CN105652318B - A kind of earthquake-proof deep-well blast pit and earthquake-proof method - Google Patents
A kind of earthquake-proof deep-well blast pit and earthquake-proof method Download PDFInfo
- Publication number
- CN105652318B CN105652318B CN201610160686.XA CN201610160686A CN105652318B CN 105652318 B CN105652318 B CN 105652318B CN 201610160686 A CN201610160686 A CN 201610160686A CN 105652318 B CN105652318 B CN 105652318B
- Authority
- CN
- China
- Prior art keywords
- earthquake
- proof
- ground
- well
- deep
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000000034 method Methods 0.000 title claims description 14
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 34
- 238000012806 monitoring device Methods 0.000 claims description 9
- 238000004891 communication Methods 0.000 claims description 7
- 239000007789 gas Substances 0.000 description 38
- 230000000694 effects Effects 0.000 description 5
- 241001465754 Metazoa Species 0.000 description 2
- 230000006378 damage Effects 0.000 description 2
- 230000007123 defense Effects 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 241000256844 Apis mellifera Species 0.000 description 1
- 241000894006 Bacteria Species 0.000 description 1
- 238000006424 Flood reaction Methods 0.000 description 1
- 241000699666 Mus <mouse, genus> Species 0.000 description 1
- 241000287127 Passeridae Species 0.000 description 1
- 241001282153 Scopelogadus mizolepis Species 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000034994 death Effects 0.000 description 1
- 231100000517 death Toxicity 0.000 description 1
- 238000009792 diffusion process Methods 0.000 description 1
- 230000003670 easy-to-clean Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000001125 extrusion Methods 0.000 description 1
- 238000000465 moulding Methods 0.000 description 1
- 239000000941 radioactive substance Substances 0.000 description 1
- 239000002341 toxic gas Substances 0.000 description 1
- 238000009423 ventilation Methods 0.000 description 1
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01V—GEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS
- G01V1/00—Seismology; Seismic or acoustic prospecting or detecting
- G01V1/28—Processing seismic data, e.g. for interpretation or for event detection
Landscapes
- Engineering & Computer Science (AREA)
- Remote Sensing (AREA)
- Physics & Mathematics (AREA)
- Life Sciences & Earth Sciences (AREA)
- Acoustics & Sound (AREA)
- Environmental & Geological Engineering (AREA)
- Geology (AREA)
- General Life Sciences & Earth Sciences (AREA)
- General Physics & Mathematics (AREA)
- Geophysics (AREA)
- Geophysics And Detection Of Objects (AREA)
Abstract
The present invention relates to earthquake-proof equipment technical fields, more particularly to a kind of earthquake-proof deep-well blast pit, including well bore, the well bore includes sequentially connected ground segment and underground water proof section from ground to underground, the ground segment offers gas vent, the bottom surface of the underground water proof section is less than the ground level where subsurface flow minimum point, and the bottom surface of the underground water proof section offers venthole, and the venthole is connected with the gas vent;The gas of hypocentral location can be discharged into outside ground by the earthquake-proof deep-well blast pit, prevent gas from overstocking eruption in hypocentral location, so as to effectively prevent the generation of earthquake.
Description
Technical field
The present invention relates to earthquake-proof equipment technical field more particularly to a kind of earthquake-proof deep-well blast pit and earthquake-proof sides
Method.
Background technology
Earthquake be also known as earthquake, vibrate, be to cause to vibrate during earth's crust quick release of energy, during which can generate seismic wave
A kind of natural phenomena.Mutual extrusion and collision between plate and plate on the earth causes edge of plate and plate interiors to generate mistake
Dynamic and rupture, is the main reason for causing earthquake.In addition, the gas of underground hypocentral location is excessive, the gas of hypocentral location is caused
Pressure is very big, when air pressure greatly to a certain extent when can occur gas erupt phenomenon, the phenomenon that causing earthquake strongly.
The place that earthquake takes place is known as focus, and the ground right over focus is known as earthquake centre.The ground of ruinous earthquake
The most strong place of vibration is known as meizoseismal area, the meizoseismal area often area namely where earthquake centre.Earthquake often results in serious personal's injures and deaths,
Fire hazard, floods, toxic gas leakage, bacterium and radioactive substance diffusion, it is also possible to cause tsunami, landslide, avalanche,
The secondary disasters such as crack.
According to statistics, the annual shake that more than 500 ten thousand secondary earthquakes about occur, i.e., up to ten thousand times to occur daily on the earth.It is wherein big absolutely
It is most too small or too far, so that people are imperceptible;Really can the mankind be caused with the earthquake about more than ten 2 seriously endangered
Ten times;It can cause the earthquake about one of especially severe disaster twice.The imperceptible earthquake of people, it is necessary to seismic detector ability
It records;Different types of seismic detector can record varying strength, different far and near earthquakes.It operates in the world thousands of
Various seismic instruments day and night monitor the trend of earthquake.
Therefore, there is an urgent need for a kind of earthquake-proof deep-well blast pits that earthquake can be effectively prevent to occur in the world at present.
Invention content
The present invention is overcomes drawbacks described above to provide a kind of earthquake-proof deep-well blast pit and earthquake-proof method, the earthquake-proof
The gas of hypocentral location can be discharged into outside ground by deep-well blast pit, prevent gas from overstocking eruption in hypocentral location, so as to have
Effect prevents the generation of earthquake;The earthquake-proof method is simple for process, and operation is easy, it is easy to accomplish, earthquake-proof effect is good, is suitable for big
Scale promotes and applies.
To achieve the above object, the present invention adopts the following technical scheme that.
A kind of earthquake-proof deep-well blast pit, including well bore, the well bore includes the sequentially connected ground from ground to underground
Section and underground water proof section, the ground segment offer gas vent, and the bottom surface of the underground water proof section is less than subsurface flow minimum point
The ground level at place, the bottom surface of the underground water proof section offer venthole, and the venthole is connected with the gas vent.
Wherein, be also associated with focus section below the underground water proof section, the focus section offers air admission hole, it is described into
Stomata is connected with the venthole.
Wherein, the ground segment is covered with outer cover, and the outer cover offers air hole, the air hole and the gas vent
Connection.
Wherein, the top of the outer cover is equipped with shielding cover, and the shielding cover is fixedly connected with the outer cover, the shielding cover
Floor space be more than the outer cover top area.
Wherein, at least one isolated protection column, the isolated protection column and the underground are equipped in the underground water proof section
Water proof section is fixedly connected, and the isolated protection column offers gas communication hole, the gas vent and the venthole respectively with institute
State gas communication hole connection.
Wherein, the isolated protection column is set on 2~10 meters of subsurface.
Wherein, the aperture of the air hole is less than the body width of ant.
Wherein, the top of the outer cover or side are equipped with monitoring device, the monitoring device and the prison at seismic monitoring center
Control screen electrical connection, the monitoring device are built-in with warning device.
Wherein, the gas vent is set on side wall or/and the top of the ground segment, and the air admission hole is set on the focus section
Side wall or/and bottom, the air hole be set on the outer cover side wall or/and top.
A kind of earthquake-proof method of earthquake-proof deep-well blast pit, includes the following steps:
Step A, the geological structure of this area is detected using geology detecting equipment in earthquake with easily sending out, obtains subsurface flow
The depth of focus of ground level depth and earthquake where minimum point;
Step B, the hole that land productivity drills out with ground auger below the depth of focus of multiple depth in earthquake, multiple holes are easily sent out in earthquake
Ground equidistant intervals distribution is easily sent out in earthquake;
Step C, the earthquake-proof deep-well blast pit of corresponding number is respectively put into the hole and is fixed;Wherein, ground
The bottom surface of lower water proof section is less than the ground level where subsurface flow minimum point, and the water of subsurface flow is avoided to enter earthquake-proof deep-well row
Gas well;The gas that the hypocentral location of earthquake generates enters earthquake-proof deep-well blast pit from venthole or air admission hole, then from exhaust
Earthquake-proof deep-well blast pit is discharged in hole, the strong eruption of underground gas is avoided, so as to fulfill the function of earthquake-proof.
Beneficial effects of the present invention are:
A kind of earthquake-proof deep-well blast pit of the present invention, including well bore, the well bore includes successively connecting from ground to underground
The ground segment and underground water proof section connect, the ground segment offer gas vent, and the bottom surface of the underground water proof section is less than underground water
The ground level where minimum point is flowed, the bottom surface of the underground water proof section offers venthole, the venthole and the gas vent
Connection;The gas of hypocentral location can be discharged into outside ground by the earthquake-proof deep-well blast pit, prevent gas from being accumulated in hypocentral location
Pressure eruption, so as to effectively prevent the generation of earthquake.
A kind of earthquake-proof method of earthquake-proof deep-well blast pit, includes the following steps:Step A, it is used with easily sending out in earthquake
Geology detecting equipment detects the geological structure of this area, obtains the ground level depth where subsurface flow minimum point and earthquake
The depth of focus;Step B, the hole that land productivity drills out with ground auger below the depth of focus of multiple depth in earthquake is easily sent out in earthquake, it is more
Ground equidistant intervals distribution is easily sent out in earthquake in a hole;Step C, the earthquake-proof deep-well blast pit of corresponding number is respectively put into institute
It states in hole and is fixed;Wherein, the bottom surface of underground water proof section avoids underground less than the ground level where subsurface flow minimum point
The water of flow enters earthquake-proof deep-well blast pit;The gas that the hypocentral location of earthquake generates enters defense sector from venthole or air admission hole
Then focal depth well blast pit discharges earthquake-proof deep-well blast pit from gas vent, avoids the strong eruption of underground gas, so as to real
The function of existing earthquake-proof;The earthquake-proof method is simple for process, and operation is easy, it is easy to accomplish, earthquake-proof effect is good, is suitable for advising greatly
Mould promotes and applies.
Description of the drawings
With attached drawing, the invention will be further described, but the embodiment in attached drawing does not form any limitation of the invention.
Fig. 1 is the structure diagram of embodiment 1.
Fig. 2 is the structure diagram of embodiment 2.
Specific embodiment
The present invention is further illustrated with reference to the accompanying drawings and examples, this is presently preferred embodiments of the present invention.
Embodiment 1.
As shown in Figure 1, the present invention a kind of earthquake-proof deep-well blast pit, including well bore, the well bore include from ground to
The sequentially connected ground segment 1 in underground and underground water proof section 2, the ground segment 1 offer gas vent 5, the underground water proof section 2
Bottom surface is less than the ground level where subsurface flow minimum point, and the bottom surface of the underground water proof section 2 offers venthole, the ventilation
Hole is connected with the gas vent 5.
The gas of hypocentral location enters earthquake-proof deep-well blast pit from venthole, then discharges defense sector focal depth from gas vent 5
Well blast pit can prevent gas from overstocking eruption in hypocentral location, so as to effectively prevent the generation of earthquake.
The ground segment 1 of the present embodiment is covered with outer cover 3, and the outer cover 3 offers air hole, the air hole and the row
Stomata 5 connects, and the setting of outer cover 3 can protect ground segment 1, and ground segment 1 is prevented to be destroyed, the mankind can also be carried out
Protection, prevents the mankind from falling into the ground segment 1.
The top of the outer cover 3 of the present embodiment is equipped with shielding cover 4, and the shielding cover 4 is fixedly connected with the outer cover 3, described
The floor space of shielding cover 4 is more than the top area of the outer cover 3, and shielding cover 4 can protect earthquake-proof deep-well blast pit, prevents
Only rainwater directly washes away earthquake-proof deep-well blast pit, and earthquake-proof deep-well blast pit is caused to corrode, while be also possible to prevent rainwater
Into in earthquake-proof deep-well blast pit, practicability is good.
Be equipped at least one isolated protection column 6 in the underground water proof section 2 of the present embodiment, the isolated protection column 6 with it is described
Underground water proof section 2 is fixedly connected, and the isolated protection column 6 offers gas communication hole, the gas vent 5 and the venthole point
It is not connected with the gas communication hole, isolated protection column 6 can prevent artificial destruction earthquake-proof deep-well blast pit internal structure, prevent
Only rubbish or animal are directly entered earthquake-proof deep-well blast pit deep.
The isolated protection column 6 of the present embodiment is set on 2~10 meters of subsurface, and the setting structure is simple, is easy to be molded so that fall
The foreign matter fallen on isolated protection column 6 is easy to clean, keeps the cleannes in earthquake-proof deep-well blast pit.
The aperture of the air hole of the present embodiment is less than the body width of ant, and the setting structure is simple, is easy to be molded, can
It prevents from the animals such as ant, honeybee, sparrow, mouse from entering in earthquake-proof deep-well blast pit to nest, exhaust is caused to have some setbacks, it is practical
Property it is high.
The top or side of the outer cover 3 of the present embodiment are equipped with monitoring device, the monitoring device and seismic monitoring center
Monitor screen is electrically connected, and the monitoring device is built-in with warning device.The setting structure is simple, is easy to be molded, can be to ground segment 1
Be monitored, once someone destroys ground segment 1, warning device will automatic alarm remind the work at seismic monitoring center
Personnel prevent destruction so that staff can be on the scene as early as possible, and practicability is good, and reliability is high.
The gas vent 5 of the present embodiment is set on side wall or/and the top of the ground segment 1, and the air admission hole is set on the shake
The side wall of source section or/and bottom, the air hole are set on side wall or/and the top of the outer cover 3.The setting structure is simple, easily
In molding, the effect of air inlet or exhaust is good, efficient.
A kind of earthquake-proof method of earthquake-proof deep-well blast pit, includes the following steps:
Step A, the geological structure of this area is detected using geology detecting equipment in earthquake with easily sending out, obtains subsurface flow
The depth of focus of ground level depth and earthquake where minimum point;
Step B, the hole that land productivity drills out with ground auger below the depth of focus of multiple depth in earthquake, multiple holes are easily sent out in earthquake
Ground equidistant intervals distribution is easily sent out in earthquake;
Step C, the earthquake-proof deep-well blast pit of corresponding number is respectively put into the hole and is fixed;Wherein, ground
The bottom surface of lower water proof section 2 is less than the ground level where subsurface flow minimum point, and the water of subsurface flow is avoided to enter earthquake-proof deep-well
Blast pit;The gas that the hypocentral location of earthquake generates enters earthquake-proof deep-well blast pit from venthole or air admission hole, then from row
Stomata 5 discharges earthquake-proof deep-well blast pit, the strong eruption of underground gas is avoided, so as to fulfill the function of earthquake-proof.
The earthquake-proof method is simple for process, and operation is easy, it is easy to accomplish, earthquake-proof effect is good, is suitable for large-scale promotion
Using.
Embodiment 2.
As shown in Fig. 2, the lower section of the underground water proof section 2 of the present embodiment is also associated with focus section 7, the focus section 7 opens up
There is air admission hole 8, the air admission hole 8 is connected with the venthole.Under this structure, the gas of hypocentral location enters from air admission hole 8
Earthquake-proof deep-well blast pit, then flows successively through venthole, gas communication hole, finally discharges earthquake-proof deep-well row from gas vent 5
Gas well can prevent gas from overstocking eruption in hypocentral location, so as to effectively prevent the generation of earthquake.
The rest part of the present embodiment is same as Example 1, and which is not described herein again.
Finally it should be noted that the above embodiments are merely illustrative of the technical solutions of the present invention rather than the present invention is protected
The limitation of range is protected, although being explained in detail with reference to preferred embodiment to the present invention, those of ordinary skill in the art should
Work as understanding, technical scheme of the present invention can be modified or replaced equivalently, without departing from the reality of technical solution of the present invention
Matter and range.
Claims (7)
1. a kind of earthquake-proof deep-well blast pit, it is characterised in that:Including well bore, the well bore includes successively connecting from ground to underground
The ground segment and underground water proof section connect, the ground segment offer gas vent, and the bottom surface of the underground water proof section is less than underground water
The ground level where minimum point is flowed, the bottom surface of the underground water proof section offers venthole, the venthole and the gas vent
Connection;
Focus section is also associated with below the underground water proof section, the focus section offers air admission hole, the air admission hole and institute
State venthole connection;At least one isolated protection column, the isolated protection column and the underground are equipped in the underground water proof section
Water proof section is fixedly connected, and the isolated protection column offers gas communication hole, the gas vent and the venthole respectively with institute
State gas communication hole connection.
2. a kind of earthquake-proof deep-well blast pit according to claim 1, it is characterised in that:The ground segment is covered with outer
Cover, the outer cover offer air hole, and the air hole is connected with the gas vent.
3. a kind of earthquake-proof deep-well blast pit according to claim 2, it is characterised in that:The top of the outer cover, which is equipped with, to be hidden
Door, the shielding cover are fixedly connected with the outer cover, and the floor space of the shielding cover is more than the top area of the outer cover.
4. a kind of earthquake-proof deep-well blast pit according to claim 1, it is characterised in that:The isolated protection column is set on ground
2~10 meters under face.
5. a kind of earthquake-proof deep-well blast pit according to claim 2, it is characterised in that:The top or side of the outer cover
Equipped with monitoring device, the monitoring device is electrically connected with the monitor screen at seismic monitoring center, and the monitoring device is built-in with alarm
Device.
6. a kind of earthquake-proof deep-well blast pit according to claim 2, it is characterised in that:The gas vent is set on describedly
The side wall of face section or/and top, the air admission hole are set on side wall or/and the bottom of the focus section, and the air hole is set on institute
State side wall or/and the top of outer cover.
7. a kind of earthquake-proof method of earthquake-proof deep-well blast pit as claimed in any one of claims 1 to 6, it is characterised in that:
Include the following steps:
Step A, the geological structure of this area is detected using geology detecting equipment in earthquake with easily sending out, show that subsurface flow is minimum
The depth of focus of ground level depth and earthquake where point;
Step B, the hole that land productivity drills out with ground auger below the depth of focus of multiple depth in earthquake is easily sent out in earthquake, multiple holes are on ground
Shake easily hair ground equidistant intervals distribution;
Step C, the earthquake-proof deep-well blast pit of corresponding number is respectively put into the hole and is fixed;Wherein, underground every
The bottom surface of water section is less than the ground level where subsurface flow minimum point, and the water of subsurface flow is avoided to enter the exhaust of earthquake-proof deep-well
Well;The gas that the hypocentral location of earthquake generates enters earthquake-proof deep-well blast pit from venthole or air admission hole, then from gas vent
Earthquake-proof deep-well blast pit is discharged, the strong eruption of underground gas is avoided, so as to fulfill the function of earthquake-proof.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610160686.XA CN105652318B (en) | 2016-03-21 | 2016-03-21 | A kind of earthquake-proof deep-well blast pit and earthquake-proof method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610160686.XA CN105652318B (en) | 2016-03-21 | 2016-03-21 | A kind of earthquake-proof deep-well blast pit and earthquake-proof method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105652318A CN105652318A (en) | 2016-06-08 |
CN105652318B true CN105652318B (en) | 2018-06-19 |
Family
ID=56494221
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610160686.XA Active CN105652318B (en) | 2016-03-21 | 2016-03-21 | A kind of earthquake-proof deep-well blast pit and earthquake-proof method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105652318B (en) |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101539633A (en) * | 2009-04-29 | 2009-09-23 | 杭州超距科技有限公司 | Online automatic monitoring device for hydrogen of earthquake precursor |
CN102383441A (en) * | 2011-08-24 | 2012-03-21 | 深圳市信能环保科技有限公司 | Refuse landfill gas guiding and exhausting well and construction process and use method thereof |
CN102767171A (en) * | 2011-05-03 | 2012-11-07 | 张科元 | Method for preventing destructive violent earthquakes and volcano eruptions |
CN104294849A (en) * | 2014-10-20 | 2015-01-21 | 中国能源建设集团广东省电力设计研究院 | Exhaust and check system for underground water pipeline |
CN204657083U (en) * | 2015-03-19 | 2015-09-23 | 深圳市利赛实业发展有限公司 | Landfill-gas collecting vertical shaft |
CN205581316U (en) * | 2016-03-21 | 2016-09-14 | 赵松和 | Defense sector focal depth well array gas well |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS5829921A (en) * | 1981-08-12 | 1983-02-22 | Misawa Homes Co Ltd | Outer wall panel structure for basement of building |
-
2016
- 2016-03-21 CN CN201610160686.XA patent/CN105652318B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101539633A (en) * | 2009-04-29 | 2009-09-23 | 杭州超距科技有限公司 | Online automatic monitoring device for hydrogen of earthquake precursor |
CN102767171A (en) * | 2011-05-03 | 2012-11-07 | 张科元 | Method for preventing destructive violent earthquakes and volcano eruptions |
CN102383441A (en) * | 2011-08-24 | 2012-03-21 | 深圳市信能环保科技有限公司 | Refuse landfill gas guiding and exhausting well and construction process and use method thereof |
CN104294849A (en) * | 2014-10-20 | 2015-01-21 | 中国能源建设集团广东省电力设计研究院 | Exhaust and check system for underground water pipeline |
CN204657083U (en) * | 2015-03-19 | 2015-09-23 | 深圳市利赛实业发展有限公司 | Landfill-gas collecting vertical shaft |
CN205581316U (en) * | 2016-03-21 | 2016-09-14 | 赵松和 | Defense sector focal depth well array gas well |
Also Published As
Publication number | Publication date |
---|---|
CN105652318A (en) | 2016-06-08 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US8346592B2 (en) | Method and system for determining a threat against a border | |
CN103544791A (en) | Underground invasion monitoring system on basis of seismic waves | |
JP2013517547A (en) | Method and system for automated location-dependent natural disaster prediction | |
JP2008537589A (en) | Radon monitoring system for earthquake prediction | |
CN104700524A (en) | Comprehensive security response system and device for multi-unit nuclear power bases | |
CN110415489A (en) | System is monitored based on wireless sensing and the geo-hazard early-warning of the communication technology | |
CN106643905A (en) | Urban public security prewarning system | |
Nakandala et al. | Detecting wild elephants via WSN for early warning system | |
CN105652318B (en) | A kind of earthquake-proof deep-well blast pit and earthquake-proof method | |
CN102289904A (en) | Intrusion detection method and system | |
CN205581316U (en) | Defense sector focal depth well array gas well | |
MIRZA | Disaster mitigation approach of urban green structure concept in coastal settlement | |
Pan et al. | The Bengkulu, Southern Sumatra, earthquake of 4 June 2000 (Mw= 7.7): another warning to remote metropolitan areas | |
Haiqal et al. | A review of vertical evacuation on tsunami mitigation case | |
Mugade et al. | Use of mangrove swamps for agricultural and house construction activities: a study of Devgad and Rajapur tehsils of coastal Maharashtra | |
Lin et al. | Design of a physical security perimeter fencing system | |
CN216893781U (en) | Protective net system with function of preventing ground digging from crossing and crossing | |
Nor et al. | A Systematic Literature Review on Earthquake Detector | |
Pariyar | Disaster Vulnerability Assessment in Parshuram Municipality, Dadeldhura, Nepal | |
CN107765294A (en) | Method of seismic source monitoring | |
Salamon | Potential tsunamigenic sources in the eastern Mediterranean and a decision matrix for a tsunami early warning system | |
APOSTOL et al. | POST-EARTHQUAKE ASSESSMENT FOR SEISMIC RISK MITIGATION IN ROMANIA: CASE-STUDIES BASED ON RECORDED DATA | |
McLennan et al. | Evacuation versus shelter in place | |
CN211206795U (en) | Portable nuclear radioactive substance detection system | |
Abdullahi et al. | Assessment of Perception and Methods of Combating Flooding in Minna City of Niger State, Nigeria |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |