CN202350000U - Novel water supplementing system of boiler with coal economizer - Google Patents

Novel water supplementing system of boiler with coal economizer Download PDF

Info

Publication number
CN202350000U
CN202350000U CN2011205147790U CN201120514779U CN202350000U CN 202350000 U CN202350000 U CN 202350000U CN 2011205147790 U CN2011205147790 U CN 2011205147790U CN 201120514779 U CN201120514779 U CN 201120514779U CN 202350000 U CN202350000 U CN 202350000U
Authority
CN
China
Prior art keywords
water tank
boiler
economizer
softened water
softened
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011205147790U
Other languages
Chinese (zh)
Inventor
李淋舟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Pigeon Electric Wire and Cable Co Ltd
Original Assignee
Chongqing Pigeon Electric Wire and Cable Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Pigeon Electric Wire and Cable Co Ltd filed Critical Chongqing Pigeon Electric Wire and Cable Co Ltd
Priority to CN2011205147790U priority Critical patent/CN202350000U/en
Application granted granted Critical
Publication of CN202350000U publication Critical patent/CN202350000U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Control Of Steam Boilers And Waste-Gas Boilers (AREA)

Abstract

The utility model discloses a novel water supplementing system of a boiler with a coal economizer. The novel water supplementing system includes softened water tanks and pipelines, wherein the softened water tanks are connected onto the boiler with the coal economizer through the pipelines, and includes a softened water tank I and a softened water tank II; a water injection pipeline is arranged between the softened water tank I and the boiler, and a water inlet pipeline is arranged between the softened water tank I and the coal economizer; a water outlet pipeline is arranged between the coal economizer and the softened water tank II; and a connecting pipeline is arranged between the softened water tank I and the softened water tank II. The novel water supplementing system overcomes the defects that the inside pipeline of the coal economizer is fractured and the flue heat is utilized incompletely because the water supplementing system of the boiler with the coal economizer runs interruptedly. The utility model provides the novel water supplementing system of the boiler with the coal economizer, and the novel water supplementing system is safe and reliable, and can effectively utilize the flue heat.

Description

The novel water charging system of band economizer boiler
Technical field
The utility model belongs to the boiler replenishing water field, is specifically related to the novel water charging system with the economizer boiler.
Background technology
At present, along with industrial expansion, the application of boiler more and more widely; In view of effective utilization of the energy, economizer is widely used in the boiler aspect, has avoided the waste of resource; But in long-term application process, some problems are also arisen at the historic moment; For example: the heating boiler of existing band economizer is in use controlled the time of in boiler, replenishing soft water by minimum, peak level value that the water level control system in the boiler is set.When water level in the boiler was lower than the lowest water level value of setting, water pump was started working, and soft water is via economizer; Get into boiler, when boiler water level surpassed the peak level value of setting, water pump quit work; When water level in the boiler was lower than the lowest water level value of setting once more, water pump reruned.At this moment, if refill flow is far longer than evaporation capacity, the water yield surpasses peak level, and twice moisturizing is just long blanking time; In a back moisturizing process, when the soft water of low temperature got into the economizer under the condition of high temperature, economizer can cause and expand with heat and contract with cold because of quenching; The long-time application down causes the economizer interior conduit to break, and not only maintenance cost increases; And have very big potential safety hazard, in addition, when water level surpasses peak level; No longer moisturizing, the heat in the economizer will cause damage so, is not utilized effectively.
The utility model content
The technical problem that the utility model will solve is to cause the economizer internal pipeline to break during to the water charging system intermitten service of existing band economizer boiler and the flue heat is used incomplete defective, provides a kind of safe and reliable and can effectively utilize the novel water charging system of the band economizer boiler of flue heat.
In order to solve the problems of the technologies described above, the utility model provides following technical scheme: the novel water charging system of band economizer boiler comprises softened water tank and pipeline; Softened water tank is connected on the boiler of band economizer through pipeline; Wherein, softened water tank comprises softened water tank one and softened water tank two, be provided with between softened water tank one to the boiler filling pipe and and economizer between be provided with water inlet pipe; Be provided with outlet conduit between economizer and the softened water tank two, be provided with between softened water tank one and the softened water tank two and be connected pipeline.
Adopt the novel water charging system of the band economizer boiler of the utility model technical scheme; Since from be provided with between softened water tank one and the boiler filling pipe and and economizer between be provided with water inlet pipe; Be provided with outlet conduit between economizer and the softened water tank two, be provided with between softened water tank one and the softened water tank two and be connected pipeline.Softened water tank one can be with a kind of with softened water tank two, and the economizer of flowing through of the soft water in the softened water tank two gets into softened water tank one, in the softened water tank one through the boiler that reinjects of the soft water after the preheating.Soft water injects boiler and no longer passes through economizer; The soft water preheating of flowing through is constantly arranged in the economizer, thereby avoid the economizer interior conduit to expand with heat and contract with cold, the phenomenon that causes breaking takes place; Not only effectively utilize the heat in the economizer flue to save the energy, also avoided causing the pipeline breaking of expanding with heat and contract with cold and causing.
Further, the novel water charging system of band economizer boiler, the lowest water level of wherein said softened water tank two is higher than the peak level of softened water tank one.Owing to have water-head, the water in the softened water tank two could flow in the softened water tank one through economizer voluntarily.
Further, the novel water charging system of band economizer boiler, wherein, described softened water tank one is provided with liquid-level switch and water pump one with the pipeline that is connected between the softened water tank two.The abundant peak level that reaches of soft water in softened water tank one promptly touches liquid-level switch and starts water pump one, and water pump one is about to unnecessary water and is withdrawn in the softened water tank two, avoids the soft water of softened water tank one to overflow.
Further, the novel water charging system of band economizer boiler, wherein, softened water tank one is provided with lid with softened water tank two.Softened water tank is provided with lid, and the economizer of having avoided flowing through gets into the thermal loss of softened water tank and prevents dust.
Further again, the novel water charging system of band economizer boiler, wherein, the water inlet pipe between softened water tank two and the economizer is provided with water valve.The water that adopts water valve can arbitrarily control in the softened water tank two flows in the softened water tank one, avoids in the softened water tank one water yield excessive.
Further again, the novel water charging system of band economizer boiler, wherein, the filling pipe of softened water tank one to boiler is provided with water pump two.Take out soft water to boiler through water pump two.
Adopt the novel water charging system of the band economizer boiler of the utility model technical scheme, with respect to the water charging system of normal tape economizer boiler, the boiler water filling economizer of not flowing through; And the soft water in the softened water tank two is flowed through in the economizer inflow softened water tank one; Final injection boiler, thus effectively utilize the water that heat is flowed through in the flue to flow into softened water tank one, finally inject boiler; And operation can arbitrarily be controlled, and avoids the economizer internal pipeline to expand with heat and contract with cold and causes breaking.
Description of drawings
Below in conjunction with accompanying drawing and embodiment the utility model technical scheme is further specified:
Fig. 1 is the structural representation of the novel water charging system embodiment of the utility model band economizer boiler.
The specific embodiment
As shown in Figure 1; The novel water charging system of the utility model band economizer boiler comprises boiler 1, softened water tank, economizer 2, wherein; Softened water tank comprises softened water tank 1 and softened water tank 24; Be provided with between softened water tank 1 to the boiler 1 filling pipe 11 and and economizer 3 between be provided with water inlet pipe 10, be provided with outlet conduit 12 between economizer 3 and the softened water tank 24, be provided with between softened water tank 1 and the softened water tank 24 and be connected pipeline 13; Connect pipeline 13 and be provided with liquid-level switch 7 and water pump 1; Water inlet pipe 12 is provided with water valve 8; Filling pipe 11 is provided with water pump 29.
In the practical implementation process; Soft water flows according to the direction of arrow; Softened water tank 24 because and have water-head between the softened water tank 1, the soft water in the softened water tank 24 flows in the softened water tanks 1 through economizer 2 voluntarily, the soft water through preheating in softened water tank 1 injects boilers 1 through filling pipe 11; Heat in economizer 2 flues also gets in the softened water tank 1 along with the soft water of flowing through, and finally flows in the boiler 1; The water yield in softened water tank 1 reaches peak level, and buoyant spheres 6 is touched liquid-level switch 7 startup water pumps 1 unnecessary soft water is withdrawn in the softened water tank 24, controls through water valve 8 simultaneously; Water pump 29 passes through filling pipe 11 suction with the soft water in the softened water tank 1.By this kind operation, the pipeline in the economizer 2 can suddenly cold and hot, cause and break, and the soft water that the heat in the flue is constantly flowed through absorbs, and has effectively utilized the energy and operation can arbitrarily be controlled.
For a person skilled in the art; Under the prerequisite that does not break away from the utility model structure; Can also make some distortion and improvement, these also should be regarded as the protection domain of the utility model, and these can not influence effect and practical applicability that the utility model is implemented.

Claims (6)

1. be with the novel water charging system of economizer boiler; Comprise softened water tank and pipeline; Softened water tank is connected on the boiler of band economizer through pipeline, it is characterized in that: softened water tank comprises softened water tank one and softened water tank two, be provided with between softened water tank one to the boiler filling pipe and and economizer between be provided with water inlet pipe; Be provided with outlet conduit between economizer and the softened water tank two, be provided with between softened water tank one and the softened water tank two and be connected pipeline.
2. according to claim 1 with the novel water charging system of economizer boiler, it is characterized in that: the lowest water level of described softened water tank two is higher than the peak level of softened water tank one.
3. according to claim 1 with the novel water charging system of economizer boiler, it is characterized in that: described softened water tank one is provided with liquid-level switch and water pump one with the pipeline that is connected between the softened water tank two.
4. according to claim 1 with the novel water charging system of economizer boiler, it is characterized in that: described softened water tank one is provided with lid with softened water tank two.
5. according to claim 1 with the novel water charging system of economizer boiler, it is characterized in that: the water inlet pipe between described softened water tank two and the economizer is provided with water valve.
6. according to claim 1 with the novel water charging system of economizer boiler, it is characterized in that: the filling pipe of described softened water tank one to boiler is provided with water pump two.
CN2011205147790U 2011-12-12 2011-12-12 Novel water supplementing system of boiler with coal economizer Expired - Fee Related CN202350000U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011205147790U CN202350000U (en) 2011-12-12 2011-12-12 Novel water supplementing system of boiler with coal economizer

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011205147790U CN202350000U (en) 2011-12-12 2011-12-12 Novel water supplementing system of boiler with coal economizer

Publications (1)

Publication Number Publication Date
CN202350000U true CN202350000U (en) 2012-07-25

Family

ID=46539002

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011205147790U Expired - Fee Related CN202350000U (en) 2011-12-12 2011-12-12 Novel water supplementing system of boiler with coal economizer

Country Status (1)

Country Link
CN (1) CN202350000U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105782947A (en) * 2014-11-18 2016-07-20 孔令斌 Unpowered water replenishing control method for steam boiler

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105782947A (en) * 2014-11-18 2016-07-20 孔令斌 Unpowered water replenishing control method for steam boiler

Similar Documents

Publication Publication Date Title
CN202048561U (en) Smoke residual heat utilization device for boiler
CN204552846U (en) A kind of back pressure steam turbines utilization system
CN202647714U (en) Boiler economizer system
CN206352835U (en) A kind of waste heat recovery of high-temperature flue gas recycles Industrial Boiler
CN202350000U (en) Novel water supplementing system of boiler with coal economizer
CN205503389U (en) Colliery pressure fan, pit water energy recovery utilize system
CN201779851U (en) Heat pump warming machine for recovering waste heat of hot spring waste water
CN204372879U (en) A kind of two medium waste heat boiler
CN204240453U (en) Heat-storage solar energy, electric energy and coal heat type heat combined heat heat source system
CN104359142B (en) Heat-storage solar energy, electric energy and coal heat type heat combined heat heat source system
CN204026649U (en) Device for utilizing waste of boiler
CN205137419U (en) Utilize waste heat of boiler flue gas heating feedwater / condensate system
CN204730180U (en) A kind of low-temperature heat still system being provided with demineralized water retracting device
CN204313512U (en) The new system of field joint stations heating crude oil
CN107178920A (en) A kind of hydrocone type solar water heater cold water retracting device
CN204214136U (en) Heat conducting oil boiler waste heat recovery device
CN203517757U (en) Flash steam recovery system
CN201917085U (en) Preboiler water supply device utilizing solar energy
CN203360836U (en) Steam circulating system for steam dryer
CN202902256U (en) Reeling mill steam cooling waste hot water utilization equipment
CN203177142U (en) High-frequency boiler
CN208108489U (en) A kind of high efficiency boiler energy-saving control system
CN202338894U (en) Water replenishing system for boiler with economizer
CN206618299U (en) A kind of waste-heat recovery device
CN104165349A (en) Boiler waste heat utilizing device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120725

Termination date: 20141212

EXPY Termination of patent right or utility model