CN105672943A - 一种具有可溶解结构的全通径滑套 - Google Patents
一种具有可溶解结构的全通径滑套 Download PDFInfo
- Publication number
- CN105672943A CN105672943A CN201610037341.5A CN201610037341A CN105672943A CN 105672943 A CN105672943 A CN 105672943A CN 201610037341 A CN201610037341 A CN 201610037341A CN 105672943 A CN105672943 A CN 105672943A
- Authority
- CN
- China
- Prior art keywords
- sliding sleeve
- full
- solubilized
- solubilized structure
- urceolus
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000007789 sealing Methods 0.000 claims description 17
- 238000011144 upstream manufacturing Methods 0.000 claims description 4
- KXGFMDJXCMQABM-UHFFFAOYSA-N 2-methoxy-6-methylphenol Chemical compound [CH]OC1=CC=CC([CH])=C1O KXGFMDJXCMQABM-UHFFFAOYSA-N 0.000 claims description 3
- -1 Lauxite Polymers 0.000 claims description 3
- 229910001051 Magnalium Inorganic materials 0.000 claims description 3
- 239000004642 Polyimide Substances 0.000 claims description 3
- 239000003822 epoxy resin Substances 0.000 claims description 3
- 229920001568 phenolic resin Polymers 0.000 claims description 3
- 239000005011 phenolic resin Substances 0.000 claims description 3
- 229920000647 polyepoxide Polymers 0.000 claims description 3
- 229920001721 polyimide Polymers 0.000 claims description 3
- 239000002002 slurry Substances 0.000 abstract description 8
- 230000002411 adverse Effects 0.000 abstract description 3
- 230000009286 beneficial effect Effects 0.000 abstract description 3
- 238000010276 construction Methods 0.000 abstract description 3
- 230000000694 effects Effects 0.000 abstract description 3
- 239000004568 cement Substances 0.000 abstract 1
- 230000011218 segmentation Effects 0.000 description 5
- 230000000903 blocking effect Effects 0.000 description 3
- 239000002253 acid Substances 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000002372 labelling Methods 0.000 description 1
- 239000007788 liquid Substances 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 239000002195 soluble material Substances 0.000 description 1
- 230000009466 transformation Effects 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B34/00—Valve arrangements for boreholes or wells
- E21B34/06—Valve arrangements for boreholes or wells in wells
- E21B34/08—Valve arrangements for boreholes or wells in wells responsive to flow or pressure of the fluid obtained
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B33/00—Sealing or packing boreholes or wells
- E21B33/10—Sealing or packing boreholes or wells in the borehole
- E21B33/13—Methods or devices for cementing, for plugging holes, crevices or the like
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/25—Methods for stimulating production
- E21B43/26—Methods for stimulating production by forming crevices or fractures
Landscapes
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Geology (AREA)
- Mining & Mineral Resources (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Reciprocating Pumps (AREA)
- Sliding-Contact Bearings (AREA)
Abstract
本发明提供一种具有可溶解结构的全通径滑套,包括:上接头、下接头、外筒、内筒、剪切销钉以及第一可溶解结构;所述上接头和下接头分别连接于外筒的两端,所述内筒通过剪切销钉锁定在外筒内部并且封闭所述外筒上所设有的导流孔;所述内筒与下接头之间具有移动空间,在所述移动空间内填充有第一可溶解结构。本发明通过在内筒的移动空间处以及内筒内壁的凹槽处采用可溶解结构进行预填充,能够有效避免固井水泥浆堵塞移动空间和凹槽而带来的不利影响,压裂施工后的井筒能够保持全通径,特别有利于油气井的后期作业,并且该滑套可以实现反复开关功能。
Description
技术领域
本发明涉及石油天然气开采技术领域,特别涉及一种带有溶解性材料的滑套。
背景技术
近年来,国内外油气田在水平井采用精细分段取得了一定的成果,精细分段需要滑套级数有较大增加,以往的投球滑套在精细分段方面就出现了分段级数不够的局限。为满足精细分段要求,国内近年来进行了全通径滑套研发,然而目前的全通径滑套(请见图1)存在固井水泥浆堵塞进液孔或填充凹槽,不利于套管滑套打开的问题,因而导致滑套失效,造成比较大的经济损失。
有鉴于此,有必要设计一种能够有效避免因固井水泥浆堵塞进液孔或填充凹槽而使套管滑套无法打开的滑套。
发明内容
针对上述问题,本发明的目的是提供一种具有可溶解结构的全通径滑套,能够有效避免因固井水泥浆堵塞进液孔或填充凹槽而使套管滑套无法打开的技术缺陷。
为达上述目的,本发明提供一种具有可溶解结构的全通径滑套,其包括:上接头、下接头、外筒、内筒、剪切销钉以及第一可溶解结构;
所述上接头和下接头分别连接于外筒的两端,所述内筒通过剪切销钉锁定在外筒内部并且封闭所述外筒上所设有的导流孔;
所述内筒与下接头之间具有移动空间,在所述移动空间内填充有第一可溶解结构。
所述的具有可溶解结构的全通径滑套,其中,所述内筒的内壁上设有对应于开滑套工具的至少一个凹槽,在凹槽内填充有第二可溶解结构。
所述的具有可溶解结构的全通径滑套,其中,所述第一可溶解结构的内径大于或等于内筒的内径。
所述的具有可溶解结构的全通径滑套,其中,所述第一可溶解结构的内径大于或等于下接头的内径。
所述的具有可溶解结构的全通径滑套,其中,所述第二可溶解结构的内径大于或等于内筒的内径。
所述的具有可溶解结构的全通径滑套,其中,所述第一可溶解结构和/或第二可溶解结构采用镁铝合金、酚醛树脂、脲醛树脂、环氧树脂或聚酰亚胺制成。
所述的具有可溶解结构的全通径滑套,其中,所述上接头与外筒螺纹连接。
所述的具有可溶解结构的全通径滑套,其中,所述下接头与外筒螺纹连接。
所述的具有可溶解结构的全通径滑套,其中,所述上接头与外筒之间安装第一密封圈,并且所述下接头与外筒之间安装第二密封圈。
所述的具有可溶解结构的全通径滑套,其中,所述外筒与内筒之间、导流孔的上游和下游分别设有第三密封圈和第四密封圈。
本发明的有益效果是:
本发明通过在内筒的移动空间处以及内筒内壁的凹槽处采用可溶解结构进行预填充,能够有效避免固井水泥浆堵塞移动空间和凹槽而带来的不利影响,压裂施工后的井筒能够保持全通径,特别有利于油气井的后期作业,并且该滑套可以实现反复开关功能。
附图说明
在下文中将基于实施例并参考附图来对本发明进行更详细的描述。其中:
图1是现有的全通径滑套的结构示意图;
图2是根据本发明的具有可溶解结构的全通径滑套的结构示意图。
在附图中,相同的部件使用相同的附图标记。附图并未按照实际的比例。
具体实施方式
下面将结合附图对本发明作进一步说明。
请见图2,其是根据本发明的具有可溶解结构的全通径滑套的结构示意图。所述全通径滑套主要包括:上接头1、下接头2、外筒3、内筒4、剪切销钉5以及可溶解结构。
其中,所述上接头1、下接头2分别连接于外筒3的两端。优选的是,上接头1可与外筒3螺纹连接,并且下接头2也可与外筒3螺纹连接,以便于安装及拆卸。然而,上接头1、下接头2与外筒3之间的连接方式并不限于上述的螺纹连接,其它可拆卸或不可拆卸的连接方式都适用于本发明。
为了确保上接头1与外筒3的密封效果,可以在上接头1与外筒3之间安装第一密封圈11。同样地,为了确保下接头2与外筒3的密封效果,可以在下接头2与外筒3之间安装第二密封圈12。所述外筒3上设有导流孔30,导流孔30能够将外筒3的内、外贯通。
所述内筒4通过剪切销钉5锁定在外筒3内部指定位置,并且在初始状态下,所述内筒4封闭所述导流孔30。此外,为了确保内筒4封闭导流孔30的密封效果,外筒3与内筒4之间、导流孔30的上游和下游分别设有第三密封圈13和第四密封圈14。需要说明的是,无论第四密封圈14位于剪切销钉6的上游或下游,均可实现对导流孔30的密封,具体可出于简化工艺步骤的目的进行设计。
在初始状态下,所述内筒4与下接头2之间具有移动空间6,在所述移动空间6内填充有第一可溶解结构7。优选地,所述第一可溶解结构7大体呈环形,且第一可溶解结构7的内径大于或等于内筒4的内径,并且大于或等于下接头2的内径,这样设置的目的是能够保证不会由固井水泥浆堵塞移动空间6,这是由于第一可溶解结构7溶解时,能够彻底地清空移动空间6,使得内筒4能够顺畅地滑向下接头2,并打开外筒3上的导流孔30。
此外,所述内筒4的内壁上还设有对应于开滑套工具(图中未示出)的至少一个凹槽40(图中示出两个凹槽),在凹槽40内可以填充有第二可溶解结构8。优选地,所述第二可溶解结构8也大体呈环形,且第二可溶解结构8的内径大于或等于内筒4的内径,这样设置的目的是能够保证当下入开滑套工具时,内筒4内部的凹槽40不会由固井水泥浆堵塞住,这是由于第二可溶解结构8溶解时,能够彻底地清空凹槽40,使得开滑套工具能够顺利地与内筒上的凹槽40接合,从而使内筒4能够顺畅地向下接头2移动,并打开外筒3上的导流孔30。
其中,所述第一可溶解结构7和第二可溶解结构8均可采用可溶解的材料制成,例如镁铝合金、酚醛树脂、脲醛树脂、环氧树脂、聚酰亚胺等等。
制成,但不以此为限。
本发明的工作原理是:
将本发明的具有可溶解结构的全通径滑套随作业管柱下入井筒,通过井筒憋压开启底层的压差滑套进行改造作业,作业完毕后从地面泵入用于溶解第一可溶解结构7和第二可溶解结构8的液体(比如酸液)至全通径滑套的位置,静置一段时间待第一可溶解结构7和第二可溶解结构8充分溶解,再从井口依次投入开滑套工具,当开滑套工具与本发明的滑套卡挂好之后,逐级开启滑套,进行储层改造作业。
综上所述,本发明的有益效果是:
本发明通过在内筒4的移动空间6处以及内筒4内壁的凹槽40处采用可溶解结构进行预填充,能够有效避免固井水泥浆堵塞移动空间6和凹槽40而带来的不利影响,压裂施工后的井筒能够保持全通径,特别有利于油气井的后期作业,并且该滑套可以实现反复开关功能。
相关技术术语的名词解释虽然已经参考优选实施例对本发明进行了描述,但在不脱离本发明的范围的情况下,可以对其进行各种改进并且可以用等效物替换其中的部件。尤其是,只要不存在结构冲突,各个实施例中所提到的各项技术特征均可以任意方式组合起来。本发明并不局限于文中公开的特定实施例,而是包括落入权利要求的范围内的所有技术方案。
Claims (10)
1.一种具有可溶解结构的全通径滑套,其特征在于,包括:上接头、下接头、外筒、内筒、剪切销钉以及第一可溶解结构;
所述上接头和下接头分别连接于外筒的两端,所述内筒通过剪切销钉锁定在外筒内部并且封闭所述外筒上所设有的导流孔;
所述内筒与下接头之间具有移动空间,在所述移动空间内填充有第一可溶解结构。
2.根据权利要求1所述的具有可溶解结构的全通径滑套,其特征在于,所述内筒的内壁上设有对应于开滑套工具的至少一个凹槽,在凹槽内填充有第二可溶解结构。
3.根据权利要求1所述的具有可溶解结构的全通径滑套,其特征在于,所述第一可溶解结构的内径大于或等于内筒的内径。
4.根据权利要求1所述的具有可溶解结构的全通径滑套,其特征在于,所述第一可溶解结构的内径大于或等于下接头的内径。
5.根据权利要求2所述的具有可溶解结构的全通径滑套,其特征在于,所述第二可溶解结构的内径大于或等于内筒的内径。
6.根据权利要求2所述的具有可溶解结构的全通径滑套,其特征在于,所述第一可溶解结构和/或第二可溶解结构采用镁铝合金、酚醛树脂、脲醛树脂、环氧树脂或聚酰亚胺制成。
7.根据权利要求1所述的具有可溶解结构的全通径滑套,其特征在于,所述上接头与外筒螺纹连接。
8.根据权利要求1所述的具有可溶解结构的全通径滑套,其特征在于,所述下接头与外筒螺纹连接。
9.根据权利要求1至8中任一项所述的具有可溶解结构的全通径滑套,其特征在于,所述上接头与外筒之间安装第一密封圈,并且所述下接头与外筒之间安装第二密封圈。
10.根据权利要求1至8中任一项所述的具有可溶解结构的全通径滑套,其特征在于,所述外筒与内筒之间、导流孔的上游和下游分别设有第三密封圈和第四密封圈。
Priority Applications (9)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610037341.5A CN105672943B (zh) | 2016-01-20 | 2016-01-20 | 一种具有可溶解结构的全通径滑套 |
CA3010247A CA3010247C (en) | 2016-01-20 | 2017-01-13 | Sliding sleeve |
RU2018128419A RU2751521C2 (ru) | 2016-01-20 | 2017-01-13 | Скользящая муфта |
MX2018008633A MX2018008633A (es) | 2016-01-20 | 2017-01-13 | Novedoso manguito deslizante. |
AU2017209219A AU2017209219B2 (en) | 2016-01-20 | 2017-01-13 | Novel sliding sleeve |
BR112018014652-8A BR112018014652B1 (pt) | 2016-01-20 | 2017-01-13 | Luva deslizante |
PCT/CN2017/071166 WO2017124978A1 (zh) | 2016-01-20 | 2017-01-13 | 一种新型滑套 |
US16/071,111 US11885201B2 (en) | 2016-01-20 | 2017-01-13 | Sliding sleeve |
ZA2018/05530A ZA201805530B (en) | 2016-01-20 | 2018-08-17 | Novel sliding sleeve |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610037341.5A CN105672943B (zh) | 2016-01-20 | 2016-01-20 | 一种具有可溶解结构的全通径滑套 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105672943A true CN105672943A (zh) | 2016-06-15 |
CN105672943B CN105672943B (zh) | 2018-07-10 |
Family
ID=56301770
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610037341.5A Active CN105672943B (zh) | 2016-01-20 | 2016-01-20 | 一种具有可溶解结构的全通径滑套 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105672943B (zh) |
Cited By (16)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105937383A (zh) * | 2016-06-20 | 2016-09-14 | 中国石油天然气股份有限公司 | 一种可溶型全通径球座工作筒 |
WO2017124978A1 (zh) * | 2016-01-20 | 2017-07-27 | 中国石油化工股份有限公司 | 一种新型滑套 |
CN108194050A (zh) * | 2018-02-01 | 2018-06-22 | 成都众智诚成石油科技有限公司 | 一种井下滑套开启方法及装置 |
CN109339757A (zh) * | 2018-08-21 | 2019-02-15 | 中国石油天然气股份有限公司 | 一种延时滑套 |
CN109812245A (zh) * | 2017-11-21 | 2019-05-28 | 中国石油化工股份有限公司 | 一种压裂滑套 |
CN111287732A (zh) * | 2020-04-01 | 2020-06-16 | 中国石油天然气集团有限公司 | 一种油气井水泥环密封性能检测评价装置及评价方法 |
CN111305795A (zh) * | 2020-03-11 | 2020-06-19 | 中国石油集团渤海钻探工程有限公司 | 一种应用插管桥塞下管式泵的方法 |
CN112211592A (zh) * | 2019-07-12 | 2021-01-12 | 中国石油化工股份有限公司 | 一种可开关固井滑套 |
CN112746834A (zh) * | 2021-03-22 | 2021-05-04 | 四川省威沃敦化工有限公司 | 一种预置套管分段阀式分段压裂方法及其专用工具 |
CN112943122A (zh) * | 2021-01-20 | 2021-06-11 | 中国石油天然气股份有限公司 | 可溶解支撑卡瓦、可溶解金属井筒开关系统及使用方法 |
CN113323627A (zh) * | 2020-02-28 | 2021-08-31 | 中国石油化工股份有限公司 | 一种压差滑套及油气井压裂施工方法 |
WO2021249498A1 (zh) * | 2020-06-12 | 2021-12-16 | 中国石油化工股份有限公司 | 滑套装置 |
CN114427379A (zh) * | 2020-09-25 | 2022-05-03 | 中国石油化工股份有限公司 | 一种暂堵式固井压裂滑套及施工方法 |
CN115247546A (zh) * | 2021-04-28 | 2022-10-28 | 中石化石油工程技术服务有限公司 | 一种趾端固井压裂滑套 |
CN115370331A (zh) * | 2022-10-26 | 2022-11-22 | 山东普瑞思德石油技术有限公司 | 一种无内管充填的泡沫金属筛管 |
WO2022257080A1 (zh) * | 2021-06-10 | 2022-12-15 | 中国石油化工股份有限公司 | 压差滑套及使用其的油气井压裂施工方法 |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2622377Y (zh) * | 2003-05-23 | 2004-06-30 | 辽河石油勘探局工程技术研究院 | 一种接触密封式热应力补偿器 |
US20090032255A1 (en) * | 2007-08-03 | 2009-02-05 | Halliburton Energy Services, Inc. | Method and apparatus for isolating a jet forming aperture in a well bore servicing tool |
US20120006553A1 (en) * | 2010-07-07 | 2012-01-12 | Baker Hughes Incorporated | Injection Valve with Indexing Mechanism |
US20120073819A1 (en) * | 2009-04-17 | 2012-03-29 | Richard Bennett M | Method and system for hydraulic fracturing |
CN103556971A (zh) * | 2013-11-15 | 2014-02-05 | 中国石油化工股份有限公司 | 用于油气井作业的全通径分层压裂滑套 |
CN204024594U (zh) * | 2014-09-01 | 2014-12-17 | 中国石油集团渤海钻探工程有限公司 | 水平井固井用可开关压裂滑套施工管串 |
CN104453784A (zh) * | 2014-12-12 | 2015-03-25 | 中国石油天然气股份有限公司 | 一种可控型可溶球座多级压裂滑套 |
CN104453778A (zh) * | 2014-11-06 | 2015-03-25 | 中国石油天然气股份有限公司 | 具有可溶解球座的压裂滑套及压裂方法 |
CN105064953A (zh) * | 2015-07-20 | 2015-11-18 | 中国石油集团渤海钻探工程有限公司 | 具有促降解中心管的快速降解桥塞 |
-
2016
- 2016-01-20 CN CN201610037341.5A patent/CN105672943B/zh active Active
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2622377Y (zh) * | 2003-05-23 | 2004-06-30 | 辽河石油勘探局工程技术研究院 | 一种接触密封式热应力补偿器 |
US20090032255A1 (en) * | 2007-08-03 | 2009-02-05 | Halliburton Energy Services, Inc. | Method and apparatus for isolating a jet forming aperture in a well bore servicing tool |
US20120073819A1 (en) * | 2009-04-17 | 2012-03-29 | Richard Bennett M | Method and system for hydraulic fracturing |
US20120006553A1 (en) * | 2010-07-07 | 2012-01-12 | Baker Hughes Incorporated | Injection Valve with Indexing Mechanism |
CN103556971A (zh) * | 2013-11-15 | 2014-02-05 | 中国石油化工股份有限公司 | 用于油气井作业的全通径分层压裂滑套 |
CN204024594U (zh) * | 2014-09-01 | 2014-12-17 | 中国石油集团渤海钻探工程有限公司 | 水平井固井用可开关压裂滑套施工管串 |
CN104453778A (zh) * | 2014-11-06 | 2015-03-25 | 中国石油天然气股份有限公司 | 具有可溶解球座的压裂滑套及压裂方法 |
CN104453784A (zh) * | 2014-12-12 | 2015-03-25 | 中国石油天然气股份有限公司 | 一种可控型可溶球座多级压裂滑套 |
CN105064953A (zh) * | 2015-07-20 | 2015-11-18 | 中国石油集团渤海钻探工程有限公司 | 具有促降解中心管的快速降解桥塞 |
Cited By (25)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
AU2017209219B2 (en) * | 2016-01-20 | 2022-10-06 | China Petroleum & Chemical Corporation | Novel sliding sleeve |
WO2017124978A1 (zh) * | 2016-01-20 | 2017-07-27 | 中国石油化工股份有限公司 | 一种新型滑套 |
RU2751521C2 (ru) * | 2016-01-20 | 2021-07-14 | Чайна Петролеум Энд Кемикал Корпорейшн | Скользящая муфта |
US11885201B2 (en) * | 2016-01-20 | 2024-01-30 | China Petroleum & Chemical Corporation | Sliding sleeve |
CN105937383A (zh) * | 2016-06-20 | 2016-09-14 | 中国石油天然气股份有限公司 | 一种可溶型全通径球座工作筒 |
CN105937383B (zh) * | 2016-06-20 | 2018-09-04 | 中国石油天然气股份有限公司 | 一种可溶型全通径球座工作筒 |
CN109812245A (zh) * | 2017-11-21 | 2019-05-28 | 中国石油化工股份有限公司 | 一种压裂滑套 |
CN108194050B (zh) * | 2018-02-01 | 2024-02-20 | 成都众智诚成石油科技有限公司 | 一种井下滑套开启方法及装置 |
CN108194050A (zh) * | 2018-02-01 | 2018-06-22 | 成都众智诚成石油科技有限公司 | 一种井下滑套开启方法及装置 |
CN109339757A (zh) * | 2018-08-21 | 2019-02-15 | 中国石油天然气股份有限公司 | 一种延时滑套 |
CN112211592A (zh) * | 2019-07-12 | 2021-01-12 | 中国石油化工股份有限公司 | 一种可开关固井滑套 |
CN113323627A (zh) * | 2020-02-28 | 2021-08-31 | 中国石油化工股份有限公司 | 一种压差滑套及油气井压裂施工方法 |
CN111305795A (zh) * | 2020-03-11 | 2020-06-19 | 中国石油集团渤海钻探工程有限公司 | 一种应用插管桥塞下管式泵的方法 |
CN111287732A (zh) * | 2020-04-01 | 2020-06-16 | 中国石油天然气集团有限公司 | 一种油气井水泥环密封性能检测评价装置及评价方法 |
WO2021249498A1 (zh) * | 2020-06-12 | 2021-12-16 | 中国石油化工股份有限公司 | 滑套装置 |
US11933138B2 (en) | 2020-06-12 | 2024-03-19 | China Petroleum & Chemical Corporation | Sliding sleeve device |
CN114427379A (zh) * | 2020-09-25 | 2022-05-03 | 中国石油化工股份有限公司 | 一种暂堵式固井压裂滑套及施工方法 |
CN114427379B (zh) * | 2020-09-25 | 2024-06-28 | 中国石油化工股份有限公司 | 一种暂堵式固井压裂滑套及施工方法 |
CN112943122A (zh) * | 2021-01-20 | 2021-06-11 | 中国石油天然气股份有限公司 | 可溶解支撑卡瓦、可溶解金属井筒开关系统及使用方法 |
CN112746834A (zh) * | 2021-03-22 | 2021-05-04 | 四川省威沃敦化工有限公司 | 一种预置套管分段阀式分段压裂方法及其专用工具 |
CN115247546A (zh) * | 2021-04-28 | 2022-10-28 | 中石化石油工程技术服务有限公司 | 一种趾端固井压裂滑套 |
CN115247546B (zh) * | 2021-04-28 | 2024-04-26 | 中石化石油工程技术服务有限公司 | 一种趾端固井压裂滑套 |
WO2022257080A1 (zh) * | 2021-06-10 | 2022-12-15 | 中国石油化工股份有限公司 | 压差滑套及使用其的油气井压裂施工方法 |
CN115370331A (zh) * | 2022-10-26 | 2022-11-22 | 山东普瑞思德石油技术有限公司 | 一种无内管充填的泡沫金属筛管 |
CN115370331B (zh) * | 2022-10-26 | 2023-01-17 | 山东普瑞思德石油技术有限公司 | 一种无内管充填的泡沫金属筛管 |
Also Published As
Publication number | Publication date |
---|---|
CN105672943B (zh) | 2018-07-10 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105672943A (zh) | 一种具有可溶解结构的全通径滑套 | |
CN201031662Y (zh) | 一种井下可控式钻具旁通阀 | |
CN102094612B (zh) | 煤层气井活性水压裂工艺 | |
CN103061684A (zh) | 裸眼水平井分段多簇均匀酸化管柱及其酸化方法 | |
CN205605160U (zh) | 破裂式尾管堵塞器 | |
CN103061707B (zh) | 井下循环开关阀 | |
CN104563947A (zh) | 一种油井井下防喷管柱 | |
CN107461182B (zh) | 分层压裂防砂方法 | |
CN116816308A (zh) | 一种小井眼页岩油井无油管清蜡举升装置 | |
CN208686362U (zh) | 一种水平井一体化高效堵水工艺管柱 | |
CN204703836U (zh) | 一种油井井下防喷管柱 | |
CN203702064U (zh) | 井口油管封堵装置 | |
RU128896U1 (ru) | Устройство для перевода скважин, в том числе обводненных, на эксплуатацию по двум лифтовым колоннам | |
CN205779596U (zh) | 一种抽油泵和采油管柱 | |
CN108240198B (zh) | 抽油泵过泵洗井装置 | |
CN205895185U (zh) | 防砂卡可泄油式油管锚定器 | |
CN204060660U (zh) | 一种静压力压差滑套 | |
CN204113210U (zh) | 一种全井段无桥塞半程固井工具 | |
CN207583343U (zh) | 油田井下油管带压作业安全防喷装置 | |
CN205714077U (zh) | 抽油泵堵塞器 | |
CN104153751B (zh) | 一种静压力压差滑套 | |
CN204371623U (zh) | 抽油泵 | |
CN111636851A (zh) | 一种井筒浮子开关器及控制井筒开关的方法 | |
CN201351597Y (zh) | 可传压抽油泵进油阀 | |
CN112392438A (zh) | 一种可洗井加药的闭式采油管柱结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |