CN105674967B - 一种轨道交通竖井联系测量的方法 - Google Patents
一种轨道交通竖井联系测量的方法 Download PDFInfo
- Publication number
- CN105674967B CN105674967B CN201610206180.8A CN201610206180A CN105674967B CN 105674967 B CN105674967 B CN 105674967B CN 201610206180 A CN201610206180 A CN 201610206180A CN 105674967 B CN105674967 B CN 105674967B
- Authority
- CN
- China
- Prior art keywords
- point
- communication center
- row communication
- well
- sets
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01C—MEASURING DISTANCES, LEVELS OR BEARINGS; SURVEYING; NAVIGATION; GYROSCOPIC INSTRUMENTS; PHOTOGRAMMETRY OR VIDEOGRAMMETRY
- G01C15/00—Surveying instruments or accessories not provided for in groups G01C1/00 - G01C13/00
Abstract
本发明提供一种轨道交通竖井联系测量的方法,通过在竖井的一侧井口已知点第一次架设全站仪,在井口架设点第二次架设全站仪,井内相对于第一排联系点的另一侧设置有井内架设点,在该井内架设点第三次架设全站仪,在竖井底部第二排联系点对侧位置设置有井底架设点,该井底架设点第四次架设全站仪,以第二排联系点作为后视点,将布设在所述井底架设点两侧的观测点作为前视点,进行多测回观测,将坐标系统传递至井底位置。本发明对地铁隧道竖井联系测量,其操作简单,使用人力、物力相对其它方法大大减少,同时精度高,误差小,工期短。
Description
技术领域
本发明涉及轨道测绘技术领域,具体涉及一种用于地铁隧道的竖井联系测量方法。
背景技术
随着城市发展的需要,国内很多城市都陆续开展了轨道交通工程的建设,以保证城市交通的顺畅,确保人民群众出行的便利。为有效利用城市空间,城市轨道交通工程主要采用地下隧道的形式进行。为了满足盾构掘进按设计要求贯通,必须研究每一步测量工作所带来的误差,包括地面控制测量、竖井联系测量即将地面的坐标系统和高程系统传递到井下、地下导线测量等几个阶段。在现有的测量技术下,地面控制测量已经可以做得很好,精度可以达到施工要求,竖井联系测量成为主要的误差来源。
在进行地下隧道的施工建设时,主要是通过竖井(车站端头井或中间工作风井)提供工作面进行施工,因此如何保证地下车站以及区间隧道严格按设计施工就成为建设者们的首要问题。竖井联系测量(平面)的目的就是将地面控制网的坐标和方位按要求精度准确地传递给地下隧道施工控制导线,为施工提供控制依据。目前国内绝大多数城市在轨道交通建设中,竖井联系测量基本上采用以下四种方法进行:陀螺定向法、钻孔投点法、联系三角形法和导线定向法,但这些方法都或多或少有各自的缺陷。陀螺定向法不足之处是陀螺经纬仪的价格昂贵,拥有陀螺经纬仪的单位较少,难以推广应用,同时其单次定位精度低,一般仪器为20″;钻孔投点法不足之处是准备工作繁多,如确定投点位置,寻找钻孔队伍,现场钻孔等,不利于钻孔投点法的推广应用;联系三角形法是一种传统的竖井联系测量方法,但存在设备笨重、工序繁多、工作时间长、劳动强度大等不足,与其他方法相比已显得比较落后;导线定向法不足之处是导线边长短且俯仰角过大,单导线检核条件少,误差大。
发明内容
本发明提供一种轨道交通竖井联系测量的方法,其测量方法成本低、简单、精度高、实用性强,能够满足地铁隧道竖井联系测量的精度要求。
为解决上述技术问题,本发明采用如下技术方案:
一种轨道交通竖井联系测量的方法,包括如下步骤:
1)在竖井的一侧井口已知点第一次架设全站仪,从地面控制网中选取另外两个已知点作为后视点,将另一侧井口架设点作为前视点;
2)在井口架设点第二次架设全站仪,将井口已知点作为后视点,将设置在井内的第一排联系点作为前视点,地面坐标系统由井口已知点传递至第一排联系点;
3)井内相对于第一排联系点的另一侧设置有井内架设点,在该井内架设点第三次架设全站仪,将第一排联系点作为后视点,将设置在第一排联系点下方的第二排联系点作为前视点,地面坐标系统由第一排联系点传递至第二排联系点;
4)在竖井底部第二排联系点对侧位置设置有井底架设点,该井底架设点第四次架设全站仪,以第二排联系点作为后视点,将布设在所述井底架设点两侧的观测点作为前视点,进行多测回观测,将坐标系统传递至井底位置。
优选地,所述第一排联系点和第二排联系点均采用4个共线的棱镜。
由以上技术方案可知,本发明对地铁隧道竖井联系测量,其操作简单,使用人力、物力相对其它方法大大减少,同时精度高,误差小,工期短。
附图说明
图1为本发明方法的系统原理图;
图2为联系三角形测量的原理图。
具体实施方式
下面结合附图对本发明的一种优选实施方式作详细的说明。
如图1所示,竖井联系测量的方法具体包括如下步骤:
a、竖井8施工完成后,在井内壁一侧上下两个三等分点位置分别埋设一排安装棱镜的套筒(规格统一,每排4个),分别形成第一排联系点1和第二排联系点2,在第一排联系点1对侧井壁的中间位置设置一固定平台,用作井内架设点3。
b、在竖井的一侧井口已知点4第一次架设全站仪,从地面控制网中选取另外两个已知点4作为后视点,将另一侧井口架设点5作为前视点。
c、在井口架设点5第二次架设全站仪,将井口已知点4作为后视点,将设置在井内的第一排联系1点作为前视点,地面坐标系统由井口已知点传递至第一排联系点。
d、在井内架设点3第三次架设全站仪,将第一排联系点1作为后视点,将设置在第一排联系点下方的第二排联系点2作为前视点,地面坐标系统由第一排联系点传递至第二排联系点。
e、在竖井底部第二排联系点2对侧位置设置有井底架设点6,该井底架设点第四次架设全站仪,以第二排联系点2作为后视点,将布设在所述井底架设点两侧的观测点7作为前视点,进行多测回观测,将坐标系统传递至井底位置。
f、内业处理可以与普通导线内业处理大致相同。
对本发明方法的精度进行分析:
参照图2,由联系三角形测量的计算公式:
可知,向下传递的中误差受a、c边长测量和角度γ测量误差对地下传递方位的影响。
①a、c边长测量对α引起的误差:
取ms=±1mm,γ=1°,取最大值1.5;
角度γ测量对α引起的误差:
取mα=±0.71″,γ=1°
方位传递中误差(地下导线的起始方向误差):
此方法中观测每次观测了4个棱镜,故方向传递中误差为:
②坐标传递中误差
测角引起的坐标传递误差:
取mα=±0.71″,S取工作井的大边长30m
测距引起的坐标传递误差:
坐标传递误差为:
此方法中观测每次观测了4个棱镜,坐标传递中误差为:
精度完全满足施工设计要求。
以上所述实施方式仅仅是对本发明的优选实施方式进行描述,并非对本发明的范围进行限定,在不脱离本发明设计精神的前提下,本领域普通技术人员对本发明的技术方案作出的各种变形和改进,均应落入本发明的权利要求书确定的保护范围内。
Claims (2)
1.一种轨道交通竖井联系测量的方法,其特征在于,包括如下步骤:
1)在竖井的一侧井口已知点第一次架设全站仪,从地面控制网中选取另外两个已知点作为后视点,将另一侧井口架设点作为前视点;
2)在井口架设点第二次架设全站仪,将井口已知点作为后视点,将设置在井内的第一排联系点作为前视点,地面坐标系统由井口已知点传递至第一排联系点;
3)井内相对于第一排联系点的另一侧设置有井内架设点,在该井内架设点第三次架设全站仪,将第一排联系点作为后视点,将设置在第一排联系点下方的第二排联系点作为前视点,地面坐标系统由第一排联系点传递至第二排联系点;
4)在竖井底部第二排联系点对侧位置设置有井底架设点,该井底架设点第四次架设全站仪,以第二排联系点作为后视点,将布设在所述井底架设点两侧的观测点作为前视点,进行多测回观测,将坐标系统传递至井底位置。
2.根据权利要求1所述的方法,其特征在于,所述第一排联系点和第二排联系点均采用4个共线的棱镜。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610206180.8A CN105674967B (zh) | 2016-03-31 | 2016-03-31 | 一种轨道交通竖井联系测量的方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610206180.8A CN105674967B (zh) | 2016-03-31 | 2016-03-31 | 一种轨道交通竖井联系测量的方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105674967A CN105674967A (zh) | 2016-06-15 |
CN105674967B true CN105674967B (zh) | 2019-03-15 |
Family
ID=56308376
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610206180.8A Active CN105674967B (zh) | 2016-03-31 | 2016-03-31 | 一种轨道交通竖井联系测量的方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105674967B (zh) |
Families Citing this family (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106767731B (zh) * | 2016-11-30 | 2019-06-07 | 中国电建集团铁路建设有限公司 | 一种联系三角形测量装置及测量方法 |
CN107063207A (zh) * | 2017-03-29 | 2017-08-18 | 国网上海市电力公司 | 一种多级控制网测量输电电缆隧道轴线的方法 |
CN108253946B (zh) * | 2018-01-09 | 2020-04-28 | 北京建筑大学 | 多功能竖向测量联系测量一体化三维坐标传递装置及方法 |
CN109682354B (zh) * | 2018-12-26 | 2021-04-06 | 中铁大桥局第七工程有限公司 | 一种联系测量系统及测量方法 |
CN111829492B (zh) * | 2020-07-24 | 2021-11-30 | 中交第二航务工程局有限公司 | 基于激光垂准仪应用的联系测量方法 |
CN113865559B (zh) * | 2021-08-31 | 2024-03-29 | 上海市基础工程集团有限公司 | 用于超深竖井自动联系测量的方法 |
Family Cites Families (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1099130A (zh) * | 1994-04-29 | 1995-02-22 | 张驰 | 一种快速定位系统 |
CN103115605A (zh) * | 2013-01-31 | 2013-05-22 | 大连市勘察测绘研究院有限公司 | 一种基于联系三角形的地铁竖井定向测量方法 |
CN103115607A (zh) * | 2013-01-31 | 2013-05-22 | 大连市勘察测绘研究院有限公司 | 利用全站仪对地铁竖井联系测量中钢丝间距的测量方法 |
CN203132535U (zh) * | 2013-04-01 | 2013-08-14 | 中国葛洲坝集团股份有限公司 | 深井建筑物滑模施工中垂直度和高程基准检测装置 |
CN103591982B (zh) * | 2013-08-21 | 2016-01-06 | 国家电网公司 | 一种电力隧道结构问题的监测方法 |
CN103644900B (zh) * | 2013-12-24 | 2016-05-18 | 中铁上海工程局集团有限公司 | 一种顶管工作井平面联系测量方法 |
-
2016
- 2016-03-31 CN CN201610206180.8A patent/CN105674967B/zh active Active
Non-Patent Citations (2)
Title |
---|
城市地下工程定向测量及监测技术研究;刘相法;《中国优秀硕士学位论文全文数据库工程科技Ⅱ辑》;20070415(第4期);正文第2.3节 |
徐浩 等.盾构竖井联系测量的几种方法探讨.《山西建筑》.2009,第35卷(第6期),第2节. |
Also Published As
Publication number | Publication date |
---|---|
CN105674967A (zh) | 2016-06-15 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105674967B (zh) | 一种轨道交通竖井联系测量的方法 | |
CN102890281B (zh) | 一种用于高层建筑的gps高精度定位测量方法 | |
CN102953304B (zh) | 地铁轨道结构施工的精密测量控制方法 | |
CN106123776B (zh) | 一种顶管智能顶进测量系统以及测量方法 | |
CN104848845B (zh) | 一种地下隧道虚拟双导线控制测量方法 | |
CN202834381U (zh) | 三维双曲线钢顶管纠偏装置 | |
CN102095401B (zh) | 长距离盾构法隧道贯通测量方法 | |
CN105091852A (zh) | 一种顶管开挖激光导向测量施工工法 | |
CN102433827A (zh) | 一种试车场高速环道路面施工放样方法 | |
CN104251688A (zh) | 顶管工程中利用激光直线定向测量工法 | |
CN103115605A (zh) | 一种基于联系三角形的地铁竖井定向测量方法 | |
CN103644900A (zh) | 一种顶管工作井平面联系测量方法 | |
CN101685010B (zh) | 一种超长距离盾构隧道的测量方法 | |
CN104807440A (zh) | 一种用于机场的全自动高频率地表沉降监测方法 | |
CN109900208A (zh) | 一种矿山法隧道开挖与初支质量检测方法 | |
CN105865416A (zh) | 一种用于沉降监测的水准尺悬挂式水准测量方法 | |
CN103712616B (zh) | 自动全站仪和陀螺仪组合导向盾构姿态自动测量方法及装置 | |
CN106199642A (zh) | 一种道路测绘方法及装置 | |
CN108613666A (zh) | 矩形顶管姿态测量方法 | |
CN107063207A (zh) | 一种多级控制网测量输电电缆隧道轴线的方法 | |
CN113532396A (zh) | 一种隧道平面控制测量方法 | |
CN102842265B (zh) | 地下管线平面与横断面一体化展现方法 | |
CN203893840U (zh) | 高精度固定式复合水准仪 | |
CN103759705B (zh) | 用于复合水准仪的三点闭合布设测量法 | |
CN109029351A (zh) | 一种大型贯通巷道的测量方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |