CN105657831A - Baseband resource management method and device - Google Patents
Baseband resource management method and device Download PDFInfo
- Publication number
- CN105657831A CN105657831A CN201410727551.8A CN201410727551A CN105657831A CN 105657831 A CN105657831 A CN 105657831A CN 201410727551 A CN201410727551 A CN 201410727551A CN 105657831 A CN105657831 A CN 105657831A
- Authority
- CN
- China
- Prior art keywords
- standard
- public resource
- clusters
- resource
- service parameter
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W88/00—Devices specially adapted for wireless communication networks, e.g. terminals, base stations or access point devices
- H04W88/08—Access point devices
- H04W88/10—Access point devices adapted for operation in multiple networks, e.g. multi-mode access points
Landscapes
- Engineering & Computer Science (AREA)
- Computer Networks & Wireless Communication (AREA)
- Signal Processing (AREA)
- Mobile Radio Communication Systems (AREA)
Abstract
The invention discloses a baseband resource management method. The method comprises following steps: obtaining business parameters demanded by various types; comparing the business parameters demanded by the various types with the current business parameters of the various types; judging whether the business demands in the various types change; when the business demands in the various types change, obtaining a new multimode mode according to the business parameters demanded by the various types and a preset multimode mode table; calculating the public resource cluster numbers actually needing to be allocated or released by the types with changed business demands according to the new multimode mode and a current multimode mode; and allocating or releasing corresponding special resources and special resources to the types with changed business demands according to the calculation results. The invention also discloses a baseband resource management device. Through the method and the device provided by the invention, the baseband resource coupling problem under various network types is solved; the baseband resources can be shared by the various types; the utilization efficiency of the baseband resources can be exerted fully; and moreover, the businesses of the various types can be operated independent without mutual interferences.
Description
Technical field
The present invention relates to the communications field, relate in particular to a kind of baseband resource managing method and device.
Background technology
Current, along with the fast development of mechanics of communication, wireless telecommunication system is also from 2 generation GSM (GlobalSystemforMobileCommunication, global system for mobile communications) to 3 generation UMTS (UniversalMobileTelecommunicationsSystem, UMTS) and 4 generation LTE(Long-TermEvolution, long evolving system) evolution, and deposit in current communication network simultaneouslyIn multiple network standards such as GSM, UMTS and LTE, in the smooth evolution of communication network, from comprehensivelyThe various factors such as renewal of the equipment and maintenance cost is considered and can be found out, multiple types is supported in a base station simultaneouslyIt will be a kind of inevitable development trend. But existing wireless communication networks baseband board is only supported singleWireless network standard is inserted the multiple baseband boards such as GSM, UMTS, LTE in a base station machine frame simultaneously,Will cause limited groove position cannot support witched-capacity network. Therefore, realize on the baseband board of existing base stationIt is very necessary that multiple network standard is shared same base-band resource.
Summary of the invention
Main purpose of the present invention is to provide a kind of baseband resource managing method and device, is intended to realize existingThere is multiple network standard on the baseband board of base station to share the object of same base-band resource, thereby make a baseBand plate can be supported the base band independent operating of multiple types simultaneously, also reduced simultaneously device upgrade cost andCost of equipment maintenance.
For achieving the above object, the invention provides a kind of baseband resource managing method, comprising:
Obtain the required service parameter of each standard;
The required service parameter of described each standard, with the current service parameter comparison of described each standard, is sentencedWhether the business demand in disconnected described each standard changes;
In the time that the business demand in described each standard changes, according to the required industry of described each standardBusiness parameter and default multimode pattern list, obtain new multimode pattern;
According to described new multimode pattern and current multimode pattern, the system that computing service demand changesThe public resource number of clusters that formula actual needs distributes or discharges, and draw result of calculation;
According to described result of calculation, for the standard that described business demand changes is distributed or discharges correspondingPrivate resource and public resource.
Preferably, described according to the required service parameter of described each standard and default multimode pattern list,Before obtaining new multimode pattern, also comprise:
In the time that the business demand in described each standard changes, according to the required business ginseng of each standardNumber and default each standard public resource bunch demand schedule, calculate the public resource number of clusters that each standard needs;
The public resource number of clusters needing according to described each standard, the public resource that each standard needs described in verificationWhether the sum of number of clusters is less than or equal to the total public resource number of clusters of base band;
The sum of the public resource number of clusters needing when described each standard is less than or equal to total public of described base bandWhen resource number of clusters, carry out described according to the required service parameter of described each standard and default multimode patternShow, obtain the step of new multimode pattern.
Preferably, described according to described new multimode pattern and current multimode pattern, computing service demandThe standard actual needs changing distributes or the public resource number of clusters of release comprises:
According to described new multimode pattern and current multimode pattern, search industry in default multimode pattern listThe new service parameter of the standard difference correspondence that business demand changes and current service parameter;
According to searching corresponding described new service parameter and the described current business ginseng of described standard obtainingNumber, from default described standard public resource bunch demand schedule, obtains the service parameter pair that described standard is newIn requisition for public resource number of clusters, and the current service parameter of described standard in requisition for public resourceNumber of clusters;
According to the new service parameter of described standard obtaining in requisition for public resource number of clusters, and described inThe current service parameter of standard in requisition for public resource number of clusters, the system that computing service demand changesThe public resource number of clusters that formula actual needs distributes or discharges, and draw result of calculation.
Preferably, the described standard that changes for described business demand is distributed or is discharged corresponding special moneyAfter source and public resource, comprise:
In the time that the standard changing for described business demand is distributed corresponding public resource, by the institute distributingState public resource bunch and be labeled as seizure condition;
In the time that the standard changing for described business demand discharges corresponding public resource, by the institute dischargingState public resource bunch and be labeled as idle condition.
Preferably, described baseband resource managing method also comprises:
When in each standard running, while existing standard occur extremely and reset successfully, will occur abnormalBefore distribute to the public resource bunch of the abnormal standard of described generation, distribute to the abnormal standard of described generation.
The present invention also provides a kind of baseband resource managing device, and described baseband resource managing device comprises:
Service parameter acquisition module, for obtaining the required service parameter of each standard;
Business change judge module, for by the required service parameter of described each standard with described each standardCurrent service parameter comparison, judges whether the business demand in described each standard changes;
Multimode pattern acquisition module, in the time that the business demand of described each standard changes, rootAccording to the required service parameter of described each standard and default multimode pattern list, obtain new multimode pattern;
Resource bunch the first computing module, for according to described new multimode pattern and current multimode pattern,The public resource number of clusters that the standard actual needs that computing service demand changes distributes or discharges, and drawResult of calculation;
Resource is distributed release module, for according to described result of calculation, for described business demand changesStandard distribute or discharge corresponding private resource and public resource.
Preferably, described baseband resource managing device also comprises:
Resource bunch the second computing module, in the time that the business demand of described each standard changes,According to the required service parameter of each standard and default each standard public resource bunch demand schedule, calculate each systemThe public resource number of clusters that formula needs;
Resource bunch correction verification module, for the public resource number of clusters needing according to described each standard, described in verificationWhether the sum of the public resource number of clusters that each standard needs is less than or equal to the total public resource number of clusters of base band;
Redirect Executive Module, for the sum of the public resource number of clusters that needs when described each standard be less than or etc.In the time of the total public resource number of clusters of described base band, carry out described according to the required business ginseng of described each standardSeveral and default multimode pattern list, obtains the step of new multimode pattern.
Preferably, described resource bunch first computing module comprises:
Service parameter is searched unit, for according to described new multimode pattern and current multimode pattern, looks intoLook for standard that in default multimode pattern list, business demand changes respectively corresponding new service parameter andCurrent service parameter;
Resource number of clusters acquiring unit, searches for basis described new business corresponding to described standard obtainingParameter and described current service parameter, from default described standard public resource bunch demand schedule, obtainThe new service parameter of described standard in requisition for public resource number of clusters, and the current business of described standardParameter in requisition for public resource number of clusters;
Resource number of clusters computing unit, for according to the new service parameter of described standard obtaining in requisition forPublic resource number of clusters, and the current service parameter of described standard in requisition for public resource number of clusters, meterThe public resource number of clusters that the standard actual needs that calculation business demand changes distributes or discharges, and draw meterCalculate result.
Preferably, described baseband resource managing device also comprises:
Seizure condition mark module, distributes corresponding for the standard when changing for described business demandWhen public resource, the described public resource bunch distributing is labeled as to seizure condition;
Idle condition mark module, discharges corresponding for the standard when changing for described business demandWhen public resource, the described public resource bunch discharging is labeled as to idle condition.
Preferably, described baseband resource managing device also comprises:
Reset distribution module, for when each standard running, exists standard occur abnormal and reset toWhen merit,, by distributing to the public resource bunch of the abnormal standard of described generation before occurring extremely, distribute to instituteState abnormal standard occurs.
Whether the present invention, according to the service parameter that obtains each standard, judges and in each standard, exists newly-increased or reduceBusiness demand; In the time there is newly-increased or minimizing business demand, according to the public money of each standard setting in advanceSource bunch demand schedule and multimode pattern list, determine multimode pattern. Last again according to the multimode pattern obtaining andDefault each standard public resource bunch demand schedule and multimode pattern list, for each standard is distributed or discharges correspondingPrivate resource and public resource, thus the problem of sharing same base-band resource under multiple network standard solved,And make a baseband board can support the base band independent operating of multiple types simultaneously, also reduce and established simultaneouslyStandby upgrade cost and cost of equipment maintenance.
Brief description of the drawings
Fig. 1 is the schematic flow sheet of data verification method the first embodiment of the present invention;
Fig. 2 is the schematic flow sheet of data verification method the second embodiment of the present invention;
Fig. 3 is the schematic flow sheet of data verification method of the present invention the 3rd embodiment;
Fig. 4 is the schematic flow sheet of data verification method of the present invention the 4th embodiment;
Fig. 5 is the schematic flow sheet of data verification method of the present invention the 5th embodiment;
Fig. 6 is the high-level schematic functional block diagram of data calibration device the first embodiment of the present invention;
Fig. 7 is the high-level schematic functional block diagram of data calibration device the second embodiment of the present invention;
Fig. 8 is the high-level schematic functional block diagram of data calibration device of the present invention the 3rd embodiment;
Fig. 9 is the high-level schematic functional block diagram of data calibration device of the present invention the 4th embodiment;
Figure 10 is the high-level schematic functional block diagram of data calibration device of the present invention the 5th embodiment.
Realization, functional characteristics and the advantage of the object of the invention, in connection with embodiment, are done further with reference to accompanying drawingExplanation.
Detailed description of the invention
Should be appreciated that specific embodiment described herein is only in order to explain the present invention, and be not used in limitDetermine the present invention.
Core concept of the present invention is for being divided into standard private resource by base-band resource and standard public resource entersLine pipe reason, by the each standard public resource bunch demand schedule and the multimode pattern list that set in advance, according to each systemThe dynamic service demand of formula, for each standard dynamic assignment or discharge corresponding private resource and public resource,To realize multiple different network formats sharing base-band resource.
In the present invention, standard refers to the diverse network standard in communication network, comprises GSM, UMTSWith multiple network standards such as LTE. It is required that base-band resource is that each network formats carries out regular traffic workResource. Base-band resource is divided into standard private resource and standard public resource by the present invention. Standard is specialResource is not shared with other standards for standard is special, therefore, is directly to divide for standard private resourceStandard under dispensing. Meanwhile, standard private resource can meet completely under standard carry out various industryWhen business, for the demand of private resource, thereby do not need to reallocate after calculating its quantity required.
Standard public resource adopts the mode of resource bunch to manage, a resource bunch definition multimode standardIn minimum public resource set in the business demand of each standard, this public resource set comprises processingThe resources such as device, memory space, communication path. Public resource bunch is distribute to each standard minimumPublic resource set. Public resource manages according to resource bunch, and each resource bunch can be carried out independenceDistribution, release and reset operation, a public resource bunch can only be distributed to a kind of standard. By public moneyCentralized distribution and release are carried out with the form of resource bunch in source, can reduce the number of times that resource is distributed and discharged,Reduce because repeatedly transmitting a large amount of signaling datas of forming shadow for whole management system operational efficiency simultaneouslyRing, improve the response speed to each network formats business demand.
With reference to Fig. 1, Fig. 1 is the schematic flow sheet of baseband resource managing method the first embodiment of the present invention. ThisIn embodiment, baseband resource managing method comprises:
Step S10, obtains the required service parameter of each standard;
In the time that the business demand of each network formats changes, can correspondingly increase or reduce in requisition forStandard private resource and standard public resource, therefore, for base-band resource is more effectively managed,In the present embodiment, need to first obtain the required service parameter of each network formats. Described each network formatsService parameter difference, for example, the service parameter of GSM network formats comprises GSM carrier number, UMTSThe service parameter of network formats comprises UMTS community number and UMTS Channel Elements number, LTE network formatsService parameter comprise LTE community number and LTE band bandwidth.
Step S20, by the required service parameter of described each standard with the current service parameter of described each standardRelatively, judge whether the business demand in described each standard changes;
By the new service parameter of each standard obtaining in step S10, respectively with the current business ginseng of each standardNumber carries out one by one relatively corresponding, and judges in the business demand that each standard is new, whether there is the industry changingBusiness demand. Do not need to carry out distribution or the release of resource for the standard that business demand variation does not occur.
Step S30, in the time that the business demand in described each standard changes, according to described each standard instituteThe service parameter of demand and default multimode pattern list, obtain new multimode pattern;
Set in advance in the present embodiment each standard public resource bunch demand schedule and multimode pattern list, described inIn standard public resource bunch demand schedule, include business demand parameter and each business demand parameter that standard is differentCorresponding public resource bunch demand number. With reference to table 1-3, table 1 is GSM standard public resource bunch demand schedule,Table 2 is UMTS standard public resource bunch demand schedule, and table 3 is LTE standard public resource bunch demand schedule.For ease of declarative description, in table 1-3, only enumerate a few example.
Table 1
GSM carrier number (individual) | The public resource number of clusters order (individual) needing |
6 | 1 |
12 | 3 |
24 | 6 |
36 | 9 |
48 | 12 |
Table 2
UMTS community number (individual) | UMTS Channel Elements number (individual) | The public resource number of clusters order (individual) needing |
3 | 128 | 1 |
6 | 384 | 3 |
9 | 768 | 6 |
12 | 1024 | 9 |
Table 3
LTE community number (individual) | LTE band bandwidth (megahertz) | The public resource number of clusters order (individual) needing |
3 | 10 | 3 |
3 | 20 | 6 |
6 | 10 | 6 |
6 | 20 | 12 |
Described multimode pattern list includes multimode pattern and each standard service parameter corresponding to each multimode pattern.With reference to table 4, table 4 is multimode pattern list, for ease of declarative description, has only enumerated a few and show in table 4Example.
Table 4
In multimode pattern list, each standard service parameter corresponding to multimode pattern must meet: each standard industryBusiness parameter in requisition for the summation of public resource number of clusters, be less than or equal to the total public resource of whole base bandNumber of clusters, can complete the distribution of base band public resource in the case, otherwise feeds back public that standard needsResource exceedes the restriction of the total public resource of base band. Therefore, according to the new service parameter of described each standard andDefault multimode pattern list, can obtain new multimode pattern. For example, GSM standard service parameter: carryWave number is 6; UMTS standard service parameter: UMTS community number is 6, UMTS Channel ElementsNumber is 384; LTE standard service parameter: LTE community number is 6, LTE band bandwidth is 20,000,000Hertz, searching multimode pattern list, to obtain corresponding new multimode pattern be 0.
Step S40, according to described new multimode pattern and current multimode pattern, computing service demand occursThe public resource number of clusters that the standard actual needs changing distributes or discharges, and draw result of calculation;
Because the assigning process of base-band resource relates to a large amount of various data messages, huge data transmit willUnderstand greatly affecting the operational efficiency of whole system and the response speed to each standard business demand, therefore,Impact system being caused for reducing this mass data transmission, in the present embodiment, only by each standardThe essential information such as version information and the new multimode pattern of acquisition send baseband resource managing system to. BaseWith resource management system again according to the new multimode pattern obtaining in step S30 and current multimode pattern,The needed public resource number of clusters of standard of the business demand that calculating changes, and draw result of calculation.
For example, new multimode pattern 2 and current multimode pattern 0 can obtain by searching multimode pattern listGo out: each standard service parameter of current multimode pattern 0 correspondence: GSM standard is 6 carrier waves; UMTSStandard is 6 communities and 384 Channel Elements numbers; LTE standard is 6 communities and each community frequencyBand bandwidth is 20 megahertzes; Each standard service parameter of new multimode pattern 2 correspondences: GSM standard is 0Individual carrier wave; UMTS standard is 6 communities and 384 Channel Elements numbers; LTE standard be 6 littleDistrict and each subdistrict frequency band bandwidth are 20 megahertzes. By contrasting new multimode pattern 2 and current manyMould pattern 0 can learn, the service parameter carrier number that only has GSM standard has become 0 from 6,New business demand has reduced by 6 carrier numbers. Again obtain according to GSM standard public resource bunch demand scheduleThe public resource number of clusters of 6 carrier number service needed of current GSM standard is 1, and new GSM systemThe public resource number of clusters of 0 carrier number service needed of formula is 0, and therefore, baseband resource managing system needsDischarge 1 public resource bunch.
Step S50, according to described result of calculation, for the standard that described business demand changes is distributed or releasesPut corresponding private resource and public resource.
Standard private resource is not shared with other standards for standard is special, therefore, special for standardResource is standard under directly distributing to. Meanwhile, standard private resource can meet affiliated system completelyWhen carrying out miscellaneous service, formula for the demand of private resource, thereby do not need by calculating its quantity requiredRear reallocation. According to the result of calculation in step S40, when the more base band money of the new business demand of standard, distribute private resource and the public resource bunch of the corresponding needs of Added Business for it when in the source; When standard newBusiness demand reduce time, for its discharge minimizing corresponding private resource and the public resource bunch of business.For example, the public resource number of clusters of the current needs of GSM standard business is 3, and the public affairs of new service neededWith resource number of clusters be 5,2 public resource number of clusters that only need reallocation to newly increase. Again for example, GSMThe public resource number of clusters of the current needs of standard business is 6, and the public resource number of clusters of new service neededBe 5, only need to discharge 1 the public resource number of clusters reducing.
In the present embodiment, by obtaining the service parameter that each standard is new, judge in each standard and whether exist, in the standard that generation business changes in the time there is the standard of generation business variation, according to the business ginseng obtainingSeveral and default multimode pattern list, obtains new multimode pattern. Again according to new multimode pattern and currentMultimode pattern, calculates the public resource number of clusters that this standard actual needs distributes or discharges. Finally according to calculatingAs a result, for this standard is distributed or discharge corresponding private resource and public resource bunch. Base-band resource is dividedFor standard private resource and standard public resource, thereby can realize better sharing of standard public resourceManagement. Meanwhile, the data that comprise due to public resource are a lot, concentrate with the form of public resource bunchManagement is by more convenient and the efficiency of management is higher. In resource allocation process, need the data volume of transmission very large,And a large amount of data message transmission certainly will have influence on the operational efficiency of baseband resource managing system and to each standardThe response speed of business demand, therefore, by obtaining multimode pattern, and by a small amount of multimode pattern etc. basicData message sends baseband resource managing system to, thereby can improve operational efficiency and the response speed of systemDegree. By baseband resource managing method in the present embodiment, dynamically realize each standard business demand resourceShare, reduced the installation requirements of more base-band resources, thereby reduced the operation cost of each standard equipmentAnd maintenance cost.
Further, with reference to Fig. 2, Fig. 2 is the flow process of baseband resource managing method the second embodiment of the present inventionSchematic diagram. Based on the invention described above baseband resource managing method the first embodiment, the base band money of the present embodimentPower supply management method also comprised before above-mentioned steps S30:
Step S60, in the time that the business demand in described each standard changes, required according to each standardService parameter and default each standard public resource bunch demand schedule, calculate the public resource that each standard needsNumber of clusters;
In the time having standard to have the business demand changing in described each standard, it is public that this standard needsResource number of clusters also can change, therefore, and need to be according to the new service parameter of each standard and default each systemFormula public resource bunch demand schedule, calculates the public resource number of clusters that each standard needs.
Step S70, the public resource number of clusters needing according to described each standard, each standard needs described in verificationWhether the sum of public resource number of clusters is less than or equal to the total public resource number of clusters of base band;
The public resource number of clusters needing according to the each standard calculating in step S60, needs each standardThe summation of the public resource number of clusters of wanting, the public resource number of clusters total with base band compares, with this verification instituteWhether the public resource bunch sum that stating each standard needs is less than or equal to the total public resource number of clusters of base band. WhenWhen whether the public resource bunch sum that each standard needs is greater than the total public resource number of clusters of base band, feedback systemThe public resource number of clusters that formula needs exceedes the restriction of the total public resource number of clusters of base band. The public affairs that described base band is totalWith resource number of clusters be known.
Step S80, the sum of the public resource number of clusters needing when described each standard is less than or equal to described base bandWhen total public resource number of clusters, carry out described according to the required service parameter of described each standard and defaultMultimode pattern list, obtains the step of new multimode pattern.
The public resource bunch sum needing when described each standard is less than or equal to the total public resource of described base bandWhen number of clusters, the service parameter of each standard in multimode pattern list by a unique corresponding multimode pattern. CauseThis, according to the new service parameter of described each standard and default multimode pattern list, can obtain new manyMould pattern.
In the present embodiment, in the time that standard generation business changes, this standard in requisition for public resource bunchQuantity also can correspondingly change, and, because each standard shares same base-band resource, therefore, needs meanwhileThe public resource number of clusters that each standard of overall calculation needs. According to the new service parameter of each standard and defaultEach standard public resource bunch demand schedule, calculates the public resource number of clusters that each standard needs. According to calculatingThe public resource number of clusters that needs of each standard, whether verification has exceeded the total public resource number of clusters of base band, ifExceeded, the public resource number of clusters that feeding back standard needs exceedes the restriction of base-band resource sum. If it is not superCross,, according to the new service parameter of described each standard and default multimode pattern list, obtain new multimodePattern. Judge by verification, filter out the standard business demand of burden requirement, and obtain multimode pattern,To realize follow-up distribution or release to standard public resource bunch.
Further, with reference to Fig. 3, Fig. 3 is the flow process of baseband resource managing method of the present invention the 3rd embodimentSchematic diagram. Based on the invention described above baseband resource managing method the first embodiment, the base band money of the present embodimentPower supply management method comprises at above-mentioned steps S40:
Step S401, according to described new multimode pattern and current multimode pattern, searches default multimodeThe new service parameter of the standard difference correspondence that in pattern list, business demand changes and current business ginsengNumber;
In the present embodiment, current multimode pattern is known, thereby does not need to obtain by calculating.Therefore,, according to the new multimode pattern obtaining and current multimode pattern, search default multimode pattern listThe standard of the business demand that middle existence changes, respectively corresponding new service parameter and current businessParameter. Because the assigning process of base-band resource relates to a large amount of various data messages, huge data transmissionWill be on greatly affecting the operational efficiency of whole system and the response speed to each standard business demand, therefore,Impact system being caused for reducing this mass data transmission, in the present embodiment, only by each standardThe essential information such as version information and the new multimode pattern of acquisition send baseband resource managing system to, continueAnd can find business corresponding to standard according to multimode pattern by multimode pattern list corresponding to index searchParameter. For example, new multimode pattern 2 and current multimode pattern 0 are passable by searching multimode pattern listDraw: each standard service parameter of current multimode pattern 0 correspondence: GSM standard is 6 carrier waves;UMTS standard is 6 communities and 384 Channel Elements numbers; LTE standard is 6 communities and eachSubdistrict frequency band bandwidth is 20 megahertzes; Each standard service parameter of new multimode pattern 2 correspondences: GSM systemFormula is 0 carrier wave; UMTS standard is 6 communities and 384 Channel Elements numbers; LTE standard is 6Individual community and each subdistrict frequency band bandwidth are 20 megahertzes.
Step S402, according to searching corresponding described new service parameter and described the working as of described standard obtainingFront service parameter, from default described standard public resource bunch demand schedule, obtains described standard newService parameter in requisition for public resource number of clusters, and the current service parameter of described standard in requisition forPublic resource number of clusters;
According to current business parameter corresponding to the standard finding in step S401 and new service parameter, logicalCross and search the default public resource of standard bunch demand schedule, obtain service parameter that described standard is new in requisition forPublic resource number of clusters order and the current service parameter of described standard in requisition for public resource number of clusters order.For example, each standard service parameter of current multimode pattern 0 correspondence: GSM standard is 6 carrier waves;UMTS standard is 6 communities and 384 Channel Elements numbers; LTE standard is 6 communities and eachSubdistrict frequency band bandwidth is 20 megahertzes; Each standard service parameter of new multimode pattern 2 correspondences: GSM systemFormula is 0 carrier wave; UMTS standard is 6 communities and 384 Channel Elements numbers; LTE standard is 6Individual community and each subdistrict frequency band bandwidth are 20 megahertzes. It is known according to the service parameter of more each standard,Only have GSM standard that business variation has occurred, index search GSM standard public resource bunch demand schedule againThe public resource bunch that obtains new service needed is 0, and the public resource bunch that current business needs is 1Individual.
Step S403, according to the new service parameter of described standard obtaining in requisition for public resource number of clusters,And the current service parameter of described standard in requisition for public resource number of clusters, computing service demand occursThe public resource number of clusters that the standard actual needs changing distributes or discharges, and draw result of calculation.
For the standard of non-first distribution base-band resource, the present embodiment does not need all to redistribute newThe public resource bunch of the respective amount of service needed, but on current existing public resource bunch basis,Change the corresponding public resource bunch increasing newly or release reduces that distributes according to standard business. Therefore, according toThe new service parameter of described standard obtaining in requisition for public resource number of clusters order and described standard currentService parameter in requisition for public resource number of clusters order, calculate the standard reality of the business demand that changesThe public resource number of clusters needing, and draw result of calculation. For example,, according to GSM standard public resource bunch needThe public resource number of clusters of asking table to obtain 12 carrier number service needed of current GSM standard is 3, and newThe public resource number of clusters of 6 carrier number service needed of GSM standard be 1, therefore, GSM standardThe public resource number of clusters that actual needs discharges is that 2 (2=3-1) are individual. Again for example, public according to GSM standardThe public resource number of clusters that resource bunch demand schedule obtains 6 carrier number service needed of current GSM standard is 1Individual, and the public resource number of clusters of new 12 carrier number service needed of GSM standard is 3, therefore,The public resource number of clusters that GSM standard actual needs distributes is that 2 (2=3-1) are individual.
In the present embodiment, can find by multimode pattern list corresponding to index search according to multimode patternThe service parameter that standard is corresponding, then the service parameter index search standard public resource bunch corresponding according to standardDemand schedule, the standard that the business of obtaining changes in requisition for public resource number of clusters, finally according to standardPoor between the public resource number of clusters that the public resource number of clusters of new service needed and standard current business needValue, calculates the public resource number of clusters that this standard actual needs distributes or discharges. Need in the each standard business of responseAsking and be that it distributes when public resource, is the public resource of maximum using base band, in the present embodiment onlyDifference for the new business of standard with public resource corresponding to current business bunch, distribute or discharge corresponding poorThe public resource bunch of value quantity.
Further, with reference to Fig. 4, Fig. 4 is the flow process of baseband resource managing method of the present invention the 4th embodimentSchematic diagram. Based on the invention described above baseband resource managing method the 3rd embodiment, the base band money of the present embodimentPower supply management method comprises after above-mentioned steps S50:
Step S90, in the time that the standard changing for described business demand is distributed corresponding public resource, willThe described public resource bunch distributing is labeled as seizure condition;
For more effectively managing base-band resource, improve the allocative efficiency of public resource bunch, in the present embodiment, whenWhen the standard of the business demand changing for described existence is distributed corresponding public resource, by what distributedPublic resource bunch is labeled as seizure condition. Meanwhile, for the public resource bunch that is labeled as seizure conditionSub-distribution again.
Step S100, in the time that the standard changing for described business demand discharges corresponding public resource,The described public resource bunch discharging is labeled as to idle condition.
In the present embodiment, when the standard of the business demand changing for described existence discharges corresponding publicWhile using resource, the public resource having discharged bunch is labeled as to idle condition, is only labeled as idle conditionPublic resource bunch just can distribute.
In the present embodiment, when before sub-distribution at the beginning of public resource bunch, all public resources in base band are bunch pre-Be made as idle condition. After public resource bunch is assigned, the public resource having distributed bunch is labeled asSeizure condition. In the time that public resource bunch is released, the public resource having discharged bunch is labeled as to idle shapeState.
Further, with reference to Fig. 5, Fig. 5 is the flow process of baseband resource managing method of the present invention the 5th embodimentSchematic diagram. Based on the invention described above baseband resource managing method the 4th embodiment, the base band money of the present embodimentPower supply management method also comprises:
Step S110, when in each standard running, while existing standard occur extremely and reset successfully,By distributing to the public resource bunch of the abnormal standard of described generation before occurring extremely, distribute to described generation differentNormal standard.
When in each standard running, exist public resource bunch that standard takies to occur abnormal and can be extensiveWhile reset, by the abnormal front public resource bunch of having distributed to the abnormal standard of described generation occurs, straightConnect fast allocation to the abnormal standard of described generation, and do not need to recalculate rear reallocation.
In the present embodiment, in standard running, the public resource taking for standard bunch generation is differentNormal and can recover to reset time, by the public resource bunch distributing before, directly distribute to described generation differentNormal standard. Can save the time of distribution by direct distribution, improve the sound for standard business demandAnswer speed and base-band resource allocative efficiency.
With reference to Fig. 6, Fig. 6 is the high-level schematic functional block diagram of baseband resource managing device the first embodiment of the present invention.In the present embodiment, baseband resource managing device comprises:
Service parameter acquisition module 10, for obtaining the required service parameter of each standard;
In the time that the business demand of each network formats changes, can correspondingly increase or reduce in requisition forStandard private resource and standard public resource, therefore, for base-band resource is more effectively managed,In the present embodiment, service parameter acquisition module 10 first obtains the required service parameter of each network formats. InstituteState the service parameter difference of each network formats, for example, the service parameter of GSM network formats comprises GSMCarrier number, the service parameter of UMTS network formats comprises UMTS community number and UMTS Channel Elements number,The service parameter of LTE network formats comprises LTE community number and LTE band bandwidth.
Business change judge module 20, for by the required service parameter of described each standard with described each systemThe service parameter comparison that formula is current, judges whether the business demand in described each standard changes;
Business changes the new business ginseng of each standard that judge module 20 obtains service parameter acquisition module 10Number, carries out corresponding comparison one by one with the current service parameter of each standard respectively, and meanwhile, business changes judgementModule 20 judges in the business demand that each standard is new, whether there is the business demand changing. For not havingThe standard that business demand variation occurs does not need to carry out distribution or the release of resource.
Multimode pattern acquisition module 30, in the time that the business demand of described each standard changes,According to the required service parameter of described each standard and default multimode pattern list, obtain new multimode pattern;Each standard public resource bunch demand schedule and multimode pattern list are set in advance in the present embodiment, when described eachWhile having standard to have the business demand changing in standard, multimode pattern acquisition module 30 is according to described eachThe service parameter that standard is new and default multimode pattern list, obtain new multimode pattern. Described standard is publicIn resource bunch demand schedule, include service parameter and public resource bunch corresponding to each service parameter that standard is differentDemand number.
Resource bunch the first computing module 40, according to described new multimode pattern and current multimode pattern, meterThe public resource number of clusters that the standard actual needs that calculation business demand changes distributes or discharges, and draw meterCalculate result;
Because the assigning process of base-band resource relates to a large amount of various data messages, huge data transmit willUnderstand greatly affecting the operational efficiency of whole system and the response speed to each standard business demand, therefore,Impact system being caused for reducing this mass data transmission, in the present embodiment, only by each standardThe essential information such as version information and the new multimode pattern of acquisition send baseband resource managing system to. MoneyThe new multimode pattern that source bunch the first computing module 40 obtains according to multimode pattern acquisition module 30 and work asFront multimode pattern, the needed public resource number of clusters of standard of the business demand that calculating changes, andDraw result of calculation.
For example, new multimode pattern 2 and current multimode pattern 0 can obtain by searching multimode pattern listGo out: each standard service parameter of current multimode pattern 0 correspondence: GSM standard is 6 carrier waves; UMTSStandard is 6 communities and 384 Channel Elements numbers; LTE standard is 6 communities and each community frequencyBand bandwidth is 20 megahertzes; Each standard service parameter of new multimode pattern 2 correspondences: GSM standard is 0Individual carrier wave; UMTS standard is 6 communities and 384 Channel Elements numbers; LTE standard be 6 littleDistrict and each subdistrict frequency band bandwidth are 20 megahertzes. By contrasting new multimode pattern 2 and current manyMould pattern 0 can learn, the service parameter carrier number that only has GSM standard has become 0 from 6,New business demand has reduced by 6 carrier numbers. Again obtain according to GSM standard public resource bunch demand scheduleThe public resource number of clusters of 6 carrier number service needed of current GSM standard is 1, and new GSM systemThe public resource number of clusters of 0 carrier number service needed of formula is 0, and therefore, actual needs discharges public moneySource number of clusters amount is 1.
Resource is distributed release module 50, according to described result of calculation, for described business demand changesStandard is distributed or is discharged corresponding private resource and public resource.
According to the result of calculation of resource bunch the first computing module 40, when the more base of the new business demand of standardBand is when resource, distributes private resource that release module 50 is the corresponding needs of its distribution Added Business and publicResource bunch; In the time that the new business demand of standard reduces, distribute release module 50 to discharge for it business reducingCorresponding private resource and public resource bunch. For example, the public resource of the current needs of GSM standard businessNumber of clusters is 3, and the public resource number of clusters of new service needed is 5, distributes release module 50 againDistribute 2 the public resource number of clusters and the private resource that newly increase. Again for example, the current need of GSM standard businessThe public resource number of clusters of wanting is 6, and the public resource number of clusters of new service needed is 5, distributesRelease module 50 discharges 1 the public resource number of clusters and the private resource that reduce.
In the present embodiment, service parameter acquisition module 10 obtains the service parameter that each standard is new, and business becomesChange judge module 20 and judge the standard that whether exists generation business to change in each standard, when there being generation businessChange standard time, multimode pattern acquisition module 30 according to obtain service parameter and default multimode patternTable, obtains new multimode pattern. Resource bunch the first computing module 40 is according to new multimode pattern and currentMultimode pattern, calculates the public resource number of clusters that this standard actual needs distributes or discharges. Finally distribute and dischargeModule 50 is according to result of calculation, for this standard is distributed or discharges corresponding private resource and public resource bunch.Base-band resource is divided into standard private resource and standard public resource, thereby can realizes better standardThe Sharing Management of public resource. Meanwhile, the data that comprise due to public resource are a lot, with public resource bunchForm manage concentratedly more convenient and the efficiency of management is higher. In resource allocation process, need to passThe data volume of sending is very large, and a large amount of data message transmission certainly will have influence on the fortune of baseband resource managing systemTherefore line efficiency and the response speed to each standard business demand, by obtaining multimode pattern, and will be manyA small amount of master data information such as mould pattern sends baseband resource managing system to, thereby can improve systemOperational efficiency and response speed. By baseband resource managing method in the present embodiment, dynamically realize each systemSharing of formula business demand resource, has reduced the installation requirements of more base-band resources, thereby has reduced each systemThe operation cost of formula equipment and maintenance cost.
Further, with reference to Fig. 7, Fig. 7 is the function of baseband resource managing device the second embodiment of the present inventionModule diagram. Based on the invention described above baseband resource managing device the first embodiment, the base of the present embodimentBand resource management apparatus also comprises:
Resource bunch the second computing module 60, in the time that the business demand of described each standard changes,, according to the required service parameter of each standard and default each standard public resource bunch demand schedule, calculate eachThe public resource number of clusters that standard needs;
In the time having standard to have the business demand changing in described each standard, it is public that this standard needsResource number of clusters also can change, therefore, and resource bunch the second computing module 60 business new according to each standardParameter and default each standard public resource bunch demand schedule, calculate the public resource number of clusters that each standard needs.
Resource bunch correction verification module 70, for the public resource number of clusters needing according to described each standard, verification instituteWhether the sum of stating the public resource number of clusters of each standard needs is less than or equal to the total public resource bunch of base bandNumber;
The public resource number of clusters that the each standard obtaining according to resource bunch the second computing module 60 needs, resource bunchThe summation of the public resource number of clusters that correction verification module 70 needs each standard is entered with the total public resource number of clusters of base bandWhether row relatively, is less than or equal to base band with the public resource bunch sum that described in this verification, each standard needs totalPublic resource number of clusters. Whether the public resource bunch sum needing when each standard is greater than the total public money of base bandWhen source number of clusters, it is total that the public resource number of clusters that resource bunch correction verification module 70 feeds back standard to be needed exceedes base-band resourceThe restriction of number. The total public resource number of clusters of described base band is known.
Redirect Executive Module 80, be less than for the sum of the public resource number of clusters that needs when described each standard orWhile equaling the total public resource number of clusters of described base band, carry out described according to the required business of described each standardParameter and default multimode pattern list, obtain the step of new multimode pattern.
The public resource bunch sum needing when described each standard is less than or equal to the total public resource of described base bandWhen number of clusters, redirect Executive Module 80 is carried out according to the required service parameter of described each standard and defaultMultimode pattern list, obtains the step of new multimode pattern.
In the present embodiment, in the time that standard generation business changes, this standard in requisition for public resource bunchQuantity also can correspondingly change, and, because each standard shares same base-band resource, therefore, needs meanwhileThe public resource number of clusters that each standard of overall calculation needs. Base-band resource is counted computing module 60 according to each standardNew service parameter and default each standard public resource bunch demand schedule, calculate the public money that each standard needsSource number of clusters. Base-band resource is counted the public resource number of clusters that correction verification module 70 needs according to the each standard calculating,Whether verification has exceeded the total public resource number of clusters of base band, if exceeded, base-band resource is counted correction verification moduleThe public resource number of clusters that 70 feedback standards need exceedes the restriction of base-band resource sum. If do not exceed,Redirect Executive Module 80 is carried out according to the required service parameter of described each standard and default multimode patternShow, obtain the step of new multimode pattern.
Further, with reference to Fig. 8, Fig. 8 is the function of baseband resource managing device the 3rd embodiment of the present inventionModule diagram. Based on the invention described above baseband resource managing device the second embodiment, the base of the present embodimentA band resource management apparatus resource bunch first calculating mould comprises:
Service parameter is searched unit 401, for according to described new multimode pattern and current multimode pattern,Search the standard new service parameter of correspondence respectively that in default multimode pattern list, business demand changesWith current service parameter;
In the present embodiment, current multimode pattern base band management system is known, thereby does not needObtain by calculating. Therefore, service parameter is searched unit 401 according to the new multimode pattern obtaining and is worked asFront multimode pattern, searches the standard of the business demand that in default multimode pattern list, existence changes and dividesNot corresponding new business demand parameter and current business demand parameter. Due to the distribution of base-band resourceJourney relates to a large amount of various data messages, and huge data transmission will be on affecting the fortune of whole system greatlyLine efficiency and the response speed to each standard business demand, therefore, for reducing this mass data transmissionThe impact that system is caused, in the present embodiment, only new many by the version information of each standard and acquisitionThe essential informations such as mould pattern send baseband resource managing system to, and service parameter is searched 401 of unit thenCan find business ginseng corresponding to standard according to multimode pattern by multimode pattern list corresponding to index searchNumber. For example, new multimode pattern 2 and current multimode pattern 0 can obtain by searching multimode pattern listGo out: each standard service parameter of current multimode pattern 0 correspondence: GSM standard is 6 carrier waves; UMTSStandard is 6 communities and 384 Channel Elements numbers; LTE standard is 6 communities and each community frequencyBand bandwidth is 20 megahertzes; Each standard service parameter of new multimode pattern 2 correspondences: GSM standard is 0Individual carrier wave; UMTS standard is 6 communities and 384 Channel Elements numbers; LTE standard be 6 littleDistrict and each subdistrict frequency band bandwidth are 20 megahertzes.
Resource number of clusters acquiring unit 402, searches for basis described new industry corresponding to described standard obtainingBusiness parameter and described current service parameter, from default described standard public resource bunch demand schedule, obtainGet service parameter that described standard is new in requisition for public resource number of clusters, and the current industry of described standardBusiness parameter in requisition for public resource number of clusters;
Search current business parameter corresponding to standard that unit 401 finds and new industry according to service parameterBusiness parameter, by searching the default public resource of standard bunch demand schedule, resource number of clusters acquiring unit 402 obtainsGet service parameter that described standard is new in requisition for public resource number of clusters order and the current business of described standardParameter in requisition for public resource number of clusters order. For example, each standard industry of current multimode pattern 0 correspondenceBusiness parameter: GSM standard is 6 carrier waves; UMTS standard is 6 communities and 384 Channel ElementsNumber; LTE standard is that 6 communities and each subdistrict frequency band bandwidth are 20 megahertzes; New multimode patternEach standard service parameter of 2 correspondences: GSM standard is 0 carrier wave; UMTS standard is 6 communitiesWith 384 Channel Elements numbers; LTE standard is that 6 communities and each subdistrict frequency band bandwidth are 20 megahertzesHereby. Known according to the service parameter of more each standard, only have GSM standard that business variation has occurred, againThe public resource bunch that index search GSM standard public resource bunch demand schedule obtains new service needed is 0Individual, and the public resource bunch that current business needs is 1.
Resource number of clusters computing unit 403, for according to the new service parameter of described standard obtaining in requisition forPublic resource number of clusters, and the current service parameter of described standard in requisition for public resource number of clusters,The public resource number of clusters that the standard actual needs that computing service demand changes distributes or discharges, and drawResult of calculation.
For the standard of non-first distribution base-band resource, the present embodiment does not need all to redistribute newThe public resource bunch of the respective amount of service needed, but on current existing public resource bunch basis,Change the corresponding public resource bunch increasing newly or release reduces that distributes according to business. Therefore, resource number of clustersComputing unit 403 according to the new service parameter of described standard obtaining in requisition for public resource number of clusters orderWith the current service parameter of described standard in requisition for public resource number of clusters order, calculate the industry changingThe public resource number of clusters of the standard actual needs of business demand, and draw result of calculation. For example,, according to GSMStandard public resource bunch demand schedule obtains the public resource of 12 carrier number service needed of current GSM standardNumber of clusters is 3, and the public resource number of clusters of new 6 carrier number service needed of GSM standard is 1,Therefore the public resource number of clusters that, GSM standard actual needs discharges is that 2 (2=3-1) are individual. Again for example, rootObtain the public affairs of 6 carrier number service needed of current GSM standard according to GSM standard public resource bunch demand scheduleWith resource number of clusters be 1, and the public resource number of clusters of new 12 carrier number service needed of GSM standardBe 3, therefore, the public resource number of clusters that GSM standard actual needs distributes is that 2 (2=3-1) are individual.
In the present embodiment, it is corresponding by index search according to multimode pattern that service parameter is searched unit 401Multimode pattern list can find service parameter corresponding to standard, and resource bunch acquiring unit 402 is according to standardCorresponding service parameter index search standard public resource bunch demand schedule, the standard that the business of obtaining changesTo in requisition for public resource number of clusters, resource bunch computing unit 403 is according to the public affairs of the new service needed of standardDifference between the public resource number of clusters needing by resource number of clusters and standard current business, calculates this standard realThe public resource number of clusters that border need to be distributed or discharge. Be that its distribution is public in the each standard business demand of responseWhen resource, be the public resource of maximum using base band, in the present embodiment only for the new business of standardWith the difference of public resource corresponding to current business bunch, distribute or discharge the public resource of corresponding difference quantityBunch.
Further, with reference to Fig. 9, Fig. 9 is the function of baseband resource managing device the 4th embodiment of the present inventionModule diagram. Based on the invention described above baseband resource managing device the 3rd embodiment, the base of the present embodimentBand resource management apparatus also comprises:
Seizure condition mark module 90, distributes for the standard for when changing for described business demandWhen corresponding public resource, the described public resource bunch distributing is labeled as to seizure condition;
For more effectively managing base-band resource, improve the allocative efficiency of public resource bunch, in the present embodiment, whenWhen the standard of the business demand changing for described existence is distributed corresponding public resource, seizure condition markThe public resource having distributed bunch is labeled as seizure condition by note module 90. Meanwhile, to being labeled as and takingBunch sub-distribution again of the public resource of state.
Idle condition mark module 100, discharges corresponding for the standard when changing for described business demandPublic resource time, by discharge described public resource bunch be labeled as idle condition.
In the present embodiment, when the standard of the business demand changing for described existence discharges corresponding publicWhile using resource, the public resource having discharged bunch is labeled as idle condition by idle condition mark module 100,The public resource bunch that is only labeled as idle condition just can distribute.
In the present embodiment, when before sub-distribution at the beginning of public resource bunch, all public resources in base band are bunch pre-Be made as idle condition. After public resource bunch is assigned, seizure condition mark module 90 will distributePublic resource bunch is labeled as seizure condition. In the time that public resource bunch is released, idle condition mark module 100The public resource having discharged bunch is labeled as to idle condition.
Further, with reference to Figure 10, Figure 10 is the merit of baseband resource managing device the 5th embodiment of the present inventionCan module diagram. Based on the invention described above baseband resource managing device the 4th embodiment, the present embodimentBaseband resource managing device also comprises:
Reset distribution module 110, for when each standard running, exists standard occur abnormal and resetWhen success,, by distributing to the public resource bunch of the abnormal standard of described generation before occurring extremely, distribute toThe standard that described generation is abnormal.
In the present embodiment, in standard running, the public resource taking for standard bunch occurs abnormalAnd can recover to reset time, the distribution module that resets 110, by the public resource bunch distributing before, be directly dividedDescribed in dispensing, there is abnormal standard. Can save the time of distribution by direct distribution, improve for systemThe response speed of formula business demand and base-band resource allocative efficiency.
These are only the preferred embodiments of the present invention, not thereby limit the scope of the claims of the present invention, everyUtilize equivalent structure or the conversion of equivalent flow process that description of the present invention and accompanying drawing content do, or directly orConnect and be used in other relevant technical fields, be all in like manner included in scope of patent protection of the present invention.
Claims (10)
1. a baseband resource managing method, is characterized in that, described baseband resource managing method comprises:
Obtain the required service parameter of each standard;
The required service parameter of described each standard, with the current service parameter comparison of described each standard, is sentencedWhether the business demand in disconnected described each standard changes;
In the time that the business demand in described each standard changes, according to the required industry of described each standardBusiness parameter and default multimode pattern list, obtain new multimode pattern;
According to described new multimode pattern and current multimode pattern, the system that computing service demand changesThe public resource number of clusters that formula actual needs distributes or discharges, and draw result of calculation;
According to described result of calculation, for the standard that described business demand changes is distributed or discharges correspondingPrivate resource and public resource.
2. baseband resource managing method as claimed in claim 1, is characterized in that, described according to instituteState the required service parameter of each standard and default multimode pattern list, before also obtain new multimode patternComprise:
In the time that the business demand in described each standard changes, according to the required business ginseng of each standardNumber and default each standard public resource bunch demand schedule, calculate the public resource number of clusters that each standard needs;
The public resource number of clusters needing according to described each standard, the public resource that each standard needs described in verificationWhether the sum of number of clusters is less than or equal to the total public resource number of clusters of base band;
The sum of the public resource number of clusters needing when described each standard is less than or equal to total public of described base bandWhen resource number of clusters, carry out described according to the required service parameter of described each standard and default multimode patternShow, obtain the step of new multimode pattern.
3. baseband resource managing method as claimed in claim 1 or 2, is characterized in that, described basisDescribed new multimode pattern and current multimode pattern, the actual need of standard that computing service demand changesThe public resource number of clusters distributing or discharge comprises:
According to described new multimode pattern and current multimode pattern, search industry in default multimode pattern listThe new service parameter of the standard difference correspondence that business demand changes and current service parameter;
According to searching corresponding described new service parameter and the described current business ginseng of described standard obtainingNumber, from default described standard public resource bunch demand schedule, obtains the service parameter pair that described standard is newIn requisition for public resource number of clusters, and the current service parameter of described standard in requisition for public resourceNumber of clusters;
According to the new service parameter of described standard obtaining in requisition for public resource number of clusters, and described inThe current service parameter of standard in requisition for public resource number of clusters, the system that computing service demand changesThe public resource number of clusters that formula actual needs distributes or discharges, and draw result of calculation.
4. baseband resource managing method as claimed in claim 3, is characterized in that, described is described industryStandard that business demand changes distribute or discharge corresponding private resource and public resource after comprise:
In the time that the standard changing for described business demand is distributed corresponding public resource, by the institute distributingState public resource bunch and be labeled as seizure condition;
In the time that the standard changing for described business demand discharges corresponding public resource, by the institute dischargingState public resource bunch and be labeled as idle condition.
5. baseband resource managing method as claimed in claim 4, is characterized in that, described base-band resourceManagement method also comprises:
When in each standard running, while existing standard occur extremely and reset successfully, will occur abnormalBefore distribute to the public resource bunch of the abnormal standard of described generation, distribute to the abnormal standard of described generation.
6. a baseband resource managing device, is characterized in that, described baseband resource managing device comprises:
Service parameter acquisition module, for obtaining the required service parameter of each standard;
Business change judge module, for by the required service parameter of described each standard with described each standardCurrent service parameter comparison, judges whether the business demand in described each standard changes;
Multimode pattern acquisition module, in the time that the business demand of described each standard changes, rootAccording to the required service parameter of described each standard and default multimode pattern list, obtain new multimode pattern;
Resource bunch the first computing module, for according to described new multimode pattern and current multimode pattern,The public resource number of clusters that the standard actual needs that computing service demand changes distributes or discharges, and drawResult of calculation;
Resource is distributed release module, for according to described result of calculation, for described business demand changesStandard distribute or discharge corresponding private resource and public resource.
7. baseband resource managing device as claimed in claim 6, is characterized in that, described base-band resourceManagement devices also comprises:
Resource bunch the second computing module, in the time that the business demand of described each standard changes,According to the required service parameter of each standard and default each standard public resource bunch demand schedule, calculate each systemThe public resource number of clusters that formula needs;
Resource bunch correction verification module, for the public resource number of clusters needing according to described each standard, described in verificationWhether the sum of the public resource number of clusters that each standard needs is less than or equal to the total public resource number of clusters of base band;
Redirect Executive Module, for the sum of the public resource number of clusters that needs when described each standard be less than or etc.In the time of the total public resource number of clusters of described base band, carry out described according to the required business ginseng of described each standardSeveral and default multimode pattern list, obtains the step of new multimode pattern.
8. the baseband resource managing device as described in claim 6 or 7, is characterized in that, described resourceBunch the first computing module comprises:
Service parameter is searched unit, for according to described new multimode pattern and current multimode pattern, looks intoLook for standard that in default multimode pattern list, business demand changes respectively corresponding new service parameter andCurrent service parameter;
Resource number of clusters acquiring unit, searches for basis described new business corresponding to described standard obtainingParameter and described current service parameter, from default described standard public resource bunch demand schedule, obtainThe new service parameter of described standard in requisition for public resource number of clusters, and the current business of described standardParameter in requisition for public resource number of clusters;
Resource number of clusters computing unit, for according to the new service parameter of described standard obtaining in requisition forPublic resource number of clusters, and the current service parameter of described standard in requisition for public resource number of clusters, meterThe public resource number of clusters that the standard actual needs that calculation business demand changes distributes or discharges, and draw meterCalculate result.
9. baseband resource managing device as claimed in claim 8, is characterized in that, described base-band resourceManagement devices also comprises:
Seizure condition mark module, distributes corresponding for the standard when changing for described business demandWhen public resource, the described public resource bunch distributing is labeled as to seizure condition;
Idle condition mark module, discharges corresponding for the standard when changing for described business demandWhen public resource, the described public resource bunch discharging is labeled as to idle condition.
10. baseband resource managing device as claimed in claim 9, is characterized in that, described base band moneySource control device also comprises:
Reset distribution module, for when each standard running, exists standard occur abnormal and reset toWhen merit,, by distributing to the public resource bunch of the abnormal standard of described generation before occurring extremely, distribute to instituteState abnormal standard occurs.
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410727551.8A CN105657831B (en) | 2014-12-03 | 2014-12-03 | Baseband resource management method and device |
PCT/CN2015/086649 WO2016086686A1 (en) | 2014-12-03 | 2015-08-11 | Baseband resource management method and device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410727551.8A CN105657831B (en) | 2014-12-03 | 2014-12-03 | Baseband resource management method and device |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105657831A true CN105657831A (en) | 2016-06-08 |
CN105657831B CN105657831B (en) | 2020-01-14 |
Family
ID=56090955
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410727551.8A Active CN105657831B (en) | 2014-12-03 | 2014-12-03 | Baseband resource management method and device |
Country Status (2)
Country | Link |
---|---|
CN (1) | CN105657831B (en) |
WO (1) | WO2016086686A1 (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106231637A (en) * | 2016-07-29 | 2016-12-14 | 深圳市金立通信设备有限公司 | Secondary cell alternative approach, device and base station |
WO2018045519A1 (en) * | 2016-09-08 | 2018-03-15 | 华为技术有限公司 | Wireless communication method, base station, and terminal |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101188818A (en) * | 2006-11-16 | 2008-05-28 | 华为技术有限公司 | Base station, processing method for its baseband signal and wireless communication system |
CN101193351A (en) * | 2006-11-20 | 2008-06-04 | 华为技术有限公司 | Multi-system base station and its information processing method and wireless communication system |
CN102387507A (en) * | 2010-09-01 | 2012-03-21 | 中兴通讯股份有限公司 | Method and device for managing multimode co-transmission transmission resource |
WO2013114335A1 (en) * | 2012-02-03 | 2013-08-08 | Telefonaktiebolaget L M Ericsson (Publ) | Apparatus suitable for use in an advanced digital baseband processor |
Family Cites Families (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US8942111B2 (en) * | 2006-08-29 | 2015-01-27 | Nokia Corporation | Network configuration |
CN102104874B (en) * | 2009-12-21 | 2013-12-04 | 中兴通讯股份有限公司 | Distribution method of network transmission resource and relevant device thereof |
CN101754386B (en) * | 2010-01-20 | 2012-04-04 | 华为技术有限公司 | Method and device for adjusting business processing resources of multi-mode base station system |
-
2014
- 2014-12-03 CN CN201410727551.8A patent/CN105657831B/en active Active
-
2015
- 2015-08-11 WO PCT/CN2015/086649 patent/WO2016086686A1/en active Application Filing
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101188818A (en) * | 2006-11-16 | 2008-05-28 | 华为技术有限公司 | Base station, processing method for its baseband signal and wireless communication system |
CN101193351A (en) * | 2006-11-20 | 2008-06-04 | 华为技术有限公司 | Multi-system base station and its information processing method and wireless communication system |
CN102387507A (en) * | 2010-09-01 | 2012-03-21 | 中兴通讯股份有限公司 | Method and device for managing multimode co-transmission transmission resource |
WO2013114335A1 (en) * | 2012-02-03 | 2013-08-08 | Telefonaktiebolaget L M Ericsson (Publ) | Apparatus suitable for use in an advanced digital baseband processor |
Non-Patent Citations (1)
Title |
---|
王波,盛煜,王蕴实,胡泽妍: "多制式基站应用研究", 《2012中国通信学会无线及移动通信委员会会议论文集》 * |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106231637A (en) * | 2016-07-29 | 2016-12-14 | 深圳市金立通信设备有限公司 | Secondary cell alternative approach, device and base station |
CN106231637B (en) * | 2016-07-29 | 2019-10-22 | 深圳市金立通信设备有限公司 | Secondary cell transform method, device and base station |
WO2018045519A1 (en) * | 2016-09-08 | 2018-03-15 | 华为技术有限公司 | Wireless communication method, base station, and terminal |
US10841930B2 (en) | 2016-09-08 | 2020-11-17 | Huawei Technologies Co., Ltd. | Wireless communication with shared resources for different radio access technologies, base station, and terminal |
Also Published As
Publication number | Publication date |
---|---|
CN105657831B (en) | 2020-01-14 |
WO2016086686A1 (en) | 2016-06-09 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101472339B (en) | Method for coordinating district interference | |
CN104066092B (en) | A kind of frequency spectrum distributing method, device and system | |
CN103220724A (en) | Cellular and dimension to dimension (D2D) user frequency spectrum accessing method in D2D communication mixing system | |
CN104768197A (en) | Channel selection method and device | |
CN114679793B (en) | Slice resource allocation method, device, terminal, network equipment and storage medium | |
CN103167620B (en) | A kind of wireless resource allocation methods and device | |
CN104580018A (en) | Bandwidth adjustment method and device in software-defined network | |
US9544905B2 (en) | Baseband resource allocation method and device thereof | |
CN109413747A (en) | Transfer resource distribution method, device, transmission resource request method and device | |
CN103179600A (en) | Multi-mode base band unit and method for managing remote radio unit | |
CN103096473B (en) | A kind of baseband resource sharing method of Large Copacity baseband pool and system | |
CN101420256B (en) | IQ channel allocation method and device | |
CN105657831A (en) | Baseband resource management method and device | |
CN103260196B (en) | A kind of control method of transmission bandwidth, Apparatus and system | |
CN103108334A (en) | System loading dynamic regulation method of radio-frequency remote system | |
CN103702320A (en) | Method and device for allocating C-RNTIs (cell radio network temporary identifiers) | |
CN105243078A (en) | File resource distribution method, system and apparatus | |
CN111447077B (en) | Network element configuration method, device and storage medium | |
CN103974224A (en) | Credit control method and equipment | |
CN102025534A (en) | Single-plate resource allocation method and device thereof | |
CN102843692A (en) | Method and device for sharing multi-carrier power of same RRU by operators | |
CN103401694B (en) | A kind of method and system for realizing node administration | |
CN109348511B (en) | Method and device for allocating baseband resources | |
CN106385688A (en) | Baseband resource distribution method and system, and controller | |
CN103269519A (en) | Method and system for allocating processing resource in centralized-type base station architecture |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |