CN105672130A - Cable division pipe and inhaul cable combined piece thereof - Google Patents

Cable division pipe and inhaul cable combined piece thereof Download PDF

Info

Publication number
CN105672130A
CN105672130A CN201610152996.7A CN201610152996A CN105672130A CN 105672130 A CN105672130 A CN 105672130A CN 201610152996 A CN201610152996 A CN 201610152996A CN 105672130 A CN105672130 A CN 105672130A
Authority
CN
China
Prior art keywords
line segment
sub
straight
wire pipe
strand
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610152996.7A
Other languages
Chinese (zh)
Inventor
唐国喜
胡可
徐宏光
吴志刚
吴平平
钟智强
屈计划
曹新垒
郑国华
武余波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Transport Consulting and Design Institute Co Ltd
Original Assignee
Anhui Transport Consulting and Design Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Transport Consulting and Design Institute Co Ltd filed Critical Anhui Transport Consulting and Design Institute Co Ltd
Priority to CN201610152996.7A priority Critical patent/CN105672130A/en
Publication of CN105672130A publication Critical patent/CN105672130A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/14Towers; Anchors ; Connection of cables to bridge parts; Saddle supports
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/16Suspension cables; Cable clamps for suspension cables ; Pre- or post-stressed cables

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses a cable division pipe and an inhaul cable combined piece thereof. The section of the cable division pipe is in a shape that the upper round shape is gradually changed into the lower raindrop shape. Lower linear segments are tangent to an upper arc. Due to the fact that included angles are formed between the linear segments of the raindrop-shaped HDPE cable division pipe and the axis of symmetry, the radial force of a cable strand acts on the pipe wall, a certain counter force is generated by the pipe wall to the cable strand, and the cable strand is clamped. Therefore, the operation that an inner pipe is filled with epoxy mortar for sealing and anchoring after a bridge is constructed is not necessary; the cable division pipe guarantees that stranded steel wires are parallel without mutual interference, and the compatibility between single inhaul cable installation and a tensioning system is complete; meanwhile, the requirement for the tensioning space is lowered; and certain convenience is brought for cable replacement in an operation period.

Description

A kind of sub-wire pipe and drag-line subassembly thereof
Technical field
The invention belongs to bridge structure technical field, it is specifically related to a kind of sub-wire pipe and drag-line subassembly thereof.
Background technology
Due to the mechanical characteristic of part cable-stayed bridge own, the maximum uneven Suo Li of its same skew cables relative to its Suo Li only account for the latter 5% less than, therefore the holding force of steering gear is required just do not have full cable-stayed bridge to require height by this bridge type, and this just adopts HDPE material to bring very big possibility to sub-wire pipe. Part cable-stayed bridge suspension cable steering gear structure is many both at home and abroad at present is made up of inner and outer pipe, and in wherein, pipe uses the more of circular sub-wire pipe, and Cheng Qiaohou pours into epoxy mortar in interior pipe and carries out closed anchoring. The saddle of this kind of structural form, due to epoxy mortar by steel strand and interior pipe conglutinate, therefore there is the situation of extruding mutually in suspension cable on the one hand, can not carry out adjustment stretch-draw by single root, can only entire beam tension. And resistant slide performance is not good. Also certain difficulty is brought to changing rope from now on the other hand.
Summary of the invention
It is an object of the invention to provide a kind of sub-wire pipe and drag-line subassembly thereof. Strand can be produced holding force by the present invention, and the installation of drag-line sub-thread and tensioning system have the fully compatible raindrop shape HDPE sub-wire pipe for Cable-stayed Bridge Pylon saddle with being convenient to change rope. The concrete structure of the present invention is as follows:
A kind of sub-wire pipe is the long pipe of the hollow of both ends open, and the cross section of this sub-wire pipe is made up of top semi-circular section 11, bottom raindrop shape section two portions.
Bottom raindrop shape is made up of left straight-line segment 12, right straight-line segment 13, bottom semicircular section 14. Bottom raindrop shape is similar to V-shaped.
The two ends of top semi-circular segments 11 are tangent with the top of the top of left straight-line segment 12, right straight-line segment 13 respectively.
The two ends of bottom semicircular section 14 are tangent with the bottom of the bottom of left straight-line segment 12, right straight-line segment 13 respectively.
Angle between left straight-line segment 12, right straight-line segment 13 is 50 °.
Profile wide at the top and narrow at the bottom is jointly formed by left straight-line segment 12, right straight-line segment 13, bottom semicircular section 14, top semi-circular section 11.
Adopt the drag-line subassembly of sub-wire pipe of the present invention:
A strand it is provided with in sub-wire pipe. Described strand is made up of steel strand material.
Non-filler or tackiness agent between described strand and sub-wire pipe.
When the radial force of strand acts on sub-wire tube wall, when namely the radial force of strand acts on left straight-line segment 12 and right straight-line segment 13, strand is produced counter-force by tube wall, and by the rubbing effect of strand and tube wall, defines tube wall to the clamping of strand.
In other words, adopt the sub-wire pipe of this structure to carry out closed anchoring without the need to pouring mortar. In addition, strand in this sub-wire pipe is parallel to each other and does not interfere with each other, the installation of drag-line sub-thread and tensioning system are had sufficient compatibility, effectively eliminates and use multiply stretch-draw screw block difficulty greatly to the restriction of drag-line specification, also reduce the requirement to stretch-draw space simultaneously.
Preferred technical scheme is: the present invention is a kind of raindrop shape HDPE sub-wire pipe for Cable-stayed Bridge Pylon saddle, its cross section is that top is semicircle to bottom raindrop shape gradual change, lower straight line segment and top circular arc are tangent, straight-line segment becomes 25 ° of angles with diad, lower end is fillet, and fillet inside radius is 5mm.
Its Advantageous Effects is: owing to the straight-line segment of raindrop shape HDPE sub-wire pipe becomes 25 ° of angles with diad, therefore the radial force making strand acts on tube wall, strand is produced again certain counter-force by tube wall, and the rubbing effect of strand and tube wall, thus form the clamping to strand, thus both carried out closed anchoring without the need to inwardly managing interior perfusion epoxy mortar at Cheng Qiaohou, in turn ensure that steel hinge line is parallel and does not interfere with each other, the installation of drag-line sub-thread and tensioning system had sufficient compatibility, effectively eliminate and use multiply stretch-draw screw block difficulty greatly to the restriction of drag-line specification, also reduce the requirement to stretch-draw space simultaneously, change rope to the operation phase and bring certain convenience. its structure is simple, and processing and fabricating is easy, and material cost is lower.
