CN105692320A - Cable paying-off device for power facility planning - Google Patents

Cable paying-off device for power facility planning Download PDF

Info

Publication number
CN105692320A
CN105692320A CN201610188962.3A CN201610188962A CN105692320A CN 105692320 A CN105692320 A CN 105692320A CN 201610188962 A CN201610188962 A CN 201610188962A CN 105692320 A CN105692320 A CN 105692320A
Authority
CN
China
Prior art keywords
ball
arranges
base
cable
groove
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610188962.3A
Other languages
Chinese (zh)
Other versions
CN105692320B (en
Inventor
刘伟
周彬
崔雅平
吕永喜
刘永涛
王春丽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Dezhou Power Supply Co of State Grid Shandong Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Dezhou Power Supply Co of State Grid Shandong Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Dezhou Power Supply Co of State Grid Shandong Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201610188962.3A priority Critical patent/CN105692320B/en
Publication of CN105692320A publication Critical patent/CN105692320A/en
Application granted granted Critical
Publication of CN105692320B publication Critical patent/CN105692320B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H49/00Unwinding or paying-out filamentary material; Supporting, storing or transporting packages from which filamentary material is to be withdrawn or paid-out
    • B65H49/18Methods or apparatus in which packages rotate
    • B65H49/20Package-supporting devices

Landscapes

  • Unwinding Of Filamentary Materials (AREA)
  • Structures Of Non-Positive Displacement Pumps (AREA)

Abstract

The invention discloses a cable paying-off device for power facility planning, and relates to the technical field of power facilities. The cable paying-off device for power facility planning comprises a base. A cavity is formed in the base part. A plurality of first grooves are formed in the bottom of the cavity. Balls are arranged in the first grooves. A supporting disc is arranged above the balls. A through hole is formed in the center of the supporting disc. A motor is arranged in the cavity. A rotary disc is arranged at the top end of an output shaft of the motor. A plurality of supporting columns are arranged between the rotary disc and the supporting disc. An outer tooth ring is arranged on the rotary disc. An inner tooth ring is arranged on the top of the base. A sliding groove is formed in the top of the base. A spring and a U-shaped fixing base are arranged in the sliding groove. A pressing device is hinged to the fixing base. A guiding frame is arranged on the top of the base and provided with a wire penetrating hole and a jamming preventing device. The cable paying-off device has the beneficial effects that the structure is simple, paying off is even, meanwhile, paying off of a cable is convenient to control, and using is flexible and convenient.

Description

Cable actinobacillus device is used in a kind of electric power facility planning
Technical field
The present invention relates to electrical facility technical field, particularly cable actinobacillus device is used in a kind of electric power facility planning。
Background technology
Cable actinobacillus device is utensil conventional in power planning construction, and its Main Function is for installing large-sized cable wheel disc, it is simple to cable wheel disc rotates folding and unfolding cable。At present, being generally adopted manual work in the mode that whole dish cable is transferred construction, one of which is transferred mode and is: cable hank central authorities penetrate a rotating shaft, and rotating shaft is horizontally disposed with, and two ends are propped by support, and then manual rotation's cable hank carries out cable and transfers operation;It is by axially vertical for cable hank setting that another kind transfers mode, is placed on the chassis that can horizontally rotate, and still manually rotates cable hank and carries out cable and transfer operation。But existing cable unwinding device unwrapping wire is uneven, it is not easy to control, in-convenience in use。
Summary of the invention
For solving deficiency of the prior art, the present invention provides a kind of electric power facility planning cable actinobacillus device, its simple in construction, and unwrapping wire is uniform, simultaneously facilitates the unwrapping wire controlling cable, flexible and convenient to use。
The present invention is for achieving the above object, it is achieved through the following technical solutions: a kind of electric power facility planning cable actinobacillus device, including base, described base portion arranges cavity, described cavity bottom annular array arranges multiple first groove, described first groove is spherical, in described first groove, ball is set, the diameter of described ball is more than the degree of depth of the first groove, described ball is provided above a support plate, described support plate central authorities arrange through hole, in described cavity, motor is set, described motor bottom is connected through through hole and base are fixing, the output shaft of described motor is vertically upward, and it is exposed to above base, described base top arranges opening, described opening connects with cavity, rotating disk is installed on the output shaft top of described motor, between described rotating disk and a support plate, multiple support column is set, described rotating disk arranges external toothing, the height at described external toothing top is lower than the height at rotating disk top, described base top arranges multiple joint pin, described joint pin top arranges the ring gear engaged with external toothing, described base top arranges chute, spring and U-shaped fixing seat are set in described chute, described U-shaped fixing seat is connected with slide, described spring one end is fixing with chute wall to be connected, the other end is fixing with U-shaped fixing seat to be connected, hinged hold down gag on described fixing seat, described fixing seat two ends arrange spliced eye, described hold down gag includes compressor arm, described compressor arm bottom arranges the convex spindle adapted with spliced eye, sheathed torsion spring in described convex spindle, described one end is fixing with spliced eye to be connected, the other end is fixing with convex spindle to be connected, described compressor arm top arranges baffle plate, described base top arranges leading truck, described leading truck arranges through wires hole and antiseize device, described antiseize device includes the bearing being arranged within through wires hole, described bearing includes inner ring, retainer, outer ring, ball, described inner ring arranges multiple ball hole, described ball is partially submerged in ball hole and externally protrudes out in bearing inner race, described retainer is for elastically keeping frame, described retainer and ball match and make ball evagination bearing inner race。
Described support tray bottom arranges the second groove adapted with ball, and described ball top is positioned at the second groove。
Described baffle plate is circular arc。
Described baffle plate arranges rubber blanket away from the side of compressor arm。
Described base is arranged to control time controller and the rotational speed governor of motor。
Contrast prior art, the beneficial effects of the present invention is:
1, cable disk is placed on rotating disk by the present invention, electric machine rotation drives rotating disk to rotate, thus realizing take-up and the unwrapping wire of cable, and rotating disk arranges the ring gear that on external toothing, base, setting is engaged with external toothing, make rotating disk steady in rotation process, retractable cable is uniform, it is simple to control, flexible and convenient to use;Further, arranging antiseize device in the through wires hole of leading truck, it is prevented that in retractable cable process, cable bending knotting causes card line;Base top arranges chute, spring and U-shaped fixing seat are set in chute, U-shaped fixing seat is connected with slide, spring one end is fixing with chute wall to be connected, the other end is fixing with U-shaped fixing seat to be connected, hinged hold down gag on fixing seat, fixing seat two ends arrange spliced eye, hold down gag includes compressor arm, compressor arm bottom arranges the convex spindle adapted with spliced eye, sheathed torsion spring in convex spindle, one end is fixing with spliced eye to be connected, the other end is fixing with convex spindle to be connected, compressor arm top arranges baffle plate, hold down gag can be facilitated can be pressed against the cable disk of different-diameter, it is possible to prevent cable coil to loosen the knotting causing cable by the hold down gag arranged。
2, supporting tray bottom and arrange the second groove adapted with ball, ball top is positioned at the second groove, increases the stability in a support plate rotation process。
3, baffle plate is circular arc, under the effect not affecting baffle plate, reduces the contact area of baffle plate and cable, reduces the pressure to cable in retractable cable process。
Accompanying drawing explanation
Accompanying drawing 1 is present configuration schematic diagram。
Label shown in accompanying drawing: 1, base;2, cavity;3, the first groove;4, ball;5, support plate is propped up;6, through hole;7, motor;8, opening;9, rotating disk;10, support column;11, external toothing;12, joint pin;13, ring gear;14, fixing seat;15, compressor arm;16, baffle plate;17, leading truck;18, through wires hole;19, bearing;20, the second groove;21, chute;22, spring;23, cable disk。
Detailed description of the invention
In conjunction with the drawings and specific embodiments, the invention will be further described。Should be understood that these embodiments are merely to illustrate the present invention rather than restriction the scope of the present invention。In addition, it is to be understood that after having read the content that the present invention lectures, the present invention can be made various changes or modifications by those skilled in the art, and these equivalent form of values fall within the application appended claims limited range equally。
Cable actinobacillus device is used in a kind of electric power facility planning, including base 1, described base 1 arranges cavity 2, described cavity 2 base circle array arranges multiple first groove 3, described first groove 3 is spherical, in described first groove 3, ball 4 is set, the diameter of described ball 4 is more than the degree of depth of the first groove 3, described ball 4 is provided above a support plate 5, described support plate 5 central authorities arrange through hole 6, in described cavity 2, motor 7 is set, it is connected through through hole 6 is fixing with base 1 bottom described motor 7, the output shaft of described motor 7 is vertically upward, and it is exposed to above base 1, described base 1 top arranges opening 8, described opening 8 connects with cavity 2, rotating disk 9 is installed on the output shaft top of described motor 7, between described rotating disk 9 and a support plate 5, multiple support column 10 is set, may insure that rotating disk can bear heavier cable first dish by the support plate arranged, electric machine rotation drives rotating disk to rotate, rotating disk rotates through support column and drives a support plate to rotate;Rotating disk rotates and drives the cable disk 23 above it to rotate, thus realizing take-up and the unwrapping wire of cable。Arranging external toothing 11 on described rotating disk 9, the height at described external toothing 11 top is lower than the height at rotating disk 9 top, it is possible to be conveniently used for the cable disk of different-diameter size。Described base 1 top arranges multiple joint pin 12, and described joint pin 12 top arranges the ring gear 13 that engage with external toothing 11, by external toothing and ring gear make rotating disk in rotation process steady, retractable cable is uniform, it is simple to control, flexible and convenient to use。Described base 1 top arranges chute 21, spring 22 and U-shaped fixing seat 14 are set in described chute 21, described U-shaped fixing seat 14 is slidably connected with chute 21, described spring 22 one end is fixing with chute 21 sidewall to be connected, the other end is fixing with U-shaped fixing seat 14 to be connected, hinged hold down gag on described fixing seat 14, described fixing seat 14 two ends arrange spliced eye, described hold down gag includes compressor arm 15, described compressor arm 15 bottom arranges the convex spindle adapted with spliced eye, sheathed torsion spring in described convex spindle, described one end is fixing with spliced eye to be connected, the other end is fixing with convex spindle to be connected, described compressor arm 15 top arranges baffle plate 16, hold down gag can be facilitated can be pressed against the cable disk of different-diameter, it is possible to prevent cable coil to loosen the knotting causing cable by the hold down gag arranged。Described base 1 top arranges leading truck 17, described leading truck 17 arranges through wires hole 18 and antiseize device, described antiseize device includes the bearing 19 being arranged within through wires hole 18, described bearing 19 includes inner ring, retainer, outer ring, ball, described inner ring arranges multiple ball hole, described ball is partially submerged in ball hole and externally protrudes out in bearing 19 inner ring, described retainer is for elastically keeping frame, described retainer and ball match and make ball evagination bearing 19 inner ring, cable traverse bearing inner race, when unwrapping wire or take-up, the rotation of the mobile drive ball of wire, make wire constantly forward or backward, prevent the generation of card line situation, wire stress is little, wire is avoided to damage。
As optimization, arranging the second groove 20 adapted with ball 4 bottom described support plate 5, described ball 4 top is positioned at the second groove 20, increases the stability in a support plate rotation process。
As optimization, described baffle plate 16 is circular arc, under the effect not affecting baffle plate, reduces the contact area of baffle plate and cable, reduces the pressure to cable in retractable cable process。
As optimization, described baffle plate 16 arranges rubber blanket away from the side of compressor arm 15, it is prevented that cable is caused abrasion。
As optimization, described base 1 is arranged to control time controller and the rotational speed governor of motor 7, it is simple to control take-up and the unwrapping wire of cable。
Embodiment 1:
Cable actinobacillus device is used in a kind of electric power facility planning, including base 1, described base 1 arranges cavity 2, described cavity 2 base circle array arranges multiple first groove 3, described first groove 3 is spherical, in described first groove 3, ball 4 is set, the diameter of described ball 4 is more than the degree of depth of the first groove 3, described ball 4 is provided above a support plate 5, described support plate 5 central authorities arrange through hole 6, in described cavity 2, motor 7 is set, it is connected through through hole 6 is fixing with base 1 bottom described motor 7, the output shaft of described motor 7 is vertically upward, and it is exposed to above base 1, described base 1 top arranges opening 8, described opening 8 connects with cavity 2, rotating disk 9 is installed on the output shaft top of described motor 7, between described rotating disk 9 and a support plate 5, multiple support column 10 is set, may insure that rotating disk can bear heavier cable first dish by the support plate arranged, electric machine rotation drives rotating disk to rotate, rotating disk rotates through support column and drives a support plate to rotate;Rotating disk rotates and drives the cable disk 23 above it to rotate, thus realizing take-up and the unwrapping wire of cable;Arranging the second groove 20 adapted with ball 4 bottom described support plate 5, described ball 4 top is positioned at the second groove 20, increases the stability in a support plate rotation process。Arranging external toothing 11 on described rotating disk 9, the height at described external toothing 11 top is lower than the height at rotating disk 9 top, it is possible to be conveniently used for the cable disk of different-diameter size。Described base 1 top arranges multiple joint pin 12, and described joint pin 12 top arranges the ring gear 13 that engage with external toothing 11, by external toothing and ring gear make rotating disk in rotation process steady, retractable cable is uniform, it is simple to control, flexible and convenient to use。Described base 1 top arranges chute 21, spring 22 and U-shaped fixing seat 14 are set in described chute 21, described U-shaped fixing seat 14 is slidably connected with chute 21, described spring 22 one end is fixing with chute 21 sidewall to be connected, the other end is fixing with U-shaped fixing seat 14 to be connected, hinged hold down gag on described fixing seat 14, described fixing seat 14 two ends arrange spliced eye, described hold down gag includes compressor arm 15, described compressor arm 15 bottom arranges the convex spindle adapted with spliced eye, sheathed torsion spring in described convex spindle, described one end is fixing with spliced eye to be connected, the other end is fixing with convex spindle to be connected, described compressor arm 15 top arranges baffle plate 16, hold down gag can be facilitated can be pressed against the cable disk of different-diameter, it is possible to prevent cable coil to loosen the knotting causing cable by the hold down gag arranged。Described baffle plate 16 is circular arc, under the effect not affecting baffle plate, reduces the contact area of baffle plate and cable, reduces the pressure to cable in retractable cable process。Described baffle plate 16 arranges rubber blanket away from the side of compressor arm 15, it is prevented that cable is caused abrasion。Described base 1 top arranges leading truck 17, described leading truck 17 arranges through wires hole 18 and antiseize device, described antiseize device includes the bearing 19 being arranged within through wires hole 18, described bearing 19 includes inner ring, retainer, outer ring, ball, described inner ring arranges multiple ball hole, described ball is partially submerged in ball hole and externally protrudes out in bearing 19 inner ring, described retainer is for elastically keeping frame, described retainer and ball match and make ball evagination bearing 19 inner ring, cable traverse bearing inner race, when unwrapping wire or take-up, the rotation of the mobile drive ball of wire, make wire constantly forward or backward, prevent the generation of card line situation, wire stress is little, wire is avoided to damage。

Claims (5)

1. cable actinobacillus device is used in an electric power facility planning, it is characterized in that: include base (1), described base (1) portion arranges cavity (2), described cavity (2) base circle array arranges multiple first groove (3), described first groove (3) is for spherical, in described first groove (3), ball (4) is set, the diameter of described ball (4) is more than the degree of depth of the first groove (3), described ball (4) is provided above a support plate (5), described support plate (5) central authorities arrange through hole (6), motor (7) is set in described cavity (2), described motor (7) bottom is connected through through hole (6) and base (1) are fixing, the output shaft of described motor (7) is vertically upward, and it is exposed to base (1) top, described base (1) top arranges opening (8), described opening (8) connects with cavity (2), rotating disk (9) is installed on the output shaft top of described motor (7), between described rotating disk (9) and a support plate (5), multiple support column (10) is set, described rotating disk (9) arranges external toothing (11), the height at described external toothing (11) top is lower than the height at rotating disk (9) top, described base (1) top arranges multiple joint pin (12), described joint pin (12) top arranges the ring gear (13) engaged with external toothing (11), described base (1) top arranges chute (21), spring (22) and U-shaped fixing seat (14) are set in described chute (21), described U-shaped fixing seat (14) and chute (21) are slidably connected, described spring (22) one end is fixing with chute (21) sidewall to be connected, the other end is fixing with U-shaped fixing seat (14) to be connected, the upper hinged hold down gag of described fixing seat (14), described fixing seat (14) two ends arrange spliced eye, described hold down gag includes compressor arm (15), described compressor arm (15) bottom arranges the convex spindle adapted with spliced eye, sheathed torsion spring in described convex spindle, described one end is fixing with spliced eye to be connected, the other end is fixing with convex spindle to be connected, described compressor arm (15) top arranges baffle plate (16), described base (1) top arranges leading truck (17), described leading truck (17) arranges through wires hole (18) and antiseize device, described antiseize device includes being arranged on the bearing (19) that through wires hole (18) is internal, described bearing (19) includes inner ring, retainer, outer ring, ball, described inner ring arranges multiple ball hole, described ball is partially submerged in ball hole and externally protrudes out in bearing (19) inner ring, described retainer is for elastically keeping frame, described retainer and ball match and make ball evagination bearing (19) inner ring。
2. a kind of electric power facility planning cable actinobacillus device according to claim 1, it is characterized in that: described support plate (5) bottom arranges the second groove (20) adapted with ball (4), and described ball (4) top is positioned at the second groove (20)。
3. a kind of electric power facility planning cable actinobacillus device according to claim 1, it is characterised in that: described baffle plate (16) is circular arc。
4. a kind of electric power facility planning cable actinobacillus device according to claim 1, it is characterised in that: described baffle plate (16) arranges rubber blanket away from the side of compressor arm (15)。
5. a kind of electric power facility planning cable actinobacillus device according to claim 1, it is characterised in that: described base (1) is arranged to control time controller and the rotational speed governor of motor (7)。
CN201610188962.3A 2016-03-29 2016-03-29 A kind of electric power facility planning cable actinobacillus device Expired - Fee Related CN105692320B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610188962.3A CN105692320B (en) 2016-03-29 2016-03-29 A kind of electric power facility planning cable actinobacillus device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610188962.3A CN105692320B (en) 2016-03-29 2016-03-29 A kind of electric power facility planning cable actinobacillus device

Publications (2)

Publication Number Publication Date
CN105692320A true CN105692320A (en) 2016-06-22
CN105692320B CN105692320B (en) 2018-08-17

Family

ID=56231810

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610188962.3A Expired - Fee Related CN105692320B (en) 2016-03-29 2016-03-29 A kind of electric power facility planning cable actinobacillus device

Country Status (1)

Country Link
CN (1) CN105692320B (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106451240A (en) * 2016-11-30 2017-02-22 国网山东省电力公司龙口市供电公司 Power cable laying device
CN107161775A (en) * 2017-07-03 2017-09-15 苏州市丹纺纺织研发有限公司 A kind of Weaving device actinobacillus device of good damping effect
CN107919597A (en) * 2017-11-05 2018-04-17 无锡胜维电气有限公司 A kind of active release type low-frequency cable component crimps system cable after-combustion module
CN107934675A (en) * 2017-11-23 2018-04-20 国网河南省电力公司栾川县供电公司 A kind of elastic self-adjustable power department cable fast winding equipment
CN108767748A (en) * 2018-08-19 2018-11-06 湖南建勋环保资源科技发展有限公司 Cable connects up installation system
CN109335868A (en) * 2018-09-26 2019-02-15 芜湖顺成电子有限公司 The wire pay-off device of automatic loading/unloading
CN110978627A (en) * 2019-12-17 2020-04-10 刘晨阳 Efficient intelligent device for automatically pasting internal connection paper on gift box
CN113086774A (en) * 2021-03-30 2021-07-09 中船澄西船舶修造有限公司 Cable paying-off turntable

Family Cites Families (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101017716A (en) * 2007-01-19 2007-08-15 东莞市奇剑工业陶瓷科技有限公司 Damp uncoiling device
CN203246962U (en) * 2013-03-21 2013-10-23 宝钢集团新疆八一钢铁有限公司 Improved galvanization unwinding H-shaped wheel brake damping device
CN203319388U (en) * 2013-05-13 2013-12-04 周海滨 Cable paying-off device
CN203419623U (en) * 2013-07-11 2014-02-05 贵州顶效经济开发区沈兴实业有限责任公司 Damping type pay-off spool
CN203699548U (en) * 2013-12-15 2014-07-09 邓拓 Paying-off device
CN204144812U (en) * 2014-10-16 2015-02-04 济宁鲁宁电力安装服务有限公司 Flatwise cable laying engineering truck
CN204216503U (en) * 2014-12-10 2015-03-18 国家电网公司 A kind of paying out drum with cell body formula brake gear
CN204474000U (en) * 2015-01-08 2015-07-15 赣州天清再生资源投资开发有限公司 A kind of open pipe apparatus for placing
CN204568980U (en) * 2015-03-11 2015-08-19 石家庄华通线缆有限公司 Thread supplying machine structure
CN204727335U (en) * 2015-05-28 2015-10-28 天津市汇和电气设备有限公司 Be provided with the Horizontal pay-off reel of interlock guiding mechanism
CN104960975A (en) * 2015-06-24 2015-10-07 芜湖扬宇机电技术开发有限公司 Cable tray with transportation and paying off integrated
CN105262007B (en) * 2015-12-04 2017-11-21 南安市鑫灿品牌运营有限公司 A kind of high-tension distributing line high speed payout device
CN205526989U (en) * 2016-03-29 2016-08-31 国家电网公司 Cable conductor pay -off is used in electric power facility planning

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106451240A (en) * 2016-11-30 2017-02-22 国网山东省电力公司龙口市供电公司 Power cable laying device
CN106451240B (en) * 2016-11-30 2018-09-28 国网山东省电力公司龙口市供电公司 A kind of power cable layer device
CN107161775A (en) * 2017-07-03 2017-09-15 苏州市丹纺纺织研发有限公司 A kind of Weaving device actinobacillus device of good damping effect
CN107919597A (en) * 2017-11-05 2018-04-17 无锡胜维电气有限公司 A kind of active release type low-frequency cable component crimps system cable after-combustion module
CN107934675A (en) * 2017-11-23 2018-04-20 国网河南省电力公司栾川县供电公司 A kind of elastic self-adjustable power department cable fast winding equipment
CN108767748A (en) * 2018-08-19 2018-11-06 湖南建勋环保资源科技发展有限公司 Cable connects up installation system
CN109335868A (en) * 2018-09-26 2019-02-15 芜湖顺成电子有限公司 The wire pay-off device of automatic loading/unloading
CN110978627A (en) * 2019-12-17 2020-04-10 刘晨阳 Efficient intelligent device for automatically pasting internal connection paper on gift box
CN113086774A (en) * 2021-03-30 2021-07-09 中船澄西船舶修造有限公司 Cable paying-off turntable

Also Published As

Publication number Publication date
CN105692320B (en) 2018-08-17

Similar Documents

Publication Publication Date Title
CN205526989U (en) Cable conductor pay -off is used in electric power facility planning
CN105692320A (en) Cable paying-off device for power facility planning
CN110342347A (en) A kind of cable reel is around with reel device
CN110670507A (en) Stable form hydraulic lifting equipment with dustproof function
CN201010245Y (en) Elevation type hopper capacity adjusting structure
JP5355159B2 (en) Self-propelled wire inspection device
JP6057817B2 (en) Double-side polishing apparatus and polishing method
CN113582078A (en) Liftable and rotatable electric tray
CN108190772A (en) A kind of novel elevator being laid with for transmission line of electricity
CN112193937A (en) Cable processing is with coiling equipment of restrainting
TW201730122A (en) Scribe head rotating apparatus for cutting substrates which greatly increases the operation efficiency
CN215557869U (en) Cable conductor is pay-off for strand machine
CN210418709U (en) Cable winding machine
CN110340685A (en) A kind of operating method convenient for adjusting the vertical vehicle lathe operation platform of diameter and height
CN205565608U (en) Can receive terminal box of line, unwrapping wire in a flexible way
KR101657911B1 (en) Electrical lifting blackboard apparatus
KR20150090592A (en) Shipping cable winder
KR102304506B1 (en) Lens processing device capable of automatic exchange between multiple lens processing modules
CN108373076B (en) Cable paying-off device
CN220976065U (en) Small-diameter cable paying-off simple device
CN107416588A (en) Optical cable unwrapping wire bearing
CN207192449U (en) Optical cable unwrapping wire bearing
CN106263846A (en) A kind of numerical control turntable
KR101346097B1 (en) Microphone for adjusting height automatically
CN220519806U (en) Cable paying-off device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180817

Termination date: 20190329

CF01 Termination of patent right due to non-payment of annual fee