CN105672196A - Competition wharf - Google Patents

Competition wharf Download PDF

Info

Publication number
CN105672196A
CN105672196A CN201610054179.8A CN201610054179A CN105672196A CN 105672196 A CN105672196 A CN 105672196A CN 201610054179 A CN201610054179 A CN 201610054179A CN 105672196 A CN105672196 A CN 105672196A
Authority
CN
China
Prior art keywords
riding boogie
boogie board
pump
cylinder
water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610054179.8A
Other languages
Chinese (zh)
Inventor
于立
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Ocean University ZJOU
Original Assignee
Zhejiang Ocean University ZJOU
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Ocean University ZJOU filed Critical Zhejiang Ocean University ZJOU
Priority to CN201610054179.8A priority Critical patent/CN105672196A/en
Publication of CN105672196A publication Critical patent/CN105672196A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/04Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
    • E02B3/06Moles; Piers; Quays; Quay walls; Groynes; Breakwaters ; Wave dissipating walls; Quay equipment
    • E02B3/062Constructions floating in operational condition, e.g. breakwaters or wave dissipating walls
    • E02B3/064Floating landing-stages

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses a competition wharf and belongs to the technical field of sports apparatuses. The competition wharf comprises a controller, a wharf body, a second inflation pump, a first inflation pump, a first floating bag, a second air cylinder, a second floating bag, a third floating bag, a third inflation pump, a second sliding rail, a second sliding block, a linear motor, a mobile block, a first air cylinder, a first sliding block, a first sliding rail, a fish-eye type bearing, a second pedal, a second water-stop expansion strip, a second elastic pipe, a second water pump, a first water-stop expansion strip, a first elastic pipe, a third air cylinder, a first water pump, a first pedal and a groove, wherein the first pedal is hinged to the right side of the wharf body; the first elastic pipe is mounted on the first pedal and internally provided with the first water-stop expansion strip; the first water pump is mounted in the first pedal; and a water pumping pipe of the first water pump stretches out of the first pedal. The competition wharf has the advantages that the pedals can be telescopic and the angle between the pedals and the wharf can also be adjusted.

Description

A kind of match harbour
Technical field
The present invention relates to a kind of match harbour, belong to sports apparatus technical field.
Background technology
Harbour be seashore, rivers limit specialize in passenger up and down, the buildings of loading and discharging, boats and ships rest on harbour limit, people go on boats and ships from harbour, scalable riding boogie board all do not installed by the harbour of prior art, and the angle of riding boogie board and harbour can not be regulated, when in boats and ships when going on board a little higher or lower than harbour, people can be made to go on board inconvenience, there is potential safety hazard. In order to solve above-mentioned difficulties, it is necessary to develop a riding boogie board scalable, and the match harbour of the angle between riding boogie board and harbour can be regulated.
Summary of the invention
It is an object of the invention to provide a kind of match harbour.
Scalable riding boogie board all do not installed by the harbour that the problem to be solved in the present invention is prior art, and can not regulate the problem of the angle of riding boogie board and harbour.
For realizing the object of the present invention, the technical solution used in the present invention is:
A kind of match harbour, comprises controller, pier body, 2nd aerator pump, first aerator pump, first water wings, 2nd cylinder, 2nd water wings, 3rd water wings, 3rd aerator pump, 2nd slide rail, 2nd slide block, straight line motor, movable block, first cylinder, first slide block, first slide rail, flake bearing, 2nd riding boogie board, 2nd sealing Expandable strip, 2nd flexible pipe, 2nd lift pump, first sealing Expandable strip, first flexible pipe, 3rd cylinder, first lift pump, first riding boogie board and groove, hinged installation first riding boogie board on the right side of described pier body, first riding boogie board is installed the first flexible pipe, first sealing Expandable strip is installed in the first flexible pipe, first lift pump is arranged in the first riding boogie board, the drinking-water pipe of the first lift pump stretches to outside the first riding boogie board, the water shoot of the first lift pump stretches in the first flexible pipe, in first riding boogie board, the first slide rail is respectively installed in both sides up and down, first slide rail is installed the first slide block, 2nd riding boogie board is installed between two the first slide blocks, 2nd riding boogie board right-hand member stretches out outside the first riding boogie board, 3rd cylinder is arranged in the first riding boogie board, the piston rod of the 3rd cylinder is connected with the 2nd riding boogie board, 2nd riding boogie board is installed the 2nd flexible pipe, 2nd sealing Expandable strip is installed in the 2nd flexible pipe, 2nd lift pump is arranged in the 2nd riding boogie board, the drinking-water pipe of the 2nd lift pump stretches to outside the 2nd riding boogie board, the water shoot of the 2nd lift pump stretches in the 2nd flexible pipe, under 2nd riding boogie board, flake bearing is installed, the piston rod of the first cylinder is arranged on flake bearing, first cylinder is arranged on movable block, movable block is arranged on straight line motor, straight line motor left end is deep in groove, groove is arranged in pier body, the 2nd slide block is respectively installed at the upper and lower two ends of straight line motor, 2nd slide block is arranged on the 2nd slide rail, 2nd slide rail is arranged in groove, 2nd cylinder is installed in groove, the piston rod of the 2nd cylinder is connected with straight line motor, first water wings is installed under pier body, first water wings is connected with the first aerator pump by pipeline, 2nd water wings is installed under the first water wings, 2nd water wings is connected with the 2nd aerator pump by pipeline, 3rd water wings is installed under the 2nd water wings, 3rd water wings is connected with the 3rd aerator pump by pipeline, first aerator pump, 2nd aerator pump and the 3rd aerator pump are all arranged in pier body, and controller is arranged in pier body, controller by wire respectively with the first aerator pump, 2nd aerator pump, 3rd aerator pump, first lift pump, 2nd lift pump is connected with straight line motor.
Built-in first magnetic valve of described first cylinder, the first magnetic valve is connected with controller by wire.
Built-in 2nd magnetic valve of described 2nd cylinder, the 2nd magnetic valve is connected with controller by wire.
Built-in 3rd magnetic valve of described 3rd cylinder, the 3rd magnetic valve is connected with controller by wire.
On the left of described pier body, chain is installed.
It is an advantage of the invention that: chain is bundled on the anchor on bank; The energising of controller control the 3rd magnetic valve or power-off, make the 3rd cylinder do stretching, make the 2nd riding boogie board to moving right, make the first slide block to moving right; Controller control straight line electric motor starting, makes movable block to moving right, makes the first cylinder to moving right; Controller controls the first cylinder and does stretching, the 2nd riding boogie board is swung up and down, regulates the 2nd angle between riding boogie board and pier body, makes the height of the 2nd riding boogie board right-hand member be applicable to the height gone on board a little of boats and ships; Controller control the 2nd cylinder does flexible motion, and straight line motor is moved left and right; Controller controls the first aerator pump and inflates in the first water wings, the first water wings is expanded, carrys out the height of adjustment code head main body; Controller control the 2nd aerator pump is inflated in the 2nd water wings, the 2nd water wings is expanded, carrys out the height of adjustment code head main body; Controller control the 3rd aerator pump is inflated in the 3rd water wings, the 3rd water wings is expanded, carrys out the height of adjustment code head main body; Controller controls the first lift pump to draining in the first flexible pipe, makes the first sealing Expandable strip water-swellable, the first flexible pipe is propped up, and when the first riding boogie board right-hand member is lower than left end, the first riding boogie board slope can be avoided excessive, avoid people to slide on the first riding boogie board; Controller control the 2nd lift pump, to draining in the 2nd flexible pipe, makes the 2nd sealing Expandable strip water-swellable, the 2nd flexible pipe is propped up, when the 2nd riding boogie board right-hand member is lower than left end, the 2nd riding boogie board slope can be avoided excessive, avoid people to slide on the 2nd riding boogie board.
Accompanying drawing explanation
Fig. 1 is the present invention one match harbour one-piece construction figure;
In figure: 1, controller 2, pier body 3, 2nd aerator pump 4, first aerator pump 5, first water wings 6, 2nd cylinder 7, 2nd water wings 8, 3rd water wings 9, 3rd aerator pump 10, 2nd slide rail 11, 2nd slide block 12, straight line motor 13, movable block 14, first cylinder 15, first slide block 16, first slide rail 17, flake bearing 18, 2nd riding boogie board 19, 2nd sealing Expandable strip 20, 2nd flexible pipe 21, 2nd lift pump 22, first sealing Expandable strip 23, first flexible pipe 24, 3rd cylinder 25, first lift pump 26, first riding boogie board 27, groove 28, chain.
Embodiment
Below in conjunction with drawings and Examples, the present invention is further illustrated.
The present invention's one match harbour, comprise controller 1, pier body 2, 2nd aerator pump 3, first aerator pump 4, first water wings 5, 2nd cylinder 6, 2nd water wings 7, 3rd water wings 8, 3rd aerator pump 9, 2nd slide rail 10, 2nd slide block 11, straight line motor 12, movable block 13, first cylinder 14, first slide block 15, first slide rail 16, flake bearing 17, 2nd riding boogie board 18, 2nd sealing Expandable strip 19, 2nd flexible pipe 20, 2nd lift pump 21, first sealing Expandable strip 22, first flexible pipe 23, 3rd cylinder 24, first lift pump 25, first riding boogie board 26 and groove 27, hinged installation first riding boogie board 26 on the right side of described pier body 2, on the left of pier body 2, chain is installed, chain is bundled on the anchor on bank,First riding boogie board 26 is installed the first flexible pipe 23, in first flexible pipe 23, first sealing Expandable strip 22 is installed, first lift pump 25 is arranged in the first riding boogie board 26, the drinking-water pipe of the first lift pump 25 stretches to outside the first riding boogie board 26, the water shoot of the first lift pump 25 stretches in the first flexible pipe 23, controller 1 controls the first lift pump 25 to draining in the first flexible pipe 23, make the first sealing Expandable strip 22 water-swellable, first flexible pipe 23 is propped up, when the first riding boogie board 26 right-hand member is lower than left end, the first riding boogie board 26 slope can be avoided excessive, people is avoided to slide on the first riding boogie board 26, in first riding boogie board 26, the first slide rail 16 is respectively installed in both sides up and down, first slide rail 16 is installed the first slide block 15,2nd riding boogie board 18 is installed between two the first slide blocks 15,2nd riding boogie board 18 right-hand member stretches out outside the first riding boogie board 26,3rd cylinder 24 is arranged in the first riding boogie board 26, built-in 3rd magnetic valve of 3rd cylinder 24,3rd magnetic valve is connected with controller 1 by wire, controller 1 controls energising or the power-off of the 3rd magnetic valve, the 3rd cylinder 24 is made to do stretching, make the 2nd riding boogie board 18 to moving right, make the first slide block 15 to moving right, the piston rod of the 3rd cylinder 24 is connected with the 2nd riding boogie board 18, 2nd riding boogie board 18 is installed the 2nd flexible pipe 20, in 2nd flexible pipe 20, the 2nd sealing Expandable strip 19 is installed, 2nd lift pump 21 is arranged in the 2nd riding boogie board 18, the drinking-water pipe of the 2nd lift pump 21 stretches to outside the 2nd riding boogie board 18, the water shoot of the 2nd lift pump 21 stretches in the 2nd flexible pipe 20, controller 1 controls the 2nd lift pump 21 to draining in the 2nd flexible pipe 20, make the 2nd sealing Expandable strip 19 water-swellable, 2nd flexible pipe 20 is propped up, when the 2nd riding boogie board 18 right-hand member is lower than left end, the 2nd riding boogie board 18 slope can be avoided excessive, people is avoided to slide on the 2nd riding boogie board 18, 2nd riding boogie board 18 times installs flake bearing 17, the piston rod of the first cylinder 14 is arranged on flake bearing 17, first cylinder 14 is arranged on movable block 13, first built-in first magnetic valve of cylinder 14, first magnetic valve is connected with controller 1 by wire, controller 1 controls the first cylinder 14 and does stretching, 2nd riding boogie board 18 is swung up and down, regulate the angle between the 2nd riding boogie board 18 and pier body 2, the height of the 2nd riding boogie board 18 right-hand member is made to be applicable to the height gone on board a little of boats and ships, movable block 13 is arranged on straight line motor 12, and straight line motor 12 left end is deep in groove 27, and controller 1 controls straight line motor 12 and starts, and makes movable block 13 to moving right, and makes the first cylinder 14 to moving right, groove 27 is arranged in pier body 2, the 2nd slide block 11 is respectively installed at straight line motor about 12 two ends, 2nd slide block 11 is arranged on the 2nd slide rail 10,2nd slide rail 10 is arranged in groove 27, installing the 2nd built-in 2nd magnetic valve of cylinder the 6, two cylinder 6 in groove 27, the 2nd magnetic valve is connected with controller 1 by wire, controller 1 controls the 2nd cylinder 6 and does flexible motion, and straight line motor 12 is moved left and right, the piston rod of the 2nd cylinder 6 is connected with straight line motor 12, pier body installs the first water wings 52 times, first water wings 5 is connected with the first aerator pump 4 by pipeline, the 2nd water wings 7 installed by first water wings 5 times, 2nd water wings 7 is connected with the 2nd aerator pump 3 by pipeline, the 3rd water wings 8 installed by 2nd water wings 7 times, 3rd water wings 8 is connected with the 3rd aerator pump 9 by pipeline, first aerator pump 4, 2nd aerator pump 3 and the 3rd aerator pump 9 are all arranged in pier body 2, controller 1 controls the first aerator pump 4 and inflates in the first water wings 5, first water wings 5 is expanded, carry out the height of adjustment code head main body 2,Controller 1 controls the 2nd aerator pump 3 and inflates in the 2nd water wings 7, the 2nd water wings 7 is expanded, carrys out the height of adjustment code head main body 2; Controller 1 controls the 3rd aerator pump 9 and inflates in the 3rd water wings 8, the 3rd water wings 8 is expanded, carrys out the height of adjustment code head main body 2; Controller 1 is arranged in pier body 2, and controller 1 is connected with straight line motor 12 with the first aerator pump 4, the 2nd aerator pump 3, the 3rd aerator pump 9, first lift pump 25, the 2nd lift pump 21 respectively by wire.
Using method of the present invention: chain is bundled on the anchor on bank; Controller 1 controls energising or the power-off of the 3rd magnetic valve, makes the 3rd cylinder 24 do stretching, makes the 2nd riding boogie board 18 to moving right, and makes the first slide block 15 to moving right; Controller 1 controls straight line motor 12 and starts, and makes movable block 13 to moving right, and makes the first cylinder 14 to moving right; Controller 1 controls the first cylinder 14 and does stretching, the 2nd riding boogie board 18 is swung up and down, regulates the angle between the 2nd riding boogie board 18 and pier body 2, makes the height of the 2nd riding boogie board 18 right-hand member be applicable to boats and ships and goes on board height a little; Controller 1 controls the 2nd cylinder 6 and does flexible motion, and straight line motor 12 is moved left and right; Controller 1 controls the first aerator pump 4 and inflates in the first water wings 5, the first water wings 5 is expanded, carrys out the height of adjustment code head main body 2; Controller 1 controls the 2nd aerator pump 3 and inflates in the 2nd water wings 7, the 2nd water wings 7 is expanded, carrys out the height of adjustment code head main body 2; Controller 1 controls the 3rd aerator pump 9 and inflates in the 3rd water wings 8, the 3rd water wings 8 is expanded, carrys out the height of adjustment code head main body 2; Controller 1 controls the first lift pump 25 to draining in the first flexible pipe 23, make the first sealing Expandable strip 22 water-swellable, the first flexible pipe 23 is propped up, when the first riding boogie board 26 right-hand member is lower than left end, the first riding boogie board 26 slope can be avoided excessive, avoid people to slide on the first riding boogie board 26; Controller 1 controls the 2nd lift pump 21 to draining in the 2nd flexible pipe 20, make the 2nd sealing Expandable strip 19 water-swellable, the 2nd flexible pipe 20 is propped up, when the 2nd riding boogie board 18 right-hand member is lower than left end, the 2nd riding boogie board 18 slope can be avoided excessive, avoid people to slide on the 2nd riding boogie board 18.

Claims (5)

1. a match harbour, comprise controller (1), pier body (2), 2nd aerator pump (3), first aerator pump (4), first water wings (5), 2nd cylinder (6), 2nd water wings (7), 3rd water wings (8), 3rd aerator pump (9), 2nd slide rail (10), 2nd slide block (11), straight line motor (12), movable block (13), first cylinder (14), first slide block (15), first slide rail (16), flake bearing (17), 2nd riding boogie board (18), 2nd sealing Expandable strip (19), 2nd flexible pipe (20), 2nd lift pump (21), first sealing Expandable strip (22), first flexible pipe (23), 3rd cylinder (24), first lift pump (25), first riding boogie board (26) and groove (27), it is characterized in that: the hinged installation first riding boogie board (26) in described pier body (2) right side, first riding boogie board (26) is upper installs the first flexible pipe (23), first sealing Expandable strip (22) is installed in the first flexible pipe (23), first lift pump (25) is arranged in the first riding boogie board (26), the drinking-water pipe of the first lift pump (25) stretches to the first riding boogie board (26) outward, the water shoot of the first lift pump (25) stretches in the first flexible pipe (23), in first riding boogie board (26), the first slide rail (16) is respectively installed in both sides up and down, first slide rail (16) is upper installs the first slide block (15), 2nd riding boogie board (18) is installed between two the first slide blocks (15), 2nd riding boogie board (18) right-hand member stretches out the first riding boogie board (26) outward, 3rd cylinder (24) is arranged in the first riding boogie board (26), the piston rod of the 3rd cylinder (24) is connected with the 2nd riding boogie board (18), 2nd riding boogie board (18) is upper installs the 2nd flexible pipe (20), 2nd sealing Expandable strip (19) is installed in the 2nd flexible pipe (20), 2nd lift pump (21) is arranged in the 2nd riding boogie board (18), the drinking-water pipe of the 2nd lift pump (21) stretches to the 2nd riding boogie board (18) outward, the water shoot of the 2nd lift pump (21) stretches in the 2nd flexible pipe (20), under 2nd riding boogie board (18), flake bearing (17) is installed, the piston rod of the first cylinder (14) is arranged on flake bearing (17), first cylinder (14) is arranged on movable block (13), movable block (13) is arranged on straight line motor (12), straight line motor (12) left end is deep in groove (27), groove (27) is arranged in pier body (2), straight line motor (12) respectively installs the 2nd slide block (11) in two ends up and down, 2nd slide block (11) is arranged on the 2nd slide rail (10), 2nd slide rail (10) is arranged in groove (27), 2nd cylinder (6) is installed in groove (27), the piston rod of the 2nd cylinder (6) is connected with straight line motor (12), first water wings (5) is installed under pier body (2), first water wings (5) is connected with the first aerator pump (4) by pipeline, 2nd water wings (7) is installed under the first water wings (5), 2nd water wings (7) is connected with the 2nd aerator pump (3) by pipeline, 3rd water wings (8) is installed under the 2nd water wings (7), 3rd water wings (8) is connected with the 3rd aerator pump (9) by pipeline, first aerator pump (4), 2nd aerator pump (3) and the 3rd aerator pump (9) are all arranged in pier body (2), controller (1) is arranged in pier body (2), controller (1) by wire respectively with the first aerator pump (4), 2nd aerator pump (3), 3rd aerator pump (9), first lift pump (25), 2nd lift pump (21) is connected with straight line motor (12).
2. one match harbour according to claim 1, is characterized in that: described built-in first magnetic valve of first cylinder (14), the first magnetic valve is connected with controller (1) by wire.
3. one match harbour according to claim 1, is characterized in that: described 2nd built-in 2nd magnetic valve of cylinder (6), the 2nd magnetic valve is connected with controller (1) by wire.
4. one match harbour according to claim 1, is characterized in that: described 3rd built-in 3rd magnetic valve of cylinder (24), the 3rd magnetic valve is connected with controller (1) by wire.
5. one match harbour according to claim 1, is characterized in that: chain (28) is installed in described pier body (2) left side.
CN201610054179.8A 2016-01-27 2016-01-27 Competition wharf Pending CN105672196A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610054179.8A CN105672196A (en) 2016-01-27 2016-01-27 Competition wharf

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610054179.8A CN105672196A (en) 2016-01-27 2016-01-27 Competition wharf

Publications (1)

Publication Number Publication Date
CN105672196A true CN105672196A (en) 2016-06-15

Family

ID=56303147

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610054179.8A Pending CN105672196A (en) 2016-01-27 2016-01-27 Competition wharf

Country Status (1)

Country Link
CN (1) CN105672196A (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201010855Y (en) * 2006-08-29 2008-01-23 刘洪辉 Stay rod fixing combined floating dock
JP2011111761A (en) * 2009-11-25 2011-06-09 Hitachi Zosen Corp Flap gate-type breakwater
CN203461060U (en) * 2013-09-10 2014-03-05 天津骏帆船舶工程有限公司 Telescopic limit boarding ladder
CN105271076A (en) * 2015-11-13 2016-01-27 舟山长宏国际船舶修造有限公司 Truss type maritime work platform spud leg aerial work platform

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201010855Y (en) * 2006-08-29 2008-01-23 刘洪辉 Stay rod fixing combined floating dock
JP2011111761A (en) * 2009-11-25 2011-06-09 Hitachi Zosen Corp Flap gate-type breakwater
CN203461060U (en) * 2013-09-10 2014-03-05 天津骏帆船舶工程有限公司 Telescopic limit boarding ladder
CN105271076A (en) * 2015-11-13 2016-01-27 舟山长宏国际船舶修造有限公司 Truss type maritime work platform spud leg aerial work platform

Similar Documents

Publication Publication Date Title
CN105644732A (en) Competition speedboat
KR101324602B1 (en) Thruster system and ship inclduing the same
WO2017054575A1 (en) Submersible floating-moving transport platform having floating dock and tower and operation method thereof
CN204979177U (en) Motor boat
CN101605986A (en) From the fluid fluctuation, extract the method for energy and the purposes of wave-power aggregate and wave-power aggregate
EP2520485A1 (en) System and method for mooring a floating vessel against a stationary object
CN101370709B (en) Device for protecting the hull of a boat and method for protecting hull by expandable device
CN207550031U (en) Drainage car
CN105672196A (en) Competition wharf
CN106240758A (en) A kind of passive type compensation of undulation is gone on board device
CN106087899A (en) Aperture width scalable float type maintenance steel-slag sand
CN105514835A (en) Marine anticorrosion panelboard
CN105398550A (en) Control console for ship
CN206437175U (en) A kind of stability Ship Structure
CN115042930B (en) Ballast water tank and floating dock
CN105714732A (en) Floating terminal
CN203855946U (en) Running efficiency increasing device for ship lock
CN205524875U (en) Marine early warning ship
CN106012984A (en) Method convenient for ship to instantly pass through gradient fall water area and flexible dam
CN109795628A (en) A kind of passenger wharf connection between ship and bank device suitable for large water-head
CN215098150U (en) Passenger ship with buoyancy adjusting mechanism
CN205524845U (en) Satellite communication intelligent terminal
CN109501964B (en) Hydraulic tidal range compensation mooring device
DE602004007290D1 (en) VEHICLE VEHICLES WITH VEHICLES FULLY ESTABLISHED UNDER THE EFFECT OF HYDROSTATIC FORCES
CN210011856U (en) Boarding equipment for pleasure boat

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20160615