Accompanying drawing explanation
Fig. 1 is one-piece construction schematic diagram of the present invention.
Fig. 2 is the A-A sectional view of Fig. 1.
Sequence number in above-mentioned figure: raindrop shape HDPE sub-wire pipe 1, non-bending steel cable 2, saddle outlet position 3, extension 4, saddle 5.
Embodiment
Now it is described with reference to the accompanying drawings the constructional feature of the present invention.
See Fig. 1, a kind of sub-wire pipe is the long pipe of the hollow of both ends open, and the cross section of this sub-wire pipe is made up of top semi-circular segments 11, bottom raindrop shape section two portions, as shown in Figure 2.
See Fig. 2, bottom raindrop shape is made up of left straight-line segment 12, right straight-line segment 13, bottom semicircular section 14. Bottom raindrop shape is similar to V-shaped.
The two ends of top semi-circular segments 11 are tangent with the top of the top of left straight-line segment 12, right straight-line segment 13 respectively.
The two ends of bottom semicircular section 14 are tangent with the bottom of the bottom of left straight-line segment 12, right straight-line segment 13 respectively.
Angle between left straight-line segment 12, right straight-line segment 13 is 50 °.
Profile wide at the top and narrow at the bottom is jointly formed by left straight-line segment 12, right straight-line segment 13, bottom semicircular section 14, top semi-circular segments 11.
Furtherly, the radius of bottom semicircular section 14 is 5mm.
Furtherly, left straight-line segment 12, right straight-line segment 13 are symmetrical. The diad of left straight-line segment 12 and right straight-line segment 13 is 25 ° to the angle of left straight-line segment 12, right straight-line segment 13.
Furtherly, the material of left straight-line segment 12, right straight-line segment 13, bottom semicircular section 14, top semi-circular segments 11 is HDPE(HighDensityPolyethylene, high density polyethylene(HDPE)).
Furtherly, the left straight-line segment 12 of sub-wire pipe, the length of right straight-line segment 13 are not less than 15mm. The radius of note top semi-circular section 11 is R, radius to be R1, central angle the be Ф of bottom semicircular section 14, the length of left straight-line segment 12 is LL, right straight-line segment 13 length be LR, a few person's relation meets:
LL=LR;
R-R1=LLTan (Ф/2);
LLSpan be not less than 15mm.
Furtherly, the softening temperature of left straight-line segment 12 and right straight-line segment 13 should be greater than 120 DEG C, temperature of fusion be greater than 150 DEG C, impact embrittlement temperature be less than-76 DEG C, the resisting environmental stress and cracking time should be greater than 6000 hours.
Furtherly, the external diameter of top semi-circular section 11 is 23mm.
Furtherly, the wall thickness of top semi-circular segments 11, left straight-line segment 12, right straight-line segment 13, bottom semicircular section 14 is 2mm.
See Fig. 2, furtherly, adopt the drag-line subassembly of sub-wire pipe of the present invention, in sub-wire pipe, it is provided with a strand. Described strand is made up of steel strand material. Non-filler or tackiness agent between described strand and sub-wire pipe. When the radial force of strand acts on sub-wire tube wall, when namely the radial force of strand acts on left straight-line segment 12 and right straight-line segment 13, strand is produced counter-force by tube wall, and by the rubbing effect of strand and tube wall, defines tube wall to the clamping of strand.
In other words, adopt the sub-wire pipe of this structure to carry out closed anchoring without the need to pouring mortar. In addition, strand in this sub-wire pipe is parallel to each other and does not interfere with each other, the installation of drag-line sub-thread and tensioning system are had sufficient compatibility, effectively eliminates and use multiply stretch-draw screw block difficulty greatly to the restriction of drag-line specification, also reduce the requirement to stretch-draw space simultaneously.
As shown in Figure 2, preferred scheme is: this is used for the raindrop shape HDPE sub-wire pipe of part cable-stayed bridge cable steering gear, tangent by the HDPE sub-wire pipe lower straight line segment of the shaping external diameter 23mm of mould drawing, wall thickness 2mm and top circular arc, straight-line segment becomes 25 ° of angles with diad, lower end is fillet, and fillet inside radius is the raindrop shape HDPE sub-wire pipe of 5mm.
See Fig. 1, in order to reduce raindrop shape HDPE sub-wire pipe the holding force of drag-line caused the fatigure failure of suspension cable, raindrop shape HDPE sub-wire pipe begins from the saddle outlet position 3 of saddle 5, outwards extend an extension 4 by intrinsic radius, make the steel strand can at position, the center outlet spout of raindrop shape HDPE sub-wire pipe.

Claims (9)

1. a sub-wire pipe is the long pipe of the hollow of both ends open, it is characterised in that: the cross section of this sub-wire pipe is made up of top semi-circular section (11), bottom raindrop shape section two portions;
Bottom raindrop shape is made up of left straight-line segment (12), right straight-line segment (13), bottom semicircular section (14); Bottom raindrop shape is similar to V-shaped;
The two ends of top semi-circular segments (11) are tangent with the top on the top of left straight-line segment (12), right straight-line segment (13) respectively;
The two ends of bottom semicircular section (14) are tangent with the bottom of the bottom of left straight-line segment (12), right straight-line segment (13) respectively;
Angle between left straight-line segment (12), right straight-line segment (13) is 50 °;
Jointly profile wide at the top and narrow at the bottom is formed by left straight-line segment (12), right straight-line segment (13), bottom semicircular section (14), top semi-circular segments (11).
2. a kind of sub-wire pipe according to claim 1, it is characterised in that: the radius of bottom semicircular section (14) is 5mm.
3. a kind of sub-wire pipe according to claim 1, it is characterised in that: left straight-line segment (12), right straight-line segment (13) are symmetrical; Left straight-line segment (12) is 25 ° with the diad of right straight-line segment (13) to the angle of left straight-line segment (12), right straight-line segment (13).
4. a kind of sub-wire pipe according to claim 1, it is characterised in that: the material of left straight-line segment (12), right straight-line segment (13), bottom semicircular section (14), top semi-circular segments (11) is HDPE.
5. a kind of sub-wire pipe according to claim 1, it is characterised in that: the length of the left straight-line segment (12) of sub-wire pipe, right straight-line segment (13) is not less than 15mm;
The radius of note top semi-circular section (11) is R, radius to be R1, central angle the be Ф of bottom semicircular section (14), the length of left straight-line segment (12) is LL, right straight-line segment (13) length be LR, a few person's relation should meet:
LL=LR;
R-R1=LLTan (Ф/2);
LLSpan be not less than 15mm.
6. a kind of sub-wire pipe according to claim 1, it is characterised in that: the softening temperature of left straight-line segment (12) and right straight-line segment (13) should be greater than 120 DEG C, temperature of fusion be greater than 150 DEG C, impact embrittlement temperature be less than-76 DEG C, the resisting environmental stress and cracking time should be greater than 6000 hours.
7. a kind of sub-wire pipe according to claim 1, it is characterised in that: the external diameter of top semi-circular segments (11) is 23mm.
8. a kind of sub-wire pipe according to claim 1, it is characterised in that: the wall thickness of top semi-circular segments (11), left straight-line segment (12), right straight-line segment (13), bottom semicircular section (14) is 2mm.
9. adopt the drag-line subassembly of sub-wire pipe described in claim 1-8, it is characterised in that:
A strand it is provided with in sub-wire pipe; Described strand is made up of steel strand material;
Non-filler or tackiness agent between described strand and sub-wire pipe;
When the radial force of strand acts on sub-wire tube wall, namely when the radial force of strand acts on left straight-line segment (12) and right straight-line segment (13), strand is produced counter-force by tube wall, and by the rubbing effect of strand and tube wall, defines tube wall to the clamping of strand;
In other words, adopt the sub-wire pipe of this structure to carry out closed anchoring without the need to pouring mortar; In addition, strand in this sub-wire pipe is parallel to each other and does not interfere with each other, the installation of drag-line sub-thread and tensioning system are had sufficient compatibility, effectively eliminates and use multiply stretch-draw screw block difficulty greatly to the restriction of drag-line specification, also reduce the requirement to stretch-draw space simultaneously.
CN201610152996.7A 2016-03-17 2016-03-17 Cable division pipe and inhaul cable combined piece thereof Pending CN105672130A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610152996.7A CN105672130A (en) 2016-03-17 2016-03-17 Cable division pipe and inhaul cable combined piece thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610152996.7A CN105672130A (en) 2016-03-17 2016-03-17 Cable division pipe and inhaul cable combined piece thereof

Publications (1)

Publication Number Publication Date
CN105672130A true CN105672130A (en) 2016-06-15

Family

ID=56234699

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610152996.7A Pending CN105672130A (en) 2016-03-17 2016-03-17 Cable division pipe and inhaul cable combined piece thereof

Country Status (1)

Country Link
CN (1) CN105672130A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106638310A (en) * 2017-03-05 2017-05-10 郑州大学 Efficient steel strand wire stay cable saddle
CN108330812A (en) * 2018-03-27 2018-07-27 安徽省交通控股集团有限公司 Using the cable-stayed bridge of revolution drag-line in the same direction

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002088715A (en) * 2000-09-18 2002-03-27 Sumitomo Electric Ind Ltd Water stopping construction at outlet portion of bridge saddle
CN102966040A (en) * 2012-11-21 2013-03-13 安徽佳路机械制造有限公司 Novel cable-stayed bridge cable saddle and manufacturing method thereof
CN202913351U (en) * 2012-11-21 2013-05-01 安徽佳路机械制造有限公司 Novel cable saddle for diagonal bridge
CN203007842U (en) * 2013-01-07 2013-06-19 合肥斯派索材料科技有限公司 Raindrop-shaped stainless steel splitting tube for rope tower dragging redirector of cable-stayed bridge
CN205012224U (en) * 2015-09-10 2016-02-03 安徽省交通规划设计研究总院股份有限公司 Cable -stay bridge centre gripping type saddle V type metal divides fiber tube skew to decompress port

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002088715A (en) * 2000-09-18 2002-03-27 Sumitomo Electric Ind Ltd Water stopping construction at outlet portion of bridge saddle
CN102966040A (en) * 2012-11-21 2013-03-13 安徽佳路机械制造有限公司 Novel cable-stayed bridge cable saddle and manufacturing method thereof
CN202913351U (en) * 2012-11-21 2013-05-01 安徽佳路机械制造有限公司 Novel cable saddle for diagonal bridge
CN203007842U (en) * 2013-01-07 2013-06-19 合肥斯派索材料科技有限公司 Raindrop-shaped stainless steel splitting tube for rope tower dragging redirector of cable-stayed bridge
CN205012224U (en) * 2015-09-10 2016-02-03 安徽省交通规划设计研究总院股份有限公司 Cable -stay bridge centre gripping type saddle V type metal divides fiber tube skew to decompress port

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106638310A (en) * 2017-03-05 2017-05-10 郑州大学 Efficient steel strand wire stay cable saddle
CN108330812A (en) * 2018-03-27 2018-07-27 安徽省交通控股集团有限公司 Using the cable-stayed bridge of revolution drag-line in the same direction

Similar Documents

Publication Publication Date Title
CN102979251B (en) A kind of SCS encased structures based on PBL stiffening rib
CN105672130A (en) Cable division pipe and inhaul cable combined piece thereof
DK2649239T3 (en) DEVICE TO ENTER A CONSTRUCTION CABLE, LIKE A BARDUNE, AND BUILDINGS WORLD COMPREHENSIVE
CN103015319B (en) Raindrop-shaped stainless steel wire distribution pipe for stay cable steering device of cable-stayed bridge tower
CN203007817U (en) SCS rectangular steel tube concrete structure with dual-stiffening structure continuously arranged in interior
CN102979180A (en) SCS (steel-tube concrete structure) with built-in shear nails
CN203065954U (en) SCS concrete filled steel tube structure with shearing-resistant function
CN102979250A (en) SCS (structure cabling system) encased structure based on longitudinal stiffening ribs
CN203475703U (en) Semi-grouting type steel bar connector
CN205956579U (en) Internal -rib reinforced polyethylene PE helical bellows strip
CN201319088Y (en) Layer stranded optical fiber ribbon cable with a plurality of stiffeners
CN205861950U (en) A kind of central tube type optical cable of flat body structure
CN203007842U (en) Raindrop-shaped stainless steel splitting tube for rope tower dragging redirector of cable-stayed bridge
CN205347810U (en) Washing machine and drainage structures thereof
CN104533022A (en) Reinforcement sleeve and template connecting structure
CN208965887U (en) Grout sleeve and sleeve concrete-bar component
CN204081278U (en) Split type steel bar sleeve is partly in the milk joint
CN205298855U (en) Modified PP plastics tubular product of stand wear and tear high strength
CN202466787U (en) Inspection well
CN205046582U (en) PE skinning foaming rotational moulding inspection shaft
CN210860127U (en) Anti-breaking pipe with anti-pulling structure
CN208674751U (en) The vertical fixture of yoke plate and replacing device for insulator
CN203191610U (en) Layer-stranding cable with 1+4 structure
CN101382629A (en) Layer stranded optical fiber ribbon cable with multi reinforcements
CN103244765B (en) Sanitary hose

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20160615