CN105677939B - A kind of door opening shape section lining concrete construction time allows the calculation method of maximum temperature - Google Patents

A kind of door opening shape section lining concrete construction time allows the calculation method of maximum temperature Download PDF

Info

Publication number
CN105677939B
CN105677939B CN201510715456.0A CN201510715456A CN105677939B CN 105677939 B CN105677939 B CN 105677939B CN 201510715456 A CN201510715456 A CN 201510715456A CN 105677939 B CN105677939 B CN 105677939B
Authority
CN
China
Prior art keywords
temperature
lining concrete
maximum temperature
concrete
door opening
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510715456.0A
Other languages
Chinese (zh)
Other versions
CN105677939A (en
Inventor
段亚辉
樊启祥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan University WHU
Original Assignee
Wuhan University WHU
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan University WHU filed Critical Wuhan University WHU
Priority to CN201510715456.0A priority Critical patent/CN105677939B/en
Publication of CN105677939A publication Critical patent/CN105677939A/en
Application granted granted Critical
Publication of CN105677939B publication Critical patent/CN105677939B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/20Design optimisation, verification or simulation
    • G06F30/23Design optimisation, verification or simulation using finite element methods [FEM] or finite difference methods [FDM]
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D15/00Handling building or like materials for hydraulic engineering or foundations
    • E02D15/02Handling of bulk concrete specially for foundation or hydraulic engineering purposes
    • E02D15/06Placing concrete under water

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Theoretical Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Paleontology (AREA)
  • Mining & Mineral Resources (AREA)
  • Civil Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Computer Hardware Design (AREA)
  • Evolutionary Computation (AREA)
  • Geometry (AREA)
  • General Physics & Mathematics (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

Allow the calculation method of maximum temperature the invention discloses a kind of door opening shape section lining concrete construction time, temperature in liner structure size, strength grade of concrete, surrounding rock deformation monitor and construction time hole is substituted into calculation formula, to calculate the permission maximum temperature of construction time door opening shape section lining concrete.The method of the present invention can effectively reflect country rock performance, liner structure size, lining concrete intensity, the influence to maximum temperature permissible value such as temperature in hole, high-precision calculates rapidly door opening shape section structure lining concrete construction time permission maximum temperature, engineering practice, more scientific and reasonable is more in line with than strong constraint method, precision is suitable with FInite Element, it can be completely used for the practical development temperature controlled anticracking design of engineering, especially construction time on-site implementation plan quickly adjusts.

Description

A kind of door opening shape section lining concrete construction time allows the calculation method of maximum temperature
Technical field
The present invention relates to engineering structure Concrete Temperature Control crack prevention technique field, specifically a kind of door opening shape section lining cutting The calculation method of concrete construction phase permission maximum temperature.
Background technique
Distress in concrete includes unstructuredness caused by structural crack caused by external load acts on and deformation variation effect Crack two major classes.Wherein 80% is all thermal cracking.The big cross section high intensity underground water conservancy project lining concrete built in recent years, only Otherwise effective temperature control measures are taken, all produce a large amount of cracks bar none, and are the construction time to generate penetrability mostly Thermal cracking.
Underground hydro-structure, which is in for a long time in moist, alternation of wetting and drying environment, to work, harmfulness crack there are serious shadows It rings the globality of engineering structure, safety, the construction speed duration, lead to leakage even seepage failure, durability and service life, work Journey cost and beauty, it is also possible to induce the occurrence and development of other diseases.Therefore, underground water-work concrete construction time thermal cracking Control become the major issue be extremely concerned about of engineering circles, carried out series and in-depth study, taken more in engineering Severe temperature controlled anticracking measure.
It is designed about underground water conservancy project lining concrete temperature controlled anticracking, current related design discipline specification allows the construction time Maximum temperature is all without explicitly regulation and design and calculation method.As " design of hydraulic concrete structures specification " is wanted in 4.1.2 (3) It asks " to the structural elements for using upper requirement to carry out Crack Control, Ying Jinhang cracking resistance or crack width calculation ", is provided in 4.1.8 " building between construction and run phrase, when having larger impact to building such as the variation of temperature, Ying Jinhang temperature stress calculation, And use construction measure and working measure preferably to eliminate or reduce temperature stress.The armored concrete for allowing crack occur in use Structural elements is considered as crack developing and makes the influence of stiffness of structural member reduction in calculation of temperature stresses ".It is provided in 4.3.2 " when reinforced concrete structural element designs, different crack-control check calculations should be carried out according to requirements.(1) it crack resisting calculation: holds The other components that can cause serious leakage after by the axial tension component of hydraulic pressure, small eccentricity tensional element and generation crack, are answered Carry out crack resisting calculation.It, can also be without crack resisting calculation when not influencing if any reliable seepage control measure or normal use ".But do not refer to Bright cracking computation method, also without Winkler's foundation.For another example " hydraulic tunnel design specification " (DL/T5195-2004) is only in 11.2.6 " influence of stress and grouting pressure to lining cutting caused by temperature change, concrete shrinkage and expansion, preferably passes through construction for item requirement Measure and construction measure solve.For the temperature stress that high temperature area generates, Ying Jinhang particular study ".
To the part underground engineering lining concrete for requiring control critical eigenvalue on using, (such as high flow rate flood discharging tunnel, power tunnel draw Water section etc.) the temperature controlled anticracking design in the construction time calculates and allows the calculating of maximum temperature, at present generally using FInite Element and With reference to the method for dam strong constraint area concrete maximum temperature controlling value (hereinafter referred to as strong constraint method).
FInite Element passes through a large amount of temperature after completing structure design and concrete mix and the test of a large amount of performance parameters The simulation calculation for controlling measure scheme is greater than code requirement factor of safety against cracking and construction is simple according to minimum factor of safety against cracking The conditions such as feasible, economic propose construction temperature controlled anticracking scheme, and the program is calculated inside concrete maximum temperature as construction Phase allows maximum temperature.It does so, precision is higher, and can be with Optimizing Construction Scheme.But it needs first to carry out concrete mix It is tested with a large amount of performance parameters, test and simulation calculation need to spend more time, fund;For no determining construction cooperation It can not be carried out when than and without concrete performance test;Scheme in concept phase and construction is not applied for quickly to adjust. Especially so far the factor of safety against cracking required value of the no construction time temperature controlled anticracking design of related specification, such as hydraulic tunnel lining cutting It is all with reference to design standard of large dams, then without ready patterns to follow for diversion tunnel, power generation tailrace tunnel etc. when Concrete Temperature Control Crack Control Design.
Strong constraint method is to belong to strong constraint area concrete, therefore strong with reference to dam since the thickness of lining concrete is small The Winkler's foundation of concrete in restraint area calculates plus the temperature difference is allowed on the basis of quasi stationary temperature field average value and proposes lining cutting The concrete construction phase allows maximum temperature.It does so, the Winkler's foundation of dam strong constraint area concrete cannot be applicable in thin-walled lining cutting Structure does not reflect concrete strength, country rock performance, lining thickness and the other influence of structure dimension equal difference.Such as a height 20m Hydraulic tunnel, lining cutting (parting length is generally less than 15m) concrete of thickness 0.5m~2.0m is all strong constraint, allow base The plinth temperature difference is identical, and environment calculates steady temperature field average value less than 1.0 DEG C in hole, therefore final maximum temperature permissible value phase Together.
In summary situation illustrates, the phase of used in Underground Engineering Lining concrete construction at present allows maximum temperature, and Regulations do not have It is distinctly claimed and factor of safety against cracking requirement;Without reasonable available method, (FInite Element does not have factor of safety against cracking requirement Value), it cannot effectively realize temperature crack control target.
Summary of the invention
The purpose of the present invention proposes a kind of door opening shape section lining concrete primarily directed to the shortcomings of the prior art The calculation method of construction time permission maximum temperature.
In order to solve the above-mentioned technical problem, the present invention is mixed with Xi Luo Du reservoir hydraulic tunnel door opening shape section structure lining cutting Based on solidifying native more than 200 storehouse scene temperature control observations and flaw detection achievement, adopts the following technical scheme that and studied.
A kind of circular cross section lining concrete construction time allows the calculation method of maximum temperature, allows maximum temperature [Tmax], Its calculation formula is as follows
【Tmax]=min (T1max, T2max) (1)
T1max=4.46 × H-0.038 × H0-0.037×L+0.096×C-0.134×E+0.3669×Ta+22.1315 (2)
T2max=Tmin+4.47×H-0.0378×H0-0.0381×L+0.0976×C-0.124×E+0.3669×Ta+ 9.254 (3)
In formula: T1maxThe temperature drop stage, which calculates, after the hot temperature rise of-early hydration allows maximum temperature (DEG C);
T2maxThe temperature drop stage in-winter, which calculates, allows maximum temperature (DEG C);
H-lining concrete structural thickness (m);
H0- peripheral wall height (m), when abutment wall and crown one-piece casting, H0+ 1/2 crown arc length of=peripheral wall height is (such as 14.57m+61 ° of angle camber line of peripheral wall height in Fig. 5);
L-lining concrete structural jointing length (m);
E-surrounding rock deformation monitor (GPa);
C-lining concrete presses the strength grade (MPa) of 90 day age design;
TaAir themperature (DEG C) in hole when-lining concrete pouring construction;
By liner structure thickness, peripheral wall height or width, parting length, surrounding rock deformation monitor, strength grade of concrete Formula (1)-(3) are substituted into air themperature in hole when concreting, the construction of door opening shape section lining concrete is calculated Phase allows maximum temperature;By 12 months 1 year temperature on average TaIt substitutes into, this is calculated and pours within 12 months door opening shape section lining The permission maximum temperature of building concrete.
It must be noted that needing to change according to specification when (1) lining concrete uses the strength grade of 28 day age design Calculating is the strength grade designed 90 day age;(2) if the construction time is kept the temperature using curtain, so that underground chamber air themperature mentions Height, then TaIt should be using air themperature in the hole after improving.In addition, since formula (2) and formula (3) are to could be used without splitting What the temperature observation achievement statistics of seam obtained, Practical Project allows maximum temperature [T using calculatingmax] when, general cracking structure can To directly adopt;Liner structure very high for demand of anti-crack, may be appropriately used 1.05~1.1 safety coefficient;For The only liner structure of Restricted Crack Width can suitably relax requirement.
Air themperature T in hole when the lining concrete pouring constructiona, including in construction time hole in water temperature and runtime hole Water temperature.It can be by water temperature or operation in liner structure size, surrounding rock deformation monitor, strength grade of concrete and construction time hole Phase water temperature substitutes TaSubstitute into can calculate circular cross section lining concrete construction time include water temperature permission maximum temperature.
The door opening shape section, the lining cutting of the compound section form including ellipse, the shape of a hoof, door opening shape and these shapes Concrete.
The door opening shape section lining concrete, including be close on ground with ground board-like lining cutting, tower, platform and this A little combined similar structures engineering concrete, if that is, by the Structural Engineering concrete equivalent dimension, country rock, basic rock mass or Deformation modulus, strength grade of concrete and the concrete pouring construction phase temperature of the other base bodies of person or other environment temperatures are replaced For TaSubstitute into, it can calculate the Structural Engineering concrete construction phase permission maximum temperature.
The formula (1), (2), (3) are obtained according to following technical solution.According to a large amount of field observations, flaw detection With FInite Element Simulation Analysis, mainly there are two the stages: early stage for the generation and development of tunnel lining concrete thermal cracking Temperature drop stage and temperature drop stage in winter.Temperature drop early stage, crack stage is warm rapidly after reaching maximum temperature due to heat of hydration temperature rise Drop generates larger tensile stress under country rock constraint, and early strength of concrete is low, about at 7 days to one month or so, tensile stress Lead to crack more than tensile strength.Temperature drop stage in winter, concrete temperature are gradually decreased with air themperature in hole, and tensile stress is continuous Increase, is more than the tensile strength in the period when concrete temperature reduces the tensile stress generated and generates crack or primary fracture is fast Speed extension.Therefore, lining concrete temperature controlled anticracking should focus on early stage and two stages of winter, and studying it respectively allows temperature drop poor With permission maximum temperature.Two stages of note early stage and winter allow temperature drop difference to be (△ T and △ Tmax), then
△ T=Tmax-Ta (4)
△Tmax=Tmax-Tmin (5)
In formula: △ T is lining concrete early stage to allow temperature drop poor (DEG C);
△TmaxAllow temperature drop poor (DEG C) for lining concrete winter;
TminFor the lowest temperature in winter hole namely country rock surface winter minimum temperature (DEG C).
Obtaining two stages of early stage and winter allows temperature drop difference △ T and △ TmaxAfterwards, it can calculate lining concrete Allow maximum temperature:
In early days: T1max=Ta+△T (6)
Low temperature season: T2max=Tmin+△Tmax (7)
For this purpose, observing more than the 200 storehouse scene temperature controls of Xi Luo Du reservoir flood discharging tunnel door opening shape section structure lining concrete (as shown in Figure 2) and flaw detection achievement are divided into and without crack, and each structural sections lining concrete is observed maximum temperature Tmax、 △ T and △ TmaxFig. 3~Fig. 4 is shown in the relationship for accordingly pouring the time.According to site operation and flaw detection data, each structure Section soleplate crack is seldom, and equal conditions are that side and roof arch (stalk+crown arc length is big) concrete is easy to produce thermal cracking mostly, So only being statisticallyd analyze to the related parameter of side and roof arch.Respectively to there is no the early stage temperature of the observing buoy of thermal cracking Difference △ T and winter temperature drop difference △ T dropsmaxRegression analysis is carried out, is obtained
△ T=4.46 × H-0.038 × H0-0.037×L+0.096×C-0.134×E-0.6331×Ta+22.1315 (8)
△Tmax=4.47 × H-0.0378 × H0-0.0381×L+0.0976×C-0.124×E+0.3669×Ta+ 9.254 (9)
Formula (8) substitution formula (6) is obtained into formula (2);Formula (9) substitution formula (7) is obtained into formula (3).
Since formula (2), formula (3) are to there is no thermal cracking hydraulic tunnel door opening shape section structure lining concretes T1maxAnd T2maxStatistics, i.e., formula (1) calculate TmaxIt is that the maximum temperature of thermal cracking will not occur, therefore can be used as door opening Shape section structure lining concrete allows maximum temperature.
The present invention is the advantages of a kind of door opening shape section lining concrete construction time allows the calculation method of maximum temperature: this Inventive method can effectively reflect country rock performance (deformation modulus), liner structure size (including height or width, parting it is long Degree, thickness), lining concrete intensity, the influence to maximum temperature permissible value such as temperature and water temperature in hole, precision is high, simple real With.
Detailed description of the invention
Fig. 1 a is the schematic diagram of flood discharging tunnel lining concrete.
Fig. 1 b is the partial enlarged view of Fig. 1 a.
Fig. 2 is the maximum temperature of door opening shape section lining concrete, placing temperature, temperature and the relationship for pouring the time in hole Figure.
Fig. 3 is that door opening shape section lining concrete observes Tmax, △ T with pour the relational graph of time.
Fig. 4 is that door opening shape section lining concrete observes Tmax、△TmaxWith the relational graph for pouring the time.
Fig. 5 is that flood discharging tunnel door opening shape section 1.0m thickness lining concrete structure chart is crossed in small stream Lip river.
Fig. 6 is flood discharging tunnel cavern climate simulation curve graph.
Fig. 7 is black East Germany diversion tunnel door opening shape section 1.0m thickness liner structure figure.
Specific embodiment
With reference to the accompanying drawing, invention is further explained.
Embodiment 1: by taking some hydropower station flood discharging tunnel is without pressure section door opening shape section lining concrete temperature controlled anticracking as an example.
1, basic document
Some hydropower station is big (one) type, and flood discharging tunnel is I grade of building.It is door opening shape section, section ruler after lining cutting without pressure section Very little to be listed in table 1 for 14m × 19m (wide × high), all kinds of rock properties and its lining style, liner structure parting length is 9m.Its Middle 1.0m thickness lining section is as shown in figure 5, cross dimensions is constant after remaining thickness lining cutting.Lining concrete design strength grade For C9040 normal concretes;Abutment wall is C9040 pump concretes;The above are C25 by crown and abutment wall water surface curve 1.0m.According to opening The data that field data and designing institute provide in digging initial stage hole, it is 23.5 DEG C that designing unit, which takes average temperature of the whole year in hole, temperature year Luffing is 1.5 DEG C, and code requirement cosine formula (10) calculates.
In formula: TaFor the air themperature at τ moment in hole;
The time (day) that τ is 1 day away from January;
τ0For the highest temperature in hole 1 day away from January time (day), τ is taken0=210 days.
Table 1 is without pressure section door opening shape section lining cutting and rocvk classification
2, FInite Element design calculates and its allows maximum temperature
Before construction, FInite Element simulation calculation has been carried out in designing unit's commission, and research lining concrete allows highest Temperature and temperature controlled anticracking measure scheme.Since amount of calculation and expense consider, only for wherein 1.0m F2 type and 1.5m F4 Type summer pouring construction situation carries out simulation calculation.Designing unit according to related design specification, concrete mix optimization and its Performance test, Finite element arithmetic achievement (in hole temperature use formula 10), according to past Temperature Controlling of Mass Concrete anticracking experience, It is difficult in view of being mainly summer temperature controlled anticracking, convenient for construction is simple to convert into F2 type and 1.5m F4 type FInite Element proposes Maximum temperature controlling value determines that the Winkler's foundation of all types of lining concretes and placing temperature are listed in table 2.
Table 2 controls standard without the temperature of pressure section lining concrete
3, the method for the present invention, which calculates, allows maximum temperature
(1) design phase the method for the present invention, which calculates, allows maximum temperature
Temperature T in each moon hole is calculated by formula (10) using the middle of the month as calculation dateaRound numbers, by related parameter substitution formula (1) Flood discharging tunnel, which is calculated, in~formula (3) has pressure to allow maximum temperature in section circular cross section lining cutting January~concrete construction phase in December It is listed in table 3 (abutment wall and crown one-piece casting, total height 25.2m).Wherein only F2 type lists T1max、T2maxCalculated value.
The 3 lining concrete construction time (design phase) of table allows maximum temperature (DEG C)
(2) construction time the method for the present invention, which calculates, allows maximum temperature
In construction, due to tunnel excavation and extraneous perforation, in hole, air themperature declines rapidly changes close to outside air temperature. It is in October, 2009 in November, 2012, total to flood discharging tunnel (left and right bank) to have carried out more than 300 temperature actual measurements, summarize and is shown in figure 6.Wherein on January 1st, 2010 for date reference axis first day.Wherein abscissa is time (day);Ordinate is temperature (DEG C). Cosine function is carried out using least square method to be fitted
In formula: TaFor temperature (DEG C) in hole;
τ is the time (day) apart from January 1.
Temperature Ta round numbers in each moon hole is calculated by formula (11) using the middle of the month as calculation date, by related parameter substitution formula (1) Flood discharging tunnel, which is calculated, in~formula (3) allows the highest temperature in section door opening shape section lining cutting January~concrete construction phase in December without pressure Degree is listed in table 4 (abutment wall and crown one-piece casting, total height 25.2m).Wherein only E1 lists T1max、T2maxCalculated value.
The 4 lining concrete construction time of table (real-time control stage) allows maximum temperature (DEG C)
4, flood discharging tunnel is without pressure section temperature controlled anticracking performance
(1) lining concrete temperature observation achievement
By left and right bank flood discharging tunnel without pressure (as space is limited, only to the wherein peak period 2010) temperature control of section lining concrete at Fruit and its overtemperature situation are for statistical analysis, are listed in table 5 and table 6.
Maximum temperature statistical form inside 5 2010 years flood discharging tunnel lining concretes of table
Table 6 2010 years left and right bank flood discharging tunnel lining concrete placing temperature statistical forms
Flood discharging tunnel is totally good without pressure section lining concrete temperature control effect it can be seen from table 5, table 6, placing temperature overtemperature Ratio is higher, and maximum temperature overtemperature (design permissible value) ratio is lower, and right bank control effect is better.Right bank lining concrete pours Temperature is built, bottom plate overtemperature ratio 4.30%, abutment wall is without overtemperature, averagely 2.86%;Inside concrete maximum temperature is without overtemperature.But It is that calculating according to the method for the present invention allows maximum temperature, even right bank, also having part is more than to pour in permissible value, especially winter Build concrete.
(2) lining concrete situation
Flood discharging tunnel is listed in table by structural sections and construction segmentation statistics without pressure section door opening shape section lining concrete situation 7。
The left and right bank flood discharging tunnel of table 7 is without pressure section door opening shape section lining concrete situation
According to the crack count situation of flood-discharging hole structure feature, lining concrete construction technology and table 7, comprehensive analysis can be with Obtain following understanding:
(1) side and roof arch lining concrete is more.Only there is crack in 2 storehouses without pressure section bottom plate.Estimation and abutment wall (side and roof arch) ruler It is related that degree is greater than bottom plate.In addition it is taken without pressure section bottom plate right bank and first pours leveling concrete, crack is less than left bank, also there is lesser shadow It rings.
(2) two sides flood discharging tunnel is compared, and left bank 1#, 2# are more than right bank 3#, the hole 4# lining concrete, mixed with left bank lining cutting Solidifying soil maximum temperature overtemperature ratio big (including the higher influence of water flowing coolant water temperature), right bank fall endpiece side and roof arch lining cutting coagulation Soil separately pours related.
(3) details generally investigated according to crack, the more hard complete thermal cracking of country rock are more.It is all that country rock is hard complete II class surrounding rock area although lining thickness is small be the main generation area of thermal cracking;The big lining cutting of IV class surrounding rock area thickness The generally seldom thermal cracking of concrete.It is harder with country rock, it is more strong closely related to the constraint of lining concrete;Meanwhile thickness Smaller, country rock is harder, and calculating according to patented method allows maximum temperature value smaller (referring to table 3, table 4), and overtemperature ratio is bigger.
(5) according to comparative analysis the case where crack and maximum temperature overtemperature, illustrate the method for the present invention, calculation formula, calculate Maximum temperature value be it is reasonable, it is more reasonable than design recommendation.First is that right bank maximum temperature is not above design permissible value, but There is more thermal cracking, is more than that the method for the present invention calculates permissible value one with the structural sections especially winter for having more thickness small It causes;Second is that the method for the present invention requires to grow with each passing hour, implementation optimization is constantly carried out in the construction time, is remained with Practical Project.
5, comparative analysis
(1) FInite Element and the method for the present invention can rationally reflect country rock performance (deformation modulus), liner structure size (packet Include height or width, parting length, thickness), lining concrete intensity, in hole air themperature etc. influence.
(2) design phase, 22 DEG C~25 DEG C of temperature in hole, FInite Element simulation calculation recommends all types of lining concretes to permit Perhaps maximum temperature is between the method for the present invention F3 and F4 summer calculated value.It on the one hand is because FInite Element only calculates summer temperature Maximum temperature permissible value is recommended in control, and design takes caused by F2 and F4 summer calculated value;On the other hand illustrate that the method for the present invention allows most High-temperature calculated value and FInite Element are almost the same.It is lower than 39 DEG C mostly in conjunction with field observation inside concrete maximum temperature, surpasses Temperature only 4% or so, but have 20% or more position in storehouse generate crack and also mostly the thickness small structural sections the case where from the point of view of, this Inventive method calculates maximum temperature permissible value closer to reality.Especially right bank also occurs without super design permissible value compared with multiple cracking, It matches with there is part to calculate maximum temperature permissible value more than the method for the present invention.
(3) construction time, tunnel excavation penetrate through, and temperature winter is substantially reduced in hole, due to FInite Element heavy workload, construction Unit lacks qualified technical personnel, and is not analyzed again using Finite element arithmetic, and design is recommended to allow maximum temperature obviously excessively high, equally Between the method for the present invention F3 and F4 summer calculated value, it cannot tally with the actual situation.And the method for the present invention can be simple quickly Calculating each moon allows maximum temperature, can quickly adjust in real time temperature controlled anticracking standard suitable for the construction time.
(4) Finite element arithmetic heavy workload, research needs to spend more expense and time, so above situation only carries out The simulation calculation of summer, leads to that practical temperature controlled anticracking needs cannot be met comprehensively.The method of the present invention can rationally be taken the post as rapidly Meaning, which pours phase concrete, allows maximum temperature.
(5) in summary analysis shows, the method for the present invention, calculation formula is simple, can rationally reflect country rock performance (distorted pattern Amount), liner structure size (including height or width, parting length, thickness), lining concrete intensity, air themperature in hole Deng influence.More scientific reflection engineering practice can calculate rapidly the circular cross section Structural Lining concrete construction phase The permission maximum temperature of each moon pouring construction phase can be completely used for the practical development temperature controlled anticracking design of engineering, especially live Construction embodiment quickly adjusts in real time.
2: the Wu Dongde power station hydraulic tunnel lining concrete construction time of embodiment allows maximum temperature
Survey and design research institute entrust to black East Germany power station hydraulic tunnel (including power tunnel, diversion tunnel, flood discharging tunnel) in the Changjiang river Concrete Temperature Control anticracking is the permission temperature difference using dam foundation concrete, with reference to " arched concrete dam design specification " (DL/ T5346-2006 it) chooses, since flood discharging tunnel lining concrete is all strong constraint area, each monthly mean temperature is (due to being to apply in hole Duration, as moon steady temperature field) on the basis of plus allow the temperature difference as maximum temperature controlling value.First according to black East Germany's water power It stands each building difference service condition locating for different periods, calculates separately temperature environment, cavern's temperature environment, construction time cavern Different-thickness infinite slab and semi-infinite slab under the conditions of temperature environment and cavern's temperature environment of corresponding elevation runtime is quasi- steady Determine temperature, is shown in Table 8 and table 9.Take 14~17 DEG C of temperature of flood discharging tunnel lining concrete quasi-steady, 14~15 DEG C of diversion tunnel.Then join Allow the temperature difference (table 10) according to dam engineering temperature difference standard application basis, finally determines that each position design allows maximum temperature such as table 11。
8 infinite slab quasi-steady temperature of table
9 semi-infinite slab quasi-steady temperature of table
Note: underground chamber environment temperature takes mean value of moon temperature (or corresponding monthly water temperature of elevation) with mean annual cost.
10 concrete foundation of table allows temperature difference unit: DEG C
The black East Germany's hydropower station of table 11, flood discharging tunnel have pressure section lining concrete to allow maximum temperature unit: DEG C
Month 12、1 2、11 3、10 4、9 5-8
Diversion tunnel, tailrace tunnel (bottom plate, barrel lining cutting) 37 37 39 40 41
Flood discharging tunnel has pressure, without pressure hole section (bottom plate, barrel lining concrete) 37 37 39 40 41
By taking diversion tunnel therein (door opening shape section) as an example, each class surrounding rock performance and its lining thickness are listed in table 12, wherein 1.0m thickness liner structure is (cross dimensions is constant after remaining thickness lining cutting) as shown in Figure 7, lining concrete strength grade C9040, Parting length 9m.Wherein 1.0m and 1.8m abutment wall (side and roof arch one-piece casting, total height 30.27m) is calculated using the method for the present invention The lining concrete construction time allows maximum temperature to calculate, in favor of comparing.Construction time surveys in hole 16~28 DEG C of temperature, i.e.,
The black East Germany's power station diversion tunnel rocvk classification of table 12 and physical and mechanical parameter value
By the above parameter substitution formula (1)~(3), obtaining the method for the present invention and calculating allows maximum temperature to be listed in table 13 and table 14。
The black East Germany's diversion tunnel 1.0m thickness lining concrete of table 13 allows maximum temperature (inventive method) unit: DEG C
Month 1 2 3 4 5 6 7 8 9 10 11 12
Ta 16 16 18 21 24 26 28 28 26 24 21 18
T1max 30.5 30.5 31.3 32.4 33.5 34.2 35 35 34.2 33.5 32.4 31.3
T2max 34.0 34.0 34.8 35.9 37.0 37.7 38.4 38.4 37.7 37.0 35.9 34.8
【Tmax 31 31 31 32 33 34 35 35 34 33 32 31
The black East Germany's diversion tunnel 1.8m thickness lining concrete of table 14 allows maximum temperature (inventive method) unit: DEG C
Month 1 2 3 4 5 6 7 8 9 10 11 12
Ta 16 16 18 21 24 26 28 28 26 24 21 18
T1max 37.5 37.5 38.3 39.4 40.5 41.2 42 42 41.2 40.5 39.4 38.3
T2max 40.8 40.8 41.6 42.7 43.8 44.5 45.2 45.2 44.5 43.8 42.7 41.6
【Tmax 37 37 38 39 40 41 42 42 41 40 39 38
Being calculated using strong constraint area concrete allows maximum temperature value, cannot reflect country rock performance (deformation modulus), lining cutting Cross dimensions and thickness, lining concrete intensity, in hole air themperature etc. influence.Experience is calculated according to lot of examples, for I The small liner structure concrete of~II class surrounding rock area thickness is obviously excessive;And to IV, the V biggish lining cutting knot of class surrounding rock area thickness Structure concrete is substantially suitable.
The method of the present invention can effectively reflect country rock performance (deformation modulus), lining section size and thickness, lining cutting coagulation The influence to maximum temperature permissible value such as temperature and water temperature in native intensity, hole, precision are apparently higher than as strong constraint area concrete Method.
To sum up example calculation analytic explanation, the present invention, calculation formula is simple, calculates lining concrete maximum temperature permissible value Can effectively reflect country rock performance (deformation modulus), liner structure size (including height or width, parting length, thickness), The influence of temperature and water temperature etc. in lining concrete intensity, hole, high-precision calculate rapidly circular cross section Structural Lining concrete and apply The permission maximum temperature of duration each moon pouring construction, is more in line with engineering practice, more scientific and reasonable, can be completely used for The practical development temperature controlled anticracking design of engineering, especially construction time on-site implementation plan quickly adjust.
Protection scope of the present invention is not limited to hydraulic tunnel door opening shape section lining concrete structure, passes through appropriate adjustment And deformation, it can be applied in similar engineering especially underground engineering structure completely.Obviously, those skilled in the art can To carry out the deformation of certain formula structures to the present invention without departing from scope and spirit of the present invention.If these changes and deformation Belong in the range of the claims in the present invention and its equivalent technologies, then including the intention invented also includes these changes and deforms.
Specific embodiment described herein is only an example for the spirit of the invention.The neck of technology belonging to the present invention The technical staff in domain can make various modifications or additions to the described embodiments or replace by a similar method In generation, however, it does not deviate from the spirit of the invention or beyond the scope of the appended claims.

Claims (3)

1. the calculation method that a kind of door opening shape section lining concrete construction time allows maximum temperature, it is characterised in that: allow most High-temperature [Tmax], its calculation formula is
【Tmax]=min (T1max, T2max) (1)
T1max=4.46 × H-0.038 × H0-0.037×L+0.096×C-0.134×E+0.3669×Ta+22.1315 (2)
T2max=Tmin+4.47×H-0.0378×H0-0.0381×L+0.0976×C-0.124×E+0.3669×Ta+9.254 (3)
In formula: T1maxThe temperature drop stage, which calculates, after the hot temperature rise of-early hydration allows maximum temperature (DEG C);
T2maxThe temperature drop stage in-winter, which calculates, allows maximum temperature (DEG C);
H-lining concrete structural thickness (m);
H0- peripheral wall height (m), when abutment wall and crown one-piece casting, H0+ 1/2 crown arc length of=peripheral wall height;
L-lining concrete structural jointing length (m);
E-surrounding rock deformation monitor (GPa);
C-lining concrete presses the strength grade (MPa) of 90 day age design;
TaAir themperature (DEG C) in hole when-lining concrete pouring construction;
Tmin- country rock surface winter minimum temperature (DEG C);
By liner structure thickness, peripheral wall height or width, parting length, surrounding rock deformation monitor, strength grade of concrete and mix Air themperature substitutes into formula (1)-(3) in hole when solidifying soil pours, and the construction time that door opening shape section lining concrete is calculated permits Perhaps maximum temperature;By 12 months 1 year temperature on average TaIt substitutes into, this is calculated, and to pour within 12 months door opening shape section lining cutting mixed Coagulate the permission maximum temperature of soil.
2. the door opening shape section lining concrete construction time according to claim 1 allows the calculation method of maximum temperature, It is characterized in that: air themperature T in hole when the lining concrete pouring constructiona, including water temperature and runtime hole in construction time hole Interior water temperature.
3. the door opening shape section lining concrete construction time as described in claim 1 allows the calculation method of maximum temperature, special Sign is: the door opening shape section lining concrete, including be close on ground with ground board-like lining cutting, tower, platform and its Composite structure engineering concrete.
CN201510715456.0A 2015-10-28 2015-10-28 A kind of door opening shape section lining concrete construction time allows the calculation method of maximum temperature Active CN105677939B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510715456.0A CN105677939B (en) 2015-10-28 2015-10-28 A kind of door opening shape section lining concrete construction time allows the calculation method of maximum temperature

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510715456.0A CN105677939B (en) 2015-10-28 2015-10-28 A kind of door opening shape section lining concrete construction time allows the calculation method of maximum temperature

Publications (2)

Publication Number Publication Date
CN105677939A CN105677939A (en) 2016-06-15
CN105677939B true CN105677939B (en) 2019-03-19

Family

ID=56947074

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510715456.0A Active CN105677939B (en) 2015-10-28 2015-10-28 A kind of door opening shape section lining concrete construction time allows the calculation method of maximum temperature

Country Status (1)

Country Link
CN (1) CN105677939B (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109815614B (en) * 2019-02-01 2021-07-20 武昌理工学院 Temperature control anti-cracking tensile stress K value control design method for tunnel floor lining concrete
CN109837873B (en) * 2019-02-01 2020-10-30 武昌理工学院 Rapid design method for temperature control, crack prevention, temperature stress control and temperature stress control of tunnel floor lining concrete
CN109977480B (en) * 2019-03-01 2023-04-07 中国三峡建设管理有限公司 Design method for controlling temperature control anti-cracking tensile stress safety coefficient of lining concrete with door-opening-shaped section
CN110502826B (en) * 2019-08-19 2022-08-02 华能澜沧江水电股份有限公司 Method for determining anti-abrasion concrete temperature control standard of concrete dam overflow surface
CN112987813B (en) * 2021-03-29 2022-02-01 武昌理工学院 Water cooling optimization control method for lining concrete with different strengths
CN113191043B (en) * 2021-04-13 2022-04-29 武昌理工学院 Hydraulic tunnel lining concrete temperature crack control strong constraint method and temperature control system
CN113591194B (en) * 2021-08-13 2023-10-20 中国水利水电科学研究院 Dynamic adjustment method for allowable maximum temperature of mass concrete

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102979307B (en) * 2012-12-12 2016-04-13 新疆生产建设兵团金来建设工程技术研发有限责任公司 A kind of Temperature-controllcrack crack prevention construction method for concrete structure
CN103420632B (en) * 2013-07-23 2015-01-21 中国水利水电科学研究院 Method for simplifying roller compacted concrete dam temperature control measures by additionally mixing magnesium oxide
CN204609908U (en) * 2015-05-04 2015-09-02 武汉大学 A kind of pressure water work tunnel concrete anticracking liner structure

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
"大型地下洞室衬砌混凝土温控防裂研究";段寅 等;《水利与建筑工程学报》;20150815;第13卷(第4期);第107-110页
"某水电站泄洪洞龙落尾段温控防裂实施效果统计分析";董亚秀 等;《中国水运》;20130930;第13卷(第9期);第197、198、231页
"理论分析法求解施工期隧洞衬砌混凝土温度应力";陈同法 等;《山东水利》;20010515(第5期);第33-34页

Also Published As

Publication number Publication date
CN105677939A (en) 2016-06-15

Similar Documents

Publication Publication Date Title
CN105677939B (en) A kind of door opening shape section lining concrete construction time allows the calculation method of maximum temperature
CN105354359B (en) A kind of circular cross section lining concrete construction time allows the calculation method of maximum temperature
CN105672187B (en) One kind is used for door opening shape section structure lining concrete temperature controlled anticracking design and calculation method
CN105260531B (en) A kind of calculation method of circular cross section lining concrete construction time inside maximum temperature
CN105155542B (en) It is a kind of to be used for circular cross section Structural Lining Concrete Temperature Control Crack Control Design computational methods
CN109815614A (en) Tunnel bottom plate lining concrete temperature controlled anticracking tensile stress K value control design case method
CN109783976A (en) Gateway opening type bottom plate lining concrete construction time maximum temperature tensile stress calculation method
CN105677938A (en) Calculation method of interior highest temperature of lining concrete for door-opening-shaped fracture surface during construction period
CN109837873A (en) Tunnel bottom plate lining concrete temperature controlled anticracking temperature stress controls Fast design method
CN110516285A (en) Lining Concrete of Diversion cools down age control method
CN109815613A (en) Door opening shape lining side wall concrete construction time maximum temperature tensile stress calculation method
Zheng et al. Innovations in design, construction, and management of pingnan third bridge—the largest-span arch bridge in the world
CN109885914A (en) Tunnel bottom plate lining concrete temperature crack control cracking resistance K value design method
CN110263355A (en) The extra-high arch dam entirety Anti-crack Design Method of complex foundation
CN109918763A (en) The factor of safety against cracking design method of door opening shape section lining side wall concrete temperature crack control
Degtyarev et al. The seasonal regulation basin dam basis deformation forecast
CN109977480A (en) Door opening shape section lining concrete temperature controlled anticracking tensile stress safety coefficient control design case method
CN109885915A (en) Circular cross section lining concrete construction time maximum temperature tensile stress quick calculation method
Lin et al. Effects of Outlets on Cracking Risk and Integral Stability of Super‐High Arch Dams
CN110569553A (en) Method for controlling cooling age of coal ash doped low-calorific-value lining concrete through water
CN110569559A (en) Method for calculating maximum temperature tensile stress of end free lining plate in concrete construction period
CN106503360B (en) Calculation method for shear design reinforcement of mass concrete structure
Wang et al. The whole modeling and structural seismic analysis of frame bridge in sluice based on Midas Civil
CN110008511A (en) Door opening shape section lining side wall concrete temperature controlled anticracking temperature stress controls Fast design method
Liu Numerical simulation and analysis of the temperature effect on the fission of concrete

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant