CN105666018B - A kind of welding production device of tie-rod configuration part - Google Patents
A kind of welding production device of tie-rod configuration part Download PDFInfo
- Publication number
- CN105666018B CN105666018B CN201610258826.7A CN201610258826A CN105666018B CN 105666018 B CN105666018 B CN 105666018B CN 201610258826 A CN201610258826 A CN 201610258826A CN 105666018 B CN105666018 B CN 105666018B
- Authority
- CN
- China
- Prior art keywords
- shaped plate
- tie
- rod
- welding
- support
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B23—MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
- B23K—SOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
- B23K37/00—Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups
- B23K37/04—Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups for holding or positioning work
- B23K37/0426—Fixtures for other work
- B23K37/0435—Clamps
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B23—MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
- B23K—SOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
- B23K37/00—Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups
- B23K37/02—Carriages for supporting the welding or cutting element
- B23K37/027—Carriages for supporting the welding or cutting element for making circular cuts or welds
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B23—MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
- B23K—SOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
- B23K37/00—Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups
- B23K37/04—Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups for holding or positioning work
- B23K37/047—Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups for holding or positioning work moving work to adjust its position between soldering, welding or cutting steps
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B23—MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
- B23K—SOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
- B23K37/00—Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups
- B23K37/04—Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups for holding or positioning work
- B23K37/053—Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups for holding or positioning work aligning cylindrical work; Clamping devices therefor
Landscapes
- Physics & Mathematics (AREA)
- Optics & Photonics (AREA)
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Butt Welding And Welding Of Specific Article (AREA)
Abstract
The invention discloses a kind of welding production device of tie-rod configuration part, including tie-rod welding bench, Frame for supporting parallel pipes, T-shaped plate clamps main runner assembly and T-shaped plate clamps time runner assembly, tie-rod welding bench middle part is provided with two sets of Frame for supporting parallel pipes, T-shaped plate clamps main runner assembly includes main rotating shaft, main shaft support and motor, described main shaft support is arranged on tie-rod welding bench one end, main rotating shaft is arranged on main shaft support and rotates, main rotating shaft inner termination middle part offers T-shaped plate and clamps groove, T-shaped plate clamps the fastening bolt for being set on groove and clamping T-shaped plate, main rotating shaft outer end sets belt pulley, motor is provided with the corresponding tie-rod welding bench of belt pulley, motor passes through belt drive pulley rotation.The T-shaped plate structure alignment at the T-shaped plate synchronization docking at steel pipe two ends, synchronous welding, and two ends can be realized, when being perforated in subsequent installation, punching rate can be effectively improved.
Description
Technical field
The present invention relates to a kind of making field of rigid tie bar structural member, and in particular to a kind of welding system of tie-rod configuration part
Make device.
Background technology
Light weight steel structure is the resistance to overturning for increasing structure, it is necessary to multiple tracks rigidity tie-rod is set between every Pin steelframes
As shown in figure 1, according to post away from and stress size, tie-rod is most to be made of the steel pipes of diameter 89 ~ 140, the two ends of steel pipe, then
Connecting plate of the T-shaped plate as tie-rod is welded into using two pieces of steel plate groups, because rigid tie bar structural member primary demand amount all compares
Greatly, it is difficult comparing by the quick errorless steel pipe two ends that are welded on of connecting plate, if connecting plate and steel-pipe welding error are big
Punching rate problem not high when can cause subsequent installation.
The content of the invention
It is to overcome the deficiencies in the prior art that the purpose of the present invention is, there is provided a kind of welding production device of tie-rod configuration part
And preparation method, in solving rigid tie bar structural member manufacturing process, T-shaped plate and steel-pipe welding efficiency is low and welding production mistake
Easily produce the problem of error in journey, the T-shaped plate at otherwise address steel pipe two ends can synchronously align the major issue of welding.
It is of the invention to be achieved through the following technical solutions:
A kind of welding production device of tie-rod configuration part, including tie-rod welding bench, Frame for supporting parallel pipes, T-shaped plate clamp main rotation
Component and T-shaped plate clamp time runner assembly, and tie-rod welding bench middle part is provided with two sets of Frame for supporting parallel pipes, and described T-shaped plate clamps master
Runner assembly includes main rotating shaft, main shaft support and motor, and described main shaft support is arranged on tie-rod welding bench one end, institute
The main rotating shaft stated is arranged on main shaft support and rotates, and described main rotating shaft inner termination middle part offers T-shaped plate and clamps
Groove, the T-shaped plate clamps the fastening bolt for being set on groove and clamping T-shaped plate, and described main rotating shaft outer end sets belt
Wheel, is provided with motor on the corresponding tie-rod welding bench of described belt pulley, described motor passes through belt drive pulley rotation.
Described T-shaped plate clamps time runner assembly includes time rotary shaft, secondary shaft support and rotary screw, described secondary turn
Bracing strut is provided with sliding block, and the described tie-rod welding bench other end is provided with the chute being engaged with sliding block, the secondary shaft branch
Frame is arranged in the chute of tie-rod welding bench by sliding block, and a hole is provided with described sliding block, and described chute collar extension end sets
Screw rodb base is equipped with, described rotary screw with sliding block is connected through screw rodb base and then by silk hole, described rotary screw outer end
It is provided with handwheel;Described secondary rotary shaft is arranged on secondary shaft support and rotates, and described secondary rotary shaft inner termination middle part is also opened
It is provided with T-shaped plate and clamps groove, the T-shaped plate clamps the fastening bolt for being also equipped with clamping T-shaped plate on groove.
Further, distinguish with main rotating shaft inner termination and time rotary shaft inner termination corresponding position on described tie-rod welding bench
Welding gun support is provided with, welding gun is installed in described welding gun support.Welding gun support, welding gun branch are provided with tie-rod welding bench
Frame is provided with welding gun, can save the welding of workman's hand torch, and the quality and efficiency of welding all improve a lot.
Further, described Frame for supporting parallel pipes includes the camber bracket and support post of placing steel tubes, the camber bracket
The upper end of support post is arranged on, described support post lower end is arranged on tie-rod welding bench.
Further, it is provided with ball on the intrados of the camber bracket.
Further, the support post is arranged in the mounting hole set on tie-rod welding bench, described support post
Side is provided with bar tooth, and described mounting hole side is provided with the gear cooperated with bar tooth, and described gear turns around the shaft
It is dynamic, it is connected with described rotating shaft and hand turns axle.Regulating height structure is provided with Frame for supporting parallel pipes, can be according to different size
Steel pipe regulation height, make steel pipe with T-shaped plate Dock With Precision Position.
Further, it is provided with graduation mark on the support post.
Further, described main rotating shaft with corresponding 0 graduation mark is provided with main shaft support, when main rotating shaft with
When 0 graduation mark set on main shaft support aligns, the T-shaped plate clamped on the main rotating shaft is in horizontality.
Further, 0 graduation mark of correspondence is provided with described secondary rotary shaft and secondary shaft support, when secondary rotary shaft and
When 0 graduation mark set on secondary shaft support aligns, the T-shaped plate clamped in described rotary shaft is in horizontality.
The present invention compared with prior art, has the following advantages and advantages:
1st, Frame for supporting parallel pipes is set by tie-rod welding bench, T can be set by tie-rod welding bench with placing steel tubes
Template clamps main runner assembly and T-shaped plate clamps time runner assembly and can realize that the T-shaped plate at steel pipe two ends is synchronously docked, synchronous
Weld, and the T-shaped plate structure at two ends aligns, and when being perforated in subsequent installation, punching rate can be effectively improved;
2nd, regulating height structure is provided with Frame for supporting parallel pipes, height can be adjusted according to various sizes of steel pipe, make steel
Pipe and T-shaped plate Dock With Precision Position;
3rd, graduation mark is provided with the support post of Frame for supporting parallel pipes, can be adjusted according to graduation mark, made on tie-rod welding bench
Two sets of Frame for supporting parallel pipes keep a level height, it is to avoid there is deviation when with T-shaped main plate opposing connection welding;
4th, welding gun support is provided with tie-rod welding bench, welding gun support is provided with welding gun, the hand-held weldering of workman can be saved
Rifle is welded, and the quality and efficiency of welding all improve a lot;
5th, offer T-shaped plate in the middle part of main rotating shaft inner termination and the termination of secondary rotary shaft 21 and clamp groove, by a letter
Single structure achieves that and T-shaped plate is firmly clamped that handling all facilitate;
6th, belt pulley is set by main rotating shaft outer end, motor is provided with the corresponding tie-rod welding bench of belt pulley,
By belt drive pulley rotation, belt pulley drives overall tie-rod to rotate welding to motor by main rotating shaft again, it is possible to achieve
Full-automatic welding, can effectively improve tie-rod welding efficiency.
Brief description of the drawings
Accompanying drawing described herein is used for providing further understanding the embodiment of the present invention, constitutes of the application
Point, do not constitute the restriction to the embodiment of the present invention.In the accompanying drawings:
Fig. 1 is the structural representation of tie-rod;
Fig. 2 is a kind of welding production apparatus structure schematic diagram of tie-rod configuration part of the invention;
Fig. 3 is the structural representation of Frame for supporting parallel pipes of the present invention;
Fig. 4 is that a kind of welding production device of tie-rod configuration part of the invention clamps tie-rod configuration schematic diagram;
Mark and corresponding parts title in accompanying drawing:
1- tie-rod welding benches, 2- Frame for supporting parallel pipes, 3-T templates clamp main runner assembly, 4- main rotating shafts, 5- main shaft branch
Frame, 6-T template parts clamp groove, 7- fastening bolts, 8- belt pulleys, 9- belts, 10- welding gun supports, 11- welding guns, 12- camber supports
Frame, 13- support posts, 14- balls, 15- bar teeth, 16- gears, 17- rotating shafts, 18- is hand to turn axle, 19- motors, the T-shaped plates of 20-
Clamp time runner assembly, 21- rotary shaft, 22- secondary shaft supports, 23- rotary screws, 24- sliding blocks, 25- chutes, 26- screw mandrels
Seat, 27- handwheels.
Specific embodiment
To make the object, technical solutions and advantages of the present invention become more apparent, with reference to embodiment and accompanying drawing, to this
Invention is described in further detail, and exemplary embodiment of the invention and its explanation are only used for explaining the present invention, do not make
It is limitation of the invention.
Embodiment 1
As in Figure 2-4, the welding production device of a kind of tie-rod configuration part of the invention, including tie-rod welding bench 1, steel pipe support
Frame 2, T-shaped plate clamp main runner assembly 3 and T-shaped plate clamps time runner assembly 20, by setting steel pipe support on tie-rod welding bench 1
Frame 2, can be with placing steel tubes, and clamping main runner assembly 3 by tie-rod welding bench 1 setting T-shaped plate can clamp T-shaped plate,
And clamping main runner assembly 3 by T-shaped plate can drive T-shaped plate rotating welding;The middle part of tie-rod welding bench 1 is provided with two sets
Frame for supporting parallel pipes 2, T-shaped plate clamps main runner assembly 3 includes main rotating shaft 4, main shaft support 5 and motor 19, main shaft support 5
The one end of tie-rod welding bench 1 is arranged on, main rotating shaft 4 is arranged on main shaft support 5 and rotates, and the inner termination of main rotating shaft 4 middle part is opened
It is provided with T-shaped plate and clamps groove 6, T-shaped plate clamps the fastening bolt 7 for being set on groove 6 and clamping T-shaped plate, the outer end of main rotating shaft 4
Portion sets belt pulley 8, and motor 19 is provided with the corresponding tie-rod welding bench 1 of belt pulley 8, and motor 19 drives belt by belt 9
Wheel 8 is rotated.Belt pulley 8 drives tie-rod to rotate welding by main rotating shaft 4 again, it is possible to achieve Full-automatic welding, can effectively carry
Tie-rod welding efficiency high.
T-shaped plate clamps time runner assembly 20 includes time rotary shaft 21, secondary shaft support 22 and rotary screw 23, secondary shaft branch
Frame 22 is provided with sliding block 24, and the other end of tie-rod welding bench 1 is provided with the chute 25 being engaged with sliding block 24, and secondary shaft support 22 leads to
Cross sliding block 24 to be arranged in the chute 25 of tie-rod welding bench 1, a hole is provided with sliding block 24, the collar extension end of chute 25 is provided with screw mandrel
Seat 26, rotary screw 23 with sliding block 24 is connected through screw rodb base and then by silk hole, and the outer end of rotary screw 23 is provided with handwheel 27;
Secondary rotary shaft 21 is arranged on secondary shaft support 22 and rotates, and the inner termination of secondary rotary shaft 21 middle part also offers T-shaped plate and clamps groove
6, the T-shaped plate clamps the fastening bolt 7 for being also equipped with clamping T-shaped plate on groove 6.The He of main runner assembly 3 is clamped by T-shaped plate
T-shaped plate clamps time runner assembly 20 and can realize that the T-shaped plate at steel pipe two ends is synchronously docked, synchronous welding, and two ends is T-shaped
Plate structure is alignd, and when being perforated in subsequent installation, punching rate can be effectively improved.
When using, the riser with connecting hole of T-shaped plate is installed in the inner termination of main rotating shaft 4 middle part and offers T-shaped plate
Part is clamped in groove 6, is then clamped with fastening bolt 7, wants two ends to align when clamping, and prevents deviation, main rotating shaft 4 occur during welding
On clamp T-shaped plate after, then clamp the T-shaped plate in time rotary shaft 21 with same method, if batch is welded for the first time,
First steel pipe is placed on two sets of Frame for supporting parallel pipes 2, the height of two sets of Frame for supporting parallel pipes of adjustment 2, with steel pipe horizontal aligument main rotating shaft 4
On T-shaped plate middle part be defined, the welding of same model tie-rod, just without adjusting again after adjusting for the first time, the height tune of Frame for supporting parallel pipes 2
It is whole it is good after, steel pipe is docked with the T-shaped plate on main rotating shaft 4, then go to handwheel 27, handwheel 27 passes sequentially through rotation
Screw mandrel 23 and sliding block 24 drive secondary shaft support 22 to be moved to steel tube head, T-shaped plate and steel pipe end in secondary rotary shaft 21
While head is pressed close to, it is ensured that the T-shaped plate structure alignment at steel pipe two ends or symmetrical configuration, steel pipe can be realized by above-mentioned steps
And the T-shaped plate at two ends presses close to alignment, then synchronous averaging welding gun, after steel pipe and the T-shaped plate in two ends are a little soldered, makes steel
Pipe be connected with the T-shaped plate in two ends can unitary rotation when, start motor 19 and drive one integral piece tie-rod to complete welding in a week, an entirety is
Bar welding is completed.
Embodiment 2
As in Figure 2-4, a kind of welding production device of tie-rod configuration part of the invention, described on the basis of embodiment 1
Tie-rod welding bench 1 on be respectively arranged with welding gun support 10 with the inner termination of main rotating shaft 4 and time inner termination corresponding position of rotary shaft 21,
4 are provided with welding gun 11 in described welding gun support.The welding of workman's hand torch can be saved, the quality and efficiency of welding have very
It is big to improve;Full-automatic welding can be realized, tie-rod welding efficiency can be effectively improved.
Embodiment 3
As in Figure 2-4, the welding production device of a kind of tie-rod configuration part of the invention, on the basis of embodiment 1, steel pipe
Bracket 2 includes the camber bracket 12 and support post 13 of placing steel tubes, and camber bracket 12 is arranged on the upper end of support post 13, props up
Support column 13 lower end is arranged on tie-rod welding bench 1.Ball 14 is provided with the intrados of camber bracket 12.
Support post 13 is arranged in the mounting hole set on tie-rod welding bench 1, and the side of support post 13 is provided with bar tooth
15, mounting hole side is provided with the gear 16 cooperated with bar tooth 15, and gear 16 17 is rotated around the shaft, in described rotating shaft 17
It is connected with and hand turns axle 18.Regulating height structure is provided with Frame for supporting parallel pipes 2, can adjust high according to various sizes of steel pipe
Degree, makes steel pipe with T-shaped plate Dock With Precision Position;Graduation mark is provided with support post 13.Set on the support post 13 of Frame for supporting parallel pipes 2
Graduation mark is equipped with, can be adjusted according to graduation mark, two sets of Frame for supporting parallel pipes 2 on tie-rod welding bench 1 is kept a level height,
Avoid deviation occur when with T-shaped main plate opposing connection welding.
Embodiment 4
As in Figure 2-4, the welding production device of a kind of tie-rod configuration part of the invention, on the basis of embodiment 1, in weldering
When connecing producing device and clamping the T-shaped plate at steel pipe and two ends in advance, the T-shaped plate structure pair of steel pipe and two ends is realized for convenience
Together, main rotating shaft 4 with corresponding 0 graduation mark is provided with main shaft support 5, set when on main rotating shaft 4 with main shaft support 5
When 0 graduation mark put aligns, the T-shaped plate clamped on main rotating shaft 4 is in horizontality.Secondary rotary shaft 21 and secondary shaft support
0 graduation mark of correspondence is provided with 22, when 0 graduation mark set in secondary rotary shaft 21 and secondary shaft support 22 aligns, secondary rotation
The T-shaped plate clamped in rotating shaft 21 is in horizontality.In docking operation is clamped, when main rotating shaft 4, main shaft support 5, secondary
When 0 graduation mark in rotary shaft 21 and secondary shaft support 22 aligns, on the basis of 0 graduation mark, illustrate that steel pipe is T-shaped with two ends
Plate structure also aligns, and can start welding.
Above-described specific embodiment, has been carried out further to the purpose of the present invention, technical scheme and beneficial effect
Describe in detail, should be understood that and the foregoing is only specific embodiment of the invention, be not intended to limit the present invention
Protection domain, all any modification, equivalent substitution and improvements within the spirit and principles in the present invention, done etc. all should include
Within protection scope of the present invention.
Claims (6)
1. a kind of welding production device of tie-rod configuration part, including tie-rod welding bench (1), Frame for supporting parallel pipes (2), T-shaped plate clamp master
Runner assembly (3) and T-shaped plate clamp time runner assembly (20), it is characterised in that:Described tie-rod welding bench (1) middle part is provided with
Two sets of Frame for supporting parallel pipes (2), described T-shaped plate clamps main runner assembly (3) includes main rotating shaft (4), main shaft support (5) and electricity
Machine (19), described main shaft support (5) is arranged on tie-rod welding bench (1) one end, and described main rotating shaft (4) is arranged on main turning
Rotated on bracing strut (5), described main rotating shaft (4) inner termination middle part offers T-shaped plate and clamps groove (6), the T-shaped plate
The fastening bolt (7) for being set on groove (6) and clamping T-shaped plate is clamped, described main rotating shaft (4) outer end sets belt pulley (8),
Motor (19) is provided with the corresponding tie-rod welding bench (1) of described belt pulley (8), described motor (19) is by belt (9)
Belt pulley (8) is driven to rotate;
Described T-shaped plate clamps time runner assembly (20) includes secondary rotary shaft (21), secondary shaft support (22) and rotary screw
(23), described secondary shaft support (22) is provided with sliding block (24), and described tie-rod welding bench (1) other end is provided with and sliding block
(24) chute (25) being engaged, the secondary shaft support (22) is arranged on the chute of tie-rod welding bench (1) by sliding block (24)
(25) in, a hole is provided with described sliding block (24), described chute (25) collar extension end is provided with screw rodb base (26), described
Rotary screw (23) with sliding block (24) is connected through screw rodb base and then by silk hole, and described rotary screw (23) outer end is provided with
Handwheel (27);Described secondary rotary shaft (21) is arranged on secondary shaft support (22) and rotates, and described secondary rotary shaft (21) is inner
Centriciput also offers T-shaped plate and clamps groove (6), and the T-shaped plate clamps and is also equipped with clamping T-shaped plate on groove (6)
Fastening bolt (7);
When welding production device clamps the T-shaped plate of steel pipe and two ends in advance, the T-shaped plate of steel pipe and two ends is realized for convenience
Part structure alignment, corresponding 0 graduation mark is provided with main rotating shaft (4) with main shaft support (5), when main rotating shaft (4) with
When 0 graduation mark set on main shaft support (5) aligns, the T-shaped plate clamped on main rotating shaft (4) is in horizontality;It is secondary
0 graduation mark of correspondence is provided with rotary shaft (21) and secondary shaft support (22), when secondary rotary shaft (21) and secondary shaft support
(22) when 0 graduation mark set on aligns, the T-shaped plate clamped on secondary rotary shaft (21) is in horizontality;Clamping docking
During, when 0 graduation mark on main rotating shaft (4), main shaft support (5), secondary rotary shaft (21) and secondary shaft support (22) is equal
During alignment, on the basis of 0 graduation mark, illustrate that steel pipe also aligns with the T-shaped plate structure at two ends, can be realized by above-mentioned steps
The T-shaped plate at steel pipe and two ends presses close to alignment, then synchronous averaging welding gun, after steel pipe and the T-shaped plate in two ends are a little soldered,
Make steel pipe be connected with the T-shaped plate in two ends can unitary rotation when, start motor (19) and drive one integral piece tie-rod to complete welding in a week, one
Overall tie-rod welding is completed.
2. the welding production device of a kind of tie-rod configuration part according to claim 1, it is characterised in that:Described tie-rod weldering
Connect and be respectively arranged with welding gun support (10) with main rotating shaft (4) inner termination and time rotary shaft (21) inner termination corresponding position on platform (1),
Welding gun (11) is installed in described welding gun support.
3. the welding production device of a kind of tie-rod configuration part according to claim 1, it is characterised in that:Described steel pipe support
Camber bracket (12) and support post (13) of the frame (2) including placing steel tubes, the camber bracket (12) are arranged on support post
(13) upper end, described support post (13) lower end is arranged on tie-rod welding bench (1).
4. the welding production device of a kind of tie-rod configuration part according to claim 3, it is characterised in that:The camber support
Ball (14) is provided with the intrados of frame (12).
5. the welding production device of a kind of tie-rod configuration part according to claim 3 or 4, it is characterised in that:The support
In the mounting hole that column (13) is set on tie-rod welding bench (1), described support post (13) side is provided with bar tooth
(15), described mounting hole side is provided with the gear (16) cooperated with bar tooth (15), and described gear (16) is around the shaft
(17) rotate, be connected with described rotating shaft (17) and hand turn axle (18).
6. the welding production device of a kind of tie-rod configuration part according to claim 5, it is characterised in that:The support post
(13) graduation mark is provided with.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610258826.7A CN105666018B (en) | 2016-04-25 | 2016-04-25 | A kind of welding production device of tie-rod configuration part |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610258826.7A CN105666018B (en) | 2016-04-25 | 2016-04-25 | A kind of welding production device of tie-rod configuration part |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105666018A CN105666018A (en) | 2016-06-15 |
CN105666018B true CN105666018B (en) | 2017-06-09 |
Family
ID=56215554
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610258826.7A Active CN105666018B (en) | 2016-04-25 | 2016-04-25 | A kind of welding production device of tie-rod configuration part |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105666018B (en) |
Families Citing this family (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106862848A (en) * | 2017-02-23 | 2017-06-20 | 成都联润科技有限公司 | It is a kind of to be applied to three devices of rotating welding |
CN108000044A (en) * | 2017-11-14 | 2018-05-08 | 中冶天工(天津)装备制造有限公司 | A kind of large-diameter steel pipe welder |
CN109317915B (en) * | 2018-10-31 | 2023-06-02 | 江苏华电铁塔制造有限公司 | Pipe tower unit concatenation frock |
CN110480123B (en) * | 2019-07-31 | 2023-08-25 | 浩德重工科技(江苏)有限公司 | Automatic welding production system for net rack connecting rod |
CN110977918A (en) * | 2019-12-10 | 2020-04-10 | 江苏省建筑工程质量检测中心有限公司 | Scribing device for longitudinal shrinkage test of plastic pipe |
CN112122858A (en) * | 2020-10-21 | 2020-12-25 | 青海柴达木职业技术学院(海西蒙古族藏族自治州职业技术学校) | Full-automatic small part welding device and welding method |
CN112178277B (en) * | 2020-10-30 | 2022-05-17 | 山东奥德圣凯能源有限公司 | Auxiliary connecting mechanism of thermal power resource conveying pipeline |
CN112677118A (en) * | 2020-12-11 | 2021-04-20 | 成都市恒动机械有限责任公司 | Metal thin-wall pipe fitting and special fixture for processing same |
CN114310111B (en) * | 2022-01-07 | 2023-10-03 | 洛阳汇成钢结构有限公司 | Steel structure tie bar welding equipment |
CN115635286B (en) * | 2022-12-19 | 2023-04-28 | 山东聚鑫集团钢结构有限公司 | Tie bar welding device |
CN117300489A (en) * | 2023-10-31 | 2023-12-29 | 南通市力行机械制造有限公司 | Double-gun welding centering fixture for dumbbell blank |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP2561948A1 (en) * | 2011-08-24 | 2013-02-27 | Wartmann Technologie AG | Device for and method of manufacturing a flange-tube-flange element using friction stir welding |
CN203918268U (en) * | 2014-06-16 | 2014-11-05 | 河北创力机电科技有限公司 | Positioning device for welding of steel pipe flanges |
CN204725077U (en) * | 2015-05-14 | 2015-10-28 | 沃达尔(天津)有限公司 | A kind of sprinkling irrigation water pipe automatic rotary welding mechanism |
CN105215561A (en) * | 2015-09-28 | 2016-01-06 | 魏俊杰 | A kind of pipe welder |
CN205496882U (en) * | 2016-04-25 | 2016-08-24 | 中国五冶集团有限公司 | Welding manufacture device of tie rod structure |
-
2016
- 2016-04-25 CN CN201610258826.7A patent/CN105666018B/en active Active
Also Published As
Publication number | Publication date |
---|---|
CN105666018A (en) | 2016-06-15 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105666018B (en) | A kind of welding production device of tie-rod configuration part | |
CN105127652B (en) | A kind of flip horizontal positioner and its application method | |
CN205967913U (en) | Pipe flange welding position frock | |
CN2561549Y (en) | Automatic tubular mother line aligned welder | |
CN112658541B (en) | Corrugated pipe outer ring welding equipment and using method thereof | |
CN113560762B (en) | Seamless butt joint method for stainless steel water supply pipeline | |
CN204221295U (en) | A kind of rotary marine piping jig | |
CN104440362A (en) | Steel pipe end alignment system and method | |
KR102655413B1 (en) | Modular jig device for pipe welding | |
CN114986074A (en) | Boiler pipeline is with anchor clamps of keeping to needs of job | |
CN105666019A (en) | Device for manufacturing rigid tie bar structural member | |
CN207858169U (en) | The pipe welding tool setup set up for transmission tower | |
CN219131343U (en) | Pipe flange pairing tool | |
CN103624467A (en) | Welding fixture for large-sized workpiece | |
CN208147276U (en) | A kind of multiposition thin-wall steel tube welder | |
CN205496882U (en) | Welding manufacture device of tie rod structure | |
CN114589385A (en) | Take centering and autogiration's long oil pipe welding set | |
CN205496883U (en) | Making devices of rigidity tie rod structure | |
CN210731415U (en) | Flange plate welding device for flange pipe fitting production | |
CN219152028U (en) | Positioning auxiliary device for pipe fitting welding processing | |
CN111390486A (en) | Welding tool and method for washing dragon cylinder body | |
CN107790951A (en) | A kind of power transmission line steel pipe rod rotational positioning welding system | |
CN109366099B (en) | method for manufacturing special-shaped spiral body | |
CN214868344U (en) | Horizontal centering device for semi-automatic welding pipeline | |
CN205798743U (en) | Pipeline welding workbench |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |