CN105668335B - Method for producing spinning cop and being further processed the spinning cop - Google Patents
Method for producing spinning cop and being further processed the spinning cop Download PDFInfo
- Publication number
- CN105668335B CN105668335B CN201511005940.0A CN201511005940A CN105668335B CN 105668335 B CN105668335 B CN 105668335B CN 201511005940 A CN201511005940 A CN 201511005940A CN 105668335 B CN105668335 B CN 105668335B
- Authority
- CN
- China
- Prior art keywords
- coil
- spinning cop
- spinning
- cop
- spool
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65H—HANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
- B65H67/00—Replacing or removing cores, receptacles, or completed packages at paying-out, winding, or depositing stations
- B65H67/08—Automatic end-finding and material-interconnecting arrangements
- B65H67/086—Preparing supply packages
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65H—HANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
- B65H67/00—Replacing or removing cores, receptacles, or completed packages at paying-out, winding, or depositing stations
- B65H67/08—Automatic end-finding and material-interconnecting arrangements
- B65H67/081—Automatic end-finding and material-interconnecting arrangements acting after interruption of the winding process, e.g. yarn breakage, yarn cut or package replacement
- B65H67/083—Automatic end-finding and material-interconnecting arrangements acting after interruption of the winding process, e.g. yarn breakage, yarn cut or package replacement handling the yarn-end of the new supply package
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65H—HANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
- B65H2701/00—Handled material; Storage means
- B65H2701/30—Handled filamentary material
- B65H2701/31—Textiles threads or artificial strands of filaments
Abstract
The present invention relates to the methods for producing spinning cop and being further processed the spinning cop.The spinning cop (9) is produced on ring spinner (30) and is further processed the spinning cop (9) on up- coiler (1), and upper coil (43) is applied to the spinning cop (9) on the ring spinner (30).According to the present invention, the spinning cop (9) with the upper coil (43) applied on the ring spinner (30) is delivered to the winding position (2) of the up- coiler (1);The end of a thread of spinning cop (9) is provided by the upper coil (43) applied on ring spinner (30) in winding position (2);The end of a thread of spinning cop (9) provided by being picked up in the winding position (2) of up- coiler (1), and form line and connect and in winding position (2) debatching spinning cop (9).
Description
Technical field
The present invention relates to a kind of methods for producing spinning cop and being further processed the spinning cop, wherein
The spinning cop is produced on ring spinner and is further processed the spinning cop on the winder, and wherein,
Upper coil is applied to the spinning cop on ring spinner.
Background technique
Spinning cop is produced on ring spinner.Spinning cop includes micro- conical spool and yarn body, the yarn
Ontology includes coil circular cone that is, in spool apex zone on top, and in lower part, i.e., includes micro- in spool foot area
Rounded pedestal.In spinning process, or during coil increases, the annular ring rail of ring spinner is along coil circular cone
Move back and forth, thus yarn body is increased and coil circular cone continues upward movement until completing in spool top orientation.
Spinning cop only has relatively small yarn volume, therefore on the winder again wound on the intersected coiled bobbin of large volume
Guan Zhong.As disclosed in 0 360 287 A1 of EP, in the process, it is pre- that coil is provided between ring spinner and up- coiler
Treating stations, the coil preprocessing station are generally integrated in winding machine.In coil preprocessing station, the end of a thread is lifted and is in up- coiler
In being further processed for winding position prepare.The end of a thread position, i.e. the end of a thread of the coil from ring spinner are usually locating
Spinning cop surface on point, may designs that are different and depending on ring spinner.Spinning cop may include lower part
Coil, rear portion coil or upper coil.Coil preprocessing station includes the line detector for being suitable for the end of a thread location type.
10 2,006 050 219 A1 of DE discloses a kind of combined system being made of ring spinner and up- coiler,
Up- coiler region is equipped with coil pretreatment unit.Pretreatment unit is necessary, because the end of a thread of spinning cop is located at ring ingot
On spinning machine, in this way unless carrying out special measurement, otherwise the end of a thread cannot be lifted in the winding position of up- coiler, therefore cannot
It is sent to the line supply part of winding position.In the illustrated embodiment, the end of a thread is placed on spinning cop as rear portion coil.
Pretreatment unit is designed to detect the rear portion coil being placed on the surface of spinning cop on ring spinner
Line, and be designed to pre-process the end of a thread be further processed with the winding position in up- coiler.(referred herein to upper coil
For top winding) mode pre-processed, i.e., in the coil of spool apex zone predetermined quantity wound on the yarn of spinning cop
Guan Shang.
100 37 513 A1 of DE describes a kind of stripping process on ring spinner.It is complete that spinning cop is described
At program later.After completing spinning cop, if it is desired, upper coil can be applied on top first, then dropped
Rear portion coil can be applied during low annular ring rail, can finally apply lower coil on spindle below coil, in
Be can be executed in spinning machine it is so-called doff, i.e. removal coil or multiple coils.
1 535 038 A1 of DE, which is disclosed, a kind of is applied to ring ingot for line deposit (i.e. upper coil and/or lower coil)
The coil of spinning machine or the upper end of spindle and/or lower end.It illustrates, in order to be further processed coil, line deposit on the winder
It is generally necessary.Upper coil or lower coil, which ensure that, is placed on the end of a thread reservation place on spinning cop, and makes it easy to
The end of a thread is found in coil pretreatment.
According to the prior art, can not be substituted for spinning cop using pretreatment unit.However, it has many lack really
Point.Pretreated production per cycle is so limited.It needs a large amount of structure investment and spends.Coil pretreatment causes yarn to waste
And energy consumption.
Summary of the invention
Therefore it is an object of the invention to improve to being further processed for spinning cop on up- coiler.
In order to reach the purpose, will there is the spinning cop of the upper coil applied on ring spinner to be transported to winding
The winding position of machine.The end of a thread of spinning cop is provided by the upper coil applied on ring spinner in winding position.It is rolling up
The end of a thread of provided spinning cop is picked up around the winding position of machine.Finally, forming line connection and in winding position debatching essence
Spin coil.
As previously mentioned, known in the art provide upper coil in pretreatment unit for coil, such the end of a thread can position
In winding position.Additionally, it is known that producing upper coil on ring spinner, it is being easier to position in pretreatment unit in this way
The end of a thread.In the modern device by convertor controls of the annular ring rail for ring spinner, any knot can be produced
The upper coil of structure, without being changed to ring spinner.It only need to accordingly adjust control parameter.According to the present invention, spinning
Coil is directly transported to winding position from ring spinner, that is, needs not move through special coil pretreatment.Therefore, it is convenient to omit pre-
Processing unit, but also it is avoided that all disadvantages.The structure of up- coiler can be made simple according to the method for the present invention, increase life
Yield simultaneously reduces energy consumption.
It is known from the prior art that up- coiler only includes the top winding device for remaining coil.The device only provides
The coil displaced from winding position.Material is thus formed in winding position not by the coil of complete debatching, for example, if in online
The end of a thread cannot be found again on spinning cop after disconnected.In the top winding device in this way for remaining coil, can also it handle
Spinning cop, these spinning cops are not provided upper coil correctly on ring spinner, therefore cannot be in winding position
It sets and catches the end of a thread.The spinning cop is only excluded winding position again.Compared with regular coil pretreatment, for residue
The top winding device of coil is only traveled through by a small number of defective coils.
Can be used for automatic association system according to the method for the present invention, (wherein coil is by transportation system automatically from ring spinning
Machine is delivered to up- coiler), it can be used for the ring spinner being installed separately and up- coiler.
Preferably, apply two or more upper coils on ring spinner.By having at least two upper lines
Circle one can assume that and provide the line of sufficient length, the line feed element of winding position is allowed to catch line and be provided to line
Attachment device.At least three upper coils may insure safer.
Line feed element may include blowning installation and clamp.Blowning installation blows the end of a thread from coil top, and such the end of a thread can
To be caught by clamp and be inserted into wire-connecting device.
Preferably, upper coil is at a distance from the top edge of the spool of spinning cop less than ten millimeters.In the position, top
Coil can reliably be blown out from coil spool.
Preferably, upper coil is greater than one millimeter at a distance from the top edge of the spool of spinning cop.Guarantee top in this way
Coil will not be not intended to skid off from spool.
Detailed description of the invention
The present invention is described in more detail below with reference to specific embodiment shown in the accompanying drawings.
Fig. 1 shows the combined system being made of ring spinner and up- coiler;
Fig. 2 shows the schematic diagrames of the yarning position of ring spinner;
Fig. 3 shows the schematic diagram of the winding position of up- coiler.
Specific embodiment
Fig. 1 shows the combined system with ring spinner 30 and up- coiler 1.The combined system include a bobbin/
Spool transportation system 3 (is equally also shown in Fig. 2), and the bobbin/spool transportation system is by the spinning cop 9 of completion from RING SPINNING
Yarn machine 30 is transported to the winding position 2 of up- coiler 1, and the spool of debatching 34 is delivered back into ring spinner 30.Bobbin/yarn
Pipe transportation system 3 includes the coil supply conveyer 4 positioned at up- coiler side.Spinning cop 9 is conveyed by branch's conveyer 44
Extremely can reverse driven store conveyer 5, and from there by the guidance of lateral transfer conveyer 6 to winding position 2.The spool of debatching
34 are delivered back into ring spinner 30 by spool echo-plex machine 7.The spinning cop 9 of incomplete debatching passes through branch's conveyer
45 are directed to the top winding device 46 for remaining coil.Remaining coil then passes through storage conveyer 5 and lateral transfer passes
The supply of machine 6 is sent to return to winding position 2.
Fig. 2 shows the yarning positions of ring spinner 30.Such ring spinner is substantially known, therefore
This is schematically shown.The structure of spinning cop 9 is more accurately shown here.Spinning cop 9 is wound
On micro- conical spool 34, spool 34 is tapered from spool foot 16 to spool top 15.The yarn body of spinning cop 9
Include micro- rounded shoulder 21 at spool foot 16 and includes coil circular cone 20 in 15 region of spool top.
Spinning cop 9 is arranged on rotating spindle 41, while annular ring rail 27 moves back and forth.Ring spinner 30 includes
Drafting system 38.The line 39 provided by drafting system 38 then passes through ring steel wire ring 31 by line guiding mechanism 36.Ring steel
Wire ring 31 rotates on spinning ring 29 around coil circular cone 20.Spinning ring 29 is arranged on annular ring rail 27, and with annular rings
Plate 27 moves back and forth, and line 39 is arranged on coil 9 in this way, is arranged in 20 region of coil circular cone.After completing coil 9, annular
Ring rail 27 moves further at the top of spool and places at least two upper lines on coil spool 34, above yarn body
Circle 43, more advantageously, three or more.The distance between top edge 17 of upper coil 43 and spool 34 for 1 to 10mm it
Between.After placing upper coil 43, annular ring rail 27 is run as early as possible to spool foot, to generate most on spinning cop 9
The rear portion coil of small number.After placing lower coil on spindle 41, the process of doffing can start.This means that from ring spinning
The spindle 41 of machine 30 removes the spinning cop 9 for being equipped with the completion of upper coil 43, and the spinning cop of completion 9 is transferred to cylinder
Pipe/spool transportation system 3.According to the method for the present invention, spinning cop 9 is fed directly to the winding position 2 of up- coiler 1, and
It is pre-processed without coil.
In winding position 2, spinning cop 9 is located at debatching position 10.Fig. 3 diagrammatically illustrates the structure of winding position 2.?
Winding position 2, line are again wrapped around from spinning cop 9 to cross-wound bobbin tube 11.In order to be wound to cross-wound bobbin tube 11, it is arranged
One winding device 24.Winding device 24 includes bobbin frame 18, and bobbin frame 18 can be rotated with around the pivot 19.Cross winding
Bobbin 11 is located in bobbin driven roller 26, and is driven by bobbin driven roller 26.Line is placed on intersection volume by mobile device 28
On bobbin 11.In order to form line connection after broken string, it is provided with wire-connecting device 13.Intersected coiled bobbin is come from order to detect
The upper lines are simultaneously inserted into wire-connecting device 13 by the upper lines of pipe, are provided with pivotable suction nozzle 12, pivotable suction nozzle 12 is logical
It crosses mechanical length negative pressure crossing members 32 and is connected to negative pressure source 33.In order to which line connection will be inserted into from the lower line of spinning cop 9
Device 13 is provided with pivotable clamp 25.Thread tensioner 14 has been disposed below in on-line joining process device 13, is tensioned and is filled by line
14 are set, lower line can be picked up after broken string.Lower line sensor 22, which detects lower line, whether there is.
If broken below thread tensioner 14 or after completing debatching spinning cop 9, coil can be triggered
Replacement circuit and new spinning cop 9 is placed in debatching position 10.The shell 40 that reduces with multiple blow guns is arranged in essence
It spins above coil, to remove the line being placed on spool top 15 as upper coil 43, and line is passed through into line guide pipe
23 are delivered up in the side of clamp 25.Lower line then can be inserted into wire-connecting device 13 by clamp 25, to form line connection.
The blow gun of shell 40 is supplied with compressed air by connecting tube 52.Connecting tube 52 is connected to machine by the valve 35 with driver 37
Tool compresses in length air duct 42.
If the end of a thread of spinning cop cannot be caught (such as since upper coil 43 is not placed correctly under RING SPINNING
On yarn machine), the winding position then spinning cop 9 is ostracised out, and it is supplied to the top winding device for remaining spool.
Claims (4)
1. method of the one kind for producing spinning cop (9) and being further processed the spinning cop (9), wherein in RING SPINNING
The spinning cop (9) is produced on yarn machine (30) and is further processed the spinning cop (9) on up- coiler (1), and
Wherein, upper coil (43) is applied to the spinning cop (9) above yarn body on the ring spinner (30)
Coil spool (34),
It is characterized by:
To there is the spinning cop (9) of the upper coil (43) applied on the ring spinner (30) to be delivered to
The winding position (2) of the up- coiler (1);
The essence is provided by the upper coil (43) applied on the ring spinner (30) in the winding position (2)
Spin the end of a thread of coil (9);
Described the end of a thread of the spinning cop (9) provided by being picked up in the winding position (2) of the up- coiler (1);And
And
The shell (40) that reduces with multiple blow guns is arranged in above the spinning cop (9), to separate as on described
Portion's coil (43) is placed on described the end of a thread on the coil spool (34), and by described the end of a thread on the direction of clamp (25)
Conveying, so that the lower line from the spinning cop (9) is inserted into wire-connecting device (13) by the clamp (25), to be formed
Line connection, and the spinning cop (9) described in the winding position (2) debatching.
2. the method according to claim 1, wherein applying two or more on the ring spinner (30)
A upper coil (43).
3. method according to any of the preceding claims, which is characterized in that the upper coil (43) and the essence
The distance of the top edge (17) of the spool (34) of coil (9) is spun less than ten millimeters.
4. the method according to claim 1, wherein the spool of the upper coil (43) and the spinning cop
(34) distance of top edge (17) is greater than one millimeter.
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE102014017818.8A DE102014017818A1 (en) | 2014-12-03 | 2014-12-03 | Process for the production and further processing of a spinning cop |
DE102014017818.8 | 2014-12-03 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105668335A CN105668335A (en) | 2016-06-15 |
CN105668335B true CN105668335B (en) | 2019-05-14 |
Family
ID=55974535
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201511005940.0A Active CN105668335B (en) | 2014-12-03 | 2015-11-30 | Method for producing spinning cop and being further processed the spinning cop |
Country Status (4)
Country | Link |
---|---|
JP (1) | JP2016108156A (en) |
CN (1) | CN105668335B (en) |
DE (1) | DE102014017818A1 (en) |
IT (1) | ITUB20159706A1 (en) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE102014014998A1 (en) * | 2014-10-09 | 2016-04-14 | Saurer Germany Gmbh & Co. Kg | Winding station with an alignment device for a spinning cop |
IT201800005658A1 (en) * | 2018-05-24 | 2019-11-24 | WINDING UNIT EQUIPPED WITH A PERFECTED ANTI-WINDING DEVICE AND METHOD OF COLLECTING A BAND OF A SPOOL THREAD AFTER CUTTING, IN A WINDING UNIT | |
CN113430683A (en) * | 2021-07-13 | 2021-09-24 | 湖北天门纺织机械股份有限公司 | Spinning frame system for manufacturing tube yarns convenient for finding ends and control method thereof |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101062739A (en) * | 2006-04-25 | 2007-10-31 | 索若两合股份有限公司 | Method for manufacturing a dye bobbin and device for winding a continuously fed thread |
CN101168419A (en) * | 2006-10-25 | 2008-04-30 | 欧瑞康纺织有限及两合公司 | Method and device for preprocessing bobbin so as to compound-wound at an automatic cross-wound bobbin winder |
CN101440539A (en) * | 2007-11-21 | 2009-05-27 | Savio纺织机械责任有限公司 | Device and process for finishing the bobbins of a ring spinning frames before transferring them to the automatic winding |
DE102012019816A1 (en) * | 2012-10-10 | 2014-04-10 | Saurer Germany Gmbh & Co. Kg | Process for preparing spinning cops made on ring spinning machines for subsequent rewinding |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB1050130A (en) | 1963-12-18 | 1900-01-01 | ||
DE3608862A1 (en) * | 1986-03-17 | 1987-09-24 | Klaus Eberhard Krieger | Apparatus for the preparation of spinning cops for the winding operation |
US5058816A (en) | 1988-09-23 | 1991-10-22 | Maschinenfabrik Rieter Ag | Cops preparation station |
DE19803036A1 (en) * | 1998-01-27 | 1999-07-29 | Rieter Ag Maschf | Cop winding at a ring spinning machine with a clamp |
DE10037513B4 (en) | 1999-09-20 | 2010-09-30 | Maschinenfabrik Rieter Ag | Method for controlling a ring spinning machine and spinning machine |
-
2014
- 2014-12-03 DE DE102014017818.8A patent/DE102014017818A1/en not_active Withdrawn
-
2015
- 2015-11-25 IT ITUB2015A009706A patent/ITUB20159706A1/en unknown
- 2015-11-30 CN CN201511005940.0A patent/CN105668335B/en active Active
- 2015-12-02 JP JP2015235521A patent/JP2016108156A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101062739A (en) * | 2006-04-25 | 2007-10-31 | 索若两合股份有限公司 | Method for manufacturing a dye bobbin and device for winding a continuously fed thread |
CN101168419A (en) * | 2006-10-25 | 2008-04-30 | 欧瑞康纺织有限及两合公司 | Method and device for preprocessing bobbin so as to compound-wound at an automatic cross-wound bobbin winder |
CN101440539A (en) * | 2007-11-21 | 2009-05-27 | Savio纺织机械责任有限公司 | Device and process for finishing the bobbins of a ring spinning frames before transferring them to the automatic winding |
DE102012019816A1 (en) * | 2012-10-10 | 2014-04-10 | Saurer Germany Gmbh & Co. Kg | Process for preparing spinning cops made on ring spinning machines for subsequent rewinding |
Also Published As
Publication number | Publication date |
---|---|
CN105668335A (en) | 2016-06-15 |
DE102014017818A1 (en) | 2016-06-09 |
ITUB20159706A1 (en) | 2017-05-25 |
JP2016108156A (en) | 2016-06-20 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP3222761B1 (en) | System with a ring spinning machine and a piecing arrangement and piecing method | |
CN105668335B (en) | Method for producing spinning cop and being further processed the spinning cop | |
CN1028039C (en) | Method and device for joining the thread in an open-end | |
CN101973470B (en) | Method for eliminating thread interruption in work station of cross-winding machine and cross-winding machine work station | |
CN102126646B (en) | Yarn winding machine and yarn guiding method | |
CN101407951B (en) | Method and device for operating open-end spinning machine | |
CN103723577B (en) | The cop manufactured on ring spinner is used for the preparation method of follow-up rewinding operation | |
US10683188B2 (en) | Method for operating a textile machine, and textile machine for producing roving | |
CN101506075B (en) | Suction nozzle for a workstation of a textile machine which produces crosswound bobbins | |
JP6738184B2 (en) | Method and system for operating a complex system consisting of at least one ring spinning machine and at least one winder | |
CN103014946A (en) | Spinning machine and method for interrupting the production of thread on a spinning machine | |
CN106467256B (en) | The method and winder station of burner gauze and filling are connected on the winder station of up- coiler | |
CN101177220B (en) | Method for operating winding head of textile machine for preparing cross-wound bobbin | |
CN103803345B (en) | The method for solving disconnection problem when by yarn winding to cross-wound bobbin tube | |
CN106241507B (en) | Spinning-in device and spinning-in method of automatic bobbin winder | |
JP2016194187A (en) | Method for operating composite system comprising at least one ring spinning machine and at least one winding machine, and composite system | |
CN105502073A (en) | A winding unit provided with an alignment device for spinning tubes | |
CN106672707B (en) | The mobile method of amendment yarn at the weaving loom station of manufacture cross winding bobbin | |
JPS58119562A (en) | Conveyer for roving bobbin | |
CN105369404B (en) | Weaving loom | |
JPH0351331A (en) | Method and apparatus for yarn handling in fine spinning frame | |
CN113026189B (en) | Three-line sweater machine | |
CN107963512A (en) | Yarn reeling device and the rotation method of shutting down of package | |
US10329693B2 (en) | Spinning preparation machine | |
US5058816A (en) | Cops preparation station |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |