CN105672666B - A kind of solid wooden floor board installation method - Google Patents
A kind of solid wooden floor board installation method Download PDFInfo
- Publication number
- CN105672666B CN105672666B CN201610085687.2A CN201610085687A CN105672666B CN 105672666 B CN105672666 B CN 105672666B CN 201610085687 A CN201610085687 A CN 201610085687A CN 105672666 B CN105672666 B CN 105672666B
- Authority
- CN
- China
- Prior art keywords
- lath
- narrowly
- floor board
- solid wooden
- wooden floor
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/14—Conveying or assembling building elements
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Floor Finish (AREA)
Abstract
The invention discloses a kind of solid wooden floor board installation method for solving the deformation of solid wooden floor board bulking, it comprises the following steps:Keel installation, solid wooden floor board laying, the narrowly lath that the laying of wall side is flexibly connected with adjacent solid wooden floor board, by wall side side cross sectional shape when narrowly lath is mated formation for chamfer is trapezoidal or inverted trapezoidal;Keel by wall side side are provided with the support batten being fixed on keel, and the cross sectional shape of the support batten is right angled triangle, and its hypotenuse is parallel with the stringcourse of adjacent narrow floor strip;Skirting is installed;The inventive method is simple, convenient disassembly, when solid wooden floor board bulking, the narrowly lath on wall side is due to stress reason, and be flexibly connected with solid wood floor block, arch camber at first is raised, it is to avoid it is raised that arch camber occurs in house middle part, during maintenance, skirting can be pried open, narrowly lath is removed, then skirting is arranged on wall, solve the problems, such as that solid wooden floor board deforms arch camber bulging deformation due to bulking.
Description
The application is Application No. 201510045819.4, and the applying date is 2015.01.29, entitled solid wooden floor board
The divisional application of installation method patent application.
Technical field
The present invention relates to a kind of installation on floor, specifically a kind of solid wooden floor board installation method is more particularly to solved
A kind of solid wooden floor board installation method that certainly solid wooden floor board bulking deforms.
Background technology
With the continuous improvement of people's quality of the life, one kind is thirsted for getting close to nature, merges natural life style by people
Generally pursue.In indoor decoration finishing, there is quite a few colony to advocate high praise and solid wooden floor board is installed.Although, solid wooden floor board
During installation, expansion joint is left, but, because solid wooden floor board moisture expansion and drying shrinkage deflection is big, and as timber variety is different, use
Region is different, and the moisture expansion and drying shrinkage amount difference occurred during use is very big, is especially apparent in south so that the timber variety having this
Sample expansion joint wide also can not meet the requirement of bulking deformation.After bulking, solid wooden floor board arch camber bulging deformation, and will not be in gas
Time dries the period and is retracted into original state again with trampling stress, arch camber bossing.After there is this situation, it is necessary to will be whole
The article in individual room is moved out, asks professional to pry open skirting, is removed solid wooden floor board and is reinstalled, and bulking widened portion is used
Saw blade cuts rejecting.Have because timber bulking deflection is big, the internal cause bulking in several years need to be reinstalled several times, be wasted time and energy
It is costly.
In this regard, Application No. 201110423127.0, the solid wooden floor board of entitled three layers of wood structure and its installation
The patent application of method specifically discloses plate and panel in being sequentially provided with base plate, and middle plate is by the splicing of at least two floor panels
Into the grain of wood between adjacent floorboard is crisscross, grain of wood direction and the floorboard of middle plate of base plate
Set in angle between grain of wood direction.Meanwhile, adjacent square floorboard is connected using U shapes buckle, conveniently in the future
Dismounting and repairing.But, in its practical application, solid wooden floor board can not be fully solved due to the expansion occurred during use
And contraction, cause deformation, the problems of crack of solid wooden floor board.
The patent application of Application No. 201210306025.5, entitled solid wooden floor board and its installation method is specifically public
The groove that rectangle is provided with the middle part of solid wooden floor board monomer right side is opened, has been provided with the middle part of left side and the groove match
First boss, the left and right end of the solid wooden floor board monomer top surface is respectively equipped with downward inclined-plane, the solid wooden floor board monomer
Bottom surface is provided with the second boss of multiple rectangles, and multiple second boss are uniform along the width of the solid wooden floor board monomer
Set.By leaving space between adjacent solid wooden floor board monomer, and only by one end of solid wooden floor board monomer and ground base
Plinth is fixed, so that the dilatation of solid wooden floor board monomer is discharged well, will not be caused cracking and be warped.But, by
There is space between adjacent solid wooden floor board monomer, unsightly, influence using effect.
The content of the invention
It is an object of the invention to provide a kind of solid wooden floor board installation method for solving the deformation of solid wooden floor board bulking.
The present invention adopts the following technical scheme that and realizes its goal of the invention, a kind of solid wooden floor board installation method, and it includes
The following steps:
(1) required according to the ground mated formation, keel are fixedly mounted on ground;
(2) it is laid on keel after solid wood floor block successively Tenon is combined;
(3) lay during to wall side, it is contour with solid wood floor block same that solid wood floor block at least installs a tile height additional by wall side side
The narrowly lath of material, the narrowly lath is connected with solid wood floor block by moving connecting mechanism, by wall side side narrowly
Cross sectional shape when lath is mated formation is inverted trapezoidal, and the upper bottom width of the inverted trapezoidal is 8 ㎜~15 ㎜, bottom width for 5 ㎜~
10 ㎜, the keel by wall side side are provided with the support batten being fixed on keel, and the cross sectional shape of the support batten is straight
Angle triangle, its hypotenuse is parallel with the stringcourse of adjacent narrow floor strip;Expansion joint when support batten and wall are reserved with wall between, wall
The width at side expansion joint is 3 ㎜~6 ㎜;It is reserved between support batten and adjacent narrow floor strip between expansion joint between plate, plate and is stretched
The width of seam is 3 ㎜~6 ㎜;
(4) skirting is installed.
For connection is simple, the present invention step (3) in, the moving connecting mechanism is in narrowly lath and solid wood floor block
Between the magnet that is correspondingly arranged.
Due to using above-mentioned technical proposal, the present invention preferably to realize goal of the invention, method is simple, convenient disassembly, when
During solid wooden floor board bulking, the narrowly lath on wall side is flexibly connected due to stress reason with solid wood floor block, is risen at first domed
Rise, it is to avoid it is raised that arch camber occurs in house middle part, during maintenance, can pry open skirting, remove narrowly lath, then by skirt
Line is arranged on wall, solves the problems, such as that solid wooden floor board deforms arch camber bulging deformation due to bulking.
Brief description of the drawings
Fig. 1 is the structural representation of the embodiment of the present invention 1;
Fig. 2 is the structural representation of the embodiment of the present invention 2.
Specific embodiment
Below in conjunction with the accompanying drawings and embodiment the invention will be further described.
Embodiment 1:
As shown in Figure 1, a kind of solid wooden floor board installation method, it comprises the following steps:
(1) required according to the ground mated formation, keel 5 are fixedly mounted on ground;
(2) it is laid on keel 5 after solid wood floor block 1 successively Tenon is combined;
(3) lay during to wall side 3, solid wood floor block 1 at least installs a tile height and solid wood floor block 1 etc. additional by the side of wall side 3
Narrowly lath 2 of same material high, the narrowly lath 2 is connected with solid wood floor block 1 by moving connecting mechanism, by wall side 3 one
Cross sectional shape when the narrowly lath 2 of side is mated formation is for chamfer is trapezoidal or inverted trapezoidal, and the chamfer is trapezoidal or inverted trapezoidal upper
Bottom width degree is 8 ㎜~15 ㎜, and bottom width is 5 ㎜~10 ㎜, and the keel 5 by the side of wall side 3 are provided with and are fixed on keel 5
Support batten 8, the cross sectional shape of the support batten 8 is right angled triangle, and its hypotenuse is parallel with the stringcourse of adjacent narrow floor strip;
Expansion joint 6 when support batten 8 and wall are reserved with wall between 3, the width at wall side expansion joint 6 is 3 ㎜~6 ㎜;Support batten 8 with
The width that expansion joint 9 between expansion joint 9 between plate, plate is reserved between adjacent narrow floor strip 2 is 3 ㎜~6 ㎜;
(4) skirting 7 is installed.
For connection is simple, the present invention step (3) in, the moving connecting mechanism is in narrowly lath 2 and solid wood floor block
The magnet 4 being correspondingly arranged between 1.
The present embodiment adds one piece of narrowly lath 2, and cross sectional shape when narrowly lath 2 is mated formation is that chamfer is trapezoidal, narrow
The upper bottom width of floor strip 2 is 12 ㎜, and bottom width is 8 ㎜, and the cross sectional shape of the support batten 8 being fixed on keel 5 is straight
Angle triangle, its hypotenuse is parallel with the stringcourse of adjacent narrow floor strip 2, and the width at wall side expansion joint 6 is expansion joint 9 between 6 ㎜, plate
Width is 6 ㎜.It is because people tramples on floor and narrow when solid wooden floor board makes moist bulking amount more than the width at expansion joint 9 between plate
Connected by magnet 4 between floor strip 2 and solid wood floor block 1, narrowly the contact surface between lath 2 and solid wood floor block 1 is oblique
Face so that narrowly lath 2 is easy to the protrusion that up arches upward, so as to avoid arching upward for solid wood floor block 1, is especially that of avoiding
Arch upward the centre of institute's flooring.During maintenance, only need to pry open skirting 7 narrowly will be removed lath 2, then skirting 7 is passed through into glass
Glue bond is on wall.
The actual conditions such as material, bulking amount according to solid wood floor block 1, described narrowly lath 2 can install polylith.
Embodiment 2:
As shown in Figure 2, the present embodiment adds one piece of narrowly lath 2, and cross sectional shape when narrowly lath 2 is mated formation is terraced to fall
Shape, bottom width is 4 ㎜, is also inclined-plane with the contact surface between adjacent solid wood floor block 1 so that narrowly lath 2 more holds
Easily up arch upward protrusion.
Remaining same embodiment 1.
Claims (2)
1. a kind of solid wooden floor board installation method, it is characterized in that it comprises the following steps:
(1) required according to the ground mated formation, keel are fixedly mounted on ground;
(2) it is laid on keel after solid wood floor block successively Tenon is combined;
(3) lay during to wall side, solid wood floor block at least installs a tile height and solid wood floor block grade high same material additional by wall side side
Narrowly lath, the narrowly lath is connected with solid wood floor block by moving connecting mechanism, by the narrowly lath of wall side side
Cross sectional shape when mating formation is inverted trapezoidal, and the upper bottom width of the inverted trapezoidal is 8 ㎜~15 ㎜, and bottom width is 5 ㎜~10 ㎜,
Keel by wall side side are provided with the support batten being fixed on keel, and the cross sectional shape of the support batten is right angle trigonometry
Shape, its hypotenuse is parallel with the stringcourse of adjacent narrow floor strip;Stretch on expansion joint when support batten and wall are reserved with wall between, wall side
The width of seam is 3 ㎜~6 ㎜;The width at expansion joint between expansion joint between plate, plate is reserved between support batten and adjacent narrow floor strip
It is 3 ㎜~6 ㎜ to spend;
(4) skirting is installed.
2. a kind of solid wooden floor board installation method according to claim 1, it is characterized in that step (3) in, the flexible connection
Mechanism is in the magnet being narrowly correspondingly arranged between lath and solid wood floor block.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610085687.2A CN105672666B (en) | 2015-01-29 | 2015-01-29 | A kind of solid wooden floor board installation method |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610085687.2A CN105672666B (en) | 2015-01-29 | 2015-01-29 | A kind of solid wooden floor board installation method |
CN201510045819.4A CN104594629B (en) | 2015-01-29 | 2015-01-29 | Solid wooden floor board installation method |
Related Parent Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510045819.4A Division CN104594629B (en) | 2015-01-29 | 2015-01-29 | Solid wooden floor board installation method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105672666A CN105672666A (en) | 2016-06-15 |
CN105672666B true CN105672666B (en) | 2017-07-07 |
Family
ID=56304262
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610085687.2A Expired - Fee Related CN105672666B (en) | 2015-01-29 | 2015-01-29 | A kind of solid wooden floor board installation method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105672666B (en) |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0198157B1 (en) * | 1985-04-16 | 1990-07-18 | Stephan Wedi | Plastic expansion joint strip, especially for the border joint of a floor construction |
WO1996027722A1 (en) * | 1995-03-08 | 1996-09-12 | Forbo-Krommenie B.V. | Method for laying a floor covering as well as floor panels to be used for such method |
GB2322880A (en) * | 1997-03-07 | 1998-09-09 | Paul Healey | Floor edging strip |
DE202007008087U1 (en) * | 2007-06-09 | 2007-08-23 | Schlüter-Systems Kg | Device for forming a connection transition between two surfaces at right angles to each other with rigid coverings |
CN101109225A (en) * | 2006-07-17 | 2008-01-23 | 季资元 | Easy-installed floor and laying method thereof |
CN201581598U (en) * | 2009-12-22 | 2010-09-15 | 浙江世友木业有限公司 | Laying structure of geothermal solid wood floor |
CN103790330A (en) * | 2012-11-01 | 2014-05-14 | 浙江菱格木业有限公司 | Method for applying solid wood floors to floor heating environment and solid wood floor paving structure |
-
2015
- 2015-01-29 CN CN201610085687.2A patent/CN105672666B/en not_active Expired - Fee Related
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0198157B1 (en) * | 1985-04-16 | 1990-07-18 | Stephan Wedi | Plastic expansion joint strip, especially for the border joint of a floor construction |
WO1996027722A1 (en) * | 1995-03-08 | 1996-09-12 | Forbo-Krommenie B.V. | Method for laying a floor covering as well as floor panels to be used for such method |
GB2322880A (en) * | 1997-03-07 | 1998-09-09 | Paul Healey | Floor edging strip |
CN101109225A (en) * | 2006-07-17 | 2008-01-23 | 季资元 | Easy-installed floor and laying method thereof |
DE202007008087U1 (en) * | 2007-06-09 | 2007-08-23 | Schlüter-Systems Kg | Device for forming a connection transition between two surfaces at right angles to each other with rigid coverings |
CN201581598U (en) * | 2009-12-22 | 2010-09-15 | 浙江世友木业有限公司 | Laying structure of geothermal solid wood floor |
CN103790330A (en) * | 2012-11-01 | 2014-05-14 | 浙江菱格木业有限公司 | Method for applying solid wood floors to floor heating environment and solid wood floor paving structure |
Also Published As
Publication number | Publication date |
---|---|
CN105672666A (en) | 2016-06-15 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CZ305227B6 (en) | Flooring system and floorboard for such a system | |
NO321469B1 (en) | Procedure for laying and mechanical joining of floorboards in parallel rows. | |
US20080005988A1 (en) | Floor or wall covering | |
WO2008011761A1 (en) | An easily assembled floor and an installation method therefor | |
CN103161294B (en) | The wooden floor of three layers of wood structure and mounting method thereof | |
CN104372914A (en) | Magnetic attraction type floorboard assembly | |
CN1873160A (en) | Keel frame for paving floor tiles | |
CN101509312A (en) | False floor tile and floor system composed of same | |
RU2683970C1 (en) | Panel and panel bundle | |
CN204186016U (en) | A kind of revetment | |
CN105672666B (en) | A kind of solid wooden floor board installation method | |
CN104594629B (en) | Solid wooden floor board installation method | |
CN108979062A (en) | Upper and lower chain floor and its installation method | |
JP2009102922A (en) | Plain roof tile and its manufacturing method | |
KR102202912B1 (en) | Floor cover for Elevator hall | |
EP0652341A1 (en) | Process of laying and connecting floor elements for optimizing the improving of contact-sound proofing | |
CN2777114Y (en) | Solid wood composite flooring | |
KR101492429B1 (en) | The construction method and stucture for rafters of traditional wooden building | |
CN104358370A (en) | Wall guard and installation method thereof | |
KR20190101232A (en) | A flooring assembly and a construction method using same. | |
US20020020135A1 (en) | Device for the removal of squeaks in floors and in stairs | |
CN101629450A (en) | Solid wood floor and rapid nondestructive warping prevention installation method thereof | |
CN200975085Y (en) | Water resistant plastic wooden floor | |
CN200964678Y (en) | Matched floor | |
CN105064632A (en) | Three-jaw inverted nail for installing wooden decorated panel, stairway and installation method thereof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20180713 Address after: 528300 one of the new century agricultural demonstration bases in Longjiang Town, Shunde District, Foshan, Guangdong. Patentee after: China and the people container Hotel Plaza Limited Address before: No. 518 Yingbin East Road, Yiyang, Hunan Province, Hunan Patentee before: Hunan City University |
|
TR01 | Transfer of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170707 Termination date: 20210129 |
|
CF01 | Termination of patent right due to non-payment of annual fee |