CN105674751B - Industrial waste gas processing system - Google Patents
Industrial waste gas processing system Download PDFInfo
- Publication number
- CN105674751B CN105674751B CN201610154868.6A CN201610154868A CN105674751B CN 105674751 B CN105674751 B CN 105674751B CN 201610154868 A CN201610154868 A CN 201610154868A CN 105674751 B CN105674751 B CN 105674751B
- Authority
- CN
- China
- Prior art keywords
- tower
- water
- flushing cinder
- cooling
- spray
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F27—FURNACES; KILNS; OVENS; RETORTS
- F27D—DETAILS OR ACCESSORIES OF FURNACES, KILNS, OVENS, OR RETORTS, IN SO FAR AS THEY ARE OF KINDS OCCURRING IN MORE THAN ONE KIND OF FURNACE
- F27D3/00—Charging; Discharging; Manipulation of charge
- F27D3/15—Tapping equipment; Equipment for removing or retaining slag
- F27D3/1545—Equipment for removing or retaining slag
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B01—PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
- B01D—SEPARATION
- B01D50/00—Combinations of methods or devices for separating particles from gases or vapours
- B01D50/60—Combinations of devices covered by groups B01D46/00 and B01D47/00
-
- C—CHEMISTRY; METALLURGY
- C01—INORGANIC CHEMISTRY
- C01B—NON-METALLIC ELEMENTS; COMPOUNDS THEREOF; METALLOIDS OR COMPOUNDS THEREOF NOT COVERED BY SUBCLASS C01C
- C01B25/00—Phosphorus; Compounds thereof
- C01B25/02—Preparation of phosphorus
- C01B25/027—Preparation of phosphorus of yellow phosphorus
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F27—FURNACES; KILNS; OVENS; RETORTS
- F27D—DETAILS OR ACCESSORIES OF FURNACES, KILNS, OVENS, OR RETORTS, IN SO FAR AS THEY ARE OF KINDS OCCURRING IN MORE THAN ONE KIND OF FURNACE
- F27D17/00—Arrangements for using waste heat; Arrangements for using, or disposing of, waste gases
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F27—FURNACES; KILNS; OVENS; RETORTS
- F27D—DETAILS OR ACCESSORIES OF FURNACES, KILNS, OVENS, OR RETORTS, IN SO FAR AS THEY ARE OF KINDS OCCURRING IN MORE THAN ONE KIND OF FURNACE
- F27D17/00—Arrangements for using waste heat; Arrangements for using, or disposing of, waste gases
- F27D17/008—Arrangements for using waste heat; Arrangements for using, or disposing of, waste gases cleaning gases
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P10/00—Technologies related to metal processing
- Y02P10/25—Process efficiency
Landscapes
- Engineering & Computer Science (AREA)
- Chemical & Material Sciences (AREA)
- Mechanical Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Organic Chemistry (AREA)
- Environmental & Geological Engineering (AREA)
- Chemical Kinetics & Catalysis (AREA)
- Inorganic Chemistry (AREA)
- Treating Waste Gases (AREA)
Abstract
The present invention relates to a kind of industrial waste gas processing systems, and a flushing cinder tower is built between electric furnace and sedimentation basin, and phosphorus slag is directly discharged into tower, the a large amount of flushing water spraying coolings of tower entrance, flush slag and the steam of generation enter flushing cinder tower, and tower is exported in immersion water, and the water in tower is discharged to slag in sedimentation basin.Steam in tower is because the reason of fluid-tight, it is impossible to which into sedimentation basin, in flushing cinder tower top cool water shower, a cooled flue gas temperature enters spray column secondary cooling at the top of spray column after flue gas cooling, using the mode along spray in spray column.Flue gas removes steam after secondary cooling from spray tower bottom by wire mesh demister, subsequently enters wind turbine supercharging and is cooled down three times into packed tower, finally from chimney discharging directly into atmosphere at the top of packed tower.
Description
Technical field
The present invention relates to the vent gas treatment systems during a kind of industrial waste gas processing system more particularly to a kind of phosphorus production
System.Belong to chemical technology field.
Background technology
Yellow phosphorus furnace slag processing method uses slag bath water quenching at present.Slag bath is ensured to certain water level, molten slag leads to
It crosses slag runner and flows directly into slag bath progress water quenching, the good later phosphorus slag of water quenching grabs slag storehouse with driving again.This method is in water quenching phosphorus
A large amount of vapor are generated during slag, and vapor contains the largely noxious materials such as fluorine-containing, and serious dirt is caused in direct emission air
In addition dye causes site environment severe, sewage and the unordered discharge of steam, it is impossible to effectively management during driving crawl phosphorus slag.For example, river
Phosphorus shares 8 sets of Yellow phosphorus furnaces, and the every 3.5 hours deslagginves of every electric furnace are primary, and 20 minutes every time, each 55t, phosphorus slag temperature was about 1350
℃.Steam is very big after flush slag, and a large amount of steam wafts and brims in the air, and working environment is quite severe, and national requirements for environmental protection is got over
Carry out higher, the present situation of urgent need change.
Invention content
The technical problems to be solved by the invention are to provide a kind of industrial waste gas processing system, energy for the above-mentioned prior art
It is enough that separation of solid and liquid is realized to yellow phosphoric tail gas, 100% steam is eliminated, meets relevant emission standards, and eliminate having in steam
Evil substance, safety and environmental protection.
Technical solution is used by the present invention solves the above problems:A kind of industrial waste gas processing system, it includes flushing cinder
Tower, spray column, packed tower, sedimentation basin, water cooling pond and hot-tub, the bottom of the flushing cinder tower are connected with electric furnace, flushing cinder tower
Outlet is immersed in the water of sedimentation basin, and the cold water in the water cooling pond is connected to the entry position of flushing cinder tower, institute by flushing pump
The outlet for stating sedimentation basin is connected with hot-tub, and hot water is driven into cooling tower cooler by hot-tub by cooling pump, cooling tower
Outlet is connected with water cooling pond, one group of level-one chilling spray head is provided on the top of the flushing cinder tower, the water cooling pond passes through
Spray pump is connected with the chilling spray head in flushing cinder tower, and the top of the flushing cinder tower is connected with the top of spray column, the spray
The top setting of tower also has two groups of two level chilling spray heads arranged above and below, and the two level chilling spray head passes through the first cooling
Pump is connected with water cooling pond, is connected in the outlet at bottom of the spray column by centrifugal blower with packed tower, in the packed tower
Top is provided with three-level chilling spray head, and the three-level chilling spray head is connected by the second cooling pump with water cooling pond.
Preferably, separating in the sedimentation basin has run-off, and the hot-tub is connected with run-off.
Preferably, it is provided with demister above the level-one chilling spray head in the flushing cinder tower.
Preferably, the outlet at bottom position of the spray column is provided with wire mesh demister.
Compared with prior art, the advantage of the invention is that:
1st, slag is directly entered in flushing cinder tower, and all collects steam with the mode of fluid-tight, and steam collects 100%.
2nd, the mode cooled flue gas of classification cooling, effect become apparent from, and outlet steam temperature is close to atmospheric temperature, without apparent water
Vapour.
3rd, steam is collected using wire mesh demister, exported without apparent steam.
Description of the drawings
Fig. 1 is a kind of system construction drawing of industrial waste gas processing system of the present invention.
Wherein:
Flushing cinder tower 1, spray column 2, packed tower 3, sedimentation basin 4, water cooling pond 5, hot-tub 6, electric furnace 7, flushing pump 8, cooling pump
9th, cooling tower 10, spray pump 11, the first cooling pump 12, centrifugal blower 13, the second cooling pump 14, level-one chilling spray head 1.1, remove
Foam device 1.2, two level chilling spray head 2.1, wire mesh demister 2.2, three-level chilling spray head 3.1, run-off 4.1.
Specific embodiment
The present invention is described in further detail below in conjunction with attached drawing embodiment.
The present invention relates to a kind of industrial waste gas processing systems, mainly include flushing cinder tower 1, spray column 2, packed tower 3, sedimentation basin
4th, water cooling pond 5 and hot-tub 6, the bottom of the flushing cinder tower 1 are connected with electric furnace 7, and the outlet of flushing cinder tower 1 is immersed in sedimentation basin 4
Water in, cold water in the water cooling pond 5 is connected to the entry position of flushing cinder tower 1 by flushing pump 8, the tail generated to electric furnace 7
Gas is rinsed, and the outlet of the sedimentation basin 4 is connected with hot-tub 6, and hot water is driven into cold by hot-tub 6 by cooling pump 9
But tower 10 cools down, and the outlet of cooling tower 10 is connected with water cooling pond 5, and it is cold that the hot water in hot-tub by cooling pump is evacuated to cooling tower
But, the water to cool down enters water cooling pond, and the water of water cooling pond is used as rinsing, spray, cool down.Separating in the sedimentation basin 4 has
Run-off 4.1, the hot-tub 6 are connected with run-off 4.1.
One group of level-one chilling spray head 1.1 is provided on the top of the flushing cinder tower 1, the water cooling pond 5 passes through spray pump
11 are connected with the chilling spray head 1.1 in flushing cinder tower 1, and chilling spray head 1.1 is mainly used to cool down the flue gas temperature in flushing cinder tower 1
Degree, the top of the flushing cinder tower 1 are connected with the top of spray column 2, laggard by demister 1.2 by primary flue gas after cooling
Enter into spray column 2.
The top setting of the spray column 2 also has two groups of two level chilling spray heads 2.1 arranged above and below, and the two level is cold
But spray head 2.1 is connected by the first cooling pump 12 with water cooling pond 5, is used in spray column along spray mode, in the spray column 2
Outlet at bottom position is provided with wire mesh demister 2.2, and the outlet of spray column 2 is connected by centrifugal blower 13 with packed tower 3,
The top of the packed tower 3 is provided with three-level chilling spray head 3.1, and the three-level chilling spray head 3.1 passes through the second cooling pump
14 are connected with water cooling pond 5.
Concrete technology flow process is as follows:
A flushing cinder tower is built between electric furnace and sedimentation basin, phosphorus slag is directly discharged into tower, and tower entrance is sprayed with a large amount of flushing waters
The steam of leaching cooling, flush slag and generation enters flushing cinder tower, and tower is exported in immersion water, and the water in tower is discharged to slag in sedimentation basin.
Steam in tower is because the reason of fluid-tight, it is impossible into sedimentation basin, in flushing cinder tower top cool water shower, once cool down cigarette
Temperature degree, enters spray column secondary cooling at the top of the spray column after flue gas cooling, using the mode along spray in spray column.Cigarette
Gas removes steam after secondary cooling from spray tower bottom by wire mesh demister, subsequently enters wind turbine supercharging and enters packed tower three
Secondary cooling, finally from chimney discharging directly into atmosphere at the top of packed tower.
Enter sedimentation basin after flushing water and cool water shower, the water in sedimentation basin overflows to run-off(Separated by sedimentation basin
It opens), the water in run-off flowed automatically to by trench in hot-tub, and it is cold that the hot water in hot-tub by cooling pump is evacuated to cooling tower
But, the water to cool down enters water cooling pond.The water of water cooling pond is used as rinsing, spray, cool down.
The flushing cinder top of tower flue gas of 5#, 6# lead to spray column, and two electric furnace deslagging times separate, and interval is not less than 0.5h.
Desired effect:Nearby steam is smaller in former flushing cinder pond, and pool inner water temperature is 50-60 DEG C, and chimney breast steam is not very bright
It is aobvious, it closely can just see steam in the case where summer relative humidity is not high.
In addition to the implementation, it is all to use equivalent transformation or equivalent replacement the invention also includes there is an other embodiment
The technical solution that mode is formed should all be fallen within the scope of the hereto appended claims.
Claims (4)
1. a kind of industrial waste gas processing system, it is characterised in that:It includes flushing cinder tower(1), spray column(2), packed tower(3), it is heavy
Shallow lake pond(4), water cooling pond(5)And hot-tub(6), the flushing cinder tower(1)Bottom and electric furnace(7)It is connected, flushing cinder tower(1)Go out
Mouth is immersed in sedimentation basin(4)Water in, the water cooling pond(5)In cold water pass through flushing pump(8)It is connected to flushing cinder tower(1)Enter
Mouth position, the sedimentation basin(4)Outlet and hot-tub(6)It is connected, hot-tub(6)Pass through cooling pump(9)Hot water is squeezed into
To cooling tower(10)Cooling, cooling tower(10)Outlet and water cooling pond(5)It is connected, in the flushing cinder tower(1)Top setting
There is one group of level-one chilling spray head(1.1), the water cooling pond(5)Pass through spray pump(11)With flushing cinder tower(1)Interior chilling spray
Head(1.1)It is connected, the flushing cinder tower(1)Top and spray column(2)Top connection, the spray column(2)Top setting
The also two groups two level chilling spray heads arranged above and below(2.1), the two level chilling spray head(2.1)Pass through the first cooling pump
(12)With water cooling pond(5)It is connected, in the spray column(2)Outlet at bottom pass through centrifugal blower(13)With packed tower(3)It is connected,
In the packed tower(3)Top be provided with three-level chilling spray head(3.1), the three-level chilling spray head(3.1)Pass through
Two cooling pumps(14)With water cooling pond(5)It is connected.
2. a kind of industrial waste gas processing system according to claim 1, it is characterised in that:In the sedimentation basin(4)In point
It is separated with run-off(4.1), the hot-tub(6)With run-off(4.1)It is connected.
3. a kind of industrial waste gas processing system according to claim 1, it is characterised in that:In the flushing cinder tower(1)Interior
Level-one chilling spray head(1.1)Top is provided with demister(1.2).
4. a kind of industrial waste gas processing system according to claim 1, it is characterised in that:In the spray column(2)Bottom
Portion outlet port is provided with wire mesh demister(2.2).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610154868.6A CN105674751B (en) | 2016-03-18 | 2016-03-18 | Industrial waste gas processing system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610154868.6A CN105674751B (en) | 2016-03-18 | 2016-03-18 | Industrial waste gas processing system |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105674751A CN105674751A (en) | 2016-06-15 |
CN105674751B true CN105674751B (en) | 2018-06-26 |
Family
ID=56310760
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610154868.6A Active CN105674751B (en) | 2016-03-18 | 2016-03-18 | Industrial waste gas processing system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105674751B (en) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112524962B (en) * | 2020-08-20 | 2022-08-02 | 云南江磷集团股份有限公司 | Yellow phosphorus electric furnace tail gas recovery and purification process |
CN113521929A (en) * | 2021-08-20 | 2021-10-22 | 骏化生态工程有限公司 | Method for washing particles in tail gas of compound fertilizer |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN205537144U (en) * | 2016-03-18 | 2016-08-31 | 江苏垦乐环保科技有限公司 | Industrial waste gas treatment system |
Family Cites Families (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2628877Y (en) * | 2003-08-08 | 2004-07-28 | 商涛 | Fluid-bed boiler slagging and refrigerating apparatus |
LU91765B1 (en) * | 2010-12-14 | 2012-06-15 | Wurth Paul Sa | Steam condensation tower for a granulation installation |
CN203281180U (en) * | 2013-04-28 | 2013-11-13 | 苏州天皓环保科技有限公司 | Activated charcoal, microwave and water-spraying combined purification tower |
CN204752617U (en) * | 2015-06-08 | 2015-11-11 | 邢台旭阳煤化工有限公司 | Wet quenching system |
-
2016
- 2016-03-18 CN CN201610154868.6A patent/CN105674751B/en active Active
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN205537144U (en) * | 2016-03-18 | 2016-08-31 | 江苏垦乐环保科技有限公司 | Industrial waste gas treatment system |
Also Published As
Publication number | Publication date |
---|---|
CN105674751A (en) | 2016-06-15 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103965971B (en) | Double-tower type coal tar recovering system and recovery method | |
CN105674751B (en) | Industrial waste gas processing system | |
US20200299134A1 (en) | Gas-solid separating method and system for simple substance sulphur in sulphur-containing exhaust | |
CN104561585A (en) | Copper concentrate smelting method and copper concentrate smelting device | |
CN108913829B (en) | Slag water quenching steam white fog eliminating system and method | |
CN102205952B (en) | Process for recovering phosphoric acid in flue gas generated in process of smelting ferro phosphorus in electric furnace | |
CN205537144U (en) | Industrial waste gas treatment system | |
CN204689642U (en) | The yellow phosphorus purification system of Yellow phosphorus recovering device and formation thereof | |
CN211885989U (en) | Three-phase separation device for water quenching product and water quenching flue gas treatment system | |
CN203170172U (en) | Tail gas negative pressure absorption emission reduction system in titanium tetrachloride production | |
CN105709528A (en) | Manganese slag drying tail gas processing system | |
CN204494455U (en) | A kind of drawing-in type combustion furnace chimney gives up fume treatment facility | |
CN103482810A (en) | Novel system and method for zero emission treatment of high-salinity heavy metal wastewater | |
CN2846424Y (en) | Environment protection type slag treating device by wheel method | |
CN204619638U (en) | A kind of anode market pot fume dust remover | |
CN111486717A (en) | Spent steam whitening treatment and water saving system and method for blast furnace slag flushing water | |
CN213193091U (en) | Water quenching slag bath hot water cooling and defogging device | |
CN105838832B (en) | Blast furnace plumbing gas extraction system | |
CN107151768A (en) | One kind is used for the post-job workpiece cooling device of galvanizing | |
CN108163824B (en) | Absorption device for improving yellow phosphorus yield | |
CN109911871B (en) | Temperature-changing phase-changing separation method and system for elemental phosphorus in phosphorus-containing tail gas | |
CN102139182A (en) | Acid mist purifying method in electrolytic manganese leaching process | |
CN209508299U (en) | A kind of slag water quenching steam disappears white haze system | |
CN103585779B (en) | The sweep-out method of simple substance sulphur in propene carbonate decarbonization system carbon third decarbonizing liquid | |
CN107701846B (en) | A kind of datonation-inhibition ventilation shaft of aluminium powder |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB02 | Change of applicant information |
Address after: 214434 Jiangsu city of Wuxi province Jiangyin City Road 201, Powerise Industrial Park wisdom Fang B Room 405 Applicant after: Jiangsu Ken Le energy-saving environmental protection science and technology limited company Address before: 214434 Jiangsu city of Wuxi province Jiangyin City Road 201, Powerise Industrial Park wisdom Fang B Room 405 Applicant before: JIANGSU KENLE ENVIRONMENTAL PROTECTION TECHNOLOGY CO., LTD. |
|
COR | Change of bibliographic data | ||
GR01 | Patent grant | ||
GR01 | Patent grant |