CN105675170A - Method for determining compaction temperature in rock asphalt dry process construction - Google Patents

Method for determining compaction temperature in rock asphalt dry process construction Download PDF

Info

Publication number
CN105675170A
CN105675170A CN201610090786.XA CN201610090786A CN105675170A CN 105675170 A CN105675170 A CN 105675170A CN 201610090786 A CN201610090786 A CN 201610090786A CN 105675170 A CN105675170 A CN 105675170A
Authority
CN
China
Prior art keywords
asphalt
temperature
rock asphalt
construction
volume
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610090786.XA
Other languages
Chinese (zh)
Other versions
CN105675170B (en
Inventor
宋小金
樊亮
杨博
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhongda Intelligent Technology Co ltd
Original Assignee
HUNAN ZHONGDA CONSTRUCTION ENGINEERING TESTING TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HUNAN ZHONGDA CONSTRUCTION ENGINEERING TESTING TECHNOLOGY Co Ltd filed Critical HUNAN ZHONGDA CONSTRUCTION ENGINEERING TESTING TECHNOLOGY Co Ltd
Priority to CN201610090786.XA priority Critical patent/CN105675170B/en
Publication of CN105675170A publication Critical patent/CN105675170A/en
Application granted granted Critical
Publication of CN105675170B publication Critical patent/CN105675170B/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01KMEASURING TEMPERATURE; MEASURING QUANTITY OF HEAT; THERMALLY-SENSITIVE ELEMENTS NOT OTHERWISE PROVIDED FOR
    • G01K13/00Thermometers specially adapted for specific purposes
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N11/00Investigating flow properties of materials, e.g. viscosity, plasticity; Analysing materials by determining flow properties

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Health & Medical Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Chemical & Material Sciences (AREA)
  • Analytical Chemistry (AREA)
  • Biochemistry (AREA)
  • General Health & Medical Sciences (AREA)
  • Immunology (AREA)
  • Pathology (AREA)
  • Road Paving Structures (AREA)
  • Working-Up Tar And Pitch (AREA)

Abstract

The invention disclosed a method for determining the compaction temperature in rock asphalt dry process construction, and the method mainly comprise a method for determining the construction compaction temperature through testing during the rock asphalt dry process construction. The method mainly comprises two parts: determining the compaction temperature through the direct testing of a mixing amount of rock asphalt when the mixing amount of the rock asphalt in modified asphalt is less than 30%; giving consideration to the impact from mineral substances in the rock asphalt when the actual mixing amount is greater than 30%, and deducing the construction compaction temperature according to the compaction temperature law in the state of a low amount of rock asphalt. The method can scientifically determine the compaction temperature in rock asphalt dry process construction, provides an effective scientific basis for the determining of the on-site construction compaction temperature, further improves the road surface compaction effect, and improves the quality of a bituminous pavement formed through rock asphalt dry process construction.

Description

The defining method of rock asphalt dry process construction compacting temperature
Technical field
The present invention relates to pavement construction technical field, in particular to the defining method of temperature parameter in a kind of rock asphalt dry process construction process.
Background technology
In road engineering, the pitch of application mainly contains Xinjiang rock asphalt, blue or green river rock asphalt, Indonesia's BUTON rock asphalt, Iran rock asphalt and Gilsonite rock asphalt etc. Rock asphalt is the bitumen that oil generates through the comprehensive action of nature in rock crack, it is made up of pitch and mineral substance, pitch composition in rock asphalt can be dissolved in pitch under the high temperature conditions, the development and application of this material in asphalt roads engineering, in order to improve the performance on road surface.
The construction technology of rock asphalt is mainly divided into wet processing and dry process. Wet processing be by rock asphalt and matrix pitch evenly miscible (through grinding or shear history) make processes of rock asphalt modified asphalt after for the production of the technique of asphalt, the compacting temperature in its construction process can be determined according to table 5.2.2-1 in JTGF40-2004 or the regulation in JT/T860.5-2014 table 3.
Dry process be rock asphalt without link miscible with matrix pitch, directly drop into pitch and mix and stir in pot, stir together with gathering materials, then mix and stir the technique forming asphalt with pitch; This technique does not have national regulation or industry standard that construction temperature carries out special regulation or instruction at present, is generally carry out pavement compaction with the compacting temperature of matrix pitch compound during site operation. But, in dry process construction process, also there is certain difference in the time required for difference according to shipment distance and the difference of site operation ability, in no special situation, from mixing and stirring transport, pave, roll to compound, the required time at 2 hours, within this period, pitch composition in rock asphalt has in the matrix pitch being partially dissolved in asphalt so that asphalt also exists rock asphalt modification to a certain degree; Owing to the bituminous matter volume in rock asphalt is higher, with matrix pitch miscible after, carrying out pavement compaction according to the compacting standard of matrix pitch stiffness and the compacting temperature of asphalt can be significantly improved, and the compacting temperature of matrix pitch site operation is on the low side, if can reduce consolidation effect merely.
Summary of the invention
The technical issues that need to address of the present invention are to provide the defining method of compacting temperature in a kind of rock asphalt dry process construction process, for the confirmation of site operation compacting temperature proposes effective scientific basis, improve field compaction effect further, ensure Pavement Performance.
For solving the problems of the technologies described above, the technical solution used in the present invention is as follows.
The defining method of rock asphalt dry process construction compacting temperature, specifically comprises the following steps:
The dissolution process of rock asphalt in pitch when A. being constructed by test simulation dry process, it is determined that temperature-viscosity curve, determines the compacting temperature of the processes of rock asphalt modified asphalt of practice of construction volume under this state with corresponding temperature during 0.28Pa s ± 0.03Pa s;
If time in B. constructing more than 30% volume rock asphalt, in the scope that rock asphalt volume is 0~30%, choose the rock asphalt of 4~6 groups of different rock asphalt volumes, the dissolution process of rock asphalt in pitch when simulation dry process is constructed and the modifying asphalt that obtains, determine its compacting temperature respectively, draw volume-compacting temperature curve, and its correlationship is carried out matching, concrete compacting temperature scope according to volume-compacting temperature curve and fit correlation thereof, in presumption rock asphalt dry process construction process.
The defining method of compacting temperature in the construction of above-mentioned rock asphalt dry process, steps A specifically comprises the following steps:
A1. choosing rock asphalt and the matrix pitch mixing and stirring of actual volume in construction, in 165 DEG C of baking ovens, constant temperature keeps 2h, makes the modifying asphalt of rock asphalt;
A2. get this modifying asphalt and carry out 135 DEG C and 175 DEG C of viscosity tests respectively, draw temperature-viscosity curve according to test-results;
A3. according to temperature-viscosity curve, to get pitch apparent viscosity be temperature during (0.28 ± 0.03) Pa s is the compacting temperature scope of modifying asphalt.
The defining method of compacting temperature in the construction of above-mentioned rock asphalt dry process, step B specifically comprises the following steps:
B1., in the scope that rock asphalt volume is 0~30%, the modifying asphalt of 6 groups of different rock asphalt volumes is prepared;
B2. get modifying asphalt one to modifying asphalt six and carry out 135 DEG C and 175 DEG C of viscosity tests respectively, draw temperature-viscosity curve according to test-results;
B3. according to temperature-viscosity curve, to get pitch apparent viscosity be temperature during (0.28 ± 0.03) Pa s is the compacting temperature of modifying asphalt, and draws the volume-compacting temperature curve under different rock asphalt volume state;
B4. the compacting temperature in volume-compacting temperature curve is returned, obtain regression formula;
B5. the compacting temperature of dry process construction under rock asphalt high additive state is determined according to regression formula.
Owing to have employed above technical scheme, the invention technological progress is as follows.
The present invention can the compacting temperature of determination rock asphalt dry process construction of science, for the confirmation of site operation compacting temperature proposes effective scientific basis, further increase road surface compaction effect, it is to increase the bituminous pavement quality of rock asphalt dry process construction.
Accompanying drawing explanation
Fig. 1 is the volume-compacting temperature graphic representation of different rock asphalt in the specific embodiment of the invention.
Embodiment
Below in conjunction with the drawings and specific embodiments, the present invention is further elaborated.
The defining method of compacting temperature in the construction of a kind of rock asphalt dry process, mainly comprise the defining method being obtained construction compacting temperature when rock asphalt dry process is constructed by test, the method mainly comprises two parts, namely when in modifying asphalt, rock asphalt volume is lower than 30%, the direct rock asphalt to construction volume can be adopted to carry out test determine, when actual volume is higher than 30%, consider the impact of contained mineral substance in rock asphalt composition, construction compacting temperature can be estimated according to the compacting temperature curve under rock asphalt low-dosage state.
Below for A-70 pitch, illustrate in practice of construction process, the detailed step that modifying asphalt compacting temperature is determined.
A., in practice of construction, the actual volume of rock asphalt, when 0~30%, determines compacting temperature according to following step.
A1. choosing rock asphalt and the matrix pitch mixing and stirring of actual volume in construction, in 165 DEG C of baking ovens, constant temperature keeps 2h, makes the modifying asphalt of rock asphalt.
A2. get this modifying asphalt and carry out 135 DEG C and 175 DEG C of viscosity tests respectively, draw temperature-viscosity curve according to test-results.
A3. according to temperature-viscosity curve, to get pitch apparent viscosity be temperature during (0.28 ± 0.03) Pa s is the compacting temperature scope of modifying asphalt.
B., in practice of construction, when the actual volume of rock asphalt is higher than 30%, compacting temperature is determined according to following step.
B1., in the scope that rock asphalt volume is 0~30%, the modifying asphalt of 6 groups of different rock asphalt volumes is prepared.
Get A-70 pitch 1kg, it is heated to 165 DEG C, mix the rock asphalt of 5%, i.e. 50g, stir after evenly with glass stick and put into 165 DEG C of baking oven constant temperature 2 hours, make modifying asphalt one.
Get A-70 pitch 1kg, it is heated to 165 DEG C, mix the rock asphalt of 10%, i.e. 100g, stir after evenly with glass stick and put into 165 DEG C of baking oven constant temperature 2 hours, make modifying asphalt two.
Get A-70 pitch 1kg, it is heated to 165 DEG C, mix the rock asphalt of 15%, i.e. 150g, stir after evenly with glass stick and put into 165 DEG C of baking oven constant temperature 2 hours, make modifying asphalt three.
Get A-70 pitch 1kg, it is heated to 165 DEG C, mix the rock asphalt of 20%, i.e. 200g, stir after evenly with glass stick and put into 165 DEG C of baking oven constant temperature 2 hours, make modifying asphalt four.
Get A-70 pitch 1kg, it is heated to 165 DEG C, mix the rock asphalt of 25%, i.e. 250g, stir after evenly with glass stick and put into 165 DEG C of baking oven constant temperature 2 hours, make modifying asphalt five.
Get A-70 pitch 1kg, it is heated to 165 DEG C, mix the rock asphalt of 30%, i.e. 300g, stir after evenly with glass stick and put into 165 DEG C of baking oven constant temperature 2 hours, make modifying asphalt six.
B2. get modifying asphalt one to modifying asphalt six and carry out 135 DEG C and 175 DEG C of viscosity tests respectively, draw temperature-viscosity curve according to test-results.
B3. according to temperature-viscosity curve, to get pitch apparent viscosity be temperature during (0.28 ± 0.03) Pa s is the compacting temperature of modifying asphalt, and draws the compacting temperature curve under different rock asphalt volume state. In the present embodiment, the compacting temperature scope obtaining modifying asphalt one to modifying asphalt six from temperature-viscosity curve is respectively: 146~155 DEG C, 151~160 DEG C, 155~164 DEG C, 158~167 DEG C, 160~169 DEG C, 162~171 DEG C, the volume drawn accordingly-compacting temperature curve is as shown in Figure 1, in figure, trilateral forms curve is volume-compacting temperature lower limit curve, and it is volume-compacting temperature upper limit curve that grid forms curve.
B4. be obtain under the low-dosage state being 0~30% at volume due to the drafting of volume-compacting temperature curve, therefore for rock asphalt volume in practice of construction process lower than 30% low-dosage modifying asphalt can directly obtain the concrete compacting temperature in rock asphalt dry process construction process according to volume-compacting temperature curve. And when rock asphalt volume is more than 30%, the mineral substance existed in rock asphalt is easily suspended in pitch, viscosity result being impacted, now returned by the compacting temperature in volume-compacting temperature curve, obtaining regression formula is:
Tmax=8.5112ln (a)+141.47
Formula one
Tmin=9.0106ln (a)+130.95 formula two
In formula: TmaxFor the compacting temperature upper limit, TminFor compacting temperature lower limit, a is rock asphalt volume.
B5. the compacting temperature of dry process construction under rock asphalt high additive state is determined according to regression formula.

Claims (3)

1. the defining method of rock asphalt dry process construction compacting temperature, it is characterised in that, specifically comprise the following steps:
A. by the test simulation dry process construction dissolution process of rock asphalt in pitch, it is determined that temperature-viscosity curve, the compacting temperature of the processes of rock asphalt modified asphalt of practice of construction volume under this state is determined with corresponding temperature during 0.28Pa s ± 0.03Pa s;
If time in B. constructing more than 30% volume rock asphalt, in the scope that rock asphalt volume is 0 ~ 30%, choose the rock asphalt of 4 ~ 6 groups of different rock asphalt volumes, the dissolution process of rock asphalt in pitch when simulation dry process is constructed and the modifying asphalt that obtains, determine its compacting temperature respectively, draw volume-compacting temperature curve, and its correlationship is carried out matching, concrete compacting temperature scope according to volume-compacting temperature curve and fit correlation thereof, in presumption rock asphalt dry process construction process.
2. the defining method of rock asphalt dry process according to claim 1 construction compacting temperature, it is characterised in that, steps A specifically comprises the following steps:
A1. choosing rock asphalt and the matrix pitch mixing and stirring of actual volume in construction, in 165 DEG C of baking ovens, constant temperature keeps 2h, makes the modifying asphalt of rock asphalt;
A2. get this modifying asphalt and carry out 135 DEG C and 175 DEG C of viscosity tests respectively, draw temperature-viscosity curve according to test-results;
A3. according to temperature-viscosity curve, to get pitch apparent viscosity be temperature during (0.28 ± 0.03) Pa s is the compacting temperature scope of modifying asphalt.
3. the defining method of rock asphalt dry process according to claim 1 construction compacting temperature, it is characterised in that, step B specifically comprises the following steps:
B1., in the scope that rock asphalt volume is 0 ~ 30%, the modifying asphalt of 6 groups of different rock asphalt volumes is prepared;
B2. get modifying asphalt one to modifying asphalt six and carry out 135 DEG C and 175 DEG C of viscosity tests respectively, draw temperature-viscosity curve according to test-results;
B3. according to temperature-viscosity curve, to get pitch apparent viscosity be temperature during (0.28 ± 0.03) Pa s is the compacting temperature of modifying asphalt, and draws the volume-compacting temperature curve under different rock asphalt volume state;
B4. the compacting temperature in volume-compacting temperature curve is returned, obtain regression formula;
B5. the compacting temperature of dry process construction under rock asphalt high additive state is determined according to regression formula.
CN201610090786.XA 2016-02-18 2016-02-18 The determination method of kir dry process construction compacting temperature Withdrawn - After Issue CN105675170B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610090786.XA CN105675170B (en) 2016-02-18 2016-02-18 The determination method of kir dry process construction compacting temperature

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610090786.XA CN105675170B (en) 2016-02-18 2016-02-18 The determination method of kir dry process construction compacting temperature

Publications (2)

Publication Number Publication Date
CN105675170A true CN105675170A (en) 2016-06-15
CN105675170B CN105675170B (en) 2017-12-26

Family

ID=56304609

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610090786.XA Withdrawn - After Issue CN105675170B (en) 2016-02-18 2016-02-18 The determination method of kir dry process construction compacting temperature

Country Status (1)

Country Link
CN (1) CN105675170B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106290108A (en) * 2016-08-09 2017-01-04 上海海事大学 Determine the improved method of polymer modified asphalt compound optimal compaction temperature
CN109444206A (en) * 2018-11-26 2019-03-08 招商局重庆交通科研设计院有限公司 Bituminous pavement quality determining method and device
CN109765258A (en) * 2019-01-09 2019-05-17 上海公路桥梁(集团)有限公司 The monitoring method of the compacting temperature of asphalt pavement

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20070191514A1 (en) * 2005-09-12 2007-08-16 Reinke Gerald H Bituminous paving composition and process for bituminous paving
CN102967392A (en) * 2012-11-15 2013-03-13 王黎明 Method for determining reasonable compacting temperature of modified asphalt mixture
CN103292930A (en) * 2013-07-01 2013-09-11 广东惠利普路桥信息工程有限公司 Thermal infrared imager for asphalt road construction detection and detection method
US20140086684A1 (en) * 2012-09-27 2014-03-27 Moba Mobile Automation Ag Device for detecting the temperature of an asphalt material to be processed by a road finishing machine, ultrasonic sensor and road finishing machine
CN105181178A (en) * 2015-10-28 2015-12-23 苏交科集团股份有限公司 System and method for detecting paving temperature segregation of asphalt pavement

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20070191514A1 (en) * 2005-09-12 2007-08-16 Reinke Gerald H Bituminous paving composition and process for bituminous paving
US20140086684A1 (en) * 2012-09-27 2014-03-27 Moba Mobile Automation Ag Device for detecting the temperature of an asphalt material to be processed by a road finishing machine, ultrasonic sensor and road finishing machine
CN102967392A (en) * 2012-11-15 2013-03-13 王黎明 Method for determining reasonable compacting temperature of modified asphalt mixture
CN103292930A (en) * 2013-07-01 2013-09-11 广东惠利普路桥信息工程有限公司 Thermal infrared imager for asphalt road construction detection and detection method
CN105181178A (en) * 2015-10-28 2015-12-23 苏交科集团股份有限公司 System and method for detecting paving temperature segregation of asphalt pavement

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
吴超凡等: "添加sasobit温拌沥青混合料的拌和与压实温度确定", 《湖南大学学报(自然科学版)》 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106290108A (en) * 2016-08-09 2017-01-04 上海海事大学 Determine the improved method of polymer modified asphalt compound optimal compaction temperature
CN106290108B (en) * 2016-08-09 2019-01-15 上海海事大学 The improved method for determining polymer modified asphalt mixture optimal compaction temperature
CN109444206A (en) * 2018-11-26 2019-03-08 招商局重庆交通科研设计院有限公司 Bituminous pavement quality determining method and device
CN109765258A (en) * 2019-01-09 2019-05-17 上海公路桥梁(集团)有限公司 The monitoring method of the compacting temperature of asphalt pavement
CN109765258B (en) * 2019-01-09 2021-07-23 上海公路桥梁(集团)有限公司 Method for monitoring the compaction temperature of asphalt paving

Also Published As

Publication number Publication date
CN105675170B (en) 2017-12-26

Similar Documents

Publication Publication Date Title
Yan et al. Effect of mineral filler on properties of warm asphalt mastic containing Sasobit
CN104164817B (en) A kind of method for designing of the heat regeneration asphalt mixture of high RAP ratio
Liao et al. Mechanical properties of filler-asphalt mastics
CN104119032B (en) A kind of SBS asphalt regenerative method of high RAP volume
Yan et al. Mechanical performance of asphalt rejuvenated with various vegetable oils
CN106145777B (en) Warm-mixed recycled asphalt mixture and preparation method thereof
CN105924988A (en) Wheel-sticking-free emulsified asphalt, preparing method, construction technology and application of wheel-sticking-free emulsified asphalt
Martinelli et al. Feasibility study of tar sands conditioning for earth pressure balance tunnelling
CN103558111B (en) Method for quickly detecting water content of emulsified asphalt cold-recycling mixture
CN105036613A (en) Crack pressure-sensitive solidification self-healing asphalt concrete, as well as preparation method and application method thereof
CN104371579B (en) A kind of Cement Concrete bridge deck water-proof tack coat and preparation method thereof
CN103396043B (en) Warmly-mixed TOR (trans-polyoctenamer rubber reactive modifier) rubber asphalt mixture and preparation method thereof
CN109180077A (en) A kind of asphalt and its production technology
CN104312175A (en) Asphalt modifier, modified emulsified asphalt, modified asphalt mixture and respective preparation methods thereof
CN103452025A (en) Method for quickly repairing and maintaining expressway pavement
CN105675170A (en) Method for determining compaction temperature in rock asphalt dry process construction
CN106149500B (en) A kind of construction method of cement emulsified asphalt mortar penetration type half-flexible pavement
Wang et al. Research on the influence of ultraviolet aging on the interfacial cracking characteristics of warm mix crumb rubber modified asphalt mortar
CN106337348A (en) Mix proportion design method for regenerated asphalt mixture
CN106396502A (en) Foamed warm mix recycled asphalt mixture and preparation method thereof
CN103204644B (en) Warmly bitumen-mixed modifier and preparation method thereof
CN104211326A (en) Regenerated warm mix asphalt mixture and preparation method thereof
CN107976389A (en) A kind of method of old material effective regeneration rate in measure heat regeneration asphalt mixture
Gao et al. Multi-scale finite element simulation of asphalt mixture anti-cracking performance
CN108504118A (en) RAP pitches softening fusion regenerative agent and its application

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 410208 bachelor road 755, bachelor street, Changsha, Hunan, Yuelu District

Patentee after: HUNAN ZHONGDA TESTING Co.,Ltd.

Address before: 410208 bachelor road 755, bachelor street, Changsha, Hunan, Yuelu District

Patentee before: HUNAN ZHONGDA CONSTRUCTION ENGINEERING TESTING TECHNOLOGY Co.,Ltd.

CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 410208 No. 755 Bachelor's Road, Yuelu District, Changsha City, Hunan Province

Patentee after: CUHK testing (Hunan) Co.,Ltd.

Address before: 410208 No. 755 Bachelor's Road, Yuelu District, Changsha City, Hunan Province

Patentee before: HUNAN ZHONGDA TESTING Co.,Ltd.

PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Determination of compaction temperature in dry process construction of rock asphalt

Effective date of registration: 20210326

Granted publication date: 20171226

Pledgee: Industrial Bank Co.,Ltd. Changsha Branch

Pledgor: CUHK testing (Hunan) Co.,Ltd.

Registration number: Y2021980002131

PE01 Entry into force of the registration of the contract for pledge of patent right
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: No.755, bachelor Road, Yuelu District, Changsha City, Hunan Province, 410205

Patentee after: Zhongda Intelligent Technology Co.,Ltd.

Address before: 410208 No. 755 Bachelor's Road, Yuelu District, Changsha City, Hunan Province

Patentee before: CUHK testing (Hunan) Co.,Ltd.

PC01 Cancellation of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20220711

Granted publication date: 20171226

Pledgee: Industrial Bank Co.,Ltd. Changsha Branch

Pledgor: CUHK testing (Hunan) Co.,Ltd.

Registration number: Y2021980002131

AV01 Patent right actively abandoned
AV01 Patent right actively abandoned
AV01 Patent right actively abandoned

Granted publication date: 20171226

Effective date of abandoning: 20230207

AV01 Patent right actively abandoned

Granted publication date: 20171226

Effective date of abandoning: 20230207