CN105674309B - Energy-saving chimney anti-icing equipment - Google Patents
Energy-saving chimney anti-icing equipment Download PDFInfo
- Publication number
- CN105674309B CN105674309B CN201610153810.XA CN201610153810A CN105674309B CN 105674309 B CN105674309 B CN 105674309B CN 201610153810 A CN201610153810 A CN 201610153810A CN 105674309 B CN105674309 B CN 105674309B
- Authority
- CN
- China
- Prior art keywords
- chimney
- water
- pipe
- top opening
- energy
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F23—COMBUSTION APPARATUS; COMBUSTION PROCESSES
- F23J—REMOVAL OR TREATMENT OF COMBUSTION PRODUCTS OR COMBUSTION RESIDUES; FLUES
- F23J13/00—Fittings for chimneys or flues
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F23—COMBUSTION APPARATUS; COMBUSTION PROCESSES
- F23J—REMOVAL OR TREATMENT OF COMBUSTION PRODUCTS OR COMBUSTION RESIDUES; FLUES
- F23J2900/00—Special arrangements for conducting or purifying combustion fumes; Treatment of fumes or ashes
- F23J2900/13006—Devices for heating the chimney top to avoid ice formation
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Chimneys And Flues (AREA)
- Sink And Installation For Waste Water (AREA)
Abstract
The present invention relates to a kind of energy-saving chimney anti-icing equipments, including water inlet pipe (1), outlet pipe (2), high-pressure hydraulic pump (3), upper hose (4), downcomer (5), water knockout drum (6), top opening hot-water line (7), top opening return pipe (8) and anti-freeze pipe network (9), wherein water inlet pipe (1) and outlet pipe (2) are connect with power plant water delivery pipeline system, water inlet pipe (1) is connect with upper hose (4) by high-pressure hydraulic pump (3), outlet pipe (2) is connect with downcomer (5) by elbow, water knockout drum (6) is located at chimney barrel top, respectively with upper hose (4) and downcomer (5), top opening hot-water line (7) and top opening return pipe (8), anti-freeze pipe network (9) top connection.The device of the invention utilizes the existing hot water pipeline of power plant, efficiently solves the technical barrier of chimney top opening icing, reduces installation and operation cost, improve energy utilization rate and service life, saved resource.
Description
Technical field
The invention belongs to the anti-freeze fields of chimney, specifically, the present invention relates to a kind of novel energy-saving chimney anti-cakings
Ice production apparatus.
Background technology
Boiler operatiopn generates flue gas and is discharged by throat after desulfurization, because flue gas after desulfurization humidity increases, flue-gas temperature drop
It is low, ultimately cause the icing of chimney top opening.
Energy-saving chimney anti-icing equipment used at present is mostly Electric radiant Heating Film/electric heating piece, this is alleviated to a certain extent
The problem of chimney top opening freezes.Its shortcoming is that the service life is not high, repair trouble, cost is high, operating cost is high, to constrain it
Development.
In view of the above-mentioned problems, the present invention provides a kind of novel energy-saving chimney anti-icing equipment, this system is analogous to
Floor heating structure utilizes the existing resource of power plant, i.e.,:Hot water and hot water pipeline, are mounted on by several outside chimney top
Heating network on barrel solves the icing of chimney top opening.This energy-saving chimney anti-icing equipment efficiently solves chimney top
The technical barrier that mouth freezes, reduces installation and operation cost, improves energy utilization rate and service life, saved resource.
Invention content
The present invention provides a kind of novel energy-saving chimney anti-icing equipments, efficiently solve the icing of chimney top opening
Technical barrier.
The purpose of the present invention is realized by following technical solution:
A kind of energy-saving chimney anti-icing equipment, it is characterised in that:It includes water inlet pipe, outlet pipe, high-pressure hydraulic pump, upper water
Pipe, downcomer, water knockout drum, top opening hot-water line, top opening return pipe and anti-freeze pipe network, wherein the water inlet pipe (1) and outlet pipe
It is connect with power plant water delivery pipeline system, the outlet pipe is connect with downcomer by elbow, and the water inlet pipe passes through with upper hose
High-pressure hydraulic pump connect, the water knockout drum respectively with upper hose and downcomer, top opening hot-water line and top opening return pipe, anti-freeze pipe network
Top connects.
The wherein described water knockout drum is located at the top of chimney barrel, and water knockout drum has several (determining according to Diameter of chimney), wherein
One water knockout drum is connect with upper and lower water pipe.
The wherein described anti-freeze pipe network is made of hot-water line and return pipe, and hot-water line is arranged in parallel with return pipe.It is described anti-
Icing pipe network can be " returning " font, " S " type, screw type and other any shapes that can uniformly distribute heat.
The water inlet pipe and outlet pipe are connect with power plant water delivery pipeline system, and material is with power plant's aqueduct and protects
Temperature.
The upper hose and downcomer select utilidor, are connect with water knockout drum, can both be fixed on chimney internal cylinder
It on wall, can also be mounted on outer tube wall, then for example with JZ-SJ01 acid resistant adhesive mortars by pipeline and chimney wall smooth even mistake
It crosses.It should be installed along cat ladder and against cat ladder when on outer tube wall.
The lift of the high-pressure hydraulic pump has to be larger than chimney height.
The pipeline of PE-RT or PE-X or similar material for example may be used in anti-freeze pipe network on the chimney outer tube wall.
Such pipeline has good flexibility, high thermal conductivity and inertia, while resistance to pressure is good, good impact resistance, resistance to pressure are more preferable,
Nontoxic, tasteless, pollution-free, environmentally protective, recyclable, heat-fusible connection are convenient to install and maintain.
All pipelines on the chimney wall are all made of anchor ear and are fixed on chimney wall, then smooth with acid resistant adhesive mortar
Transition.
The invention further relates to energy-saving chimney anti-icing equipment according to the present invention concrete chimney, steel stack or
Application in brick chimney.
The anti-icing equipment of the present invention utilizes the existing hot water pipeline of power plant, and the hot water pipeline is from water delivery starting point to cigarette
Chimney bottom stage uses the pipeline with power plant water-carriage system same material and keeps the temperature, to prevent thermal loss.The work of the present invention is former
Reason is as follows:First, hot water is led into chimney bottom by water inlet pipe, then with high-pressure hydraulic pump by hot water by being fixed on chimney barrel
On wall on the upper hose force feed of (or inner tube wall or outer tube wall) to the water knockout drum of chimney top opening, water knockout drum has several (according to cigarette
Chimney diameter is determined), one of water knockout drum is connect with upper and lower water pipe, have top opening hot-water line to be connected with return pipe between water knockout drum,
Hot water is back to point by the anti-freeze pipe network on the outer tube wall of chimney top respectively by the water knockout drum of chimney top opening again
Hydrophone, is finally delivered to downcomer by water knockout drum and finally flows through outlet pipe and be back in the piping network of power plant.
The anti-icing equipment of the present invention solves the technical barrier of chimney top opening icing with effectively arriving, and reduces installation and fortune
Row cost, improves energy utilization rate and service life, has saved resource.
Description of the drawings
Fig. 1 a are the schematic diagrames of the energy-saving chimney anti-icing equipment of the present invention, and Fig. 1 b are the offices at referred to position at A in Fig. 1 a
Portion's enlarged drawing.
Fig. 2 is the enlarged diagram positioned at chimney top mouth region domain of the energy-saving chimney anti-icing equipment of the present invention.
Fig. 3 is the schematic diagram of the anti-freeze pipe network of the energy-saving chimney anti-icing equipment of the present invention.
Fig. 4 is the schematic diagram that the energy-saving chimney anti-icing equipment of the present invention is located inside chimney.
Reference sign:
1- water inlet pipes;2- outlet pipes;3- high-pressure hydraulic pumps;4- upper hoses;5- downcomers;6- water knockout drums;7- top opening hot-water lines;
8- top opening return pipes;The anti-freeze pipe networks of 9-;10- chimneys;The ground 11-;12- chimney top openings;13- chimney walls;14- chimney outer barrels
Wall;15- chimney internal cylinder walls.
Specific implementation mode
The present invention is described in more detail by specific example below in conjunction with the accompanying drawings, but any limit is not constituted to the present invention
System.
Embodiment 1
As depicted in fig. la, a kind of " returning " font chimney anti-icing equipment, including:Water inlet pipe 1, outlet pipe 2, high pressure water
Pump 3, upper hose 4, downcomer 5, water knockout drum 6, top opening hot-water line 7, top opening return pipe 8, anti-freeze pipe network 9, wherein the water inlet
Pipe 1 and outlet pipe 2 are connect with power plant water delivery pipeline system, and the water inlet pipe 1 is connect with upper hose 4 by high-pressure hydraulic pump 3, described
Outlet pipe 2 is connect with downcomer 5 by elbow, and the water knockout drum 6 is located at the top of chimney barrel, is separately connected upper hose 4 under
Water pipe 5, top opening hot-water line 7 and top opening return pipe 8 and 9 top of anti-freeze pipe network.
The installation of the device:
1. separating a pipeline (i.e. water inlet pipe 1) from the hot water pipeline of power plant extends to bottom in chimney, water inlet pipe 1 is adopted
It with the pipeline with power plant water-carriage system same material and keeps the temperature, to prevent thermal loss;Water inlet pipe 1 is supported using steel bracket, steel
Holder carries out preservative treatment.
2. water inlet pipe 1 is connect with high-pressure hydraulic pump 3, high-pressure hydraulic pump 3 is located on chimney bottom ground..
3. high-pressure hydraulic pump 3 is connect with upper hose 4, upper hose 4 is extended upwardly to from 3 interface of chimney bottom high-pressure hydraulic pump
It is connect on the water knockout drum of chimney top opening and with water knockout drum 6, upper hose 4 uses finished product thermal insulation pipeline, is fixed upper hose 4 with anchor ear
In on chimney internal cylinder wall, then seamlessly transitted with acid resistant adhesive mortar.Water knockout drum 6 has several (determining according to Diameter of chimney), wherein
One water knockout drum is connect with upper hose 4, downcomer 5, has top opening hot-water line 7 and top opening return pipe 8 to connect between water knockout drum 6, then
Hot water is back to a point water by the anti-freeze pipe network on the outer tube wall of chimney top respectively by the water knockout drum of chimney top opening
Device, each water knockout drum 6 connect a pair of anti-freeze pipe network 9, and anti-freeze pipe network 9 is fixed on by anchor ear on the outer tube wall of chimney top, and
It is seamlessly transitted with acid resistant adhesive mortar.
4. downcomer 5 is connect with water knockout drum 6, and is close to chimney internal cylinder wall and is extended downward into chimney bottom, and passes through elbow
It is connect with outlet pipe 2.Downcomer 5 uses finished product thermal insulation pipeline, upper hose 4 is fixed on chimney internal cylinder wall with anchor ear, then
It is seamlessly transitted with acid resistant adhesive mortar.Outlet pipe 2 is using the pipeline with power plant water-carriage system same material and keeps the temperature, to prevent heat from damaging
It loses.
5. outlet pipe 2 is supported using steel bracket, steel bracket carries out preservative treatment, outlet pipe 2 from chimney bottom elbow with
Downcomer 5 connects, and extends out in power plant's water return pipeline system.
Claims (7)
1. a kind of energy-saving chimney anti-icing equipment, it is characterised in that:It includes water inlet pipe (1), outlet pipe (2), high-pressure hydraulic pump
(3), upper hose (4), downcomer (5), water knockout drum (6), top opening hot-water line (7), top opening return pipe (8) and anti-freeze pipe network (9),
The wherein described water inlet pipe (1) and outlet pipe (2) are connect with power plant water delivery pipeline system, and the water inlet pipe (1) is logical with upper hose (4)
High-pressure hydraulic pump (3) connection is crossed, the outlet pipe (2) is connect with downcomer (5) by elbow, and the water knockout drum (6) is located at chimney
At the top of cylinder, respectively with upper hose (4) and downcomer (5), top opening hot-water line (7) and top opening return pipe (8), anti-freeze pipe network
(9) top connects.
2. energy-saving chimney anti-icing equipment as described in claim 1, it is characterised in that:The anti-freeze pipe network (9) is by heat
Water pipe and return pipe composition, the hot-water line are arranged parallel to each other with return pipe.
3. energy-saving chimney anti-icing equipment as described in claim 1, it is characterised in that:The anti-freeze pipe network (9) is
" returning " font, " S " type or screw type.
4. energy-saving chimney anti-icing equipment as described in claim 1, it is characterised in that:The wherein described anti-freeze pipe network (9)
It is fixed on chimney outer tube wall by anchor ear.
5. the energy-saving chimney anti-icing equipment as described in any one of claim 1-4, it is characterised in that:Described is anti-freeze
Pipe network (9) is PE-RT or PE-X pipelines.
6. energy-saving chimney anti-icing equipment as described in claim 1, it is characterised in that:High-pressure hydraulic pump (3) lift is big
In chimney height.
7. energy-saving chimney anti-icing equipment as described in claim 1, it is characterised in that:The upper hose (4) and downcomer
(5) it is fixed on chimney internal cylinder wall or outer tube wall by anchor ear.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610153810.XA CN105674309B (en) | 2016-03-18 | 2016-03-18 | Energy-saving chimney anti-icing equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610153810.XA CN105674309B (en) | 2016-03-18 | 2016-03-18 | Energy-saving chimney anti-icing equipment |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105674309A CN105674309A (en) | 2016-06-15 |
CN105674309B true CN105674309B (en) | 2018-09-04 |
Family
ID=56310718
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610153810.XA Active CN105674309B (en) | 2016-03-18 | 2016-03-18 | Energy-saving chimney anti-icing equipment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105674309B (en) |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN205560796U (en) * | 2016-03-18 | 2016-09-07 | 北京金汇中电力科技有限公司 | Anti -freeze device of energy -saving chimney |
Family Cites Families (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102573142B (en) * | 2010-12-09 | 2014-07-16 | 沈阳市中色测温仪表材料研究所有限公司 | Anti-icing electric heating device for chimney mouth |
CN103162304B (en) * | 2011-12-13 | 2016-03-09 | 河南省电力勘测设计院 | The first automatic thawing device of chimney barrel and change ice method thereof |
CN204063605U (en) * | 2014-08-01 | 2014-12-31 | 中油辽河工程有限公司 | One self-priming anti-water collecting device on oil field heating furnace |
CN105091010A (en) * | 2015-08-18 | 2015-11-25 | 来宾市江明科技开发有限公司 | Smoke recovery device for boiler |
-
2016
- 2016-03-18 CN CN201610153810.XA patent/CN105674309B/en active Active
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN205560796U (en) * | 2016-03-18 | 2016-09-07 | 北京金汇中电力科技有限公司 | Anti -freeze device of energy -saving chimney |
Also Published As
Publication number | Publication date |
---|---|
CN105674309A (en) | 2016-06-15 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207316481U (en) | Intelligent pipeline | |
CN205013938U (en) | City tap water pipeline water connection pipe construction structures that does not stop | |
CN105674309B (en) | Energy-saving chimney anti-icing equipment | |
CN109140234A (en) | A kind of optimization method and device of heating steam pipe network | |
CN205560796U (en) | Anti -freeze device of energy -saving chimney | |
CN202074602U (en) | The Book of Changes dry type paving floor heating system | |
CN201462272U (en) | Reinforced type reducing branching pipe joint structure and reducing branching pipe joint thereof | |
CN103953166B (en) | A kind of flat roof deck induces snow blowing apparatus step by step | |
CN206514071U (en) | A kind of pipeline | |
CN203657070U (en) | Water hammer preventing system of steam heat supply pipeline network | |
CN204176167U (en) | Intelligence prefabricated direct-buried thermal insulation pipe crosslinked polyethylene working pipe | |
CN208535348U (en) | A kind of new indoor hot water pipe and its mounting structure | |
CN102454981A (en) | Comprehensive control system for industrial steam recovery | |
CN207880217U (en) | The cold-resistant high resistance to compression PVC pipe of one kind | |
CN207796342U (en) | It is easily installed the feed pipe of docking | |
CN206361334U (en) | Positive and negative pair of muscle overlap joint mounting structure of pipe insulation outer casing | |
CN211290230U (en) | Heating system individual transmission and distribution pipeline component in pipe well and pipe well heating pipeline | |
CN204693366U (en) | A kind of system of preventing and treating the quick-fried leakage of DG2060/17.6-II 1 type boiler roof tube | |
CN202000371U (en) | Wall attached with water supply and return pipe of GSHP (ground source heat pump) | |
CN206944515U (en) | The steel modeling conversion maintenance room of vertical buried pipe heat exchange system | |
CN203948137U (en) | For the circulating water pipeline layout of three tower unifications, two machine one towers | |
CN204514056U (en) | A kind of distributor being applied to industrial furnace cooling water | |
CN207040476U (en) | A kind of energy-efficient warming pig house using biogas | |
CN202350000U (en) | Novel water supplementing system of boiler with coal economizer | |
CN208886215U (en) | A kind of three-dimensional three-way pipe |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
DD01 | Delivery of document by public notice | ||
DD01 | Delivery of document by public notice |
Addressee: Power Tech Corp. Inc. in the Jin Hui of Beijing Document name: the First Notification of an Office Action |
|
GR01 | Patent grant | ||
GR01 | Patent grant |