is characterised in that: described underframe 19 is A3 Steel material.
Embodiment 2
1, around the pressure rail hoisting apparatus of Factory Building, including: pulley 1, wirerope 2, lever arm 3, capstan box 4, lower connecting rod 5, handle stem 6, hanging scaffold 7, capstan winch motor 8, capsizing moment spindle 9, arm 10, support column 11, upper connecting rod 12, upper movable arm axle 13.1, lower movable arm axle 13.2, get on the right track 14, track arm 15, movable pulley 16, outside lower railway 17.1, inner side lower railway 17.2, link 18, underframe 19, foundation construction thing top 101, foundation construction thing sidewall 102;
It is characterized in that:
The cross section of outside lower railway 17.1 and inner side lower railway 17.2 is I-shaped;
Get on the right track 14 cross section for fall I-shaped;
Track arm 15 is inverted "L" shaped, is positioned on foundation construction thing top 101;
Get on the right track on the downside of the end of 14 connection track arm 15 cantilevers;
Outside lower railway 17.1 and inner side lower railway 17.2 are respectively positioned on foundation construction thing top 101;
Outside lower railway 17.1 is parallel with inner side lower railway 17.2;
Get on the right track and 14 overlap with inner side lower railway 17.2 projection in the horizontal plane;
Underframe 19 connects movable pulley 16;
Equipped with lower movable arm axle 13.2 on underframe 19;
Lever arm about 3 two ends connect movable arm axle 13.1 and lower movable arm axle 13.2 respectively;
Equipped with support column 11 on underframe 19, support column 11 is perpendicular to underframe 19;
Arm 10 connects upper movable arm axle 13.1;
Arm 10 is symmetrical two groups, is connected by many upper connecting rods 12 between arm 10;
Lower connecting rod 5 connects the underframe 19 of the left and right sides;
Link 18 connects the underframe 19 of the left and right sides;
Capstan winch motor 8 is contained on link 18;
Two pulleys 1 of front and back carrying same wirerope 2 are one group;
Pulley 1 connects wirerope 2, and wirerope 2 connects capstan box 4, and capstan box 4 connects capstan winch motor 8 by capsizing moment spindle 9;
Arm 10 connects pulley 1;
Wirerope 2 connects hanging scaffold 7;
Hanging scaffold 7 is parallel to horizontal plane.
2, the described pressure rail hoisting apparatus around Factory Building, it is characterised in that: described track arm 15 have multiple (depending on the goods weight of carrying and get on the right track 14 length, every meter-gage road is equipped with 4).
3, the described pressure rail hoisting apparatus around Factory Building, it is characterised in that: described upper connecting rod 12 has 5.
4, the described pressure rail hoisting apparatus around Factory Building, it is characterised in that: described movable pulley 16 and get on the right track and have gap between 14, its gap is 10mm.
5, the described pressure rail hoisting apparatus around Factory Building, it is characterised in that: equipped with handle stem 6 on described hanging scaffold 7.
6, the described pressure rail hoisting apparatus around Factory Building, it is characterised in that: described pulley 1 is 8 groups;Difference group pulley 1 layout straggly in the height direction of homonymy.
7, the described pressure rail hoisting apparatus around Factory Building, it is characterised in that: described wirerope 2 is 8.
8, the described pressure rail hoisting apparatus around Factory Building, it is characterised in that: there is gap between described hanging scaffold 7 and foundation construction thing sidewall 102;Its gap is 200mm.
9, the described pressure rail hoisting apparatus around Factory Building, it is characterised in that: described lever arm 3 is alloy material, has outward antirust coat.
10, the described pressure rail hoisting apparatus around Factory Building, it is characterised in that: described underframe 19 is A3 Steel material.
Claims (10)
1. around the pressure rail hoisting apparatus of Factory Building, including: pulley, wirerope, lever arm, capstan box, lower connecting rod, handle stem, hanging scaffold, capstan winch motor, capsizing moment spindle, arm, support column, upper connecting rod, upper movable arm axle, lower movable arm axle, get on the right track, track arm, movable pulley, outside lower railway, inner side lower railway, link, underframe, foundation construction thing top, foundation construction thing sidewall;
It is characterized in that:
The cross section of outside lower railway and inner side lower railway is I-shaped;
The cross section got on the right track is for falling I-shaped;
Track arm is inverted "L" shaped, is positioned on foundation construction thing top;
Get on the right track connect track crane arm sling arm end on the downside of;
Outside lower railway and inner side lower railway are respectively positioned on foundation construction thing top;
Outside lower railway is parallel with inner side lower railway;
Get on the right track and overlap with the projection in the horizontal plane of inner side lower railway;
Underframe connects movable pulley;
Equipped with lower movable arm axle on underframe;
The upper and lower two ends of lever arm connect movable arm axle and lower movable arm axle respectively;
Equipped with support column on underframe, support column is perpendicular to underframe;
Arm connects upper movable arm axle;
Arm is symmetrical two groups, is connected by many upper connecting rods between arm;
Lower connecting rod connects the underframe of the left and right sides;
Link connects the underframe of the left and right sides;
Capstan winch motor is contained on link;
Two pulleys of front and back carrying same wirerope are one group;
Pulley connects wirerope, and wirerope connects capstan box, and capstan box connects capstan winch motor by capsizing moment spindle;
Arm connects pulley;
Wirerope connects hanging scaffold;
Hanging scaffold is parallel to horizontal plane.
2. the pressure rail hoisting apparatus around Factory Building as claimed in claim 1, it is characterised in that: described track arm has multiple.
3. the pressure rail hoisting apparatus around Factory Building as claimed in claim 1, it is characterised in that: described upper connecting rod has 2-5 root.
4. the pressure rail hoisting apparatus around Factory Building as claimed in claim 1, it is characterised in that: described movable pulley and have gap between getting on the right track, its gap is 5-10mm.
5. the pressure rail hoisting apparatus around Factory Building as claimed in claim 1, it is characterised in that: equipped with handle stem on described hanging scaffold.
6. the pressure rail hoisting apparatus around Factory Building as claimed in claim 1, it is characterised in that: described pulley is 4-8 group;The difference group pulley layout straggly in the height direction of homonymy.
7. the pressure rail hoisting apparatus around Factory Building as claimed in claim 1, it is characterised in that: described wirerope is 4-8 root.
8. the pressure rail hoisting apparatus around Factory Building as claimed in claim 1, it is characterised in that: there is gap between described hanging scaffold and foundation construction thing sidewall;Its gap is 100-200mm.
9. the pressure rail hoisting apparatus around Factory Building as claimed in claim 1, it is characterised in that: described lever arm is alloy material, has outward antirust coat.
10. the pressure rail hoisting apparatus around Factory Building as claimed in claim 1, it is characterised in that: described underframe is A3 Steel material.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610201707.8A CN105712216A (en) | 2016-03-31 | 2016-03-31 | Press-rail hoisting device surrounding factory building |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610201707.8A CN105712216A (en) | 2016-03-31 | 2016-03-31 | Press-rail hoisting device surrounding factory building |
Publications (1)
Publication Number | Publication Date |
---|---|
CN105712216A true CN105712216A (en) | 2016-06-29 |
Family
ID=56160612
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610201707.8A Pending CN105712216A (en) | 2016-03-31 | 2016-03-31 | Press-rail hoisting device surrounding factory building |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105712216A (en) |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1309078A (en) * | 2000-02-18 | 2001-08-22 | 株式会社京新产机 | Cage winding device for cradle vehicle |
CN201834713U (en) * | 2010-09-30 | 2011-05-18 | 北京二七轨道交通装备有限责任公司 | Track platform |
CN102596786A (en) * | 2009-11-06 | 2012-07-18 | 艾劳埃斯·乌本 | Elevator |
CN103770790A (en) * | 2014-02-20 | 2014-05-07 | 四川大学 | Overhead rail transport platform system |
CN104495684A (en) * | 2014-12-09 | 2015-04-08 | 济南华北升降平台制造有限公司 | Lifting platform with automatic moving rail |
WO2015152235A1 (en) * | 2014-03-31 | 2015-10-08 | 三井造船株式会社 | Method for manufacturing crane and system for mounting superstructure of crane |
CN205500622U (en) * | 2016-03-31 | 2016-08-24 | 武夷学院 | Encircle pressure rail formula hoisting apparatus of factory building |
-
2016
- 2016-03-31 CN CN201610201707.8A patent/CN105712216A/en active Pending
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1309078A (en) * | 2000-02-18 | 2001-08-22 | 株式会社京新产机 | Cage winding device for cradle vehicle |
CN102596786A (en) * | 2009-11-06 | 2012-07-18 | 艾劳埃斯·乌本 | Elevator |
CN201834713U (en) * | 2010-09-30 | 2011-05-18 | 北京二七轨道交通装备有限责任公司 | Track platform |
CN103770790A (en) * | 2014-02-20 | 2014-05-07 | 四川大学 | Overhead rail transport platform system |
CN103770790B (en) * | 2014-02-20 | 2016-10-05 | 四川大学 | Overhead system rail transport plateform system |
WO2015152235A1 (en) * | 2014-03-31 | 2015-10-08 | 三井造船株式会社 | Method for manufacturing crane and system for mounting superstructure of crane |
CN104495684A (en) * | 2014-12-09 | 2015-04-08 | 济南华北升降平台制造有限公司 | Lifting platform with automatic moving rail |
CN205500622U (en) * | 2016-03-31 | 2016-08-24 | 武夷学院 | Encircle pressure rail formula hoisting apparatus of factory building |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206486233U (en) | A kind of installing engineering Special elevator | |
CN205500622U (en) | Encircle pressure rail formula hoisting apparatus of factory building | |
CN205500639U (en) | Ring building area trailer delivery machine | |
CN201276388Y (en) | Special sling for rolling mill backing roll | |
CN206784896U (en) | A kind of high-lift operation hanging cradle with aluminium sheet soldering | |
CN206437822U (en) | A kind of plain type carries dummy car | |
CN105712216A (en) | Press-rail hoisting device surrounding factory building | |
CN202429920U (en) | Multi-trolley and double-girder gantry crane | |
CN205500641U (en) | Take dual -purpose hoisting machine of handcart | |
CN205634699U (en) | Belt hoist device of rail is pressed to delivery formula | |
CN105731270A (en) | Application of pressing rail type lifting device surrounding plant | |
CN105692477A (en) | Two-purpose hoisting machine with trolley | |
CN207192615U (en) | A kind of tensile testing machine lifts by crane turnover device | |
CN104512700B (en) | A kind of railway goods train bogie overhauls pipeline | |
CN205603091U (en) | Formula hoisting apparatus can haul | |
CN202186847U (en) | Movable hanger frame | |
CN205527499U (en) | Liftable trailer combination | |
CN105776041A (en) | Carrying type rail pressing circuit lifting device | |
CN105692487A (en) | Liftable trailer combination | |
CN207275550U (en) | A kind of novel automatic hangs sky pipeline | |
CN105692475A (en) | Application of dual-purpose hoisting machine with trolley | |
CN105692476A (en) | Surrounding building loader with trailer | |
CN207468039U (en) | Complete non-maintaining simple and easy hoisting system manually | |
CN206955470U (en) | Low headroom cucurbit Combined manual monorail trolley peculiar to vessel | |
CN206814280U (en) | A kind of adjustable gantry crane |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20160629 |